HomeMy WebLinkAbout027-O-22 To Approve the Construction of a Local Improvement Known as Evanston Special Assessment No. 15283/9/2022
27-0-22
AN ORDINANCE
To Approve the Construction of a Local Improvement Known as
Evanston Special Assessment No. 1528
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
EVANSTON, ILLINOIS:
SECTION 1: A local improvement shall be made within the City of
Evanston, County of Cook, and State of Illinois, the nature, character, locality and
description of which is as follows, to -wit:
That the unimproved public alley in the block bounded by Colfax Street on
the north, Grant Street on the south, Grey Avenue on the west, and Brown Avenue on
the east, in the City of Evanston, be improved by excavating, constructing the
necessary drainage system and paving with 8" Portland Cement Concrete Pavement, to
a width of sixteen feet (16).
SECTION 2: The Recommendation (Exhibit A) of the Board of Local
Improvements of the City of Evanston, Illinois, of this Ordinance, and the Estimate of the
Cost (Exhibit B) of said improvement made by the Engineer of said Board, both
attached hereto, be and the same are hereby approved and by reference thereto made
a part hereof.
SECTION 3: Said improvement shall be made and the cost thereof,
including the sum of Three Hundred Five Thousand Eighty and 10/100 Dollars
($305,080.10), being the cost of making and collecting the Assessment and all other
Page 1 Of 9 Doc ID: 377eb3069le4aab559fObdl7ff7dd545450ed23e
27-0-22
expenses as provided by law, shall be paid for by Special Assessment in accordance
with the Illinois Municipal Code, Chapter 65, Section 5/9-2-1, et seq.
SECTION 4: One Hundred Fifty Two Thousand Five Hundred Forty and
05/100 Dollars ($152,540.05) of the cost of said improvement shall be allocated by the
City; and the remainder of the cost, One Hundred Fifty Two Thousand Five Hundred
Forty and 05/100 Dollars ($152,540.05) will be allocated as private benefit.
SECTION 5: The aggregate amount to be assessed and each individual
assessment shall be divided into ten (10) installments in the manner provided by law,
and each of said installment shall bear interest at the rate of Three and 35/100 percent
(3.35%) per annum from sixty (60) days after the date of the first voucher issued on
account of work done upon said proposed improvement.
SECTION 6: That, for the purpose of anticipating the collection of the
installments of said assessment levied against the real estate benefited thereby,
general obligation bonds have been issued, up to One Hundred Fifty Two Thousand
Five Hundred Forty and 05/100 Dollars ($152,540.05) of which are payable by the City,
homeowners pay up to One Hundred Fifty Two Thousand Five Hundred Forty and
05/100 Dollars ($152,540.05) of which are payable out of said installments, bearing
interest at the rate of Three and 35/100 percent (3.35%) per annum, payable annually
and signed on behalf of the City of Evanston, Illinois, by its Mayor and attested by its
City Clerk and its corporate seal affixed thereto; and each interest coupon attached to
said bonds shall likewise be executed by and shall bear the official or facsimile
signature of the same officers who signed said bonds and who, if facsimile signatures
—2—
Page 2 Of 9 Doc ID: 377eb30691e4aab559fObd17ff7dd545450ed23e
27-0-22
are used, do adopt by their execution of said bonds as and for their proper signatures
their respective facsimile signatures appearing on said coupons; and that said bonds
shall be issued in accordance with and shall be in all respects conform to the provisions
of an Act of the General Assembly of the State of Illinois, knows as the "Illinois
Municipal Code," effective July 1, 1961, and the Amendments thereto.
SECTION 7: That Edgar Cano, President of the Board of Local
Improvements of the City of Evanston, Illinois, be and he is hereby directed to file a
Petition in the Circuit Court of Cook County, Illinois, praying that steps may be taken to
levy a Special Assessment to pay the cost of said improvement in accordance with the
provisions of this ordinance and in the manner prescribed by law.
SECTION 8: All ordinances or parts of ordinances in conflict herewith are
hereby repealed.
SECTION 9: If any provision of this ordinance or application thereof to
any person or circumstance is held unconstitutional or otherwise invalid, such invalidity
shall not affect other provisions or applications of this ordinance that can be given effect
without the invalid application or provision, and each invalid application of this ordinance
is severable.
SECTION 10: The findings and recitals contained herein are declared to
be prima facie evidence of the law of the City and shall be received in evidence as
provided by the Illinois Compiled Statutes and the courts of the State of Illinois.
SECTION 11: This ordinance shall be in full force and effect from and
after its passage, approval, and publication in the manner provided by law.
—3—
Page 3 Of 9 Doc ID: 377eb3069le4aab559fObdl7ff7dd545450ed23e
27-0-22
Introduced: March 9 , 2022 Approved:
Adopted: April 11 , 2022 April 13 , 2022
Isamd, &jj
Daniel Biss, Mayor
Attest: Approved as to form:
Jlza h laj 6. Cgn z *
Stephanie Mendoza, City Clerk Nicholas E. Cummings, Corporation Counsel
Page 4 of 9 Doc ID: 377eb30691e4aab559fObd17ff7dd545450ed23e
27-0-22
Exhibit A
Recommendation
-5-
Page 5 of 9 Doc ID: 377eb30691e4aab559fObd17ff7dd545450ed23e
SPECIAL ASSESSMENT NO. 1528
RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board of Local Improvements of the City of Evanston, Illinois, herewith submits the
draft of Ordinance 27-0-22 for the making of a local improvement within the City of
Evanston, County of Cook, and State of Illinois, the nature, character, locality and
description of which is as follows, to -wit:
That the unimproved public alley in the block bounded by Colfax Street on
the north, Grant Street on the south, Grey Avenue on the west, and Brown Avenue on
the east, in the City of Evanston, be improved by excavating, constructing the
necessary drainage system and paving with 8" Portland Cement Concrete Pavement, to
a width of sixteen feet (16').
and, as part of said Ordinance, and in conjunction therewith, said Board also herewith
submits the plans and specifications of an estimate of the cost of said improvement,
including the cost of engineering services, as finally determined by said Board; and said
Board hereby recommends the passage of Ordinance 27-0-22 and the making of the
improvement described therein.
APPROVED AS TO FORM:
exandra B. Ruggie
Attorney for the Board of Local
Improvements of the City of Evanston, Illinois
ALEXANDRA B. RUGGIE
CITY of EVANSTON LAW DEPARTMENT
2100 RIDGE AVENUE
EVANSTON, ILLINOIS 60201
(847) 866-2937
Attorney Code 46996
Respectfully submitted,
BOARD OF LOCAL IMPROVEMENTS
CITY OF EVANSTON, ILLINOIS
By. Q�
Ed moo. Preside►
011ie 1
Date: Ma(-Ck 1(0 2022
Page 6 Of 9 Doc ID: 377eb3069le4aab559fObdl7ff7dd545450ed23e
27-0-22
Exhibit B
Estimate
Page 7 of 9 Doc ID: 377eb30691e4aab559fObd17ff7dd545450ed23e
ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore
adopted, providing that the unimproved public alley in the block bounded by Colfax Street on the north,
Grant Street on the south, Grey Avenue on the west, and Brown Avenue on the east, in the City of
Evanston, be improved by excavating, constructing the necessary drainage system and paving with 8"
Portland Cement Concrete Pavement, to a width of sixteen feet (16').
Said improvement to be constructed in detail as specified in aforesaid Resolution.
I, herewith submit an estimate of cost of such improvement as described in said Resolution,
including labor, materials, and all other lawful expenses attending the proceedings for making said
improvement and the cost of making and collecting the assessment therefore as provided by law,
COST ESTIMATE
ITEOM
UNIT
N.
ITEM
UNIT
QUANTITY
TOTAL
1
EARTH EXCAVATION
CU. YD.
428
55.00
$
23,540.00
2
TRENCH BACKFILL
CU. YD.
213
38.00
$
8,094.00
3
SUB -BASE GRANULAR MATERIAL, TYPE B
CU. YD.
15
38.00
$
570.00
4
GRANULAR CRADLE MATERIAL, CA-11
TON
150
36.00
$
5,400.00
5
AGGREGATE BASE COURSE, TYPE B,4"
SQ. YD.
995
7.00
$
6,965.00
6
INCIDENTAL HOT -MIX ASPHALT SURFACING
TON
10
300.00
$
3,000.00
7
PORTLAND CEMENT CONCRETE PAVEMENT, 8"
SQ. YD.
1,010
93.00
$
93,930.00
8
STORM SEWERS, SPECIAL, 10" (D. I. P. / CL 50)
FOOT
176
135.00
$
23,760.00
9
STORM SEWERS,12", TYPE 2 (R. C. P. / CL III)
FOOT
231
115.00
$
26,565.00
10
CATCH BASIN, TYPE A, 4' DIAMETER, TYPE 1 FRAME, OPEN LID
EACH
1
6000.00
$
6,000.00
11
MANHOLE, TYPE A, 4' DIAMETER, TYPE 1 FRAME, OPEN LID
EACH
1
5,900.00
$
5,900.00
12
INLET, TYPE A, TYPE 1 FRAME, OPEN LID
EACH
4
2,300.00
$
9,200.00
13
CONCRETE CURB, TYPE B
FOOT
245
35.00
$
8,575.00
14
PAVEMENT REMOVAL
SQ.YD.
45
26..00
$
1,170.00
15
DRIVEWAY PAVEMENT REMOVAL
SQ. YD.
275
18.00
$
4,950.00
16
CURB REMOVAL
FOOT
245
7.00
$
1,715.00
17
SIDEWALK REMOVAL
SQ. FT.
315
2.00
$
630.00
18
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT - 6"
SQ. YD,
275
72.00
$
19,800.00
19
PORTLAND CEMENT CONCRETE SIDEWALK - 5"
SQ. FT,
315
8.00
$
2,520..00
20
PROTECTIVE SEALER
SQ. YD.
1,285
1.60
$
2,056.00
21
CRUSHED STONE, CA -14
TON.
20
35..00
$
700.00
22
FURNISHING AND PLACING TOPSOIL, 3"
SQ.YD.
90
9.00
$
810.00
23
SODDING, SALT TOLERANT
SQ. YD.
90
18.00
$
1,620.00
24
DETECTABLE WARNINGS
SQ. FT.
40
37.50
$
1,500.00
25
CLASS B PATCHES,SPECIAL 9"( HES)
SQ. YD.
24
110.00
$
2,640.00
26
HOT -MIX ASPHALT SURFACE REMOVAL
SQ. YD.
45
30.00
$
1,350.00
27
TEMPORARY FENCE
FOOT.
90
7.00
$
630.00
28
CONSTRUCTION LAYOUT AND STAKING
LUM. SUM.
1
6,000.00
$
6,000.00
Page 8 of 9 Doc ID: 377eb3069le4aab559fObdl7ff7dd545450ed23e
BLI_EST_1528
Page -2-
Estimate of Engineer of BLI - S.A. 1528
(Alley N/Grant St., E/Grey Ave.)
ITEOM
UNIT
ITEM
N.RICE
UNIT
QUANTITY
TOTAL
29 STREET SWEEPINGS
EACH
2 500.00
$
1,000.00
30 CLOSED CIRCUIT TV INSPECTION
LUM. SUM.
1 4,000.00
$
4,000.00
31 PRE -CONSTRUCTION SURFACE VIDEO TAPING
LUM. SUM.
1 1,500.00
$
1,500.00
32 EPDXY PAVEMENT MARKING LINE-6" YELLOW
FOOT.
95 40.00
$
3,800.00
TOTAL
$
279,890.00
Cost of Engineering Services ......................... $ 12,595..05
For Lawful Expenses, etc ............................. $ 12,595.05
Sub -Total ....................................... $ 25,190.10
RECAPITULATION
Construction Cost ............................ $ 279,890.00
Engineering ................................... $ 12,595.05
Legal ........................................... $ 12,5595.05
Total Cost ..................................... $ 305,080.10
I hereby certify that in my opinion the above estimate does not exceed the probable cost of
the above proposed improvement and the lawful expenses attending the same.
�0-
L r N. Biggs,
L
City Engineer
Board of Local Improvements
Page 9 of 9 Doc ID: 377eb30691e4aab559fObd17ff7dd545450ed23e