Loading...
HomeMy WebLinkAbout060-R-22 Authorizing the City Manager to Execute a Memorandum of Understanding with Evanston/Skokie School District 65 And to Execute an Agreement With Cordogan Clark Architects in Connection Therewith08/08/2022 60-R-22 A RESOLUTION Authorizing the City Manager to Execute a Memorandum of Understanding with Evanston/Skokie School District 65 And to Execute an Agreement With Cordogan Clark Architects in Connection Therewith Whereas, Evanston/Skokie School District 65 ("District 65") is planning on the construction of a new school building located within the City of Evanston's Fifth Ward and in the vicinity of the City's Fleetwood -Jou rdai n facility on property owned by District 65 and an adjacent property owned by the City; and Whereas, the City and District 65 have discussed the possibility of constructing a joint facility on their properties that would accommodate District 65 use, City of Evanston use, and shared use between District 65 and the City; and Whereas, the City seeks to enter into a Memorandum of Understanding ("MOU") with District 65 in the form attached hereto as Exhibit A in order to facilitate the construction of a building in the City that would accommodate both the City and District 65; and Whereas, the City also desires to enter into an initial agreement in the form attached hereto as Exhibit B with District 65's architect of record for the project to obtain initial programming, design and budget assistance with the proposed joint use facility. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, COOK COUNTY, ILLINOIS: —1 Page 1 of 19 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 60-R-22 SECTION 1: That the foregoing recitals are hereby found as fact and incorporated herein by reference. SECTION 2: The City Manager is hereby authorized to execute a Memorandum of Understanding with Evanston/Skokie School District 65 in the form attached hereto as Exhibit A. SECTION 3: The City Manager is hereby authorized to execute an agreement with Cordogan Clark for initial planning and assessments of the City's programming and budgetary requirements for the joint use facility in the form attached hereto as Exhibit B. SECTION 3: That this Resolution 60-R-22 shall be in full force and effect from and after its passage and approval in the manner provided by law. Attest: Stephanie Mendoza, City Clerk Adopted: August 8 , 2022 hanzd% idz- f s Daniel Biss, Mayor Approved as to form: On- Derke Price, Interim Corporation Counsel Page 2 of 19 —2— Doc ID: 968be321655f89c29c8947f80771890c28e75d17 60-R-22 EXHIBIT 1 -3- Page 3 of 19 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF EVANSTON AND EVANSTONISKOKIE SCHOOL DISTRICT 65 This MEMORANDUM OF UNDERSTANDING ("MOU") is entered into between the City of Evanston (the "City"), whose address is 2100 Ridge Avenue, Evanston, IL 60201, and the Board of Education of Evanston/Skokie School District 65, Cook County, Illinois ("District 65"), whose address is 1500 McDaniel Street, Evanston, IL 60201. The City and District 65 shall be collectively referred to as the "Parties". RECITALS Whereas, District 65 is a local school district located within the City of Evanston and a portion of the Village of Skokie; and Whereas, District 65 is planning on the construction of a new school building located within the City's Fifth Ward on property owned by District 65, commonly known as Foster Park, and adjacent to the City's Fleetwood-Jourdain facility; and Whereas, the City of Evanston approached District 65 about exploring the possibility of constructing a joint -use facility that included the school and other uses on the Foster Park property and the Fleetwood Jourdain property that would accommodate District 65 use, City of Evanston use, and shared use between District 65 and the City; and Whereas, the parties agree to enter this Memorandum of Understanding ("MOU") to explore and facilitate the construction of a joint use building in the City that would accommodate both the City and District 65. NOW, THEREFORE, in consideration of the foregoing recitals, and the mutual covenants and undertakings hereinafter set forth, the receipt and sufficiency of which are hereby acknowledged, it is agreed between the Parties hereto, as follows: 1. Recitals. The recitals set forth above are incorporated herein by reference and made a part hereof. 2. Compliance with All Laws Generally. The Parties agree that the construction and payment will comply with all applicable laws, statutes, ordinances, and regulations in effect now or later and whether or not they appear in this MOU to the extent of their applicability. 3048615.1 Page 4 of 19 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 3. Mutual Agreements. The Parties agree to the following: a. Move expeditiously to negotiate a development agreement (the "Development Agreement") setting forth the specific responsibilities and obligations of both parties, including the manner of funding the design work of District 65's architect, Cordogan Clark, the construction delivery method to be used, the budget for the project, the real estate to be transferred, demolition costs, and funding of the construction of the joint use building and facilities. b. Move expeditiously to negotiate a facilities use agreement (the "Facilities Use Agreement") setting forth the responsibilities and obligations of the parties for using and maintaining the joint use building and facilities after substantial completion. c. If the planned improvements (when suitably developed and agreed) require any zoning variations from the City of Evanston's code of ordinances, then the parties will cooperate in taking the proposed plan through the City's land use approval process in accordance with Illinois law. d. To work cooperatively and as expeditiously on permitting and other matters as is reasonable in light of funding deadlines. 4. District 65 agrees to do the following: a. Contribute land and funds towards the construction of a building in the City's Fifth Ward that will accommodate District 65 use, City of Evanston use, and shared use between District 65 and the City. b. Take measures to pursue approvals from the North Cook Intermediate Service Center for the construction of the facility. c. Waive any claims against the City for any losses or damages or expenses arising out of or related to any funding commitments or deadlines. 5. The City agrees to the following: a. Contribute funds, and land to District 65 where the Fleetwood-Jourdain facility is located, towards demolition costs and the construction of a building in the City's Fifth Ward that will accommodate District 65 use, City of Evanston use, and shared use between District 65 and the City. b. Work with District 65 and Cordogan Clark, in programming, public engagement, concept design, cost estimating, and scheduling for construction of the shared facility. i. The City and Cordogan Clark are negotiating a proposal concerning the first phase of work by Cordogan Clark on behalf of the City. The City Manager is hereby authorized to execute said proposal 2 3048615.1 Page 5 of 19 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 when the City Manager has concluded the negotiations and approves of said terms. The City commits to entering into an agreement with Cordogan Clark by September 15, 2022. 6. Notice. All notices, demands, requests or other communication desired or required under this MOU shall be in writing and sent to the addresses set forth below, via the following means: (a) personal service; (b) electronic communication, by facsimile together with confirmation of transmission; (c) overnight courier; or (d) registered or certified US Mail, postage prepaid, return receipt requested. City of Evanston: City Manager's Office Attn: Dave Stoneback 2100 Ridge Avenue Evanston, Illinois 60201 With a copy to: Law Department Corporation Counsel City of Evanston 2100 Ridge Avenue Evanston, Illinois 60201 lawCcDcitvofevanston.orq District 65: Dr. Devon Horton Superintendent School District 65 1500 McDaniel Street Evanston, IL 60201 Franczek P.C. 300 S. Wacker, Ste. 3400 Chicago, Illinois 60606 Attn: Brian P. Crowley bpc@franczek.com Changes in these addresses must be in writing and delivered in accordance with the provisions of this Section 6. Notices delivered by mail are considered received three days after mailing in accordance with this Section 6. Notices delivered personally are considered effective upon receipt. Refusal to accept delivery has the same effect as receipt. 7. Entire Agreement. This MOU contains the entire agreement of the Parties and there are no other promises or conditions in any other agreement whether oral or written. This MOU supersedes any prior written or oral agreements between the Parties. 8. Amendment. This MOU may be modified or amended, but any such amendment must be in writing and signed by both Parties. 9. Severability. If any provision of this MOU shall be held to be invalid or unenforceable for any reason the remaining provisions shall continue to be valid and enforceable, and if by the Parties mutually agreed limiting of such provision it would become valid and enforceable, then such provision shall be deemed to be written, construed, and enforced as so limited. 3 3048615.1 Page 6 of 19 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 10.1 Assignment; Parties in Interest. Neither Party may sell, assign or transfer this MOU without the prior written consent of the other Party hereto. The terms and provisions of this MOU are binding upon and inure to the benefit of, and are enforceable by, the respective successors and permitted assigns of the Parties hereto. 11. Counterparts. This MOU may be executed in counterparts with the same effect as if both Parties had signed the same document. All such counterparts shall be deemed an original, shall be construed together and shall constitute one and the same instrument. 12. Governing Law. This MOU shall be governed by and construed in accordance with the internal laws of the State of Illinois. Venue shall be within Cook County, Illinois. The parties waive trial by jury. 13. Non -liability of Officials. No official, employee or agent of the City shall be charged personally by District 65 or by an assignee or subcontractor, with any liability or expenses of defense or be held personally liable under any term or provision of this MOU because of their execution or attempted execution or because of any breach hereof. 14. Disclaimer. Nothing contained in this MOU nor any act of the City shall be deemed or construed by either of the Parties, or by any third person, to create or imply any relationship of third -party beneficiary, principal or agent (except as specifically provided otherwise herein), limited or general partnership or joint venture, or to create or imply any association or relationship involving the City. 15. Waiver. Nothing in this MOU authorizes the waiver of a requirement or condition contrary to law or ordinance or that would result in or promote the violation of any federal, state or local law or ordinance. 16. Termination. If the City does not enter into an agreement with Cordogan Clark as contemplated by this memorandum of understanding by September 15, 2022, or if the Development Agreement and the Facilities Use Agreement are not approved and executed by the respective corporate authorities of the Parties by January 1, 2023, either Party may terminate this Agreement after providing 14 days written notice. If the Agreement is terminated for one of these reasons, District 65 may pursue the development of a new school building located at Foster Park. 17. Effective Date. This Agreement shall be deemed dated and become effective on the date the last of the parties signs as set forth below the signature of their duly authorized representatives. 0 3048615.1 Page 7 of 19 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 IN WITNESS WHEREOF, the Parties agree to the above terms and have executed this Memorandum of Understanding as the last date written below: SCHOOL DISTRICT 65 Devon Horton Superintendent Dated: 5 CITY OF EVANSTON An Illinois municipal corporation Luke Stowe Interim City Manager Dated: 3048615.1 Page 8 of 19 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 e CORDOGAN CLARK IIIIIIIi ARCHITECTURE • ENGINEERING • CONSTRUCTION August 1, 2022 Stefanie Levine, PLA, Senior Project Manager Public Works Agency City of Evanston 2100 Ridge Avenue Evanston, IL 60201 Re: City of Evanston Community Center Programming, Conceptualization, Estimating Study in Conjunction with the SD65 New 5th Ward School Proposal Dear Ms. Levine, Thank you for the opportunity for Cordogan Clark (CC) to provide professional services for the potential new Community Center Building as an extension of the new 5th Ward School that we are designing for Evanston/Skokie SD65. Our experience related to Park and Recreation work is quite extensive and is a great corollary to be combined with our PK-12 experience for this exciting project for the Community. The synergies that the new 511 Ward School has with the neighboring Community Center and Family Focus are extraordinary and warrant a closer study to see how a combined site and building may be a far better solution for the community than isolated improvements done independently. Cordogan Clark is pleased to provide our professional Services Proposal as defined in the following four parts: • Project Understanding • Scope of Services • Compensation • Schedule PROJECT UNDERSTANDING The City of Evanston (COE) has requested that our team undertake a series of tasks that are defined in the attached breakdown of services and hours. Generally, the scope of work is broken into two phases with the first phase focused on the tasks as outlined in the detailed fee proposal. This Phase shall focus on the initial programming, conceptualization, concept estimating and coordination of space sharing and use agreements between D65 and the COE. Phase One shall include meetings with various stake holder groups such as the COE Park & Rec Team to gain the initial information to produce a program and concept design. The Phase Two portion shall focus on the Community Engagement piece and shall include meetings with Fleetwood Jourdain (FWJ) staff, 511 Ward leaders, Neighborhood town halls, Community groups, FWJ Focus Groups and Family Focus to ascertain the programmatic needs, review concepts produced from the programmatic information gathered, discuss wants and needs, ascertain if a Pool is a viable option. Review project budgets for the suggested building needs and review the project schedule. The primary goal of this study is to allow the COE to make an informed decision on advancing an Intergovernmental Agreement (IGA) with D65 to advance the full design and construction of a combined School and Community Center Building. SCOPE OF SERVICES CC proposes to lead the programming efforts to ascertain the full scope of the proposed Community Center and how this may impact the design of the combined SD site plus the COE 960 RIDGEWAY AVENUE AURORA, ILLINOIS 60506 TEL: 630,896.4678 AURORA, IL • CHICAGO, IL LAFAYETTE, IN ST. LOUIS, MO SAWYER, MI MADRID, SPAIN Page 9 of 19 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 City of Evanston Community Center Programming & Conceptualization Proposal Page 2 of 3 Community Center site and to review the Family Focus site and how that facility may be impacted by the design options and determine if there are synergies to making stronger ties to this site and building. There will be design concepts that will be presented and reviewed with the various constituency groups noted above and refinements will be made between the various touch points noted in the detailed proposal document. It was requested that one meeting be held with the COE Park & Rec/FWJ Staff to develop a preliminary program to allow the CC Team to produce a preliminary concept to review with the remaining Community Groups. One meeting has been designated to review the information with the 5t" Ward Constituents & Leaders that will follow the initial COE meeting. Following this meeting, concepts may be adjusted, then there will be three meeting (or Town Halls) with the Evanston Community and three meetings with FWJ Focus Groups and Family Focus groups. There will be adjustment time between meetings for any concept refinements. The end goal is to produce the preferred concept and to produce visualizations of this solution as well as cost estimates. A master schedule has been created and is attached to the proposal for reference. This schedule is a road map to the COE and D65 to finalize the partnership and the paperwork needed for our team to complete the design, bidding and construction of the facility. COMPENSATION We propose to provide the professional services described above for fixed fee amounts as outlined below. Phase One Programming, Conceptualization, Estimating & Scheduling We propose to provide the professional services described above for a fixed amount of $65,480 plus an estimated $3,500 in reimbursables, for a total of $68,980. In addition to our services, we have partnered with WaterTech, Inc. (WTI) to help our team develop the Aquatics Program and assist with the Aquatics Conceptualization and estimating. The fee for WTI for the preliminary work is $13,750. This includes two virtual meetings. Reimbursable are estimated to be $2,500 for WTI. We have also partnered with WT Engineering for surveying on the project and they have already completed the topographic and boundary surveys for the D65 site. They have proposed and additional $6,950 to complete the surveying work for the COE FWJ site and Family Focus site, plus a private utility locate for both sites for $1,950 and property corner staking for $850. The Total Combined Fee for all the Phase One tasks outlined above plus estimated reimbursables is $95,255. Phase Two Community Engagement, Updated Estimating & Scheduling We propose to provide the professional services described above and as outlined in the detail fee proposal for a fixed amount of $106,170 plus an estimated $3,500 in reimbursables, for at total of $109,670. If scope increases beyond what is described within this proposal, CC shall notify and discuss with the COE possible additional compensation beyond the fixed fee amount. Page 10 of 19 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 City of Evanston Community Center Programming & Conceptualization Proposal Page 3 of 3 SCHEDULE We understand the critical nature of getting this study and we would propose that the project start at the middle of August and be completed by the mid November 2022. Thank you for this opportunity to serve the COE on this project. Should you require any additional information or clarifications, please do not hesitate to contact me. If this proposal meets your satisfaction, please execute, and email it to me at bkronewitter@cordoganclark.com Respectfully submitted, Cordogan Clark Brian K. Kronewitter, AIA, DBIA Executive Vice President Upon approval of this agreement please forward a copy of the signed proposal letter back to our office. Cordogan Clark & Associates, Inc. City of Evanston BY: a BY: Its representative Its representative DATE: 811122 DATE: Page 11 of 19 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 City of Evanston Cost of Services Break Down - Programming, Conceptualization, Engagement & Budgeting August 1, 2022 e CORDOGAN CLARK ARCHIIECT{1RE •ENGINEERING •CONSTRUCTION Proposed Hourly Tasks Proposed Staff Position Total Hours Rate PHASE 1 TASKS Gather input from stakeholders to include COE Park & Rec staff (1) Meeting on site at FWJ. Prepare Preliminary Program & Site Concept Based on this Information. Coordinate Space Sharing & Use agreements between D65 & COE Prepare Cost Estimates based on input and concept evolutions. Update Master Schedule Prepare Renderings of the preferred Concept One Presentation to COE City Council POOL CONSULTANT Principal/EVP 30 $250 $7,500 Vice President 20 $210 $4,200 Associate 26 $205 $5,330 Architect II 20 $135 $2,700 Subtotal: 96 $19,730 Principal/EVP 14 $250 $3,500 Estimator 50 $210 $10,500 Associate 8 $205 $1,640 Scheduler 6 $185 $1,110 Subtotal: 78 $16,750 Principal/EVP 4 $250 $1,000 Vice President 4 $210 $840 Associate 20 $205 $4,100 Rendering Architect 45 $150 $6,750 Subtotal: 73 $12,690 Principal/EVP 8 $250 $2,000 Vice President 8 $210 $1,680 Associate 8 $205 $1,640 Subtotal: 24 $5,320 Total Projected Hours & Cost for all Tasks: 271 Cost: $65,480 Estimated Reimbursables: $3,500 SUBTOTAL:J $68,980 WaterTech Pool Consultants Senior Pool Planner 1 501 $275 $13,750 Estimated Reimbursables: $2,500 SUB TOTAL: $16,525 SURVEYING WT Engineering Boundary & Topo Survey (FWJ & FF Sites) $6,950 Private Utility Locate $1,950 Property Corner Staking $850 SUB TOTAL: $9,750 COMBINED TOTAL ALL TASKS (PHASE 1) + ESTIMATED REIMBURSABLE&: $95,255 Page12 of19 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 City of Evanston Cost of Services Break Down - Programming, Conceptualization, Engagement & Budgeting August 1, 2022 e CORDOGAN CLARK ARCHIIECT{1RE •ENGINEERING •CONSTRUCTION Tasks Proposed Staff Position Proposed Hourly Total Hours Rate PHASE 2 TASKS (ENGAGEMENT) Gather input from stakeholders to include 5th Ward Representatives (1) Meeting. Prepare Preliminary Program & Site Concept Based on this Information Gather input from Community Engagement Neighborhood Town Hall Meeting #1. Prepare Preliminary Program & Site Concept Based on this Information Gather input from Community Engagement Neighborhood Town Hall Meeting #2. Prepare Preliminary Program & Site Concept Based on this Information Gather input from Community Engagement Neighborhood Town Hall Meeting #3. Prepare Preliminary Program & Site Concept Based on this Information Gather input from Community Engagement (FF & FWJ Focus Groups) Meeting #1. Prepare Preliminary Program & Site Concept Based on this Information Gather input from Community Engagement (FF & FWJ Focus Groups) Meeting #2. Prepare Preliminary Program & Site Concept Based on this Information Principal/EVP 10 $250 $2,500 Vice President 10 $210 $2,100 Associate 18 $205 $3,690 Architect II 20 $135 $2,700 Subtotal: 58 $10,990 Principal/EVP 10 $250 $2,500 Vice President 10 $210 $2,100 Associate 18 $205 $3,690 Architect II 20 $135 $2,700 Subtotal: 58 $10,990 Principal/EVP 10 $250 $2,500 Vice President 10 $210 $2,100 Associate 18 $205 $3,690 Architect II 20 $135 $2,700 Subtotal: 58 $10,990 Principal/EVP 10 $250 $2,500 Vice President 10 $210 $2,100 Associate 18 $205 $3,690 Architect II 20 $135 $2,700 Subtotal: 58 $10,990 Principal/EVP 10 $250 $2,500 Vice President 10 $210 $2,100 Associate 18 $205 $3,690 Architect II 20 $135 $2,700 Subtotal: 58 $10,990 Principal/EVP 10 $250 $2,500 Vice President 10 $210 $2,100 Associate 18 $205 $3,690 Architect II 20 $135 $2,700 Subtotal: 58 $10,990 2 Page 13 of 19 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 City of Evanston Break Down Programming, e CORDOGAN CLARK Cost of Services - Conceptualization, Engagement & Budgeting `AR°H E°T°RE • EN�NEER N� • °°NS,°°F °N August 1, 2022 Tasks Proposed Staff Position I Proposed Hourly) Total Hours Rate Principal/EVP 10 $250 $2,500Vice Gather input from Community Engagement (FF President 10 $210 $2,100 & FWJ Focus Groups) Meeting #3. Prepare Associate 18 $205 $3,690 Preliminary Program & Site Concept Based on this Information Architect II 20 $135 $2,700 Subtotal: 58 $10,990 Principal/EVP 10 $250 $2,500 Gather input from Community Engagement (FF Vice President 10 $210 $2,100 & FWJ Focus Groups) Meeting #1. Prepare Associate 18 $205 $3,690 Preliminary Program & Site Concept Based on this Information Architect II 20 $135 $2,700 Subtotal: 58 $10,990 Principal/EVP 20 $250 $5,000 Prepare Cost Estimates as needed based on Estimator 50 $210 $10,500 input and concept evolutions. Update Master Associate 8 $205 $1,640 Schedule Scheduler 6 $185 $1,110 Subtotal: 84 $18,250 Total Projected Hours & Cost for all Tasks: 490 Cost: $106,170 Estimated Reimbursables: $3,500 SUB TOTAL: 1 $109,6701 ICOMBINED TOTAL ALL TASKS (PHASE 2 ENGAGEMENT) + ESTIMATED REIMBURSABLES: I $109,670 3 Page 14 of 19 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 e CORDOGAN CLARK _ �Aa�a�,r�,anr rae�nrrk�ae.�galraa�r�ga Evanston/Skokie SD#65 New 5th Ward School + COE Community Center Project Schedule Schedule Pdnt Date: 81122 ID Task Name Durabgn Start R—h ptr 1, 2022 Jan I Feb Mar t New 5th Ward School + COE Community Center Project 1048 days 911121 9 1512 2 BOE Approval of Project f Project 148 days 911121 312512 380 days 3/28122 918/2 5 DESIGN PHASE 3128 6 5W School Program Confirmation & Budget Alignment 40 day 3128/22 512012 Program Col 3/28 q T Review Design Process & Steering Committee Est. 5 day 3128/22 4/1/2 • n Process 8 3/28 r 9 Programming and Data Gathering 20 day 3/28122 4/22/2r'Jgramming a 3128 1 8 Meet with City of Evanston to Outline P&Z Process 2 day 4/25/22 4/26/22 1 City of Eval 4/ 10 Preliminary Program Estimate & Schedule 4 day 4/26122 4/29/22 lminary Frog 41 11 Client Review & Scope Alignment 15 day 5/2122 5/200 Client Rev! 12 SW School + COE Community Center MOU/Program/Conceptualization 109 days 7121 /22 1212012 SW Sch 13 COE CS Programming/ConcepUEstimates/MOU Fee Proposal Approval 13 day 7/21122 818/22 CS Program) 14 D65 MOU Approval 6 day 8/9122 8116/2 15 Programming & Data Gathering COE Park & Rec 10 day 8/9122 8/22/2 Pro! 16 Prepare Concepts/Budget/Space Share D65 & COE Process 20 days 8123/22 9/19/22 Prepal 17 Community Engagement - Ward 5 1 day 9/20122 9/200 18 Community Engagement Town Hall #1- Neighborhood Groups 1 day 9/28122 9/28/2 Coln 19 Update Concepts & Estimates from CE #1 Input 5 day 9/29/22 10/512 22 Community Engagement Town Hall #3- Neighborhood Groups 1 day 10/4122 10/4/2 Cor 24 Community Engagement FWJ/FF Focus Group #1 1 day 10/10/22 10/10/2 n z5 Update Concepts & Estimates from FG #1 Input 5 day 10/11/22 10/17/2 Eva Community Engagement FWJ/FF Focus Group #2 1 day 10/13/22 10/1312 to � T Update Concepts & Estimates from FG #2 Input :� 5 day 10/14/22 10120/2 CD W28 Community Engagement FWJ/FF Focus Group #3 N 1 day 10/17/22 10/17/2 0) Update Concepts & Estimates from FG #3 Input 5 days 10/18/22 10/24/2 CT1 aim Community Engagement Town Hall #2- Neighborhood Groups 1 day 1025/22 10125/2 01 Update Concepts & Estimates from CE #2 Input 5 days 1026122 11/1/2 "D cD z3OD Update Concepts & Estimates from CE #3 Input tD W 5 days 1026122 11/112 J30 Process Community Input & Update Concepts 15 days 1026/22 111152 3, Update Concept Estimates & Schedule Update 5 days 11/16/22 112212 V COE & D65 Finalize IGA & Approve Concept 20 day 1123122 12/20/2 OD 039 City of Evanston Planning & Zoning Process 68 days 1220/22 3223 N mto 41� Plan Commission Public Notification 10 days 1220/22 1/2/2 a V ptr 2, 2022 A3,202 p1,202e3w hpr2,223pr3,2023 ,o203eJp1,2024 tr 25 O2,22J5un ptr3, 2bMI INoJan FMrbAAr ayI Jun Jul I A S Ocul u q lAuAq SDs JptrFeMar ul A tndSchoo+AE ep Ocpt tl Wommunity Center Project srs 312s DESIGN PHASE firmation & Budget Alignment 5/20', Steering Ccrilmitttee Est 4/1 id Data Gathering M 4122 ston to Outline P&Z Process 151 4/26 am Estimate & Schedule is il 4/29 w 8, ScopeAlignment 512 M 5/20 ,ol + COE Community Center MOU/Program/Conceptualization ring/Comelp/1I`Estimates/MQU Fee Proposal Approval V 1 8/8 D65 MOU Approval 819 ® 8116 ramming 8, Data Gathering COE Park & Rec 8/9 ® 8/22 Concepts/Budget/Space Share D65 & COE Process 8/23 EM 9/19 Community Engagement. Ward'S ♦ 9/20 nunhy Engagement Town Hall #1- Neighborhood Groups ♦ 9/2a Update Concepts & Estimates from CE 91 Input Imunity Engagement Town Hall #3-Neighborhood Groups ♦ 10/4 Community Engagement FWJ/FF Focus Group #1 ♦ 10110 Update Concepts & Estimates frontFG #1 Input Community Engagement FWJ/FF Focus Group #2� ♦ 10/13 Update Concepts 8, Estimates from FG #2 Input', 10114 a 10/20 Community Engagement FWJ/FF Focus Group #3 * 10/17 Update Concepts & Estimates from FG #3 Input, 10/18 M 10124 ommunity Engagement Town Hall #2- Neighbomoo&Groups ♦ 10125 Update Concepts & Estimates from CE #2 Input Update Concepts &Estimates from CE #3 Input Process Commu ity Input 8, Update Concepts 10�26 EM 11 /15, Update Concept Estimates & Schedule Update 11/16 ® 11122 COE & D65 Finalize IGA & Approve Concept City of Evanston Planning & Zoning Process 12120 W----eep' 3123 Plan Commission Public Notification Page 1 Evanston/Skokie SD#65 e CORDOGAN CLARK New 5th Ward School + COE Community Center Project Schedule `Axcx11—Unr.exoixerniuo. coxsraucDou Schedule Print Date: 811122 n ID Task Name Durzbgn start Finish ptr 1, 2022 ptr 2, 2022 Jan Feb Mar Aq May Jun ptr 3, 2022 ptr 4, 2022 ptr 1, 2023 Q, 2, M23 ptr 3, 2023 Otr 4, 2023 ptr 1, 2024 ptr 2, 2024 ptr 3, 2024 ptr 4, 2024 ptr 1, 2125 Otr 2, 2025 ptr 3, 2025 pb Jul I Auq Sep Oc[ l Nqv Dec Jan I Feb I Mar APr May Jun Jul Auq SeP Oc[ Nov Dec Jan Feb Mar APr Mav Jun Jul Auq SeP Oct Nqv Des Jan Feb Mar Aqr Mav Jun Jul Auq SeP Oct of 40 PU Submittal Date 1 day 12/21/22 12/21/22 P Submittal dale * 12/21 42 Plan Commission Submittal Date 10 days 1/3123 1/16/23 Plan Commission Submittal Date 1/3 1/16 43 P&Z Public Notification 10 days 1/12123 1/25/23 PU Public Notification �'� 1112 0 1/25 Plan Commission Public Hearing 1 day 219/23 219/23 �'� �'� Plan Commission Public Hearing ♦ 219 45 PU Approval 20 days 2110123 3/9/23 PU Approval 2/10 UM 3/9 4s City Council Approval 10 days 3/10123 3/23/23 ,City Council Approval 3110 EM ',323 33 Schematic Design 53 days 1221122 313123 Schematic Design' 12/21 ill 313 34 Schematic Design 30days 12/21/22 1/31/23 SchematicDesign 12/21 M= 1/31 , 35 SD Estimate & Construction Schedule 5 days 1/30123 2/3/23 gD Estimate & Construction Schedule 1/30 0 213 36 Internal SD Constructability Review 9 days 1/31/23 2/10/23 Internal SD Constructability Review 1/3102/0 37 SD Design and Estimate Modifications 10 days 2113/23 W4/23 SD Design Intl Estimate Modifications 21130 2124 38 Client Review and Approval of SD 5 days 2127123 3/3/23 Client Review and Approval of SD 2/27 9 3/3 47 Design Development 63 days 2/10/23 519/23 Design Development 2110 �1 5/9 48 Design Development 40 days 2110/23 4/6/23 Design Development 2110 Eg= 4/6 49 DD Estimate & Construction Schedule 7 days 4/5/23 4/13/23 DD Estimate & Construction Schedule 4/5 l341113 50 Internal DD Constructability Review 10 days 4/5/23 4/18/23 Internal DD Constructability Review 4/5 4/18 51 DD Design and Estimate Modifications 10 days 4/19123 5/2/23 DD Design and Estimate Modifications 4/19 5/2 Client Review and Approval of DD 5 days 5/3123 5/9/23 Client Review and Approval of DD 5/3 a 5/9 53 Construction Documentation 98 days 4126/23 918123 Construction Documentation 4126 , , 918 061 Construction Docs BG #1 - Site, Precast, Foundations & Steel 57 days 4/26/23 7/13/23 Construction Does B4 #1 -Site, Precast, Foundations & Steel p 4/26 EMMM= 7113 0 55 Construction Docs BG #2 - Shell, MEP & Interiors 65 days 5/10/23 818/23 Construction Docs BG #2 - Shell, MEP & Interiors 0 5110 EMEMERM 818 056 Scope Definition & Specs - BG #1 5 days 7/7123 7113/23 ', Scope Definition & Specs - BG #1 59 Constructability, Review of CD's BG #1 10 days 7/14/23 7/27/23 1 1 1 1 1 Constructability Review of CD's BG #1 CD 7/14 7127 N57 Scope Definition & Specs - BG #2 5 days 8/2123 818/23 Scope Definition & Spec4 - BG #2 s 8/2 ® 818 Constructability Review of CD's BG #2 Final Modifications of CD and Internal Review 10 days 8/9123 10 days 8125/23 8/22/23 Constructability Review of CD's BG #2 8/9 8/22' 8/24/23 CD Design, Estimate, and Schedule Modifications 8/16 ® 8124 917/23 Final Modifications of CD and Internal Review 8/25 0 917 Client Approval of CD 1 day 9/8/23 9/8/23 Client ApprovII of CD ♦ 9118 PERMITTING & BIDDING 66 days 712823 10127123 PERMITTING & BIDDING 7/28 10/27 BID MANAGEMENT 66 days 712823 10127123 BID MANAGEMENT 71�8 Weee—ei-e-1 10127 COE FWJ Demo Bid Group 15 days 7/28123 8/17/z3 COE FWJ Demo Bid Group 7128 M 8117 ' COE FWJ Demo Bid Award 15 days 8118/23 917/23 COE Fw18 emo Award 0Bid 1 - Page 2 V Evanston/Skokie SD#65 e CORDOGAN CLARK New 5th Ward School + COE Community Center Project Schedule `na Schedule Print Date: 81122 -Y^_y '< cxlrrclukr.rxolxrrkiuo. coxsraucNou r� ID Task Name Du,.b.n start Finish ptr 1, 2022 ptr 2, 2022 ptr 3, 201M Jan Feb I Mar Apr I May I Jun Jul I Auq Sep ptr 4, 2022 Otr 1, 2023 pir 2, 2023 0, 3, 2023 ptr 4, 2023 ptr 1, 2024 ptr 2, 2024 ptr 3, 2024 ptr 4, 2024 ptr 1, 2025 Otr 2, 2025 ptr 3, 2025 pb OI Nov Dec Jan Feb Mar Apr I May Jun Jul I Auq I Sep Oc[ Nov I Dec Jan I Feb I Mar Apr I Mav I Jun JUI I Aun Sep Oct I Nov I Des Jan I Feb I Mar Apr I Mav Jun Jul Auq I Sep Oct -1 68 Bid Group #1 - Site, Precast, Foundations & Steel 15 days 7/28123 8/17/25 I id Group #1 -site; Precast, Foundations & Steel p 7/28 SM7 sg Bid Group #1 - Bid Opening 1 day 9/8/23 918/23 Bid Group #1 -Bid Opening ♦ 918 70 Bid Group #2 - Shell, Interiors & MEP/FP 15 days 9/11123 9/29/23 Bid Group #2 -Shell, Interiors & MEPIFP 9/11 M 9129 72 BG #1 Scope Reviews & Recommendation to BIDE 7 days 9/11123 9/19/23 BG #1 Scope Reviews & Recommendation to BIDE 74 Issue Contracts - BG #1 7 days 9/20123 9/28/23 Issue Contracts - BG #t 9/20 fg 9128 11 Bid Group #2 - Bid Opening 1 day 10/2123 10/2123 �'� �', Bid Group #2 - Bid Opening ♦ 1012 73 BG #2 Scope Reviews & Recommendation to BIDE 7 days 10/3/23 10/11/23 BG #2 Scope Reviews & Recommendation to BIDE 10/30 10/11 75 Issue Contracts - BG #2 12 days 10/12123 10/27/23 Issue contracts - BG 92 10/12 M 10127 s4 ROE Building Permit- Full Building 35 days 9/8123 10/26/23 ROE Building Peknit - Full Building 918 a= 10126 76 CONSTRUCTION PHASE 497 days 10112123 915125 CONSTRUCTION PHASE lour , J/s LONG -LEAD PROCUREMENT 94 days 10112123 2120124 LO�JG-LEAD PROCUREMENT 10/12 2/20 76 Reber, Concrete Mix Designs, etc. 56 days 10112123 122823 Reber, Concrete Mix Designs, etc. 10/1I2' IIIlaaaaaaa " 12/28 79 Prepare Shop Drawings 10 days 10/12123 10/25/23 Prepare $hop Drawing B0 Submit Shop Drawings for Approval 5 days 1026/23 11IV23 'Submit shop Drawings for Approval 10/26 ®1111 81 Shop Drawing Review 3 days 11/2123 1116123 Shop Drawing Review i1/2 a 11/6 Return Shop Drawings 3 days 11/7123 1119123 Return Shop Drawings 11/7 il 11/9 69 Order & Delivery 7 Wks 11/10/23 12128/23 & Delivery 77Order 6 s4 Steel 59 days 10112123 1@24 Steel 10/12 112 Prepare Shop Drawings 12 days 10/12123 10/27/23 Prepare Shop Drawings 10112 M 10127 C B6 Submit Shop Drawings for Approval 1 day 10/30/23 10/36/23 Submit Shop Drawings for Approval 10/30 1 10/30 087 Shop Drawing Review 5 days 10/31/23 11/6123 Shop Drawing Review 0 10131 D 1116 Return Shop Drawings 1 day Detail, Precast 6 WKS Prepare Shop Drawings 5 days 10/12123 11/7123 Return Shop Drawings �11/7 1 11/7 1 112/24 Detail, Fabricate, and Deliver Steele 1118 1/2 212124 Precast 10/12 212 10/18/23 Prepare Shop Drawings 10112 ® 10/18 10/19/23 Submit Shop Drawings for Approval 10/19 1 10/19 Shop Drawing Review 5 days 1020/23 10/26/23 1 1 1 1 Shop Drawing Review 10120 0 10126 Return Shop Drawings 1 day 1027/23 10/27/23 Return Shop Drawings 10127 1 10127 Fabricate, and Deliver Precast 14 Wks 10 30/23 2/2/24 Fabricate, and Deliver Precast 10130 EMMEMEM= 2/2 Windows & Curtainwall 47 days 10112123 12/15123 windows & Curtainwan 10/12 12/15 Prepare Shop Drawings 10 days 10/12123 1025/23 Prepare Shop Drawings 10112 ® 10125 Submit Shop Drawings for Approval 1 day 1026123 1026/23 Submit Shop Drawings for Approval 10�26 1 10/26 Q Page 3 V Evanston/Skokie SD#65 e CORDOGAN CLARK New 5th Ward School + COE Community Center Project Schedule -Y^_y`Aacxnrclunr.rxolxerniuo-coxsraucNou Schedule Print Date: 811122 11 N ID Task Name Durabgn start Finish ptr 1, 2022 ptr 2, 2022 ptr 3.2 ptr 4, 2022 Jan Feb Mar Aq May Jun JulIAuq Sep Oc[ Nov Dec ptr 1, 2023 pir 2, M23 013, 2023 ptr 4, 2023 ptr 1, 2024 ptr 2, 2024 ptr 3, 2024 ptr 4, 2024 ptr 1, 2025 Otr 2, 2025 ptr 3,2 025 pb Jan Feb Mar Apr May Jun Jul A Sev Oct INov Dec Jan Feb Mar Apr Mav Jun Jul Auq Sep Oct Nqv Des Jan Feb Mar Aqr Mav Jun Jul I Sep Oct 29 105 Shop Drawing Review 5 days 1027/23 11/2129 op Drawing �eview ,os Return Shop Drawings 1 day 1113/23 11/3123 Return Shop Drawings 101 Production and Delivery 6 wks 11/6123 12/15/23 Production and Delivery 96 Mechanical Equipment 82 days 10130123 2120124 Mechanical Equipment 10/3o W Prepare Shop Drawings 15 days 10/30/23 11/17/23 Prepare Shop Drawings 99 Submit Shop Drawings for Approval 1 day 1120/23 11/20/23 Submit Shop Drawings for Approval 11120 1 11/20 1 99 Shop Drawing Review 5 days 1121/23 1127/23 Shop Drawing Review 11/21 ® 11127 100 Return Shop Drawings 1 day 1128123 1128/23 Return Shop Drawings 11128 1 11/28 101 Production and Delivery 12 wks 1129/23 2/20/24 Production and Delivery 11129 2/20 oe MOBILIZATION & FWJ DEMO 28 days 10/12123 1112023 MOBILIZATION & FWJ DEMO 10/17 W—W 11/20 109 Install temporary power 5 days 10/12123 10/18/23 Install temporary powet 10/12 ® 10118 110 Set up site office 3 days 10/19/23 1023/23 Setup site office 10119 g 10/23 111 Set line and grade benchmarks 3 days 1024/23 1026/23 Set line and grade benchmarks 10124 1 10/26 112 Prepare site - temporary fencing, erosion control 2 days 1027/23 10/30/23 Prepare site - temporary fencing, erosion control 10/27 0 10130 113 Demolish FWJ & Clear Site 15 days 10/31/23 1120/23 Demolish FWJ & ClI8r Site 10131 1112Q 114 BUILDING SITE WORK 18 days 11121/23 12/1423 BUILDING SITE�wORK 11/21 r1 12/14 115 Rough grade Site (cut and fill) 8 days 1121/23 11/30/23 Rough grade site (cut and fill) 11/21 ® 11/40 118 Install underground utilities (Storm, Sanitary, Fire Line & Riser) 10 days 12/1123 12/14/25 Install underground utilities (Storm, Sanitary, Fire Line & Riser) 1211 0 12/14 7 BUILDING SHELL &MEP CONSTRUCTION zoo days 12115/23 9N924 BUILDING SHELL & MEP CONSTRUCTION 1211.',9/19 d1e Trench footings for precast 15 days 12/15/23 114/24 Trench footings for precast p 12/15 M 1/4 n119 Excavate & Pour Foundations 5 wks 1/5/24 218/24 Excavate & Pour Foundations 0 115 MM 218 (fl 20 Backfill 7days 1/19124 1129/24 Backfill 03 11190 1/29 21 Rough -in Underground Plumbing & Electric 4 wks 1/2624 2/22/24 Rough -In Underground Plumbing & Electric CD 1/2s EM 2/22 ni22 Precast installation 12days 212324 3/11/24 Precastinstauatlon 2123 3/11 w 23 Prepare and pour concrete floor 15 days 3/12/24 411/24 Prepare and pour concrete floor za Masonry installation 8 wks 4/5/24 5/30/24 Masonry installation 4/5 5/30 IVlzs CoO Metal Panel installation 8 wks 5/3/24 6/27/24 Metal Panel installation 513 MEEM 6/27 ( 0 Rough -in Electric 8 wks 5110124 7l4/24 Rough -in Electric 4�- 5/10 EMMEM 714 is Install miscellaneous steel (Lintels, Columns, etc.) 4 wks 5/1024 6/6/24 Install miscellaneous steel (Lintels, Columns, etc.) CD 5/10 IgM 6/6 427 Rough -in Plumbing 8 wks 5/17124 7/11/24 Rough -in Plumbing 5/17 EEM= 7111 O030 Steel Installation & Detailing 30 days 6/28124 8B/24 Steel Installation & Detailing 9 o 6/28 M= 6/6 1128 Set HIM frames in Msry (doors and windows) 5 days 7/1224 7/18/24 Set HM frames in Mary (doors and windows) m 7/12 ® 7118 Q Page 4 V Evanston/Skokie SD#65 e CORDOGAN CLARK New 5th Ward School + COE Community Center Project Schedule `Axc 11—Ukr.rxoixrrkiuo. coxsraucriou Schedule Pdnt Date: 811122 ID Task Name m 131 Install Roof Deck Duration 10 day Start 8/9/24 Finish I JaDt)Feb�Mar A gMay�Jun JuDI tI Augo sep Oc[ Ngv1Dec Ja Feb ZMar A l I M: 3.n I Jua AugDZSep 8/22/24 I O� Nqv I2Dec I Jan Feb ZMar Apr Mavl�Jun JulO AupDZSeo Oct IJgv 2Des JaOn FebZMar ApO MavDZJun JuDI AuglJSep O� Install Roof Deck 9/19/24 819 o 8/22 Rough Carpentry 2arapet blocking, etc.) 132 Rough Carpentry (parapet walls, blocking, etc.) 20 days 8123/24 9/12/2 9wailllls, 8/3 Install Curbs and Roofing 133 Install Curbs and Roofing 15 day 8/23124 9/17/2 '� �'� �'� '� �'� '� �'� 8123 M 9/12 ', ', Install Exterior, Windows, Glazing, and Openings 134 Install Exterior Windows, Glazing, and Openings 18 days 8123124 6125125 8n3 EM 9/17 MEP & INTERIOR FINISHES CONSTRUCTION 135 MEP & INTERIOR FINISHES CONSTRUCTION 219 days 8/23/24 10/3/2 81236125 Fire Protection Rough -in 136 Fire Protection Rough -in 30 day 8/23/24 11 /1 4/_24 8123 10/3 Metal Stud Walls 13e Metal Stud Walls 45 day 9/13/24 1 V7124 9/13 Emmmm 11114 HVAC Duct work 139 HVAC Duct Work 40 day 9/13/24 10/8/2 9/13 EM= 1117 HVAC Roof Top Units 137 HVAC Roof Top Units 15 day 9/18124 119/25 9/16 m 10/8 Drywall 140Drywall 8 wks 11/15/24 215/2 Casework 141 Casework 5 wks 1/2/25 z/zs/z 112 EM 2/5 Painting 142 Painting 6wk 1/16/25 2119/2 1116 2/26 Interior Window 8 Door Mstallation 143 Interior Window & Door Installation 20 day 1/23125 3/19/2 1/ 3 2/19 Electrical Trim Work 145 Electrical Trim Work 8 wks 1/23/25 3/12/2 1/23 EMM= 3119 Install Ceiling Grid 14a Install Ceiling Grid 5 wks 2I6/25 5/7/2 2/6 3/12 HVAC Trim Work 146 HVAC Trim Work 8 wks 3/13125 4/16/2 3/13 MEE= 5/7 ,Fire Protection Trim Work' 148 Fire Protection Trim Work 5wk 3/13/25 4/2/2 3/13 EM 4116 Install ceiling Tiles sz Install Ceiling Tiles 15 days 3/13125 5/21/25 3/13 M 4/2 Install Flooring & Wall Tile 147 Install Flooring & Wall Tile 25 days 4/17125 5/21/25 4/17 EM 5121 Plumbing Trim Work d49 Plumbing Trim Work 3 wks 5/1/25 p 6/25/2 51 M 52 Final Site Work & Field Installation nlso Final Site Work & Field Installation 8 wks 5/1/25 0 5/21/25 5/1 6/25 Paint Touch up & Final Finishes tp 51 Paint Touch up & Final Finishes 3 wks 5/1/25 M 712312 PRo.1Ecr ct.o$E our 53 PROJECT CLOSE OUT 20 day 6/26/25 CD 1 7/23/25 6/26 sties -it, V 23 Punch list 54 Punch list N 20 days 6126/25 7/2/2 6/26 EM 7/23 Inspections 8 Testing w ss Inspections & Testing 5 day 6/26125 CJ1 7/16/25 6/26 o 7/2 Systems Training & Commissibninc s6 Systems Training & Commissioning 15 days 6126125 r9 s/zs M 7/16 Substantial Completion 1 day 7/3/25 7/3/2 OPERATIONS START UP 52 day 6/26/25 9/5/2 �+sg Technology Implementation 0 460 FF&E Installation 0p161 (D Move -In & Occupancy IN) First Day of Operations (U CL v CL 0. Page 5 Substantial Completion ♦ 713 OPERATIONS START UP 6126 ities1 9/5 Technology,Implementation Ens EpMM 7/29 FFgE Installation Y/30M 8/14 Move -In & Occupano 8115 M 914 First Day of Operatic ♦ 9/5