Loading...
HomeMy WebLinkAbout057-R-22 Authorizing the City Manager to Sign a Local Public Agency Engineering Services Agreement for the Ridge Avenue Construction Engineering Services Agreement with Kimley-Horn Inc. and IDOT for Federal Funding Participation08/08/2022 57-R-22 A RESOLUTION Authorizing the City Manager to Sign a Local Public Agency Engineering Services Agreement for the Ridge Avenue Construction Engineering Services Agreement with Kimley-Horn Inc. and Illinois Department of Transportation (IDOT) for Federal Funding Participation WHEREAS, the City of Evanston seeks to utilize Highway Safety Improvement Program (HSIP) grant funds to make intersection improvements to Ridge Avenue between Oakton Street and Church Street, said improvement to be identified as Illinois Department of Transportation (IDOT) State Section Number: 19-00284-00-CH, State Job Number: C-91-120-20, and Project Number: SKFL(966) hereinafter referred to as the "Project"; and WHEREAS, said intersection improvements consist of traffic signal modifications, ADA ramp reconstruction, and pavement marking replacement; and WHEREAS, the State of Illinois and the City of Evanston intend to use HSIP money committed to fund the Project; and WHEREAS, the HSIP fund source requires a match of the funds by the City of Evanston; and WHEREAS, the City of Evanston seeks to enter into a Local Public Agency Engineering Services Agreement with Kimley-Horn, to provide certain professional engineering services in connection with the project, NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, COOK COUNTY, ILLINOIS: Page 1 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 57-R-22 SECTION 1: That the foregoing recitals are hereby found as fact and incorporated herein by reference. SECTION 2: The City Manager is authorized to allocate Thirty Three Thousand, Two Hundred and Sixty Eight Dollars ($33,268.00) or as much needed for completion of the Project. SECTION 3: The City Manager is hereby authorized to sign the Local Public Agency Engineering Services Agreement with Kimley-Horn and the Illinois Department of Transportation, attached hereto as Exhibit A. SECTION 3: That this Resolution 57-R-22 shall be in full force and effect from and after its passage and approval in the manner provided by law. Attest: Stephanie Mendoza, City Clerk Adopted: August 8 2022 hanzd% ez. Ij Daniel Biss, Mayor Approved as to form: 0- Derek Price, Interim Corporation Counsel —2— Page 2 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 57-R-22 EXHIBIT A Local Public Agency Engineering Services Agreement Between the City of Evanston and Kimley-Horn -3- Page 3 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 I11nois it Local Public Agency o 0 of Tidy ��Nul cation Engineering Services Agreement ° Ayieemt--;it For Usi. iV t'.du ai Funds? ® Yes ❑ No Federal CE LOCAL PUBLIC AGENCY Aaraement Typp Original ra cal Publ�, Aoencv Countv Section Number Job Number ty of Evanston Cook I�19-00284-00-CH IIC-91-120-20 Proie�j Number ,onlact Name Phone Number mail ISKFL(966) Sat Nagar 11(847) 866-2967 1a1 iauza tw:_6iyu 'e va nston.o rg SECTION PROVISIONS ocal Sjreet/Road Name Kev Route rncith Structure Number Ridge Avenue 9-2744 (51 IINA Location Termini I Add Location IOakton Street and Church Street Remove Location Project Dz;,. ,, iu The project involves intersection improv&ai8i its including traffic signal mod&,&Iilu.16, ADA ramp reconstruction, and pavement o mi AI, ry replacement. ngineering Funding ® Federal ❑ MFTR6P ❑ State ❑ Other E tALIPuftu Construction Funding ® Federal ❑ lVir i r i Bi-, ❑ State ❑ Other Consultant (Firm) Name IKimley-Horn Address 14201 Winfield Road AGREEMENTFOR ® Phase III - Construction Engineering CONSULTANT Contact Name Phone Number IISagar Sonar I1(630) 487-3469 1�jtv IlWarrenville Email Iisagar.sonar�7a kimley-horn.com State p Code L 6a555 THIS AGREEMENT IS MADE between the above Local Public Agency {LPA} and Consultant (ENGINEER) and covers certain professional engineering services in-.—PcJL;-,i with the improvement of the above SECTION. Project funding allotted to the LPA by the State of Illinois under the general supervision of the State Department of Tr&.mr,a,Indun, hereinafter called the "DEPARTMENT," will be used entirely or in part to finance LNVtNLLRING services as described under AGREEMENT PROVISIONS. Since the services contemplated under the AGREEMENT are professional in nature, it is understood that the ENGINEER, acting as an individual, partnership, firm or legal entity, qualifies 11— v, col status and will be w-... ,i�%� by FitF.l ethics in its relationship to the LPA and the Dizft"A c i IVILNT. The LPA acknowledges the vru'n:.alewal and ethical status of the ENGINEER by entering into an AGREEMENT on the basis of its qualifications and experience and determining its compensation by mutually 6a()'�Siaauiy iieyotidi6us. WHEREVER IN THIS AuKLt:iVltrlT or attached exhibits the following terms are used, they shall be interpreted to mean: Regional Engineer Deputy Director, Office of Highways Project Implementation, Regional Engineer, Department of Transportation Resident Construction Supervisor Authorized) umNi aytn�ailVe of the LPA in immedidkt� 6riaige of the �-, qyl. details of the construction PROJECT In Charge A full time LPA employee authorized to administer inherently governmental PROJECT activities Contractor Company or Companies to which the construction contract was awarded Completed 07/04/22 Page t of 11 BLR 05530 (Rev. 08/05/21 ) Page 4 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 AGREEMENT EXHIBITS The following EXHIBITS are attached hereto and made a part of hereof this AGREEMENT: ® EXHIBIT A: Scope of Services ® EXHIBIT B: Project Schedule ® EXHIBIT C: Direct Costs Check Sheet ® EXHIBIT D: Qualification Based Selection (QBS) Checklist ® EXHIBIT E: Cost Plus Fixed Fee Cost Estimate of Consultant Services Worksheet (BLR 05513 or BLR 05514 J THE ENGINEER AGREES, 1, To po%F. i.. U4 aN�„ ,4u for oC the Scope of Services presented in EXHIBIT A for the LPA in connection with the proposed impp.,w�iii�i ►� herein before described. 2. The Classifications of 0 Pc \:, Pp iuyees used in the work shall be consistent with the employee classifications and .:SL;lI �UtL& staff hours. If higher -salaried personnel of the firm, including the Principal Engineer, perform surviL'e& filth are to be by I E:osr---..i.p 1,;=J personnel, the wage rate billed for such services shall be commensurate with the payroll rate for the work performed. 3. That the ENGINEER shall be ivspuru ible for the accuracy of the work and shall promptly make necessary reVis�uiis u� corrections required as a result of the ENGINEER'S error, „, ,ilu.�i,,,,,, or negligent acts without adaitionai winpeu,d7run. AL.r,u�Aa..,e of work by the LPA or DEPARTMENT will not relieve the ENGINEER of the, PL�p ,pr.bility to make subsequent ..,,-- 6L� ur- of any such errors or omissions or the responsibility for clarifying ambiguities. 4, That the ENGINEER will comply glut appficable Federal laws and regulations, State of Illinois Statutes, and the local laws or ordinances of the LPA. 5. To pay its subconsultants for satisfactory performance no later than 36 uay� opi i receipt of payment from the LPA. 6, To invoice the LPA for Preliminary and/or Design Engineering: The ENGINEER shall submit all invoices to the LPA within three months of the completion of the work called for in the AGttLLMLN i or any subsequent Amendment or Supplement. 7, To submit d u,ri-i. �etieJ BLR 05613, Engineering Payment Report, to the DEPARTMENT within three months of the completion of the work called for in this AGREEMENT or any Amendment or Supplement. The form shall be submitted with the final invoice. 8, The ENGINEER or bul,Lu,,..ultant shall not discriminate on the basis of race, color, national origin or sex in the psi of this AGREEMENT. The ENC,INLtrt shall carry out applicable requirements of 49 CFR part 26 in the adr006uailun of US Department of T,�., .. (US DOT) assisted contract. Failure by the Engineer to carry out these requirements is a material breach of this A6)-tLLnnLNT, which may result in the termination of this AGREEMENT or such other remedy as the LPA deems ap pouN(uifs. 9. That none of the services to be furnished by the ENGINEER shall be sublet assigned v, a ai i�Li i uu to any %ii; ie, paP Ly or parties without written consent of the LPA. The consent to sublet, assign or otherwise transfer any portion of the services to be furnished by the ENGINEER shall be construed to relieve the ENGINEER of any responsibility for the fulfillment of this AGREEMENT. 10. For Construction Engineering Contracts: (a) The ENGINEER shall L� p.fied with the STATE in Construction Inspection. All of the ENGINEER serving as t'r t-.,rwit.: resident construction y:�s� or providing construction Ilispett»,, shall have a valid Documentation of Contract Quantities certification. (b) For all projects where testing is required, the ENGINEER shall obtain samples to the STATE Bureau of Materials, "Manual of Test Procedures for Materials," submit STATE Bureau of Materials reports; and verify ,,,i,Nriw i with contract specifications. 11. That the uvi,Liu6,-% '..:es shall include all equipment, losuuiiienis, supplies, transportation and jd.uu.mLl iu peifu.ai the duties of the ENGINEER in connection with this AGREEMENT See Exhibit C). II. THE LPA AGREES, 1, To certify by execution of this AGREEMENT that the selection of the ENGINEER r6a� pt06pii.tJ in accordance with the following: (a) Professional Services Selection Act (50 ILCS 510), The Brooks Act (40 USC 11), and the Pr(JV;.iclllEili, M- ;: and Administration of E. iyli ewe] Design Related Services (23 CFR part 172). Exhibit D is required to be completed with this AGREEMENT. 2, To furnish the ENGINEER all presently available survey data, plans, specifications, a.,d p.information. 3, For Construction Engineering Contracts: (a) To furnish a full time LPA to be In Charge authorized to administer inherently PROJECT activities. (b) To submit approved forms BC 775 and BC 776 to the L)EPAR i MENT when federal funds are utilized. 4, To pay the ENGINEER: Completed 07/04/22 Page 2 of 11 BLR 05530 (Rev. 08/05/21 ) Page 5 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 (a) For progressive payments - Upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LPA, monthly payments for the work performed shall be due and payable to the ENGINEER, such payments to be equal to the value of the partially completed work minus all previous partial payments made to the ENGINEER. (b) Final Payment - Upon approval of the work by the LPA but not later than 60 days after the work is completed and reports have been made and accepted by LPA and DEPARTMENT, a sum of money equal to the basic fee as determined in this AGREEMENT less the total of the amount of partial payments previously paid to the ENGINEER shall be due and payable to the ENGINEER. 5. To pay the ENGINEER as compensation for all services rendered in accordance with the AGREEMENT on the basis of the following compensation method as discussed in 5-5.10 of the BLR Manual. Method of Compensation: Lump Sum Specific Rate ® Cost plus Fixed Fee: Fixed Total Compensation = DL + ❑C + OH + FF Where: DL is the total Direct Labor, DC is the total Direct Cost, OH is the firm's overhead rate applied to their DL and FF is the Fixed Fee. Where FF = (0.33 + R) DL + %SubDL, where R is the advertised Complexity Factor and %SubDL is 10% profit allowed on the direct labor of the subconsultants. The Fixed Fee cannot exceed 15% of the DL + OH. Field Office Overhead Rates: Field rates must be used for construction engineering projects expected to exceed one year in duration or if the construction engineering contract exceeds $1,000,000 for any project duration. 6. The recipient shall not discriminate on the basis of race, color, national original or sex in the award and performance of any US DOT -assisted contract or in the administration of its DBE program or the requirements of 49 CFR part 26. The recipient shall take all necessary and reasonable steps under 49 CFR part 26 to ensure nondiscrimination in the award and administration of US DOT -assisted contracts. The recipient's DBE program, as required by 49 CFR part 26 and as approved by US DOT, is incorporated by reference in this agreement, Implementation of this program is a legal obligation and failure to carry out its terms shall be treated as violation of this AGREEMENT. Upon notification to the recipient of its failure to carry out its approved program, the Department may impose sanctions as provided for under part 26 and may, in appropriate cases, refer the matter for enforcement under 18 U.S.C. 1001 and/or the Program Fraud Civil Remedies Act of 1986 (31 U.S.0 3801 et seq.). 7. To certify by execution of the AGREEMENT that the selection of the ENGINEER was performed n accordance with the Local Government Professional Services Selection Act 50 ILCS 510, the Brooks Act Off USC 11, and Procurement, Management, and Administration of Engineering and Design related Services (23 CRF part 172). Exhibit C is required to be completed with this agreement. III. IT IS MUTUALLY AGREED, 1. No work shall be commenced by the ENGINEER prior to issuance by the IDOT of a written Notice to Proceed. 2. To maintain, for a minimum of 3 years after the completion of the contract, adequate books, records and supporting documents to verity the amount, recipients and uses of all disbursements of funds passing in conjunction with the contract; the contract and all books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General, and the DEPARTMENT, the Federal Highways Administration (FHWA) or any authorized representative of the federal government, and to provide full access to all relevant materials. Failure to maintain the books, records and supporting documents required by this section shall establish a presumption in favor of the DEPARTMENT for the recovery of any funds paid by the DEPARTMENT under the contract for which adequate books, records and supporting documentation are not available to support their purported disbursement. 3. That the ENGINEER shall be responsible for any and all damages to property or persons arising out of an error, omission and/or negligent act in the prosecution of the ENGINEER's work and shall indemnify and save harmless the LPA, the DEPARMTENT, and their officers, agents, and employees from all suits, claims, actions or damage liabilities, costs or damages of any nature whatsoever resulting there from. These indemnities shall not be limited by the listing of any insurance policy. The LPA will notify the ENGINEER of any error or omission believed by the LPA to be caused by the negligence of the ENGINEER as soon as practicable after the discovery. The LPA reserves the right to take immediate action to remedy any error or omission if notification is not successful; if the ENGINEER fails to reply to a notification; or if the conditions created by the error or omission are in need of urgent correction to avoid accumulation of additional construction costs or damages to property and reasonable notice is not practicable. 4. This AGREEMENT may be terminated by the LPA upon giving notice in writing to the ENGINEER at the ENGINEER's last known post office address. Upon such termination, the ENGINEER shall cause to be delivered to the LPA all drawings, plats, surveys, reports, permits, agreements, soils and foundation analysis, provisions, specifications, partial and completed estimates and data, if any from soil survey and subsurface investigation with the understanding that all such material becomes the property of the LPA. The LPA will be responsible for reimbursement of all eligible expenses incurred under the terms of this AGREEMENT up to the date of the written notice of termination. Completed 07/04/22 Page 3 of 11 BLR 05530 (Rev. 08105121) Page 6 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 5. In the event that the DEPARM ENT stops payment to the LPA, the LPA may suspend work on the project. If this agreement is suspended by the LPA for more than thirty (30) calendar days, consecutive or in aggregate, over the term of this AGREEMENT, the ENGINEER shall be compensated for all services performed and reimbursable expenses incurred as a result of the suspension and resumption of its services, and the ENGINEER's schedule and fees for the remainder of the project shall be equitably adjusted. 6. This AGREEMENT shall continue as an open contract and the obligations created herein shall remain in full force and effect until the completion of construction of any phase of professional services performed by others based upon the service provided herein. All obligations of the ENGINEER accepted under this AGREEMENT shall cease if construction or subsequent professional services are not commenced within 5 years after final payment by the LPA. 7, That the ENGINEER shall be responsible for any and all damages to property or persons arising out of an error, omission and/or negligent act in the prosecution of the ENGINEER's work and shall indemnify and have harmless the LPA, the DEPARTMENT, and their officers, employees from all suits, claims, actions or damages liabilities, costs or damages of any nature whatsoever resulting there from. These indemnities shall not be limited by the listing of any insurance policy. 8, The ENGINEER and LPA certify that their respective firm or agency: (a) has not employed or retained for commission, percentage, brokerage, contingent fee or other considerations, any firm or person (other than a bona fide employee working solely for the LPA or the ENGINEER) to solicit or secure this AGREEMENT, (b) has not agreed, as an express or implied condition for obtaining this AGREEMENT, to employ or retain the services of any firm or person in connection with carrying out the AGREEMENT or (c) has not paid, or agreed to pay any firm, organization or person (other than a bona fide employee working solely for the LPA or the ENGINEER) any fee, contribution, donation or consideration of any kind for, or in connection with, procuring or carrying out the AGREEMENT. (d) that neither the ENGINEER nor the LPA is/are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any Federal department or agency, (e) has not within a three-year period preceding the AGREEMENT been convicted of or had a civil judgment rendered against them for commission of fraud or criminal offense in connection with obtaining, attempting to obtain or performing a public (Federal, State or local) transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property, (f) are not presently indicated for or otherwise criminally or civilly charged by a government entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (e) and (g) has not within a three-year period preceding this AGREEMENT had one or more public transaction (Federal, State or local) terminated for cause or default. Where the ENGINEER or LPA is unable to certify to any of the above statements in this certification, an explanation shall be attached to this AGREEMENT. 9. In the event of delays due to unforeseeable causes beyond the control of and without fault or negligence of the ENGINEER no claim for damages shall be made by either party. Termination of the AGREEMENT or adjustment of the fee for the remaining services may be requested by either party if the overall delay from the unforeseen causes prevents completion of the work within six months after the specified completion date. Examples of unforeseen causes include but are not limited to: acts of God or a public enemy; act of the LPA, DEPARTMENT, or other approving party not resulting from the ENGINEER's unacceptable services; fire; strikes; and floods. If delays occur due to any cause preventing compliance with the PROJECT SCHEDULE, the ENGINEER shall apply in writing to the LPA for an extension of time. If approved, the PROJECT SCHEDULE shall be revised accordingly. 10. This certification is required by the Drug Free Workplace Act (30 ILCS 580). The Drug Free Workplace Act requires that no grantee or contractor shall receive a grant or be considered for the purpose of being awarded a contract for the procurement of any property or service from the DEPARTMENT unless that grantee or contractor will provide a drug free workplace. False certification or violation of the certification may result in sanctions including, but not limited or suspension of contract on grant payments, termination of a contract or grant and debarment of the contracting or grant opportunities with the DEPARTMENT for at least one (1) year but not more than (5) years. For the purpose of this certification, "grantee" or "Contractor" means a corporation, partnership or an entity with twenty-five (25) or more employees at the time of issuing the grant or a department, division or other unit thereof, directly responsible for the specific performance under contract or grant of $5,000 or more from the DEPARTMENT, as defined the Act. The contractor/grantee certifies and agrees that it will provide a drug free workplace by: (a) Publishing a statement: (1) Notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled substance, including cannabis, is prohibited in the grantee's or contractor's workplace. (2) Specifying actions that will be taken against employees for violations of such prohibition. (3) Notifying the employee that, as a condition of employment on such contract or grant, the employee will: (a) abide by the terms of the statement; and (b) notify the employer of any criminal drug statue conviction for a violation occurring in the workplace no later than (5) days after such conviction, (b) Establishing a drug free awareness program to inform employees about: Completed 07/04/22 Page 4 of 11 BLR 05530 (Rev. 08105121) Page 7 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 (1 ) The dangers of drug abuse in the workplace; (2 The grantee: a u, .0 G tors policy to mall,la'r. o .;. ug , (3, Any available drug —,ia=0,y, rehabilitation and c,,r.iuyc�- assistance program; and (4,- The penalties that may be imposed upon an employee for drug violations. (c) F`,a . upy of the iiLiii required by sulbp�. ..Q ,. &,,. (a) to each di i,pluye� engaged in the pti fug i , im r.:t of the .,c j� a, 4 and to post the cfe,t,:n,k: r. 6 i G Ni uu d,N.::i d place in the workplace. (d) Notifying the contracting, or granting agency within ten (10) days after receiving notice under part (b) of pa.ay.api. (3) of subsection (a) above from an or at;.c..yio,-, receiving actual notice of such conviction. (e) Imposing a sanction on, or requiring the satisfactory participation in a drug abuse assistance or rehabilitation program. (f) Assistli. j au : 6u in selecting a course of action in the event drug counseling, treatment and rehabilitation is required and indicating that a trained referral team is in place. Making a good faith effort to continue to maintain a drug free workplace through imp1k-,—od&1AfU„ of the Drug Free Workplace Act, the ENGINEER, LPA and the Department agree to meet the PROJECT SCHEDULE outlined in EXHIBIT B. Time is of the essence on tl15 plojeY:t anu ine ENGINEER's ability to meet the PROJECT SCHEDULE will be a factor in the LPA selecting the ENGINEER for future project. The ENGINEER will submit progress reports with each invoice showing work that was completed during the last ,t., —t:+.y period and work they expect to G"�,,,p;41, curing the following period. 11. Due to the physical location of the project, ra i o,,ai1, classifications may be subject to the Prevailing Wage Act (820 ILCS 130M.01 et seq.). 12. For Construction Engineering Contracts: (a) That all services are to be furnished as required by construction progress and as determined by the LPA employee In Responsible Charge. The ENGINEER shall complete all services herein within a time considered reasonable to the LPA, after the GUN i KAU i un has completed the construction contract. (b) That all field notes, test records and reports shall be turned over to and become the property of the LPA and that during the performance of the engineering services herein provided for, the ENGINEER shall be responsible for any loss ui urai.irayt n, the documents herein enumerated while they are in the ENGINEER's possession and any such loss or damage shall be restored at the ENGINEER's expense, (c) That any difference between the ENGINEER and the LPA , ,, mg the I, dci N. �tal1un of the v, wv;dtu, of this AGREEMENT shall be referred to a committee of disinterested parties consisting of one member awNrllo&,J by the ENGINEER, one Lipp iii,led by the LPA, and a third member appointed by the two othL) W(UHILL1. for ulapoJo,i , and that the committee's decision shall be final. (d) That in the event that engineering and inspection se-a/kc,, tU L,,v Furnished and performed by the LPA (including personnel furnished by the ENGINEER) shall, in the opinion of the STATE be incompetent employed on such work at the expense of the LPA. (e) Inspection of all materials when i, is not provided by the sources by the STATE Central Bureau of Materials, and submit inspection reports to the LPA and STATE in with the STATE Central Bureau of Materials "Project Procedures Guide" and the policies of the STATE, AGREEMENT SUMMARY Prime Consultant TIN/FEIN/SS Number Agreement Amount JKimley-Horn k6-0885615 $78,226.00 Subconsultants TlNn-LIN155 Number Agreement Amount JQuigg Engineering 20-4818431 $43,455.00 JI nterra, Inc. 36-4U40 r 6'0 $7,587.00 Subconsultant Total $517042.00 Prime Consultant Total $78,226.00 Total for all work $129,268.00 Add Subconsultants AGREEMENT SIGNATURES Local Public Agency Type Name of Local Public Agency Attest: TheJcity I ofiEvanston By (Signature & Date) By (Signature & Date) Completes u 1 iu4i22 Page 5 of 11 BLR 05530 (Rev. 08105121) Page 8 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Name of Local Public Agency Local Public Agency Type Title Evanston City Clerk (SEAL) Executed by the ENGINEER: Consultant (Firm) Name Attest: Kim ley -Horn By (Signature & Date) By (Signature & Date) Title Title Senior Vice President Associate Completed07/04/22 Page 6 of 11 BLR 05530 (Rev. 08/05/21) Page 9 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Local Public Agency (City of Evo, -'L.,, s County Section Number I (Cook 1119-00284-90-CH EXHIBIT A SCOPE OF SERVICES To perform or be responsible for me perrurrnaru.6 of the engineering services for the LPA, in connection with the PROJECT herein before described and enumerated below Completed 07/04/22 Page 7 of 11 BLR 05530 (Rev. 08/05/21 ) Page 10 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Ridge Avenue Traffic Signal Improvements Kimley)))Horn Oakton Street to Church Street City of Evanston Phase III - Scope of Services The project involves Ridge Avenue from Oakton Street to Church Street located in the City of Evanston, Cook County. The City is the lead agency forthe project that is funded by Highway Safety Improvement Program (HSIP). The purpose of the project is to construct intersection improvements (Phase III) identified in the plans and specifications prepared by Kimley-Horn in Phase II. The intersections included in the project are as follows: 1. Ridge Avenue and Oakton Street 2. Ridge Avenue and Main Street 3. Ridge Avenue and Greenleaf Street 4. Ridge Avenue and Dempster Street 5. Ridge Avenue and Lake Street 6. Ridge Avenue and Davis Street 7. Ridge Avenue and Church Street Dempster Street is under Illinois Department of Transportation (IDOT) jurisdiction and otherstreets within the project limits are under City jurisdiction. The major construction activities are anticipated to occur in two calendar months starting June 6, 2023 and ending August 5, 2023 when local schools are on summer break. Kimley-Horn and Associates, Inc. ("Kimley-Horn" or "Consultant") is pleased to submit this scope of services for Phase III services to the City of Evanston ("City"). Based on our understanding of the project, we anticipate the following tasks to guide the City through this project: Task 1 —Construction Supervision Construction supervision forthe project will be provided by Quigg Engineering according to IDOT procedures (See attached scope of services by Quigg Engineering). The construction supervision will be provided by an experienced resident engineer. Kimley-Horn staff will be available to answer questions. Task 2—Shoo drawina review The Consultant will obtain shop drawings forthe project from the Contractor. The Consultant will perform a review of shop drawings for completeness before sending them to IDOT forapproval. The Consultant will coordinate with IDOT and contractorto request missing items and ensure timely approval of shop drawings to allow procurement of traffic signal equipment. Task 3—Reauest for Information (RFIJ The Consultant will respond to questions and request for information (RFI). The Consultant will maintain a tracking spreadsheet for RFI to ensure timely resolution of items. Task 4—Material Testinq Material testing will be performed by Interra Inc. (See attached scope of services by Interra Inc.). The Consultant with coordinate construction schedule with Interra Inc. to ensure material testing is scheduled and completed. Page 11 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Ridge Avenue Traffic Signal Improvements Oakton Street to Church Street City of Evanston Phase III - Scope of Services Task 5 —Administration and Manaaement Kimley)))Horn The Consultant will attend two meetings within project corridorevery week forthe duration of construction period of June 6 to August 5, 2023. The meetings will be used to address questions to maintain the aggressive construction schedule. The Consultant will perform project management and administration, including staff and resource scheduling, progress monitoring, monthly invoice and progress reports. The Consultant will hold internal coordination meetings with all pertinent team members to ensure project progress. 2 Page 12 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Local Public Agency County Section Number City of Evo, i-ew, s IICook 1119-00284-00-CH EXHIBIT B PROJECT SCHEDULE Project Letting - September 23, 2022 Begin construction - June 6, 2023 End construction - August 5, 2023 Completed 07/04/22 Page 8 of 11 BLR 05530 (Rev. 08/05/21 ) Page 13 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Local Public Agency County Section Number (City of Evanston IlCook II19-00284-99-CH Exhibit C Direct Costs Check Sheet List ALL direct costs required for this project. Those not listed on the form will not be eligible for reimbursement by the LPA on this project. Item Allowable Lodging Actual cost (per GOVERNOR'S TRAVEL CONTROL BOARD) (Up to state rate maximum) Lodging Taxes and Fees Actual Cost (per GOVERNOR'S TRAVEL CONTROL BOARD) ❑ Air Fare Vehicle Mileage ❑ (per GOVERNOR'S TRAVEL CONTROL BOARD) ® Vehicle Owned or Leased [] Vehicle Rental [] Tolls [] Parking [] Overtime �] Shift Differential [] Overnight Delivery/Postage/Courier Service [] Copies of Deliverables/Mylars (In-house) [] Copies of Deliverables/Mylars (Outside) f] Project Specific Insurance (] Monuments (Permanent) [] Photo Processing [] 2-Way Radio (Survey or Phase III Only) [] Telephone Usage (Traffic System Monitoring Only) CARD [] Web Site [] Advertisements F-] Public Meeting Facility Rental Public Meeting Exhibits/Renderings & Equipment [] Recording Fees [] Transcriptions (specific to project) [] Courthouse Fees [] Storm Sewer Cleaning and Televising []Traffic Control and Protection F Aerial Photography and Mapping F-] Utility Exploratory Trenching Testing of Soil Samples [] Lab Services [] Equipment and/or Specialized Equipment Rental I� I� I� Coach rate, actual cost, requires minimum two weeks' notice, with prior IDOT approval Up to state rate maximum Quantity Contract Rate Total $32.50/half day (4 hours or less) or $65/full day 19 $65.00 $1,235.00 Actual cost (Up to $55/day) Actual cost Actual cost Premium portion (Submit supporting documentation) Actual cost (Based on firm's policy) Actual cost (Submit supporting documentation) Actual cost (Submit supporting documentation) Actual cost (Submit supporting documentation) Actual Cost Actual Cost Actual Cost Actual Cost Actual Cost Actual cost (Max $15/hour) Actual cost (Submit supporting documentation) Actual cost (Submit supporting documentation) Actual cost (Submit supporting documentation) Actual cost (Submit supporting documentation) Actual Cost Actual Cost Actual Cost Actual cost (Requires 2-3 quotes with IDOT approval) Actual cost (Requires 2-3 quotes with IDOT approval) Actual cost (Requires 2-3 quotes with IDOT approval) Actual cost (Requires 2-3 quotes with IDOT approval) Actual Cost Actual Cost (Provide breakdown of each cost) Actual Cost (Requires 2-3 quotes with IDOT approval) Total Direct Costs $1,235.00 Completed 07/04/22 Page 9 of 11 BLR 05530 (Rev. 08105121) Page 14 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Local Public Agency County Section Number City of Ego, i-ew, s IlCook 1119-00284-00-CH Exhibit D Qualification Based Selection (QBS) Checklist The LPA must Exhibit D. If the value meets or will exceed the th-i _, iulU rn 50 ILLS 510, CABS requirements must be followed. Under the threshold, QBS requirements do not apply. The threshold is adjusted annually. If the value is under the threshold with federal funds being used, federal small purchase guidelines must be followed. ❑ Form Not Applicable (engineeriigj se) less than the threshold) Items 1-13 are required when using federal funds and OBS process is applicable. Items 14-16 are required when using State funds and the QBS process is applicable. No Yes 1 Do the written QBS J procedures discuss the initial administration (procurement, management ❑ and administration) concerning erlLdtl refit 11 ry and design related consultant services? 2 Do the written QBS policies and procedures follow the requirements as outlined in Section 5-5 and ❑ specifically Section 5-5.06 (e) of the BLRS Manual? 3 Was the scope of services for this project clearly defined? ❑ 4 Was publiL. I10OLt given for this project? ❑ If yes Due date of submittal 111195119 "ethodls} used for adverli� , 1�1 IL M 11 dates Pioneer Press, Demand Star and City website 5 Do the written QBS policies and procedures coves Gui66uw of interest? ❑ 6 Do the written GIBS policies and procedures use covered methods of verification ft,i and ❑ debarment? 7 Do the written QBS policies and procedures discuss the methods of evaluation? ❑ Project Criteria Weighting - Qualifications and Expertise 30% - Completeness of Proposal 45% . Execute City PSA 10% - MIWIEBE Partlt,,NdG\,, 15%1 Add 8 Do the written QBS policies diiu ProU taures discuss the method of selection? SeieUiu,i uv�r.r»itttee (titles) for thisproiOct Public works agency Director; Senior Project Manger, Tran6pur Wtlur ; Senior Project Manager, St & ROW; Traffic Operations Supervisor; and Purchasing Specialist Top three consultants ranked for this project in order 1 Kimley-Horn 2 Singh and Associates 3 Terra Engineering 9 Was an estimated cost of engineering for this project developed in-house prior to contract 10 Wcn o , ,,,y�fiations for this project performed in accordance with federal requirements. 11 Were acceptable costs for this project verified? 12 Do the written QBS policies and procedures _.�.. and appiuvi,ig fur payment, befo'. Sing t;Pc Pc;%1ur::jl for reimLmtac,,,V„, — IDOT for further review and approval? Do the written QBS policies and procedures cove, and finaYJi,y of the project 13 (monitoring, evaluation, closing -out a contract, records retention, -,I:Ality, remedies to violations or breaches to a contract, and resolution of disputes)? 14 QBS to State requirements used? 15 Existing relationship used in lieu of QBS process? El E El E El M ® ❑ Completed 05/04/22 Page 10 of 11 BLR 05530 (Rev. 08105121) Page 15 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Local Public Agency City of Evanston 16 ILPA is a home rule community (Exempt from QBS). County Cook Section Number 19-00284-00-CH ❑I❑I Completed 05/04/22 Page 11 of 11 BLR 05530 (Rev. 08/05/21) Page 16 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Ridge Avenue Traffic Signal Improvements Ki m I e>>> H o r n Oakton Street to Church Street City of Evanston Phase III - Scope of Services Exhibit E: CECS Worksheet Page 17 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Illinois Department of Transportation EXHIBIT E COST ESTIMATE OF CONSULTANT SERVICES WORKSHEET FIXED RAISE Local Public Agency County Section Number ICity of Evanston I JCook 19-00284-00-CH Consultant (Firm) Name Prepared By Date Kimle -Horn ISa ar Sonar 7/4/2022 PAYROLL ESCALATION TABLE CONTRACT TERM 9 MONTHS START DATE 5/1/2023 RAISE DATE 7/1/2023 END DATE 1/31/20241 ESCALATION PER YEAR Year First Date Last Date Months 0 5/1/2023 7/1/2023 2 1 7/2/2023 2/1 /2024 7 The total escalation = 1.56% OVERHEAD RATE 195.25% COMPLEXITY FACTOR % OF RAISE % of Contract 22.22% 79.33% Printed 7/4/2022 1:32 PM Page 1 of 5 BLR 05514 (Rev. 04/30/21) Payroll Escalation Local Public Agency County Section Number City of Evanston I Cook 119-00284-00-CH MAXIMUM PAYROLL RATE 78.00 ESCALATION FACTORI 1.56%1 PAYROLL RATES Exhibit E Cost Estimate of Consultant Services Worksheet Fixed Raise IDOT CLASSIFICATION PAYROLL RATES CALCULATED RATE ON FILE Principal $77.00 $78.00 $78.00 $70.48 $65.10 $34.71 $36.79 $41.10 $50.19 $70.74 $44.84 $37.32 $39.64 $30.32 Project Manager $76.85 Senior Project Engineer $69.40 Project Engineer $64.10 Design Engineer 1 $34.18 Design Engineer 2 $36.23 Design Engineer 3 $40.47 Design Engineer 4 $49.42 Senior Landscape Architect $69.66 Senior Designer $44.15 Designer $36.75 Admin. Assistant $39.03 Secretary/Clerical $29.86 BLR 05514 (Rev. 04/30/21) Payroll Rates Printed 7/4/2022 1:32 PM Page 2 of 5 Page19 of40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Local Public Agency County Section Number City of Evanston ICook 119-00284-00-CH SUBCONSULTANTS Exhibit E Cost Estimate of Consultant Services Worksheet Fixed Raise Total 17,608.00 1,760.80 BLR 05514 (Rev. 04/30/21) Subconsultants Printed 7/4/2022 1:32 PM Page 3 of 5 Page 20 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Local Public Agency City of Evanston v N 0 C) OVERHEAD RATE TASK Construction supervision Shop drawing review RFI Material Testing Admin & Mgmt 0 0 0 rn 00 C7 m w N_ W U7 Cn 00 DD C) N 0 0 OD Subconsultant DL ao TOTALS 0 4 co 0 0 0 N 00 (D v v, CL County Cook COST ESTIMATE WORKSHEET Exhibit E Cost Estimate of Consultant Services Worksheet Fixed Raise 195.25%1 COMPLEXITY FACTOR STAFF HOURS PAYROLL 16 24 4 276 320 805 1,247 197 20,669 22,918 67,666 Section Number 19-00284-00-CH 0 OVERHEAD & FRINGE BENEFITS - 1,572 2,435 385 40,356 44,748 I DIRECT COSTS I FIXED FEE 266 412 65 6,821 1,761 9,325 I SEOT ERSRVICES BY 43,455 I TOTAL 43,455 2,643 4,094 8,234 69,081 1,761 129,268 7,587 1,235 1,235 51,042 % OF GRAND TOTAL 33.62% 2.04% 3.17% 6.37% 53.44% 1.36% 100.00% BLR 05514 (Rev. 04/30/21) Cost Estimate Worksheet Printed 7/4/2022 1:32 PM Page 4 of 5 Local Public Agency Cky of Evanston v N N 0 0 County I kook AVERAGE HOURLY PROJECT RATES Exhibit E Cost Estimate of Consultants Services Worksheet Fixed Raise PAYROLL AVG TOTAL PROJ. RATES HOURLY Hours % CLASSIFICATION RATES Part. Principal 78.00 0.0 Section Number 1 19-DB284-OD-CH SHEET 1 OF 1 Construction supervision shop drawing review RFI Material Testing ^dmin & Mc mt Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Avg Part. Avg Part. Avg Part. Avg Part. Avg Part, Avg Project Manager 78.00 265.0 82.81 % 64,59 Senior Project Engineer 70,48 0.0 _ Project Engineer 65,10 0,0 NINE - Design Engineer 1 34.71 0.0 i Design Engineer 2 36.79 17.0 5.31 % 1,95 Design Engineer 3 41,10 22.0 6,88% 2,83 _ Design Engineer 4 50,19 8.0 2,50% 1,25 Senior Landscape Architec 70,74 0.0 _ Senior Designer 44A4 0.0 Designer 37,32 0.0 i Admin. Assistant 39.64 8.0 2,50% 0.99 _ Secretary/Clerical 30.32 0.0 _ I 0 00 m w r¶ 00 N (C) W A v 38 TOTALS 4 0 cm 0 0 N 00 (D v V1 Q 0.0 _ 0.0 M. 0.0 _ 0.0 0.0 0.0 �. 0.0 _ 0.0 0-0 0.0 0.0 0.0 0.0 0.0 d 25.00%❑ 19.50 8 33,33% 26.00 SEEN RL ,M M N% 33.33% 75,009/o 30,82 IML 33,33% SEEN- '.MEMO SEEN- 101111111111[ MEMO �- NONE[ M NONE[ M I1M1MM[ .M 12.26 13,70 1 ,. 25,00% 19,50 I� 1 25.00% 9.20 2 50,00% 20.55 II� II� 252 91.30% 71.22 1 III. in 8, § 2.90% 2,90% SEEK 2.90% OPW lip 320.0 100% $71.62 0.0 0,00% $0.00 16.0 100% $50.32 24.0 100% $51.96 4.0 100% $49.25 276.0 100% $74,891 Printed 7J412022 1:32 PM Page 5 of 5 BLR 35514 (Rev. 04/30/21) Avg Hourly 1 Ridge Avenue Traffic Signal Improvements Oakton Street to Church Street City of Evanston Phase III - Scope of Services K i m I ey'>\/\/ H o r n Exhibit F: Subconsultant Scope and CECS Page 23 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Ridge Avenue Traffic Signal Improvements Ki m I e>>> H o r n Oakton Street to Church Street City of Evanston Phase III - Scope of Services Quigg Engineering Inc. Page 24 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 111 S. Wacker Dr., Suite 3910 CIE -Chicago, Illinois 60606 L Phone: 312-235-6783 URL: www.quiggengineering.com QUIGG ENGINEERING INC SCOPE OF SERVICES Construction Inspection Services for the Traffic Signal Improvement City of Evanston, Illinois The Quigg Engineering, Inc. team has the skills, knowledge, and ability to effectively manage and coordinate all Phase III services for the City of Evanston's Traffic Signal and ADA Ramp Improvement. Quigg proposes the following scope of services to ensure that the improvement is completed on -time and under budget while exceeding professional construction management industry standards: Pre -Construction: 1. Coordinate contact with City representatives to establish a working relationship and to discuss all areas of concern. 2. Phase II design plans and other supporting documents. 3. Update the contact list in the project Special Provisions with names, affiliation, addresses, email addresses and phone numbers of personnel assigned to the project including the City, utilities, railroads, emergency response teams, schools and any other identified entities of interest. 4. Review site with plans in -hand to determine if any change conditions exist since plan submittal. 5. Document all removal items. 6. In conjunction with the City, determine what level of public outreach may be needed to advise residents, businesses, and motorists of stages of work and identify the methods and responsibilities of this public outreach. 7. Call for a utility meeting to determine if any conflicts exist and determine if relocates that may be needed are going to occur in the needed time frame. Arrange for progress meetings as needed 8. Set up field books and review quantities and other pay items. 9. Attend Pre -Construction Conference 10. Review progress schedule and milestone dates to verify manpower assignments, supplier delivery dates, utility clearance, staging changes, and public notices. 11. Aid in setting up regular meetings between the contractor, City, and Utilities (if needed.) Construction: 1. Review all construction submittals, request for information (RFI) and contract modifications. 2. Conduct project meetings with appropriate staff: i.e. City of Evanston Engineer, Resident Engineer, General Contractor's representative(s) and any other personnel required to review and compile all procedures to be used on project. 3. Inspect, document and report maintenance of traffic control. 4. Spot check contractor staking/ layout as required. 5. Perform construction inspection and material testing work in accordance with IDOT procedures and the following IDOT publications: • Project Contract, Plans and Special Provisions • IDOT Construction Manual Page 25 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75dl7 • Standard Specifications for Road and Bridge Construction • Supplemental Specifications and Recurring Special Provisions as identified in the construction contract • Construction Memorandums • Construction Inspection Check List 6. Maintain daily records of contractor's activities and progress. 7. Prepare all required partial and final pay estimates, change orders, records, documentation and reports required by the City and State. Post -Construction: 1. Coordinate final inspection that includes all responsible parties. 2. Supervise corrections of any items of concern identified during said inspection. 3. Create as -built plans to correctly reflect constructed project. 4. Provide final project documents within a reasonable time. Key personnel: 1. A Project Manager who will be responsible for all aspects of the work documents (must be an Illinois Licensed Professional Engineer) 2. A Resident Inspector — responsible for daily operations of inspection and documentation of contract pay items, knowledgeable in specifications, the IDOT Construction Manual including the Construction Inspectors Checklists, and other IDOT manuals and guides. Page 26 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 EXHIBIT E v m N v 0 C) 0 Illinois Department of Transportation COST ESTIMATE OF CONSULTANT SERVICES WORKSHEET FIXED RAISE Local Public Agency County Section Number ICity of Evanston lCook 1 119-00284-00-CH Consultant (Firm) Name Prepared By Date IQuigg Engineering, Inc. jKurt Horton, PE 1 16/20/2022 PAYROLL ESCALATION TABLE CONTRACT TERM 3 MONTHS START DATE 6/1/2023 RAISE DATE 7/1/2023 END DATE 8/31/20231 ESCALATION PER YEAR Year First Date Last Date Months 0 6/1 /2023 7/1 /2023 1 1 7/2/2023 9/1 /2023 2 The total escalation = 1.33% OVERHEAD RATE 134.64% COMPLEXITY FACTOR 0 % OF RAISE % of Contract 33.33% 68.00% Printed 6/20/2022 10:43 AM Page 1 of 4 BLR 05514 (Rev. 04/30/21) Payroll Escalation Local Public Agency County Section Number City of Evanston I Cook 1 19-00284-00-CH MAXIMUM PAYROLL RATE 78.00 ESCALATION FACTOR 1.33%1 PAYROLL RATES Exhibit E Cost Estimate of Consultant Services Worksheet Fixed Raise CLASSIFICATION ENGR IV ENGR III Administrative Principal IDOT PAYROLL RATES ON FILE $56.00 $43.30 $64.98 CALCULATED RATE $56.75 $43.88 $65.85 BLR 05514 (Rev. 04/30/21) Payroll Rates Printed 6/20/2022 10:43 AM Page 28 of 40 Page 2 of 4 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Local Public Agency City of Evanston v N co o OVERHEAD RATEI TASK Construction Inspection Project Management Project Administration 0 0 0 rn 6 m w r� rn N Q0 0 OD v ob Q 0° Subconsultant DL 0 TOTALS 00 cD 4 v, 0_ County Cook COST ESTIMATE WORKSHEET Exhibit E Cost Estimate of Consultant Services Worksheet Fixed Raise 134.64%I COMPLEXITY FACTORI STAFF HOURS 324 15 3 342 PAYROLL 14,216 851 198 15,265 35,818 OVERHEAD & DIRECT COSTS FRINGE BENEFITS 19,141 2,405 1,146 1 195 266 20,553 2,600 OI FIXED FEE SERVICES BY OTHERS 4,691 281 65 0 5,037 - Section Number 19-00284-00-CH TOTAL % OF GRAND TOTAL 40,453 93.09% 2,473 5.69% 529 1.22% 43,455 100.00% BLR 05514 (Rev. 04/30/21) Cost Estimate Worksheet Printed 6/20/2022 10:43 AM Page 3 of 4 Local Public Agency City of Evanston v CD w 0 C C PAYROLL AVG HOURLY CLASSIFICATION RATES ENGR IV 56.75 ENGR III 43.88 Administrative Principal 65.85 TOTALS 0 0 4 0 (D 0 0 N 0 (D v CTI County Cook AVERAGE HOURLY PROJECT RATES Exhibit E Cost Estimate of Consultants Services Worksheet Fixed Raise Section Number 1 19-00284-00-CH SHEET 1 OF TOTAL PROJ. RATES Construction Inspection Project Management Project Administration Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Part. Avg Part. Avg Part. Avg Part. Avg Part. 15.0 4.39% 2.49 15 ' 100.00% 56.75 - 324.0 94.74% 41.57 324 100.00% 43.88 , - 3.0 0.88% 0.58 3 M 100.00% 65.85 - 0.0 mom - 0.0 AML - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 - 0.0 0.0 342.0 100% $44.63 324.0 100.00% $43.88 15.0 100% $56.75 3.0 100% $65.85 0.0 0% Wgtd I Hours Avg $0.00 I 0.0 1 % Wgtd Part. Avg 0% $0.00 BLR 05514 (Rev. 04/30/21) Printed 6/20/2022 10:43 AM Page 4 of 4 Avg Hourly 1 q�J Illinois Department of Transportation Direct Costs Check Sheet COMPANY NAME: Quigg Engineering PTB NUMBER: 19-00284-00-CH TODAY'S DATE: 6/20/2022 BOARD) Lodging (per GOVERNOR'S TRAVEL CONTROL BOARD) Lodging Taxes and Fees (per GOVERNOR'S TRAVEL CONTROL BOARD) Air Fare Vehicle Mileage (per GOVERNOR'S TRAVEL CONTROLBOARD) Vehicle Owned or Leased Vehicle Rental Tolls Parking Overtime Shift Differential Overnight Delivery/Postage/Courier Service Copies of Deliverables/Mylars (In-house) Copies of Deliverables/Mylars (Outside) Project Specific Insurance Monuments (Permanent) Photo Processing 2-Way Radio (Survey or Phase III Only) Telephone Usage (Traffic System Monitoring Only) CADD Web Site Advertisements Public Meeting Facility Rental Public Meeting Exhibits/Renderings & Equipment Recording Fees Transcriptions (specific to project) Courthouse Fees Storm Sewer Cleaning and Televising Traffic Control and Protection Aerial Photography and Mapping Utility Exploratory Trenching Testing of Soil Samples* Lab Services* Equipment and/or Specialized Equipment Rental* to state rate maximum Actual cost (Up to state rate maximum) Actual cost Coach rate, actual cost, requires minimum two weeks' notice, with prior IDOT approval Up to state rate maximum $32.50/half day (4 hours or less) or $65/full day Actual cost (Up to $55/day) Actual cost Actual cost Premium portion (Submit supporting documentation) Actual cost (Based on firm's policy) Actual cost (Submit supporting documentation) Actual cost (Submit supporting documentation) Actual cost (Submit supporting documentation) Actual cost Actual cost Actual cost Actual cost Actual cost Actual cost (Max $15/hour) Actual cost (Submit supporting documentation) Actual cost (Submit supporting documentation) Actual cost (Submit supporting documentation) Actual cost (Submit supporting documentation) Actual cost Actual cost Actual cost Actual cost (Requires 2-3 quotes with IDOT approval) Actual cost (Requires 2-3 quotes with IDOT approval) Actual cost (Requires 2-3 quotes with IDOT approval) Actual cost (Requires 2-3 quotes with IDOT approval) Actual cost Actual cost (Provide breakdown of each cost) Actual cost (Requires 2-3 quotes with IDOT approval) TOTAL DIRECT CO *If other allowable costs are needed and not listed, please add in the above spaces provided. LEGEND W.O. = Work Order X 1 40 28.00 $0.00 75.00 $0.00 $9.75 $0.00 $0.00 $0.00 $0.00 $2,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 PRINTED 6/20/2022 BDE 436 (Rev. 02/02/17) Page 31 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Ridge Avenue Traffic Signal Improvements Oakton Street to Church Street City of Evanston Phase III - Scope of Services K i m I ey'>\/\/ H o r n I nterra Inc. Page 32 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 INTERRA, INC. 600 Territorial Dr, Suite G, Bolingbrook, IL 60440 Scope of Services — Materials Testing Ridge Avenue Route: FAU 2744 Section: 19-00284-00-CH County: Cook City of Evanston PROJECT TEAM The Key Project Personnel are as listed below: Principal Engineer/ PM: Anshuman Balekai, P.E. Reporting Staff Engineers: Anna Dudziak, Srivani Guntaka Administrative Assistant: Samantha Mejia Laboratory Testing: Bipin Patel Material Field Testers: TBD SCOPE OF WORK General scope of the services includes quality assurance testing in the field & laboratory testing for curb & gutter, sidewalks, driveways, and light pole foundations. The number of field testing trips will be determined by the client (Kimley-Horn) to satisfy the quality assurance requirements and Interra's field technician will be scheduled accordingly. The required materials testing services include field testing for cast -in -place concrete for temperature, slump, air content, and laboratory compressive strength in our MOT approved laboratory; and the preparation and submittal in a timely manner of all test results and reports using the IDOT's QMP package for reporting. Our testing and inspection scope will be completed in accordance with the Plans, Project Specifications and the IDOT 2022 SSRBC (Standard Specs for Road & Bridge Construction). All report work will be completed and submitted on MOT Forms in accordance with project requirements. Page 33 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 EXHIBIT E v m w 0. 0 0 Illinois Department of Transportation COST ESTIMATE OF CONSULTANT SERVICES WORKSHEET FIXED RAISE Local Public Agency County Section Number ICity of Evanston lCook 1 119-00284-00-CH Consultant (Firm) Name Prepared By Date Interra, Inc. lAnshuman Balekai 4/25/2022 PAYROLL ESCALATION TABLE CONTRACT TERM 2 MONTHS START DATE 6/1/2022 RAISE DATE 1/1/2023 END DATE 7/31/20221 ESCALATION PER YEAR OVERHEAD RATE 144.85% COMPLEXITY FACTOR 0 % OF RAISE % of Year First Date Last Date Months Contract 0 6/1 /2022 7/31 /2022 2 100.00% The total escalation = 0.00% Printed 4/25/2022 12:52 PM Page 1 of 11 BLR 05514 (Rev. 04/30/21) Payroll Escalation Local Public Agency County Section Number City of Evanston kook 119-00284-00-CH MAXIMUM PAYROLL RATE 78.00 ESCALATION FACTOR 0.00% PAYROLL RATES Exhibit E Cost Estimate of Consultant Services Worksheet Fixed Raise BLR 05514 (Rev. 04/30/21) Payroll Rates Printed 4/25/2022 12:52 PM Page 2 of 11 Page 35 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 Local Public Agency City of Evanston CD w 0 C) OVERHEAD RATE TASK Project Management Materials Quality Assurance Testing Project Engineering Reporting and Administrative 0 a 0, ;D w N :n ;n 00 w N N 00 a x 0 J v 00 o Subconsultant DL 00 TOTALS m CTI 0_ Printed 4/25/2022 12:52 PM County Cook COST ESTIMATE WORKSHEET Exhibit E Cost Estimate of Consultant Services Worksheet Fixed Raise 144.85%I COMPLEXITY FACTOR STAFF HOURS 4 32 6 10 52 PAYROLL 312 1,543 228 260 2,343 5,738 Section Number 19-00284-00-CH 01 F INGOVERHEAD BENEFITS 452 2,236 330 377 3,395 Page 4 of 11 I DIRECT COSTS I FIXED FEE 103 509 75 86 0 773 I SERVICE SBY I TOTAL % O TOTAL ND 867 11.43% 5,364 70.70% 633 8.34% 723 9.53% 7,587 100.00% BLR 05514 (Rev. 04/30/21) Cost Estimate Worksheet 1,076 1,076 Local Public Agency County City of Evanston I JCook AVERAGE HOURLY PROJECT RATES w Exhibit E Cost Estimate of Consultants Services Worksheet Fixed Raise Section Number 1 19-00284-00-CH o SHEET 1 OF 0 Materials Quality Reporting and PAYROLL AVG TOTAL PROJ. RATES Project Management Assurance Testing Pro ect Engineering Administrat ve HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours CLASSIFICATION RATES Part. Avg I Part. Avg Part. Avg Part. Avg Part. Avg Principal Engineer 78.00 4.0 7.69% 6.00 rl 1 100.00% 78.00 Materials Technician 48.23 32.0 61.54% 29.68I 32 1100.00% 48.23 Staff Engineer (Reports) 38.00 6.0 11.54% 4.381 6 100.00% 38.00 Administrative Assistant 26.02 10.0 19.23% 5.00 I 10 100.00% 26.02 0 0 0 --W, 00 {D w 4 0 (D 0 0 N 00 (D v V1 Q 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1 % Wgtd I Part. Avg 52.0 100% $45.07 1 4.0 1 100.00% $78.001 32.0 1 100% $48.231 6.0 1 100% $38.00 1 10.0 1 100% $26.02 1 0.0 1 0% $0.00 1 BLR 05514 (Rev. 04/30/21) Printed 4/25/2022 12:52 PM Page 5 of 11 Avg Hourly 1 Illinois Department of Transportation Direct Costs Check Sheet COMPANY NAME: Interra Inc. PTB NUMBER: 19-00284-00-CH TODAY'S DATE: 4/30/2022 Per Diem (per GOVERNOR'S TRAVEL CONTROL BOARD) Lodging (per GOVERNOR'S TRAVEL CONTROL BOARD) Lodging Taxes and Fees (per GOVERNOR'S TRAVEL CONTROL BOARD) Air Fare Vehicle Mileage (per GOVERNOR'S TRAVEL CONTROLBOARD) Vehicle Owned or Leased Vehicle Rental Tolls Parking Overtime Shift Differential Overnight Delivery/Postage/Courier Service Copies of Deliverables/Mylars (In-house) Copies of Deliverables/Mylars (Outside) Project Specific Insurance Monuments (Permanent) Photo Processing 2-Way Radio (Survey or Phase III Only) Telephone Usage (Traffic System Monitoring Only) CADD Web Site Advertisements Public Meeting Facility Rental Public Meeting Exhibits/Renderings & Equipment Recording Fees Transcriptions (specific to project) Courthouse Fees Storm Sewer Cleaning and Televising Traffic Control and Protection Aerial Photography and Mapping Utility Exploratory Trenching Testing of Soil Samples* Lab Services* Equipment and/or Specialized Equipment Rental* Up to state rate maximum cost (Up to state rate maximum) Actual cost Coach rate, actual cost, requires minimum two weeks' notice, with prior IDOT approval Up to state rate maximum $32.50/half day (4 hours or less) or $65/full day Actual cost (Up to $55/day) Actual cost Actual cost Premium portion (Submit supporting documentation) Actual cost (Based on firm's policy) Actual cost (Submit supporting documentation) Actual cost (Submit supporting documentation) Actual cost (Submit supporting documentation) Actual cost Actual cost Actual cost Actual cost I cost I cost (Max $15/hour) I cost (Submit supporting documentation) I cost (Submit supporting documentation) I cost (Submit supporting documentation) I cost (Submit supporting documentation) Icost Icost Icost I cost (Requires 2-3 quotes with IDOT approval) I cost (Requires 2-3 quotes with IDOT approval) I cost (Requires 2-3 quotes with IDOT approval) I cost (Requires 2-3 quotes with IDOT approval) Icost I cost (Provide breakdown of each cost) I cost (Requires 2-3 quotes with IDOT approval) I TOTAL DIRECT COA *If other allowable costs are needed and not listed, please add in the above spaces provided. LEGEND 1 $0.00 $0.00 $0.00 $0.00 $0.000 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1, 076.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1, 076.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 PRINTED 5/1/2022 EDE 436 (Rev. 02/02/17) Page 38 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17 �J Illinois Department of Transportation Direct Costs Check Sheet W.O. = Work Order J.S. = Job Specific COMPANY NAME: Interra Inc. PTB NUMBER: 19-00284-00-CH TODAY'S DATE: 4/30/2022 UTILIZE W.O. ONLY J.S. ONLY PRINTED 5/1/2022 Page 39 of 40 BIDE 436 (Rev. 02/02/17) Doc ID: 968be321655f89c29c8947f80771890c28e75d17 city of Memorandum Evanston" To: Edgar Cano, Acting Director Public Works Lara Biggs, P.E. Bureau Chief — Capital Planning / City Engineer Sat Nagar, Senior Project Manager From: Tammi Nunez, Purchasing Manager Subject: Resolution 57-R-22 Local Public Agency Engineering Services Agreement with Kimley-Horn and Illinois Department of Transportation (IDOT) for the Ridge Avenue Traffic Signal Improvement Project, (RFQ 19-44) Date: August 8, 2022 The goal of the Minority, Women and Evanston Business Enterprise Program (M/W/EBE) is to assist such businesses with opportunities to grow. In order to help ensure such growth, the City's goal is to have general contractors utilize M/W/EBEs to perform no less than 25% of the awarded contract. With regard to the recommendation for Resolution 57-R-22 Local Public Agency Engineering Services Agreement with Kimley-Horn and Illinois Department of Transportation (IDOT) for the Ridge Avenue Traffic Signal Improvement Project, RFQ 19-44, Kimley-Horn & Associates, total base bid is $129,268.00 and they are found to be in compliance with the City's goal. They will receive credit for 39.49% M/W/EBE participation. Name of M/W/EBE Scope of Work Contract Amount % MBE WBE EBE Quigg Engineering, Inc. Inspection $43,455.00 33.62% X 111 S. Wacker Drive Services Suite 3910 Chicago, IL 60606 Interra, Inc. Material $7,587.00 5.87% X 600 Territorial Drive Testing Suite G Bolingbrook, IL 60440 Total M/W/EBE $51,042.00 39.49% cc: Hitesh Desai, Chief Financial Officer Resolution 57-R-22 Traffic Signal Improvement, RFQ 19-44, M/W/EBE Memo 08.8.2022 Page 40 of 40 Doc ID: 968be321655f89c29c8947f80771890c28e75d17