HomeMy WebLinkAboutResolution 208-R-26 Authorizing the City Manager to Execute Change Order No. 2 to the Agreement with A. Epstein _amp; Sons International- Inc
09/14/2026
208-R-26
A RESOLUTION
Authorizing the City Manager to Execute Change Order No. 2 to the
Agreement with A. Epstein & Sons International, Inc. for Phase II
Design Engineering Services for the Chicago Avenue Corridor
Improvements (RFQ 20-35)
WHEREAS, the City of Evanston is undertaking the Chicago Avenue
Corridor Improvements Project to provide multimodal transportation improvements
along Chicago Avenue from Howard Street to Davis Street; and
WHEREAS, on September 14, 2020, the City Council approved a
professional engineering services agreement with A. Epstein & Sons International, Inc.
for Phase I Engineering Services for the Chicago Avenue Corridor Improvements
Project; and
WHEREAS, on August 26, 2024, the City Council approved Amendment
No. 1 to the agreement to provide Phase II Design Engineering Services for the project;
and
WHEREAS, the City Council subsequently approved Change Order No. 1
for additional Phase II Engineering Services associated with modifications to the
corridor design, including parking revisions and fiber optic infrastructure; and
WHEREAS, as the project has advanced through Phase II Engineering,
additional design requirements have been identified through continued design
Page 1 of 43
208-R-26
development, field investigation, stakeholder coordination, and review by the Illinois
Department of Transportation and other agencies; and
WHEREAS, as the project has advanced through Phase II Engineering,
additional design requirements have been identified through continued design
development, field investigation, stakeholder coordination, and review by the Illinois
Department of Transportation and other agencies; and
WHEREAS, these additional requirements include engineering services
associated with Phase I reevaluation and environmental coordination, traffic signal and
interconnect improvements, agency-required traffic analysis, intersection design,
electrical and security infrastructure, lighting modifications, supplemental survey, and
civil design revisions; and
WHEREAS, A. Epstein & Sons International, Inc. has submitted a
proposal to provide the additional Phase II Engineering Services for a total not -to-
exceed amount of One Hundred Nineteen Thousand Three Hundred Fifty -One Dollars
($119,351.00); and
WHEREAS, Change Order No. 2 will increase the contract amount by
One Hundred Nineteen Thousand Three Hundred Fifty-One Dollars ($119,351.00) to
provide the additional engineering services necessary to advance the project toward
completion of Phase II Engineering; and
WHEREAS, the City Council has determined that approving Change
Order No. 2 is in the best interests of the City.
Page 2 of 43
208-R-26
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF
THE CITY OF EVANSTON, COOK COUNTY, ILLINOIS:
SECTION 1: The foregoing recitals are hereby found to be true and
correct and are incorporated herein as though fully set forth.
SECTION 2: The City Council hereby authorizes the City Manager to
execute Change Order No. 2 to the agreement with A. Epstein & Sons International, Inc.
for Phase II Design Engineering Services for the Chicago Avenue Corridor
Improvements (RFQ 20-35), increasing the contract amount by $119,351.00, in
substantially the form attached hereto and approved as to form by the Corporation
Counsel.
SECTION 3: The City Manager, Corporation Counsel, City Clerk, and
other appropriate City officials are hereby authorized and directed to execute all
documents and take all actions necessary to carry out the intent of this Resolution.
SECTION 4: If any provision of this Resolution is declared invalid or
unenforceable by a court of competent jurisdiction, such determination shall not affect
the validity of the remaining provisions.
SECTION 5: This Resolution shall be in full force and effect from and after
its passage and approval in the manner provided by law.
_______________________________
Daniel Biss, Mayor
Attest:
_______________________________
Stephanie Mendoza, City Clerk
Approved as to form:
_______________________________
Alexandra B. Ruggie, Corporation Counsel
Adopted: __________________, 2026
Page 3 of 43
September 14
ITEM C1
SUPPORTING
DOCUMENTATION
Page 4 of 43
August 31, 2026
Mr. Chris Sous, PE, PTOE, PTP, CFM
Assistant City Engineer
City of Evanston
909 Davis Street
Evanston, IL 60201
Dear Chris,
As requested, enclosed are the scope and fees for the A. Epstein and Sons International,
Inc. (Epstein) team to provide additional Phase II Engineering services to the City of
Evanston for the improvement of Chicago Avenue from Howard Street to Davis Street.
Materials include scope of work and engineering fees by firm. The breakdown of fees
between the prime and subconsultants are as shown below:
Epstein (Prime) $ 55,775
Christopher B. Burke Engineering $ 63,576
Project Total $ 119,351
If you have questions or require additional information, please do not hesitate to contact
me at 312-429-8093 or jkarlovitz@epsteinglobal.com.
Sincerely,
John Karlovitz, P.E.
Project Manager
Epstein
Enclosure
cc: Sat Nagar, City of Evanston
Martin Michalowicz, CBBEL
PN 19218
Page 5 of 43
August 31, 2026
SUPPLEMENT #3
SCOPE OF SERVICES
Epstein and Christopher B. Burke Engineering, Ltd. (CBBEL) are requesting consideration
for an amendment to our professional construction engineering service agreement. The
amendment is for completion of the following services:
Epstein Tasks
Task E.1 – (Phase I Reevaluation and PESA response)
During the Phase II Kicko. Meeting, IDOT requested three items be completed before
Phase II design could proceed. Phase I Design Approval had been issued prior to
concurrence from the IDOT Geometrics and Environmental Units. Following receipt of the
initial Design Approval, the Geometrics Unit approved the South Boulevard Intersection
Design Study (IDS) and IDOT issued the Preliminary Environmental Site Assessment
(PESA). Upon receipt of the PESA, IDOT required the IDS concurrence, an extensive PESA
Response for inclusion in the Phase I Reevaluation, as well as resubmittal of the previously
approved Cultural Clearance using a new form.
Task E.2 Temporary Tra.ic Signals
The original tra.ic signal scope included full replacement of three signals at
Chicago/Kedzie, Chicago/South Boulevard, and Chicago/Howard. The scope was later
expanded to include a signal interconnect. A field review determined the existing
controllers at Chicago/Greenleaf and Chicago/Main are incompatible with the proposed
interconnect, requiring controller replacement rather than the originally scoped signal
modernization. This requires temporary signals and controllers during construction at both
intersections, resulting in additional design, calculations, and coordination not included in
the original scope.
Task E.3 CDOT Coordination
The original scope did not include a Synchro Analysis and Tra.ic Signal Requirement plan
as required by CDOT during the CDOT kicko. meeting and as part of the overall review
process. This will result in further design, calculations and coordination e.orts.
Page 6 of 43
August 31, 2026
Task E.4 Dempster IDS
The original understanding was the City of Evanston maintained Dempster Street. After the
Phase II kicko. meeting it was discovered IDOT never signed the Jurisdictional Transfer and
Dempster Street is still under the Jurisdiction of IDOT. This requires the submission of an
Intersection Design Study (IDS), truck turning movements and ADA sidewalk exhibits at
intersection of Chicago Ave./Dempster St.
CBBEL Tasks
Task C.1 – Electrical – Fiber/Security
During the design development of the security camera system, the number of security
cameras increased from the original design concept. Originally, cameras were to be
installed at 12 signalized intersections along Chicago Avenue as stated in the September
3,2025 Proposal for Supplemental Professional Engineering Services. The initial camera
locations were all at signalized intersection. The number of cameras increased to
approximately 40 with the additional cameras being placed between signalized
intersections. The additional cameras were instructed to be placed in between signalized
intersections which weren’t part of the initial supplement. This was added during the
design process after the supplement was executed. The additional cameras a.ected
circuit lengths, electrical loading, and voltage drop calculations, resulting in further design
revisions and coordination e.orts. Supplemental field survey was also required because
several of the street lighting systems serving the cameras were located outside the original
project limits and were not included in the initial survey e.ort.
Task C.2 – Electrical - Photometrics
The original Phase 1 and Phase 2 photometric reports did not include a piggyback
luminaire, as this fixture was added after submission of the original Phase 2 report.
Additional e.ort was required to revise the project photometric analyses and lighting
calculations. In accordance with IDOT requirements, any modification to the lighting
system or fixture configuration necessitates updates to the photometric reports and
supporting calculations. Consequently, revised analyses and documentation were
prepared and submitted to reflect the final lighting design.
Page 7 of 43
August 31, 2026
Task C.3 – Additional Survey
The additional survey work was required to provide su.icient topographic and
infrastructure information to support the expanded design limits and project development
needs. The supplemental survey also provided the detailed information necessary to
evaluate existing drainage patterns, verify compliance with ADA accessibility requirements,
and develop proposed roadway profile adjustments as shown at each location on the
attached exhibit. These profile refinements were critical to achieving appropriate tie-ins
with Chicago Avenue and accommodating the viaducts along the western edge of the
Chicago Avenue corridor while maintaining acceptable grades and drainage. All additional
survey is within the Phase 1 approved ESR limits.
The total additional distance for this task is approximately 2,250 LF.
Task C.4 – Civil
The project included unanticipated redesign related to the Trader Joe’s site access and
driveway configuration, requiring additional engineering analysis, plan revisions, and
coordination. The City of Evanston met with Trader Joe’s and the circulation into and out of
Trader Joe’s parking was revised. This in turn caused pavement marking and lane
reconfiguration within Chicago Ave. This also included various AutoTurn truck analysis and
design impacts due to confined space and Trader Joe’s logistics.
Page 8 of 43
September 3, 2025
City of Evanston
Public Works Department
2100 Ridge Avenue
Evanston, IL 60201
Attention: Sat Nagar, PE – Senior Project Manager
Subject: Proposal for Supplemental Professional Engineering Services
Chicago Avenue Corridor Project
Evanston, Illinois
Dear Mr. Nager:
Christopher B. Burke Engineering, Ltd. (CBBEL) is pleased to submit this proposal for
supplemental professional engineering services related to the Chicago Avenue Corridor
project located on Chicago Avenue between Howard Street and Davis Street. The requested
engineering services will include the installation of IT Network fiber optic cable and
infrastructure for future camera nodes along Howard Street from Callan Avenue to Paulina
Street, Chicago Avenue from Howard Street to Church Street, and then along Church Street
to terminate into the existing IT Network fiber optic handhole located adjacent to the City of
Evanston Public Library. Included in this proposal is our Scope of Services and Fee Estimate.
UNDERSTANDING OF THE ASSIGNMENT
CBBEL understands the City of Evanston is seeking to expand their IT Network fiber optic
cable and plan for future surveillance camera installations along the Chicago Avenue corridor
at major intersections. As mentioned above, the IT Fiber Optic network will include conduit
and cabling along: Howard Street from Callan Avenue to Paulina Street, Chicago Avenue from
Howard Street to Church Street, and then along Church Street to terminate into the existing
IT fiber optic handhole located adjacent to the City of Evanston Public Library. This
supplemental agreement includes the data collection, existing record drawing reviews, plan
development, and modification to the Chicago Avenue Corridor project bid set to include this
work in the contract. The future camera installations will be planned for the signalized
intersections along Chicago Avenue which include: Church Street, Davis Street, Grove Street,
Lake Street, Greenwood Street, Dempster Street, Greenleaf Street, Main Street, Kedzie
Street, South Boulevard, Howard Street, as well as Howard Street and Paulina Street. See
Exhibit 1 for the project location map. Additional conduit between identified light poles will be
installed at each signalized intersection to eventually power the future cameras from the traffic
signal cabinet. All ethernet switches, camera installations, service cables, and additional
camera poles with NEMA enclosures (if needed) would be installed under future contracts.
It states that future cameras
will be planned for these
specific signalized
intersections.
During design it was
increased to 37.
Page 9 of 43
Page 2 of 2
SCOPE OF SERVICES
CBBEL proposes the following services to assist the City in the expansion of their IT Fiber
Optic Network:
Task 1 – Data Collection and Field Reconnaissance: CBBEL will request and review the
existing record drawings from the City regarding the previous fiber installation at the Library
site and at the Howard Street termination locations. Field Reconnaissance will be conducted
to determine the best routing for the IT network conduit and to field locate adjacent City IT
Network infrastructure on Howard Street and at the Library.
Task 2 – Utility Coordination: CBBEL will conduct additional utility coordination as needed for
the roadway segments that are outside of the current project limits. Hours have been included
for requesting, tracking/coordination, and drafting utilities into the project’s base files.
Task 3 – IT Fiber Optic Cable Installation Plan Sheets: With the updated utility information
and field data, CBBEL will develop base files using aerial imagery for the identified project
corridor. CBBEL will design the conduit routing and handhole placement on the aerial images
and create plan sheets. Standalone camera poles, fiber optic terminations and splicing will
be called out on the sheets as well.
Task 4 – Modification to Traffic Signal Plans for Future Camera Nodes: The traffic signal
plans will reference in the IT Network conduit system with additional conduit between the
traffic signal cabinet and light pole(s) to be utilized to power future camera installations near
the signalized intersection. These modifications include labeling additional raceways to
nearby light poles, conduit fill calculations and modified light pole details as needed.
Task 5 – Quantities and Specs: This task includes all fiber optic cable and infrastructure
special provisions for the project. City of Evanston special provisions will be used as
applicable. In addition, CBBEL will provide an engineer’s opinion of probable construction cost
estimate for the fiber optic work with each PS&E submittal.
Task 6 – Coordination with City and IT Department: This task includes additional hours for
coordinating the fiber optic installation plans with the City and IT Department. Time has been
included for revising the plans based on the City’s comments.
We estimate the fee for these services to be $44,916.00 as outlined on the attached Cost
Estimate Worksheet. If you have any questions, don’t hesitate to contact us.
Sincerely,
Michael E. Kerr, PE
President
Encl: Cost Estimate of Consultant Services Worksheet
Location Map
N:\PROPOSALS\ADMIN\2023\Evanston Chicago Avenue (SUB TO EPSTEIN)\Supplement_Aug 2025\Evanston_IT Fiber Installation_Camera
Nodes.docx
Page 10 of 43
City of Evanston
2100 Ridge Avenue
Evanston, IL 60201
Public Library
Fiber Terminations
Proposed IT
Network Fiber
Chicago Ave @
Church St
Chicago Ave @
Davis St
Chicago Ave @
Grove St
Chicago Ave @
Lake St
Chicago Ave @
Greenwood St
Chicago Ave @
Dempster St
Chicago Ave @
Greenleaf St
Chicago Ave @
Main St
Chicago Ave @
Kedzie St
Chicago Ave @
South Blvd
Chicago Ave @
Howard St
Howard St @
Paulina St
Howard St @
Callan Ave
Fiber Terminations
N
240623
08/28/2025
Legend:
Signalized Intersection
Page 11 of 43
200+00 201 202HOWARD
STREET
HOWARD
STREET
WO
L
C
O
T
T
AV
E
N
U
E
CL
Y
D
E
AV
E
N
U
E
WI
N
C
H
E
S
T
E
R
AV
E
N
U
E
CA
L
L
A
N
AV
E
N
U
E
CU
S
T
E
R
AV
E
N
U
E
DA
M
E
N
AV
E
N
U
E
SCALE: 1" = 50'
0 50 100
PTZPTZ
TO EXISTING LIGHT POLE
VIDEO SYSTEM (1 EACH) MOUNTED
PROPOSED REMOTE CONTROLLED
70'-CNC-2"
448'-CNC-2"
10'-CNC-2"
358'-CNC-2"
TO EXISTING LIGHT POLE
VIDEO SYSTEM (1 EACH) MOUNTED
PROPOSED REMOTE CONTROLLED
210+00208209 HOWARD
STREET
PAU
LINA
STREE
T
HOWARD
STREET
PAU
LINA
STREET
PTZ PTZ
PTZ
211'-CNC-2"
288'-CNC-2"
TO EXISTING LIGHT POLE
VIDEO SYSTEM (1 EACH) MOUNTED
PROPOSED REMOTE CONTROLLED
5'-CNC-2"
5'-CNC-2"
TO EXISTING LIGHT POLE
VIDEO SYSTEM (1 EACH) MOUNTED
PROPOSED REMOTE CONTROLLED
278'-CNC-2"2'-CNC-2"EXISTING LIGHT POLE
(1 EACH) MOUNTED TO
CONTROLLED VIDEO SYSTEM
PROPOSED REMOTE
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
USER NAME =
PLOT DATE =DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS STA. TO STA.
-
-
-
-
-
-
-
-
CONTRACT NO.
SCALE:
STATE OF ILLINOIS
DEPARTMENT OF TRANSPORTATION
N:
\
E
V
A
N
S
T
O
N
\
2
4
0
6
2
3
\
C
A
D
D
_
S
h
e
e
t
s
\
D
1
_
2
4
0
6
2
3
_
S
H
T
_
T
S
-
P
l
a
n
.
d
g
n
FI
L
E
N
A
M
E
:
IT
N
e
t
w
o
r
k
0
1
MO
D
E
L
:
bgunnells
4/1/2026 TRF-33
2853 21-00288-00-R5 COOK 228
CHICAGO AVENUE FROM HOWARD ST. TO CHURCH ST.
(SHEET 1 OF 6)
FIBER OPTIC CABLE INSTALLATION PLAN
(SEE
NEXT SHEE
T
)
M
ATCH LINE B - B
(S
E
E
N
E
X
T
S
H
E
E
T
)
MA
T
C
H
L
I
N
E
A
-
A
187
CONSTRUCTION NOTES:
DETAILS.
REFER TO LIGHING PLANS FOR PROPOSED LIGHT POLE FOUNDATION
VIDEO SYSTEM.
SHALL BE INCLUDED IN THE UNIT COST FOR: REMOTE CONTROLLED
THE REMOTE CONTROLLED VIDEO SYSTEM FULLY OPERATIONAL
ALL FIBER SPLICES AND TERMINATIONS REQUIRED TO MAKE 1
2
ADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ORIGINAL
SUPPLEMENT
Page 12 of 43
20
5
+00
210
+00
10+00
15+00
20+00
WV
WV
W
GGM
WV
G
W
W
W
W
GM
GV
WV
WV
WV
WV
WV
WV
W
20
5
+00
20
3
20
4
20
6
20
7
21
0
+00
21
1
10+00
15+00 20+00
9
11 12 13 14 16 17 18 19 21 22 23
HO
W
ARD
STREE
T
CHICAGO AVENUE
CHICAGO AVENUE
JUN
EW
AY
TE
RR
ACE
SCALE: 1" = 50'
0 50 100
130'-CNC-2"
11'-CNC-2"
508'-CNC-2"
50'-CNC-2"
35'-CNC-2"295'-CNC-2"
6'-CNC-2"
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
PTZ
PTZ
PTZ
PTZ
TO EXISTING LIGHT POLE
VIDEO SYSTEM (1 EACH) MOUNTED
PROPOSED REMOTE CONTROLLED
146'-CNC-2"
5'-CNC-2"
218'-CNC-2"
PTZ
3'-CNC-2"
TO EXISTING LIGHT POLE
VIDEO SYSTEM (1 EACH) MOUNTED
PROPOSED REMOTE CONTROLLED
JJ
PROPOSED JUNCTION BOX (2) EACH
33'-CNC-2"
84'-CONDUIT ATTACHED TO STRUCTURE-2"
10'-CNC-2"
25+00 30+00 35+00
WV
WV
W
GM
WV
WV
25+00 30+00 35+00242627282931323334 36 37
CHICAGO AVENUE CHICAGO AVENUE
MULFORD
STREE
T
368'-CNC-2"570'-CNC-2"
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
3'-CNC-2"
588'-CNC-2"
8'-CNC-2"
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
PTZ
PTZ
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
USER NAME =
PLOT DATE =DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS STA. TO STA.
-
-
-
-
-
-
-
-
CONTRACT NO.
SCALE:
STATE OF ILLINOIS
DEPARTMENT OF TRANSPORTATION
N:
\
E
V
A
N
S
T
O
N
\
2
4
0
6
2
3
\
C
A
D
D
_
S
h
e
e
t
s
\
D
1
_
2
4
0
6
2
3
_
S
H
T
_
T
S
-
P
l
a
n
.
d
g
n
FI
L
E
N
A
M
E
:
IT
N
e
t
w
o
r
k
0
2
MO
D
E
L
:
bgunnells
6/2/2026 TRF-34
2853 21-00288-00-R5 COOK 228
CHICAGO AVENUE FROM HOWARD ST. TO CHURCH ST.
(SHEET 2 OF 6)
FIBER OPTIC CABLE INSTALLATION PLAN
MA
T
C
H
L
I
N
E
C
-
C
MA
T
C
H
L
I
N
E
C
-
C
(S
E
E
N
E
X
T
S
H
E
E
T
)
MA
T
C
H
L
I
N
E
D
-
D
(SEE PREVIOUS SHEET)
MATCH LINE B - B
(SEE PREVIOUS SHEET)
MATCH LINE A - A
188
CONSTRUCTION NOTES:
REFER TO LIGHING PLANS FOR PROPOSED LIGHT POLE FOUNDATION DETAILS.
OPERATIONAL SHALL BE INCLUDED IN THE UNIT COST FOR: REMOTE CONTROLLED VIDEO SYSTEM.
ALL FIBER SPLICES AND TERMINATIONS REQUIRED TO MAKE THE REMOTE CONTROLLED VIDEO SYSTEM FULLY 1
2
ADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ORIGINAL
SUPPLEMENT
ORIGINAL
SUPPLEMENT
Page 13 of 43
24
0
+00
40+00
45+00
50+00
WV
WV
WVWV
WV
GV WV
WV
WV
WV
WV
WV
WV
WV
WV
WV
WW
22
1
22
2
22
3
22
4
24
0+00
24
1
40+00
45+00
50+00
38
39
41
42
43
44
46
47
48 49 51 52
SOUTH
BLVD.
CHICAGO AVENUE
CHICAGO AVENUE
KEE
NEY
STREE
T
SCALE: 1" = 50'
0 50 100
387'-CNC-2"
3'-CNC-2"
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
170'-CNC-2"
79'-CNC-2"
22'-CNC-2"
PTZ
PTZ
PTZ
PTZ
3'-CNC-2"
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
PTZ
3'-CNC-2"
570'-CNC-2"
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
356'-CNC-2"
26
0
+00
55+00
60+00
65+00
28
5+00
WV
WV
WV
GV
WV
WV
WV
WV
WV
WV
WV
WV
WV
GV
W
WV
WV
GV
VP
WV WV
WV
W
W
WV
W
GV
WV
WV
WV
WV
WV WV
W
WV
W
WV
WM
GV
GV
GM
VP
25
2
25
3
25
4
26
0
+00
261
55+00
60+00
65+00
53 54 56 57 58 59
61 62 63 64
66
271
27
2
27
3
28
5+00
28
3
284
286
M
ADISON
STREE
T
KEDZIE
STREE
T
W
ASHINGTON
STREE
T
CHICAGO AVENUE
CHICAGO AVENUE
MAIN
STREE
T
410'-CNC-2"
49'-CNC-2"
PTZ
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
7'-CNC-2"
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
18'-CNC-2"
PTZ
PTZ
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
3'-CNC-2"400'-CNC-2"
24" DIA., TYPE A, FOUNDATION (4' DEPTH)
PROPOSED 22' TRAFFIC SIGNAL POST (1 EACH)
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
PTZ
293'-CNC-2"10'-CNC-2"
407'-CNC-2"
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
USER NAME =
PLOT DATE =DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS STA. TO STA.
-
-
-
-
-
-
-
-
CONTRACT NO.
SCALE:
STATE OF ILLINOIS
DEPARTMENT OF TRANSPORTATION
N:
\
E
V
A
N
S
T
O
N
\
2
4
0
6
2
3
\
C
A
D
D
_
S
h
e
e
t
s
\
D
1
_
2
4
0
6
2
3
_
S
H
T
_
T
S
-
P
l
a
n
.
d
g
n
FI
L
E
N
A
M
E
:
IT
N
e
t
w
o
r
k
0
3
MO
D
E
L
:
bgunnells
6/2/2026 TRF-35
2853 21-00288-00-R5 COOK 228
CHICAGO AVENUE FROM HOWARD ST. TO CHURCH ST.
(SHEET 3 OF 6)
FIBER OPTIC CABLE INSTALLATION PLAN
MA
T
C
H
L
I
N
E
E
-
E
MA
T
C
H
L
I
N
E
E
-
E
(S
E
E
P
R
E
V
I
O
U
S
S
H
E
E
T
)
MA
T
C
H
L
I
N
E
D
-
D
(S
E
E
N
E
X
T
S
H
E
E
T
)
MA
T
C
H
L
I
N
E
F
-
F
189
CONSTRUCTION NOTES:
REFER TO LIGHING PLANS FOR PROPOSED LIGHT POLE FOUNDATION DETAILS.
FULLY OPERATIONAL SHALL BE INCLUDED IN THE UNIT COST FOR: REMOTE CONTROLLED VIDEO SYSTEM.
ALL FIBER SPLICES AND TERMINATIONS REQUIRED TO MAKE THE REMOTE CONTROLLED VIDEO SYSTEM 1
2
ADDITIONAL
LOCATIONADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ORIGINAL
SUPPLEMENT
ORIGINAL
SUPPLEMENT
ORIGINAL
SUPPLEMENTORIGINAL
SUPPLEMENT
Page 14 of 43
70+00
75+00
80+00
30
0+00
315
+00
WV
W
GV
GM
W
WV
W
W
WGV
WV
GV
WV
WV
GV
WV
WV
W
W
WV
WV
WV
W
WV
WV
W
W
W
W
WV
W
W
WV
W
W
W
W
W
W
GM
GV
W
W
W
W
GV W
W
GV
GM
GV
WV
70+00
75+00
80+00
67 68 69
71 72 73 74
76 77 78 79
81
30
0
+00
30
1
31
5
+00
31
1
31
2
313
314
LE
E
STREE
T
GREE
NLE
AF
STREE
T
CHICAGO AVENUE
CHICAGO AVENUE
SCALE: 1" = 50'
0 50 100
292'-CNC-2"
300'-CNC-2"
PTZ
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
10'-CNC-2"
PTZ
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
3'-CNC-2"
PTZ
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
52'-CNC-2"
480'-CNC-2"
PTZ
65'-CNC-2"
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
PTZ
105'-CNC-2"
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
85+00
90+00
95+00
32
0
+00
33
5
+00
WV
GV
WW
WV
W
WV
W
GV
WV
WV
WV
WV
W
W
GV W
GV
W
WV
WM
GV
WV
WV
GV
GV
WV
WV
W
W WV
WV
WV
WV
WV
WV
85+00
90+00
95+00
82
83
84
86
87 88 89 91 92 93 94
32
0
+00
32
1
33
5
+00
33
2
33
3
334
HA
M
ILT
O
N
STREE
T
CHICAGO AVENUE
DEM
PS
TE
R
STREE
T
391'-CNC-2"214'-CNC-2"
584'-CNC-2"
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
PTZ
52'-CNC-2"
PTZ
12'-CNC-2"
PTZ5'-CNC-2"
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
75'-CNC-2"
71'-CNC-2"
150'-CNC-2"
16'-CNC-2"
PTZ
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
PTZ
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
USER NAME =
PLOT DATE =DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS STA. TO STA.
-
-
-
-
-
-
-
-
CONTRACT NO.
SCALE:
STATE OF ILLINOIS
DEPARTMENT OF TRANSPORTATION
N:
\
E
V
A
N
S
T
O
N
\
2
4
0
6
2
3
\
C
A
D
D
_
S
h
e
e
t
s
\
D
1
_
2
4
0
6
2
3
_
S
H
T
_
T
S
-
P
l
a
n
.
d
g
n
FI
L
E
N
A
M
E
:
IT
N
e
t
w
o
r
k
0
4
MO
D
E
L
:
bgunnells
6/2/2026 TRF-36
2853 21-00288-00-R5 COOK 228
CHICAGO AVENUE FROM HOWARD ST. TO CHURCH ST.
(SHEET 4 OF 6)
FIBER OPTIC CABLE INSTALLATION PLAN
MA
T
C
H
L
I
N
E
G
-
G
(S
E
E
P
R
E
V
I
O
U
S
S
H
E
E
T
)
MA
T
C
H
L
I
N
E
F
-
F
(S
E
E
N
E
X
T
S
H
E
E
T
)
MA
T
C
H
L
I
N
E
H
-
H
M
ATCH LINE G - G
190
CONSTRUCTION NOTES:
REFER TO LIGHING PLANS FOR PROPOSED LIGHT POLE FOUNDATION DETAILS.
FULLY OPERATIONAL SHALL BE INCLUDED IN THE UNIT COST FOR: REMOTE CONTROLLED VIDEO SYSTEM.
ALL FIBER SPLICES AND TERMINATIONS REQUIRED TO MAKE THE REMOTE CONTROLLED VIDEO SYSTEM 1
2
ADDITIONAL
LOCATIONADDITIONAL
LOCATIONADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ADDITIONAL
LOCATIONADDITIONAL
LOCATION
ORIGINAL
SUPPLEMENT
ORIGINAL
SUPPLEMENT
ORIGINAL
SUPPLEMENT
Page 15 of 43
BUS
95+00
100+00
105+00
355+00
36
5
+00
WV
WV
WV
GV
WWV
WV
WV
GV
GVWV
WV
GV
WV
WV
H
W
H
WV
H
H
H
WV
WV
W
W
WV
WV
W
WV W WV
GV
W
GV
WVWV
WV
WV
WV
95+00
100+00
105+00
96
97
98
99
101
102 103 104
106
107
108
109
341
34
2
34
3
34
4
35
5
+00
35
2
35
3
35
4
36
5
+00
36
2
36
3
36
4
CHICAGO AVENUE
GREE
NW
OO
D
STREE
T
LAK
E
STREE
T
CHICAGO AVENUE
GROVE
STREE
T
114'-CNC-2"
542'-CNC-2"
5'-CNC-2"
VIDEO SYSTEM (1 EACH)PROPOSED REMOTE CONTROLLED
PTZ
638'-CNC-2"
PTZ
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
SYSTEM (1 EACH)
CONTROLLED VIDEO
PROPOSED REMOTE
PTZ
45'-CNC-2"
PTZ
167'-CNC-2"
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
248'-CNC-2"
PTZ
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
54'-CNC-2"
315'-CNC-2"
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
USER NAME =
PLOT DATE =DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS STA. TO STA.
-
-
-
-
-
-
-
-
CONTRACT NO.
SCALE:
STATE OF ILLINOIS
DEPARTMENT OF TRANSPORTATION
N:
\
E
V
A
N
S
T
O
N
\
2
4
0
6
2
3
\
C
A
D
D
_
S
h
e
e
t
s
\
D
1
_
2
4
0
6
2
3
_
S
H
T
_
T
S
-
P
l
a
n
.
d
g
n
FI
L
E
N
A
M
E
:
IT
N
e
t
w
o
r
k
0
5
MO
D
E
L
:
bgunnells
6/2/2026 TRF-37
2853 21-00288-00-R5 COOK 228
CHICAGO AVENUE FROM HOWARD ST. TO CHURCH ST.
(SHEET 5 OF 6)
FIBER OPTIC CABLE INSTALLATION PLAN
(SEE NEXT SHEET)
MATCH LINE I - I(SEE
PREVIOU
S SHEE
T
)
MATCH LINE H - H
191
CONSTRUCTION NOTES:
DETAILS.
REFER TO LIGHING PLANS FOR PROPOSED LIGHT POLE FOUNDATION
VIDEO SYSTEM.
SHALL BE INCLUDED IN THE UNIT COST FOR: REMOTE CONTROLLED
THE REMOTE CONTROLLED VIDEO SYSTEM FULLY OPERATIONAL
ALL FIBER SPLICES AND TERMINATIONS REQUIRED TO MAKE 1
2
SCALE: 1" = 50'
0 50 100
ADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ADDITIONAL
LOCATION
ORIGINAL
SUPPLEMENT
Page 16 of 43
STOPBUS
110+00
115+00
37
5
+00
WV
GV
W
WV
WV WV
GM
110+00
115+00
111 112 113 114
37
5
+00
37
4
37
6
37
7
DA
V
IS
STREE
T
CHU
RCH
STREE
T
CHICAGO AVENUE CHICAGO AVENUE
ORRINGTON AVENUE
CHU
RC
H
STREE
T
585'-CNC-2"
193'-CNC-2"
5'-CNC-2"
PTZ
VIDEO SYSTEM (1 EACH)
PROPOSED REMOTE CONTROLLED
97'-CNC-2"
SECTION COUNTY
ILLINOIS FED. AID PROJECT
TOTAL
SHEETS
SHEET
NO.RTE.
USER NAME =
PLOT DATE =DATE
DESIGNED
CHECKED
DRAWN
REVISED
REVISED
REVISED
REVISED
F.A.
SHEET OF SHEETS STA. TO STA.
-
-
-
-
-
-
-
-
CONTRACT NO.
SCALE:
STATE OF ILLINOIS
DEPARTMENT OF TRANSPORTATION
N:
\
E
V
A
N
S
T
O
N
\
2
4
0
6
2
3
\
C
A
D
D
_
S
h
e
e
t
s
\
D
1
_
2
4
0
6
2
3
_
S
H
T
_
T
S
-
P
l
a
n
.
d
g
n
FI
L
E
N
A
M
E
:
IT
N
e
t
w
o
r
k
0
6
MO
D
E
L
:
bgunnells
6/2/2026 TRF-38
2853 21-00288-00-R5 COOK 228
CHICAGO AVENUE FROM HOWARD ST. TO CHURCH ST.
(SHEET 6 OF 6)
FIBER OPTIC CABLE INSTALLATION PLAN
(S
E
E
P
R
E
V
I
O
U
S
S
H
E
E
T
)
MA
T
C
H
L
I
N
E
I
-
I
SCHEDULE OF QUANTITIES
192
CONSTRUCTION NOTES:
DETAILS.
REFER TO LIGHING PLANS FOR PROPOSED LIGHT POLE FOUNDATION
VIDEO SYSTEM.
SHALL BE INCLUDED IN THE UNIT COST FOR: REMOTE CONTROLLED
THE REMOTE CONTROLLED VIDEO SYSTEM FULLY OPERATIONAL
ALL FIBER SPLICES AND TERMINATIONS REQUIRED TO MAKE 1
2
SCALE: 1" = 50'
0 50 100
ORIGINAL
SUPPLEMENT
Page 17 of 43
ITEM C3
SUPPORTING
DOCUMENTATION
Page 18 of 43
Revised March 25, 2024
1
City of Evanston
Chicago Avenue
Task 1A – Supplemental Topographic Survey
CBBEL will perform additional Topographic Survey of Chicago Avenue, from Davis
Street to Howard Avenue for use in Design Engineering Services. This will supplement
the previous survey completed during Phase I and include the survey of underground
utilities. CBBEL will perform the following survey tasks if necessary:
The survey will be used as a base map for design purposes. Included are the
following survey tasks:
Horizontal Control: CBBEL will recover and verify existing primary control utilizing
state of the art GPS equipment based on NGS Control Monumentation.
Vertical Control: CBBEL will recover and verify existing benchmarks and confirm
elevations on existing horizontal control points. This will be based on GPS observed
NGS Control Monumentation (NAVD’88 vertical control datum).
Existing Right-of-Way: CBBEL will update the approximate existing right-of-way of
the roadways within the project limits based on monumentation found in the field,
plats of highways, subdivision plats and any other available information.
Topographic Survey: CBBEL will field locate all pavements, driveways, curb and
gutters, pavement markings, signs, manholes, utility vaults, drainage structures,
utilities, driveway culverts, cross road culverts, etc. for areas not originally surveyed
within the project limits. CBBEL will establish all rim and invert elevations, utility sizes
& type, depth subterranean structure, etc., at all points of access to below-grade
utilities.
Cross Sections: CBBEL will survey cross sections along the project limits at 50’
intervals, at driveways, and at all other grade controlling features. Survey will be
obtained in areas not originally surveyed.
Tree Survey: CBBEL will locate all trees not previously located over 6” inches in
diameter within the existing right-of-way for the project in order to assess potential tree
impacts, if any, associated with the project. The located trees will be identified by
species (deciduous or coniferous) and the size and condition determined as appropriate.
Utility Survey and Coordination: All existing storm and sanitary sewers will be
surveyed to determine rim and invert elevations and pipe sizes. Above ground
facilities of any additional underground utilities including water main, gas, electric,
cable, etc. will also be located.
Base Mapping: CBBEL will compile all of the above information onto one base map
at 1”=20’ scale that is representative of existing conditions for use as the base sheet
for the construction of any public or private infrastructure subsequent to the findings
of engineering/drainage analysis.
Limits of survey
Page 19 of 43
Revised March 25, 2024
2
*NOTE: No land acquisition is anticipated. Boundary/Land Acquisition Survey,
Plats of Easement, and Right-of-Way/Plat of Highway Scope of Services are not
included in this proposal.
Task 1B – Julie Utility Coordination
CBBEL will continue previous coordination with JULIE to retrieve atlas information for all
applicable underground utilities including water main, gas, electric, cable, etc. CBBEL
will also collect City atlases and include this info in base mapping. CBBEL will compile
all Utility Atlas information into the base map. Locations of existing utilities /obstructions /
systems shown on the base map are the compilation of available utility plans provided
by utility owners and JULIE Utility Coordination. All utilities /obstructions / systems may
not be shown. Contractor shall be responsible for locating and protecting all
underground utilities /obstructions / systems whether or not shown on base map. JULIE
Utility Coordination Atlas information is typically isolated to Public Right-of-Way (off-site)
& limited areas adjacent to Public Right-of-Way. Identification & location of all private
subsurface utilities within project area (on-site) is the responsibility of the client.
Task 4 - Plans – Dempster Street to Davis Street
CBBEL will prepare full plans for Chicago Avenue from just south of Dempster Street
(Station 85+50) to Davis Street (Station 110+00). At a minimum, the sheets will include
the following:
Sheet Title
Estimate
# of
Sheets
Estimated Hours
Summary of Quantities 1 40 hr./sheet
Alignment, Ties, Benchmark 2 16 hr./sheet
Typical Sections 1 24 hr./sheet
Maintenance of Traffic General Notes
and Typical Sections 2 16 hr./sheet
MOT Stage 1 (1” = 40’) 2 16 hr./sheet
MOT Stage 2 (1” = 40’) 2 16 hr./sheet
Removal Plans (1” = 20’) 5 16 hr./sheet
Proposed Plans (1” = 20’) 5 40 hr./sheet
Erosion Control Plans (1” = 40’) 1 12 hr./sheet
Pavement Marking and Signage Plans (1” = 20’) 3 24 hr./sheet
Total 24 556 Hours
In addition to the plans, CBBEL will assist Epstein with preparing and assembling
quantities, specifications and estimates of time and cost.
Task 5 – Plans – Traffic Signals
CBBEL will prepare pre-final and final traffic signal plans, technical specifications, and
an engineer’s cost estimate for the modifications of the existing traffic signal installations
at five (5) intersections along Chicago Avenue. The plans will be developed based on
current and applicable IDOT, City of Evanston and MUTCD design criteria and
standards.
Page 20 of 43
Revised March 25, 2024
3
The five (5) intersections along the project limits that are scoped to have the existing
traffic signals to be modified are listed below (from north to south):
- Chicago Avenue and Davis Street (modification)
- Chicago Avenue and Grove Street (modernized)
- Chicago Avenue and Lake Street (modification)
- Chicago Avenue and Greenwood Street (modification)
- Chicago Avenue and Dempster Street (modification)
Field Reconnaissance and Data Collection: CBBEL obtain the existing traffic
signal record plans at the eight intersections. This will be supplemented by
existing plan data and CBBEL will conduct a field reconnaissance of the existing
traffic signal equipment at each signalized intersection to verify the existing traffic
signal equipment data and layout.
Base Sheet Preparation: CBBEL will prepare base sheets in MicroStation at a
scale of 1 in = 20 ft for the temporary traffic signal and traffic signal modification
plans using the project’s topographic survey, maintenance of traffic staging plans,
and the proposed roadway geometry layout.
Existing Traffic Signal Removal Plans: Existing traffic signal removal plans will be
required for each of the eight intersections. A list of existing traffic signal
equipment items to be removed, relocated (if necessary), or returned to the
maintaining highway agency will be provided with notes. One traffic signal
removal plan sheet will be required per existing signalized intersection.
Temporary Traffic Signal Installation Plans: Temporary traffic signal installation
plans will not be required for each of the five (5) intersections. It is assumed that
the MOT will not require temporary traffic signal installations.
Traffic Signal Modification Plans, Cable Plans, and Illuminated Street Name
Signs: The five existing traffic signal installations will be modified with additional
signal equipment as necessary. Each intersection will require a minimum of three
(3) plan sheets for the installation plan, cable plan, and illuminated street name
sign detail sheet. All additional traffic signal equipment will be new. New traffic
signal equipment may include (and is not limited to) new handholes, new cables,
new posts, new combination mast arm assemblies, new traffic signal indications,
new pedestrian signal heads, new accessible pedestrian signals, bike signals,
new emergency vehicle preemption equipment, new service installation, new
illuminated street name signs, and new full-actuated controller and cabinet with a
new uninterruptible power supply unit. All new traffic signal equipment will be
designed using current IDOT, City of Evanston, and MUTCD standards.
The modification plan sheet will depict the conduit and foundation design of the
new traffic signal equipment. Also shown on the modification plan sheet will be
the location of the vehicle detection zones, posts and combination mast arm
assemblies, and service location. The second sheet will show the cable plan
which will include the controller sequence, emergency vehicle preemption
sequence, and wattage requirements for the proposed electrical service.
Page 21 of 43
Revised March 25, 2024
4
The third sheet will show the illuminated street name sign details and the
schedule of quantities for the traffic signal improvements at the intersection.
Technical Specifications, Quantities, and Opinion of Probable Cost: Technical
specifications employing IDOT and/or City of Evanston special provisions to the extent
that they apply will be assembled. Pay items will be identified along with quantities for
each pay item. An engineer’s opinion of probable construction cost will be prepared
based on the traffic signal and interconnect system schedule of quantities.
The plan sheets for the contents described in this task will include three
anticipated review submittals (Preliminary, Pre-Final, and Final) to the reviewing
Highway Agency. The following plan sheets will be included in each review
submittal (estimated number of sheets shown in parentheses):
IDOT District 1, Standard Traffic Signal Design Details (8 sheets)
Remove Existing Traffic Signal Equipment Plans (4 sheets)
Temporary Traffic Signal Installation Plans (30 sheets)
Temporary Cable Plans and Temporary Phase Sequence Diagrams
(30 sheets)
Traffic Signal Modification Plans (5 sheets)
Cable Plans and Phase Sequence Diagrams (5 sheets)
Illuminated Street Name Sign Details and Schedule of Quantities (5 sheets)
Temporary Interconnect Plans and Schematics (5 sheets)
Proposed Interconnect Plans, Schematics, and Schedule of Quantities
(5 sheets)
Task 6– Plans – Lighting
Project Understanding
The lighting improvements will include complete removal and replacement of all street
lighting components (poles, foundations, conduit, controllers, etc.) along Chicago from
Howard Street to Davis Street. Intersection lighting improvements will also include the
following signalized intersections:
- Chicago Avenue and South Boulevard
- Chicago Avenue and Kedzie Street
- Chicago Avenue and Main Street
- Chicago Avenue and Greenleaf Street
- Chicago Avenue and Dempster Street
- Chicago Avenue and Greenwood Street
- Chicago Avenue and Lake Street
- Chicago Avenue and Grove Street
- Chicago Avenue and Davis Street
- Chicago Avenue and Howard Street
The proposed lighting units will consist of a spun aluminum pole with 8-foot davit arm
and LED cobra head type luminaire mounted at 30 feet; and a fluted aluminum pole with
post top Tallmadge LED luminaire mounted at 16 feet.
Davit arm poles are proposed for the segment between Howard Street and South
Boulevard.
Page 22 of 43
Revised March 25, 2024
5
A combination of alternating davit arm poles and Tallmadge poles are proposed on the
east side of the street for the segment from South Boulevard to Kedzie Street.
A combination of alternating davit arm poles and Tallmadge poles are proposed on both
the east and west sides of the street for the segment from Kedzie Street to Davis Street.
Across the street from every davit pole will be a Talmage pole in this section.
Temporary lighting will be provided at all intersections where signal improvements are
proposed.
A power supply detail will be provided at 1245 Chicago Avenue between the bike lane
and parking lane.
Preliminary (Photometric) Submittal
CBBEL will meet with the appropriate personnel as required to determine the minimum
lighting requirements, preferred lighting equipment and obtain existing lighting
information. CBBEL will perform site visit to obtain information regarding the existing
field conditions.
Based on the information collected, lighting photometric calculations will be performed
for the proposed lighting. The calculations will determine the proposed lighting levels for
the roadway and intersections. The photometric calculations will be performed using the
last version of AGI32 photometric software.
We understand these photometric calculations to include the following:
Proposed photometric calculations for each individual roadway multi-lane cross
section including sidewalk horizontal illuminance calculations.
Proposed and temporary photometric calculations for signalized intersections.
Based on the photometric calculations and existing/proposed field conditions, a
proposed light pole layout will be determined, field verified, and incorporated into a
preliminary set of lighting plans. A Preliminary lighting submittal report will be created
including a project description, target lighting levels with justification, photometric
calculations, and cut sheets of the proposed lighting equipment. The preliminary report
will be submitted along with the preliminary plans for review.
Prefinal and Final Submittal
Upon approval from the reviewing agencies, temporary/removal/proposed roadway
lighting plans/detail sheets and specifications will be prepared. The plan sheets will
include the locations of the lighting units along with electric cables/raceways, controllers
and hand holes. Detail drawings will include light pole and luminaire, concrete
foundation, lighting controller(s) cabinet/ component schedule/ wiring diagram, pole
handhole wiring diagram, one-line circuit diagram, handhole and conduit installation
details. Detailed specifications will be prepared along with the appropriate standards.
Voltage drop calculations and opinion of probable construction cost and summary of
quantities will also be performed and submitted under this task. The detailed prefinal
design will be submitted for review. CBBEL will also coordinate and meet with the
electric utility to determine location for new electric service to the proposed lighting
controller(s) under this task.
Page 23 of 43
Revised March 25, 2024
6
Task 7 – Deputy Project Management and QA/QC
CBBEL (Mike Kerr) will provide Deputy Project Management duties throughout the
duration of Phase II. Additionally, CBBEL will provide a detailed QA of the traffic signals
designed by Epstein.
N:\PROPOSALS\ADMIN\2023\Evanston Chicago Avenue\Scope of Work_Evanston Chicago Avenue.032524.doc
Page 24 of 43
7'
10
'
10
'
3'
8'
10
'
10
'
3'
8'
MULFORD ST.
10
'
10
'
11
'
8'
8'
25'25'
50
'R
50
'R 50
'R
50'R
CHICAGO AVE.
JUN
EW
AY
TE
R.
CHICAGO AVE.
PR ON-STREET PARKING
PR B-6.12 CURB & GUTTER
EX CURB & GUTTER TO BE REMOVED
PR � CHICAGO AVENUE
20'R 20'R
5'R 5'R
PR SB BUS STOP
PR B-6.12 CURB & GUTTER
EX CURB & GUTTER TO BE REMOVED
PR � CHICAGO AVENUE
PR B-6.12 CURB & GUTTER
EX CURB & GUTTER TO BE REMOVED
8'
9'
46' (1:28 TAPER)
PR RAISED CROSSWALK
PR SIDEWALK
PR B-6.12 CURB & GUTT
EX CURB & GUTTER TO B
PR RAISED ISLAND
14
'
14
'
1'
6'
5'
9'
15'R
CDOT everything east of CL
CDOT paying for lights S of here
- BOARDING ISLAND
PR NB BUS STOP(TYP)
TREE REMOVAL
603
603
604
604
604
60
4
604
604
605
60
5
605
606
606
607
607
608
608
608608
609
60
6
.53
60
6
.65
60
6
.94
60
6
.94
60
7
.23
60
7
.23
60
7
.37
60
7
.13
60
6
.87
60
5
.46
60
5
.55
60
6
.03
60
6
.03
60
6
.23
60
6
.23
60
6
.14
60
5
.52
60
5
.55
60
6.12
60
6.12
60
5
.88
60
5
.88
60
5
.36
60
5
.83
60
5
.55
60
4
.56
60
7
.31
60
7
.19
60
6
.31
60
6
.37
60
5
.61
60
5.81
60
5.63
60
5
.61
60
4.70
604.23
602.52
605.21
604.60
60
4
.54
605.00
604.67
604.37
604.38
604
.08
603.93 604
.21604.27
604.34
604.29 60
2
.7460
4.06
60
4
.15
60
4
.42
604.37
604.11
603.80
603
.80
603.85
60
3.83
60
4
.29
604
.62
604.66
603.69
60
4
.72
60
4
.54
60
4.96
604.82
604.61
604
.53
60
4
.78
604.16
604.77
604.93
604.79
60
4
.70
60
4.63
60
4
.29
60
4
.24
60
4
.56
603.77
60
3
.90
604.22
60
4
.18
604.17
60
4
.12
604.21
60
4
.19
604.05
60
4.05 604.11
604.11
60
4
.14
604.15
604.28
60
4
.38
60
4
.21
60
4.18
60
4.29
60
4
.29
604.30
604.3960
4.34
604.44
605.51
60
4.96
607.34
60
7.42
60
7.45
60
3.77
604.39
604
.58
60
4
.50
604
.34
60
3
.62
604
.34
60
4
.28
60
3.80
60
3
.82
603
.49
604.30
604.24
604.13
60
3.76
60
4
.30
604.31
604.56
604.26
606.58
60
7.88
607.78
60
7.12
60
4
.67
60
6
.53
60
5
.55
60
5
.36
60
4
.36
60
4
.26
603.89
603.86
604
.11
604.13
604.39
60
6
.70
60
5.48
60
5
.48
60
5.35
60
5
.32
604.44
604.00
60
4
.16
604.78
604.73
604.62
604.46
60
4
.48
60
4
.84
606
.07
607.02
606.40
60
7.91
21
1
21
0
+00
272625+0020+00 24232221
N
10-24-2024
JU
N
E
W
A
Y
T
E
R
.
MU
L
F
O
R
D
S
T
.
CHICAGO AVE.
Needed for ADA and
drainage
requirements Needed for ADA and
drainage
requirements
Page 25 of 43
10
'
10
'
10
'3'
8'
60'10'
ALL
E
Y
SOUTH BLVD
.
PR NB BUS STOP - SHARED PLATFORM
EX SIGNAL TO BE REMOVED AND RELOCATED
EX CURB & GUTTER TO BE REMOVED
PR B-6.12 CURB & GUTTER
PR RAISED ISLAND
PR � CHICAGO AVENUE
CHICA
TO BE RELOCATED
EX UTILITY POLE
3'
6'
15'R
10'R
24.5:1 TAPER (DOTTED LINE)
31:1 TAPER (DOUBLE YELLOW)
30:1 TAPER (EOP)
90'135'
10
'
10
'
10
'
4'
4'
1.
5
'
10
'
4'
4'
15'R
18'R15'R
604604
604
604
605
605
605
605
60
5 606
606
60
6
607
608
608
60
7
60
7.40
60
7.40
60
7.46
60
7.42
60
7.37
60
7
.53
60
7
.77
60
9
.16
60
7
.99
60
7
.34
60
7
.88
60
7
.93
60
7
.59
60
8
.19
60
7
.96
60
8
.01
60
7
.79
60
7
.80
60
7
.80
60
7
.76
60
6
.52
60
7
.50
60
7
.36
60
5.69
605
.51
60
5
.33
60
5.58
60
5
.77
60
7
.05
605
.68
605
.39
604
.79
60
4
.83
604
.8560
4
.88
60
5
.27
604
.25
604.09
60
3
.83
60
3
.83
60
4
.14
60
4
.20
603
.55
60
4
.20
60
4
.54
60
4
.74
60
4.53
60
3.41
603
.59
603.60
60
4
.02
60
4
.46
60
4
.05
604.15
604.35
60
4
.67
60
4.40
60
5
.02
60
4.80
605.27
60
5
.27
604.01
60
6.04 605.84
60
5.42
603
.70
60
3.22
60
3.73
60
3
.76
604.25
60
4.40
60
4.50
604.40
604
.26
60
4.18
60
4.31
60
4.53
60
3.64
60
3.80
60
5.42
60
5.42
605.46
60
5
.36
604
.79
604
.99
604
.99
60
5.07
60
5.07
605.06
604.89
60
4
.87
605
.19
60
5
.11
605.10
60
5.30
605
.29
605.42
605.46
605.46
60
5.54
60
5.54
60
5.52
60
5.56
60
5.33
60
5
.33
60
5.61
60
5.64
60
5.64
60
5.62
60
5.62
60
5.60
60
5.33
60
5.37
60
5.57
60
5
.54
60
5.54
60
5.55
60
5
.55
60
5.59
60
5
.66
60
5.67
60
5.67
605
.53
60
5
.53
60
5.54
60
5
.56
60
5.49
60
5.46
60
5.52
605.48
605.50
60
5.46
605.47
60
5
.51
60
5.51
60
5
.62
60
5
.41
60
5.42
60
5.65
60
5.65
60
5
.62
60
5
.62
605.57
60
5
.40
60
5
.40
60
5
.24
60
5.23
60
5.34
60
5
.37
60
5
.37
60
8
.21
60
8
.00
60
7
.10
60
6
.52
60
4
.15
60
4
.64
60
5.46
60
5.40
605
.36
604
.24
60
8
.13
60
7
.97
60
6
.86
604
.65
60
4.93
605.17
60
5.22
60
5
.54
60
5.26
60
5.26
60
3.49
60
4.25
60
4.10
604.10
60
4
.32
604.91
60
4.96
60
6
.10
605.98
606.12
604.20
604.21
60
4
.20
60
4.25
60
8
.84
TO BE RELOCATED
EX UTILITY POLE & GUTTER
PR SB BUS STOP
PR � SOUTH BLVDBE REMOVED
LIGHT POLE
TO BE REMOVED
EX LIGHT POLE
BICYCLE SIGNALS TO BE ADDED
EXISTING SIGNALS TO BE MODERNIZED
CHICAGO AVE. @ SOUTH BLVD.
115' (LT STORAGE)
(TYP)
TREE REMOVAL
22
2
22
1
22
3
41 4240+00398
N
10-24-2024
SO
U
T
H
B
L
V
D
.
CHICAGO AVE.
Needed for ADA and
drainage
requirements
Needed for ADA and
drainage
requirements and for
viaduct information
Page 26 of 43
KEE
NEY ST.
10'
3'10'
11'
PR � KEENEY STREET
PR B-6.12 CUR
EX CURB & GUT
EX CURB & G
11
4
5
'R
5'
11
'
20
'R
20'R
602
602 60
2
603603
60
3
603
6
603
603
604
60460
4.52
60
4
.38
60
4
.38
60
4.50
60
4.50
60
4.50
60
4.46
60
4.46
60
4.45
60
4.23
60
4.21
60
4
.21
60
4
.20
60
4
.20
60
4
.08
60
4
.18
60
4
.18
60
4
.20 60
4
.16
60
4
.14
60
4
.16
60
4
.15
60
4
.19
60
4
.18
60
4
.20
60
4
.22
60
4
.14
60
4
.1260
4
.02
60
4
.00
60
4
.11
60
4
.11
60
4
.08
60
4
.08
60
4
.07
60
3
.97
60
3
.97
60
4
.04
60
4
.04
60
4
.07
60
4
.00
60
3
.92
60
3
.74
60
3
.74
60
3
.95
60
3
.95
60
3
.98
60
3
.98
60
3
.79 60
3
.60
60
3
.57
60
3
.46
60
3
.45
60
3
.45
60
3
.56
60
3
.56
60
3
.66
60
3
.66
60
3
.56
60
3
.55
60
3.68
60
3.72
602.91 60
3
.11
60
3.48
60
2
.74
60
3
.48
60
3
.13
60
2
.89
60
2
.74
60
2
.83
60
2
.80
60
3
.0360
2
.98
60
2
.54
60
2
.54
602.88
602.88
60
3
.13
60
2
.61
602.68
60
3
.04
60
2
.76
60
2
.56
60
2
.75
60
2
.61
60
2
.42
60
2
.72
603.04
60
3.47
60
3
.51
60
3
.69
60
3
.63
603.60
603
.58 603
.58
60
3.52
603
.71
60
3
.63 60
2
.72
60
2.7060
3
.33603.48
60
3.45
60
3.39
60
3.42
60
3.49
60
3.47
60
3
.47
603
.51 60
3.20
60
2
.68
60
3
.36
60
3.38
60
3.46
60
3
.44
60
3.37
602.67
60
5
.05
60
5
.03
60
4
.76
60
4
.28
60
4
.13
60
3
.90
60
3
.42
60
5
.38
60
4
.42
60
4.39
60
4
.22
60
4
.39
604
.59
604.61
60
4
.52
60
4
.45
60
3
.65
60
3
.77
60
3
.48
60
3
.39
60
3.44
60
3
.37
60
4
.51
60
4.55
606
.96
60
3
.32
24
1
46
47
48
49
50+00
24
0
+00
N
10-24-2024
KE
E
N
E
Y
S
T
.
CHICAGO AVE.
Needed for ADA and
drainage
requirements and
additional parking
along Keeney
Page 27 of 43
KEDZIE ST.
32'
11
'
10
'
7'4'
8'
10
'
10
'
8'
6'
8'
10
'
10
'
8'
6'
8'
10
'
10
'
8'5'
8'
10
'
10
'
13
'
8'
CHICAGO AVE.
M
AD
ISON
ST.
W
ASHING
TON ST.
CHICAGO A
35'45'
PR � CHICAGO AVENUE
PR LOADING ZONE
PR NB BUS STOP - BOARDING ISLAND
PR SB BUS STOP
30'
PR � MADISON STREET
PR � KEDZIE STREET
80' (1:20 TAPER)
PR B-6.12 CURB & GUTTER
TO BE REMOVED
EX CURB & GUTTER
EX CURB & GUTTER TO BE REMOVED
PR B-6.12 CURB & GUTTER
PR B-6.12 CURB & GUTTER
BRICK BUFFER
PR 1' DECORATIVE
BRICK BUFFER
PR 2' DECORATIVE
PR � WASHINGTON STREET
PR ON-STREET PARKING
20' (TYP.)
PR ON-STREET PARKING TO BE
EX CURB
PR B-6.12 CSIDEWALK LEVEL
PR BIKE LANES ONALK LEVEL
IKE LANES
5'
4'
1'
5'R
8'R
20'R20'R
20'R 10'R5'R
20'R20'R
8'R8'R
(TYP)
TREE REMOVAL
(TYP)
TREE REMOVAL
60
360
3
603
03
604
604
604
604
604
604
604
604
60
4
604 604
604
604
604
604
604
604
605
60
5
605 60
5605
606
606
606
607
604.76
604
.88
60
4
.77
60
4
.89
604
.72
604
.72
604
.74
60
4.76
604
.69
60
4.69
60
4
.62
604.76
60
4.89
60
4
.92
604.95
60
4.86
60
4
.79
604
.78
604.50
60
4.57
604.57
604
.49
604.35
604.30
60
4
.41
60
4.44
604
.43
60
4.40
60
4.26
604.29
604
.30
60
4.30
604
.38
60
4.37
60
4
.34
60
4.37
604.30
60
4.24603
.72
604
.29
604.30
604.34
60
4
.33
60
4.34
604.40
604
.27
604.29
604
.45
604
.39
604.38
604
.26
604.32
603
.89
60
4.22
60
4.15
604
.20
604.16
604.16
604.09
604
.10
603
.59
60
3
.96
60
5
.09
60
5
.55
60
4
.99
60
3
.95
60
3
.96
60
5
.02
60
5
.04
60
3
.95
60
3
.97
60
5
.37
60
5
.02
60
3
.97
60
3
.02
60
3
.99
60
4
.00
60
3
.76
60
4
.00
60
3
.99
60
3
.50
60
3
.22
603.98
60
4
.01
60
4
.04
60
3
.48
60
3.27
60
3.25
60
3.20
603
.17
603
.20
602
.74
603.64
603.25
603
.29
603
.86
603
.91
60
3
.98
604.00
603
.95
603.93
604.03
604.06
604.05
604
.00
604
.00
603.57
604.01
603
.90
603
.90
603
.87603
.70
603
.92
603
.89
60
3
.90
603.88
603
.87
60
3.76
603.80 60
3
.79
603
.39
603.26
603.12
60
3
.01 603.15
603
.09
60
3
.07
602
.96
60
3
.37
60
3.40
603
.12
603.55
603.62
603.06
603.50
603.53
603.59
603.47
603
.66
603
.66
60
3.62
603
.73
603
.73603.71
603
.72
60
3
.86603.80
60
3.82
60
3.82
603.91
603.99604.06
604.06
604.09
604.06
604.06
603.99
603.84
603.87
603.73
603.71
603.68
604.05
603.51
60
3
.96
60
3.97
603.44
603
.45
60
3.81
603
.80
60
4.14
60
4
.26
604.34
604.14
604.31
604.18
604.27
604.23
604.26
604.30
603
.7060
3.87
603.85
603.73
603
.98
603
.98
603.99
603.71603
.87
603
.84
60
3.69
604.01
604.01
604
.11
604
.11603.89
603.97
60
4
.00
603.73603.93
603
.91
603
.75
60
4.09
60
4.09
604
.09
604
.15
604
.14
604
.18
60
4.20
60
4
.20604
.17
60
4.14
604
.15
604
.05
60
4
.08
604.08
604
.06
603
.50
60
4.43
604.05
60
4.27
60
4.27
60
4.28
603
.44
603
.52
603
.48
604.29
603
.90
604
.03
604.11
603
.62
604.05
604.01
603
.77
60
4.28
603.96
603.94
603.74
603
.99
604.39
60
4.65
60
4.65
60
4.67
60
4.53
60
4.63
604
.56
604
.48
604.43
604
.53
604
.01
604
.07
60
4.15
60
3
.79
603
.83
60
3
.83
60
4
.
60
4
.36
60
4
.55
60
4
.73
60
5
.09
60
5
.13
604
.97
603.70
603.67
603
.89
60
3.77
60
3
.86 60
3.66
603
.67
60
4
.92
604.12604.22
604.09
604.12
603
.70
603.64
603.69
604.91
604.52
604
.49
604.32
60
6.82
606
.99
60
5
.56
605
.71
60
5
.88 605.82
60
5
.85
605.36
60
6.17
606.43
606.51
606.65
606.62
606
.24
60
6
.78
60
6
.90
606
.89
607
.00
60
7
.03
607
.17607
.11
60
7.01
60
6.94
60
6
.57
60
6.99
60
7
.21
60
7
.77
604.06
604.23
60
4.27
604.18
604
.26
604.28
604.28
604.41
604.54
604.54
604.49
604.49
60
4.4660
4
.22
604
.57
605.16
605.25
605.31
605
.30
605.73
605.85
605.89
60
5
.87
605.85 60
5
.73
605.10
605
.14
605.11
605.12
60
4.65
60
4.65
605.75
605.72
605.05
606.15
605
.72
60
6
.18
60
4
.27
604.01 605
.59
605
.40
605
.79
607
.06
606.80
60
6.67
606
.04
604
.88
606
.86 606.61
60
6.02
60
4
.89
60
6.6760
6.43
606.02
606
.17
607
.25
60
4
.07
604.40
60
4
.13
60
3
.97
60
3
.98
60
3
.96
60
3
.98
35'
77' (1:10
18'
BICYCLE SIGNALS TO BE ADDED
EXISTING SIGNALS TO BE MODERNIZED
CHICAGO AVE. @ KEDZIE ST.
25
3
25
4
26
1
26
2
27
2
27
3
56
57 58 59 61 62 60+00 55+00
26
0
+00
N
10-24-2024
KE
D
Z
I
E
S
T
.
CHICAGO AVE.
MA
D
I
S
O
N
S
T
.
WA
S
H
I
N
G
T
O
N
S
T
.
Needed for ADA and
drainage
requirements and for
viaduct information
Needed for ADA and
drainage
requirements and for
viaduct information
Needed for ADA and
drainage
requirements
Page 28 of 43
10
'
10
'
8'
6'
8'
10
'
10
'
10
'
10
'
3'
8'
CHICAGO AVE.
M
AIN ST.
CHICAGO AV
PR ON-STREET PARKING
PR � CHICAGO AVENUE
PR NB BUS STOP - SHARED PLATFORM
PR SB BUS STOP
94'80' (LT STORAGE)
1:10 TAPER
1:100 TAPER
TO BE REMOVED
EX CURB & GUTTER
PR B-6.12 CURB & GUTTER
PR RAISED ISLAND
PR B-6.12 CURB & GUTTER
PR � MAIN STREET
PR � CHICAGO AVENUE
PR B-6.12 CURB & GUTTER
PR B-6.12 CURB AND GUTTER
EX CURB & GUTTER TO BE REMOVED
11
'
8'R
3'R
20'R18'R
20'R 20'R8'R5'R
8'R
604
604 604
604
604
604
604
604
60
5
605
605
605
605
605 605605
605
605
60
5
60
5
606
606
607
607
607
60
5
.48
60
5
.49
60
5
.39
604.96
60
5.10
605
.18
60
4
.95
604
.95
60
5.27
605.29
60
4
.95
604
.94
60
5
.33
605
.53
60
5.22
605
.35
60
5.57
60
5.57
60
5.63
60
5.60605
.63
605
.58
605
.55
60
5.49
605.48
605
.44
605.45
60
5.46
605
.3260
5.29605
.25
605
.31
60
5.1660
4.40
605
.18
60
5
.11
605
.45
60
5.49
605
.47
605.4360
5.14
60
5
.08
60
5.21
60
5.25
605.44
60
5.44
60
5.47
60
5.4360
5.25
60
5.22
605.23
605.28
60
5
.45
605.46
605
.46
605
.42
605.26
605
.32
605.28
605.25
60
5.49
605.50
605.50
60
5.48
605
.26
60
5.34
605
.33
605
.27
605.31
605
.50
605.46
605
.43
605.48
605.29
605.24
1717
605
.22
605
.22
605
.04
60
4.89
605
.04
604.96
60
4.92
605
.09
605
.23
60
5.21
605
.15
604
.9760
5.12
605
.10
60
4
.98
60
5.23605
.22605
.10605
.21
605
.09
60
5
.12
604.45
605
.14
60
5
.30
605
.38
605.39
605.29
604.97
605.11
60
5
.13
60
4
.98
605
.28
60
5
.79
60
5
.83
60
5
.28
604.92604
.99
605
.05
605
.05
605.00
604.93
604.97
60
4
.97
60
5.02
60
5.02
604.99
60
5
.15605.16
605.14
605.09
604.93
604.92
604.79
604
.92
60
4
.9660
5
.04
605
.00
604.94
604
.9060
5
.01
604.99
604.85
604.86
60
5.23
604.75604
.88
604.87
604.71
604.28
605
.12
605.63
605.63
60
5.61605
.62
605.61
605.62
605
.68605
.67
605.53
605
.55
605
.32
605.31
605.50
605.49
605.51
605.50
605.30
605.37
605.34
60
5.36
605.52
605.47
605.51
605.53
605.31
605.35
605.58
605.55
605
.53
605.52
605.33
605.36
605
.49
605
.49
605
.49
60
5.29
605.46
60
5.61
60
5
.31
605.38
604
.57
605.60
605
.52
605
.43
605.40
605.53
605.5160
5.50
605.50
604
.31
60
4.64
604
.46
604.98
605.59
603.94
604
.12
604.40
605
.12
604.98
604.70
604.96
604
.82
604.83
605.00
604
.94
604.80
605.08
604
.92
60
4
.91
60
4.97
604.68
605
.11
605.04
60
4.90
60
4
.83
603
.98
604.70
604.70
60
4
.79
605
.04
60
5.28
605.32
60
5.29
60
5
.08
604.85604.68
60
4
.76
604.62
604.74
60
4
.76
60
5
.03
60
4
.94
60
4
.84
60
4
.91
60
5
.90
60
5
.48
60
4
.88
604.51
60
4
.77
60
4
.79
60
4
.71
60
4
.89
60
4
.72
60
4.72
60
4
.74
60
4
.76
60
4
.69
60
4
.69
60
4
.62
60
4
.76
60
4
.89
60
4
.92
60
4
.95
60
4
.86
60
4
.79
60
4
.78
605
.19
605
.05
604
.97604.95
60
4.74
604.55
604
.49
604.26
604
.11
604.23
604.15
603.86
603.72
603.72
603.80
604.22
60
3
.83
603.86
60
5
.53
604.00
604.06
60
4
.08
604
.02
60
4
.08
604.26
604
.39
604.31
604.06
604.15
604.26
60
4.26
604.19
604.37
604.34
60
4
.24
60
3
.73604.23
60
4
.27
60
4.30
60
4.30
604
.30
60
4.2360
4.30
604.13
60
3
.98
60
3.84
603.90
603
.88
603.94
60
4.32
60
4
.24
60
4
.28
60
4
.29
60
4
.3360
4
.20
60
4
.29
60
4
.08
60
4
.38
60
4
.37
60
4
.50
60
4
.57
60
4
.57
60
4
.49
60
4
.35
60
4
.30
60
4
.41
60
4
.44
60
4
.43
60
4
.40
60
4
.26
60
4
.29
60
4
.30
60
4
.30
60
4
.38
60
4
.37
60
4
.34
60
4
.37
60
4
.30
60
4
.2460
3
.72
60
4
.29
60
4
.30
60
4
.34
60
4
.33
60
4
.34
60
4
.40
60
4
.27
60
4
.29
60
4
.45
60
4
.39
60
3
.50
60
4
.43
60
4
.05
60
4
.27
60
4
.27
60
3
.99
60
4
.28
60
4
.28
60
4
.29
604
.05
60
3
.96
60
3
.94
60
4
.39
60
4
.65
60
4
.65
60
4
.67
60
4
.53
60
4
.63
60
4
.56
60
4
.48
605.56
60
5.60 60
5
.32
605.44
605
.36
604
.78
604.51
604.43
604.93
605.06
60
5
.00
60
4.86
604.95
604.86
604
.93
604.98
60
4
.91
605
.10
604
.81
60
4
.84
604.69
60
4
.87
604.74
605
.04
605.10
605.0860
4
.43
60
4
.53
604
.43
60
4.8660
4
.47
604
.47
60
4
.78
60
4
.01
60
4
.07
60
4
.15
60
4
.77
60
6
.82
60
6
.99
60
5
.56
60
5
.71
60
5
.88 60
5
.82
60
5
.85
60
5
.36
60
6
.17
60
6
.43
60
6
.51
60
6
.65
60
6
.62
60
6
.24
60
6
.78
60
6
.90
60
6
.89
60
7
.00
60
7
.03
60
7
.1760
7
.11
60
7
.01
60
6
.94
60
5
.34
60
5
.63
606
.57
60
6
.99
60
7
.21
60
7
.77
60
5
.72
60
5
.71
60
5
.86
60
5
.51
607.49 607
.43
607.63
607.79
60
5
.64
605.96
60
6
.07
606.25
606.62
606.65
60
6.84
607
.10
607
.08
60
7.53
60
7.46
60
7.46
607
.43
60
7
.45
607.3160
7.25
60
7.09 60
7
.11
60
7.07
606.65
606.71606.60
60
6.64
606.67
606
.18606.03
60
5
.9560
5.66
605.72
606.07
606.46
606.64
60
6
.46
60
6.04
604
.85
605.03
605.07
605.07
605.34605
.24
60
5
.72
60
6
.18
60
5
.59
60
5
.40
60
5
.79
60
7
.06
60
6
.80
60
6
.67
60
6.04
60
4
.88
60
6
.86 60
6
.61
60
6
.02
60
4
.89
60
6
.6760
6
.43
60
6
.02
60
6
.17
60
5
.36
60
6
.00
60
5
.85
60
5
.75
60
6
.0260
5
.78
605.67
606.05
604
.92
604.82
606
.02
60
4.97
604.16
60
7
.25
60
4
.40
60
4
.13
PR ON-STREET PARKING
8'
3'
10
'
10
'
10
'
8'
35'
100' (LT STORAGE)77' (1:10 TAPER)53'
60' (1:20 TAPER)
EX CURB & GUTTER TO BE REMOVED PR ON-STREET PARKING
PR ON-STREET PARKING
25'
59'18'
BICYCLE SIGNALS TO BE ADDED
EXISTING SIGNALS TO BE MODERNIZED
CHICAGO AVE. @ MAIN ST.
28
4
28
6
28
7
62 63 64 66 67 68 65+00
28
5
+00
N
10-24-2024
MA
I
N
S
T
.
CHICAGO AVE.
Needed for ADA and
drainage
requirements and for
viaduct information
Needed for ADA and
drainage
requirements
Page 29 of 43
7'
10
'
10
'
8'
3'
8'
LE
E
ST.
PR � LEE STREET
PR RAISED ISLAND PR RAISED ISLAND
PR B-6.12 CURB AND GUTTER
EX CURB & GUTTER TO BE REMOVE
11
'
11
'
50'48'20'
8'R 8'R
7'R 7'R 7'R7'R7'R
'R8'R
605
605
605
605
605 605
605 605
60
4.45
60
5.06
60
5
.07
60
4
.84
60
5.09
605.12
60
4
.97
60
4
.97
60
4
.88
60
5.02604.87
60
4
.86
60
5
.26
605.20
60
4
.74
60
4
.58
60
5
.01
604.91
60
4
.14
60
5.31
60
5
.26
604
.97
604
.97
60
5.02
605
.06
60
5.44
605
.02
60
4
.68
60
4.47
60
4.60
60
5
.03
60
5
.03
60
5
.07
60
4
.79
60
4
.63
60
4
.63
604
.87
605.07
60
5.16
60
5.16
60
5
.00 60
4
.78
604
.90
60
4
.92
60
5
.01
605.15
60
5.00 604.67
60
4
.61
60
4
.86
60
4
.85
60
4
.64
60
4
.28
60
4
.96
60
4
.96
60
4
.75
60
4
.88
60
4
.75
60
4
.68
60
4
.75
60
4
.71
60
4
.82
60
4
.92
60
4
.98
60
4
.98
60
4
.98
60
5
.14
60
5.19
60
5
.2060
5
.23
60
4
.91
60
5
.23
605
.22
60
4
.82
604.82
60
5
.16
60
5
.16
605.40
60
5
.09
60
5
.09
60
5
.18
60
4
.77
60
5.13
60
5.13
60
4
.97
60
5
.34
60
5.2860
4.95
604
.61
60
4.66
60
4.66
60
5.19
60
5.19
605
.29
60
5
.28
60
5
.28
60
4
.92
60
4
.48
60
4
.80
60
5
.35
60
5
.23
60
4
.81
60
4
.37
60
5
.33
60
5
.33
60
4
.86
60
5
.28
60
5
.51
60
5
.51
60
5
.53
60
5
.53
60
5
.52
60
4
.86
60
5
.00
60
5
.01
604.85
604
.88
604.82
60
4
.60
60
4
.66
60
4.40
604
.57
60
4
.94
604
.81
60
4
.63
60
4
.61
60
5
.06
60
5.16
60
5
.08
604.78
0.00
30'12'20' (TYP.)
30'19'30'
20'R 20'R
30
1
71 72 73 70+00
30
0
+00
N
10-24-2024
LE
E
S
T
.
CHICAGO AVE.
Needed for ADA and
drainage
requirements
Page 30 of 43
18
'
10
'
8'
3'
8'
7'
10
'
10
'
8'
3'
8'
CHICAGO AVE.
GREE
NLE
AF ST.
CHICAGO
R PR B-6.12 CURB AND GU
PR B-6.12 CURB AND GUTTER
MOVED
EX CURB & GUTTER TO BE REMOVED
EX CURB & GUTTER TO BPR � CHICAGO AVENUE
PR � GREENLEAF STREET
20' (TYP.)
34'
34'
20'R 15'R
20'R20'R8'R 8'R8'R
604
604 604
604
604
604
604604
604
604
604
604
604
604
60
460
4
605
605
605
60
5
604
.60
604.73
604
.6760
4.59
604.21
604
.40604
.54
60
4
.51
60
4.41
60
3
.11
603
.43
603
.39
603
.51
60
4.15
60
4.23
60
4.23
603
.78
603.73
604
.10
603
.94
604.37
604.49
604
.50
604.37
604.39
604.49
60
4.49604.39
604.31
604.46
604
.41
60
4
.26
604.13
60
4.30
604.30
604.14
604
.07
604.22
604
.18
604.02
603.98
604
.11
60
4
.10603
.93
604
.03
603.59
60
4
.04
60
3.96
60
3
.97
60
3.96
60
3
.74
60
3
.5260
3
.71
60
3.77
603.93
60
3
.99604
.03
60
4.08
60
4.09
60
3.96
604.16
604.1160
3
.84
604.28
605.0660
4
.30
603.93
60
4.21
60
4.21
604
.26
604
.26
60
4
.34
60
4
.43
60
4
.36
60
4
.54
60
4
.64
60
4
.64
60
4
.55
60
4
.04
60
4
.05
603
.83
60
3.67
60
3
.72
60
3.90
60
3.90
60
3
.87
60
3
.82
60
3
.80
60
3.84
603
.76
60
3.7660
3
.66
60
3.64
60
3.64
60
3.62
60
3.62
60
3
.48
60
3
.74
60
3
.93
60
3.88
60
3
.96
60
3.95
604.33
60
4.32
604
.04
603
.80
60
3.85
60
3
.79
60
3.76
60
3.77 60
3.69
60
3
.70
60
3
.70
60
3
.58603
.74
60
3
.79
603
.54
603.45
60
3
.6960
3
.86
60
3
.71
60
3
.67
60
3
.70
60
4
.05
60
4
.05
60
4
.12
60
4
.10
60
3
.70
60
3
.89
60
4
.04
60
3
.43
603.98
604.03
60
4.24
60
4
.2760
4.05
60
3
.45
60
4
.08
60
4
.32
60
4
.3160
4
.07
60
3
.96
60
4
.37
60
4
.31
60
3
.97
60
4
.58
60
4
.61
60
4
.71
60
4
.66
60
4
.23
60
4
.57
60
4
.23
60
4
.58
60
4
.58
60
4
.80
60
5
.05
60
5
.59
60
4
.86
60
4
.99
60
4
.99
60
4
.37
60
3
.97
603.64
603
.67
60
4
.12
60
4
.16
60
4.08
60
3.88
604.08
604.07
60
4
.00
60
3
.89
60
4
.04
60
3
.48
60
3
.58
60
3
.73
603.80
60
3.53 603
.58
60
3.81
603
.72
604.54
60
4.50
604.40
60
4
.37
604.24
604.08
604
.14
603.98
604
.85
60
3.96
604
.34
603.56
60
4.35
60
3.92
60
4
.24
60
4
.33
60
3
.54
60
4
.02
UPN
30'30'21'30'
30'23'30'
BICYCLE SIGNALS TO BE ADDED
EXISTING SIGNALS TO BE MODERNIZED
CHICAGO AVE. @ GREENLEAF ST.
31
2
31
3
31
4
76 77 78
79
81
80+00 75+00
31
5
+00
N
10-24-2024
GR
E
E
N
L
E
A
F
S
T
.
CHICAGO AVE.
Needed for ADA and
drainage
requirements
Needed for ADA and
drainage
requirements
Page 31 of 43
10
'
10
'
8'
3'
8'
10
'
10
'
11
'
8'
AGO AVE.
HA
M
ILT
ON
ST.
CHICAGO AVE.
B AND GUTTER
PR B-6.12 CURB AND GUTTER
PR B-6.12 CURB AND GUTTER
TER TO BE REMOVED
EX CURB & GUTTER TO BE REMOVED
EX CURB & GUTTER TO BE REMOVED
PR � HAMILTON STREET
PR RAISED ISLAND
PR RAISED ISLAND
PR RAISED ISLAND
15'R 8'R 8'R 8'R 8'R
BOARDING ISLAND
PR NB BUS STOP
PR SB BUS STOP
20
'R
5'R 5'R
CROSSWALK
PR RAISED
603
604
604
604
604
605
60
5
605
605
605 605 605
60
5
60
5
605
605
605
60
3
.93
603
.95
604.13
604.13
604.16 60
4
.08
604.21
604
.25
60
4.40
60
4.36
60
4
.44
60
4
.44
604
.25
604
.20
604.31
604
.37
604
.35
60
4
.27604.33
604
.26
60
4.43
60
4.43
604.45
604.43
60
4
.36
604.51
604.48
604.60
60
4
.56
604
.51
604.48
604.08
604.63
60
4.68
60
4
.78
604
.84
604.74
604.81
604.77
604
.75
604.75
604
.73
604.80
604
.75
604
.68
604.91
604.91
604.91
604.83
604
.78
604.73
604.84
604.84
604.75
604.53
604.53
604
.50
604.64
604.64
604
.75
604.87
604
.80
605
.01
60
4.94
60
4.94
604.82
604.82
604.83
60
4
.65
60
4.59
604.96
604.96
60
5.03
60
5.03
605.08
605.18
60
5.17
605.11
604.63
604.92
604.92
605.18
605.03
604
.18
603.87
60
3.97
60
3.97603.96
60
4
.04
604
.09
603
.98
603.99
603.99
604
.06
60
4
.10603
.97
603
.97
60
4.03
604
.09
60
4
.15604.00
604
.35
604
.35
603.99
604.24
604.30
604.30
60
4
.26
60
4
.26
603.80
60
4.11
603.96
603
.96
60
4.06
60
4
.40
604
.25
604
.25
60
4
.40
60
4
.40
603.98
603.71605.06
60
5.03
60
4
.95
60
5.01
60
4
.24
60
4
.61
60
4
.95
60
4
.93
60
4
.93
60
4
.99
60
4
.57
60
4
.87
60
4
.59
60
4
.81
60
4
.79
60
4
.57
60
4
.60
60
4
.73
60
4
.67
60
4
.59
604.86
60
4
.65
60
4
.65
60
4
.93
604.93
605
.01
604
.99
604.95
604.93
604.89
60
4.84
60
4.84
604.83
60
4.7760
4.95
60
4.95
60
4.68
60
4.60
60
4.84
60
4
.91
60
4
.67
60
4
.46
60
4
.74
60
4
.80
60
4
.21
60
5.03
60
5.25
605
.29
60
5.23
60
5.33
60
5.02
60
4
.76
60
4
.76
60
4
.74
60
4
.74
60
4
.29
60
4
.89
60
4
.90
60
4
.90
60
4
.86
60
3
.25
60
2
.87
60
3
.00
60
3
.23
60
5.05
60
5
.01
60
5
.11
60
4
.59
60
4
.67
605
.20
605.18
604.63
60
4.59
604
.50
60
4
.45
603.67
603
.90
603
.94
60
4
.36
60
4
.35
603
.70
60
3.63
603
.74
604.46
604
.05
60
4.06
60
4
.69
60
4
.50
604
.57
60
4.71
604.73
60
5
.30
60
4.36
30'
30'
30'22'23'36'
86'10'
17
'
32
1
82
83
84
86
87
85+00
32
0
+00
N
10-24-2024
HA
M
I
L
T
O
N
S
T
.
CHICAGO AVE.
Needed for ADA and
drainage
requirements and
driveway redesign
due to driveway
consolidation
Page 32 of 43
10
'
10
'
10
'
11
'
8'
10
'
10
'
10
'
3'
8'
7'
10
'
10
'
8'3'
10
'
8'
3'
8'
10
'
10
'
10
'
DEM
PSTE
R ST.
CHICAGO AVE.
PR B-6.12 CURB AND GUTTER
PR B-6.12 CURB AND GUTTER
OVED
EX CURB & GUTTER TO BE REMOVED
EX CURB & GUTTER TO BE REMOVED
P
PR ON-STREET PARKINGPR ON-STREET PARKING
PR � CHICAGO AVENUE
PR � CHICAGO AVENUE
PR � DEMPSTER STREET
D
PR RAISED ISLAND
PR RAISED ISLAND
8'R 8'R
10'
3'
60'
PR NB BUS STOP - BOARDING ISLAND
PR SB BUS STOP
10
'
PR RAISED CROSSWALK
20'R 20'R
23'R20'R
60
2
602
602
602
602
602
602602
603
603
603
603
603
603
60
4
60
4
60
2.02
602
.30
60
2.08
601.59
60
1.59
601.99
60
2.39
601.95
601
.90
602.13
60
2.16
60
2
.02
601.96
601.96
60
1
.84
60
1
.84
60
1
.48
60
1.88
60
2.02
60
2
.12
60
2.23
602.24
60
2.01
60
2.01601.97
601.97
60
1
.94
60
2
.16
60
2
.16
60
2.04
60
2.24
60
2
.31
60
2
.2360
2.08
60
2.08
602.00
60
2
.08
60
2
.10
60
2.05
60
2
.07
60
2.11
60
2.11
60
2.03
60
2.14
602.23602.07
602.07
60
2.11
60
1
.54
60
2
.29
60
2
.29
602.26
602.37
602.45602.30
602.30
602.27
602.39
602.39
602.88
602.88
602.59
602.59
602.46
60
2
.70
602
.6460
2.58
60
2.58
60
2.52
60
2.70
60
2.70
602.61
60
2
.71
602.7860
2
.70
60
2
.70
60
2.60
60
1.47
60
1
.83
601
.74
60
1
.83
60
1
.83
60
1
.91
601.90
60
1.84
60
1.81
60
1.55
60
1.72
60
1.72
60
1
.79
601.80
60
1.80
60
1.80
602.25
60
2.28
602.24
601.97
602.04
602.04
601.79
601.74
601.80
60
1.85
60
1.85
60
2
.02
60
2
.02
601.94
60
2
.09
60
2
.10
60
1
.99
60
1
.99
60
1
.9660
2.07
60
2.07
60
2.00
60
2
.12
602.12
60
2.02
60
2.02
602.04
60
2
.25
60
2
.25
602.20
602.20
602.26
602.18
602.18
602.10
60
2
.24
60
2.26
60
2.12
60
2.12
60
2.14602.25
602.25
60
2.17
60
2.30
60
2
.30
602.21
602.21
602.21
602
.25
602
.25
602.25
60
2
.35
602.38
60
2
.29
60
2
.29
602
.24
60
2
.28
60
2
.28
602.30
60
2
.40
60
2.44
60
2
.35
60
2
.35
602.31
60
2.42
60
2.44
60
2.10602.02
60
1
.91
601.84
602.56
60
2
.44
602.42
60
2.11
602.60
60
2.54
60
2.16
60
2.20
60
2
.17
602.17
60
3.38
60
3
.41
602.98
60
2
.17
603.3060
3.29
60
3.30
60
2
.27
60
2
.26
602.4760
2
.5060
2
.39
602
.84
603
.08
60
3.19
60
2.84
60
3.4560
3.41
603
.01
60
3.18
603.24
60
3.06
603
.36
603
.36
60
3
.27
60
3
.27
60
3.27
60
3
.23
60
2
.18
602.17
602
.36 60
2
.26
60
2.37602.43
602.33
60
2.57
602.39
60
2.47
602.60
602.39
60
2.99
602
.27
602
.98
603
.16
60
3
.14
60
3
.13
60
3
.13
60
2
.82
60
2
.66
603
.14
60
2
.75
60
2
.99
60
3
.18
60
3
.18
60
3
.43
60
3
.79
60
3.76
603
.36
603
.36
60
3
.46603
.37
60
3.57
60
3.57
603
.41
60
3
.57
60
3
.52
60
3
.36
60
2
.92
60
2
.92
60
3
.88
60
3
.88
60
2
.98
60
2
.98
60
3
.97
60
3
.97
60
3
.47
60
3
.4760
3
.39
60
3
.31
60
3
.51
60
3
.51
60
3
.76
60
3
.64
60
2
.98
60
2
.98
60
3
.58
60
3
.61
60
3
.59
60
3
.60
60
2
.97
60
2
.97
60
3
.59
60
3
.50
60
3
.74
60
3
.65
60
2
.74
60
3
.50
60
3
.50
60
3
.58
60
3
.6960
3
.67
60
3
.67
60
3
.57
60
3
.73
60
3
.7660
3
.58
60
3
.59
60
3
.59
60
3
.72
60
3
.7560
3
.66
60
3
.66
60
2
.86
60
2.9460
3
.09
60
3.10
60
3
.02
60
3
.0260
3
.11
60
3
.07
60
3
.12
60
3
.24
60
3
.24
60
3
.13
60
3
.13
60
3
.52
60
3
.39
60
3
.30
60
3
.07
60
3
.62
60
3
.16
60
3
.17
60
3
.64
60
3
.67
60
3
.76
60
3
.90
60
3
.84
60
3
.14
60
3
.33
60
3
.66
60
3
.22
60
3
.17
60
3
.24
60
3
.07
60
3
.41
60
3
.07
60
3
.13
60
3
.33
60
3
.41
60
3
.34
60
3
.05
60
3
.19
602
.82
602.90
60
3.00
60
3
.50
60
2
.27
60
1
.48
60
1.56
60
1.55
601.59
60
1.59
603.02
603
.09
60
3
.15
60
3
.44
60
2.90
60
3
.16
60
2
.20
60
2
.25
60
1.99
602.10
602.18
602.32
60
3.04
60
2.37
601.75
601.96
60
2.17
60
1
.93
602
.00
602
.07
60
2.21
30'
100' (1:10 TAPER)60' (LT STORAGE)60' (LT STORAGE)100' (1:10 TAPER)
90' (LT STORAGE)
20'R
4'R
BICYCLE SIGNALS TO BE ADDED
EXISTING SIGNALS TO BE MODERNIZED
CHICAGO AVE. @ DEMPSTER ST.
33
2
33
3
33
4
89
91
92 93 94
90+00
33
5
+00
N
10-24-2024
DE
M
P
S
T
E
R
S
T
.
CHICAGO AVE.
Needed for ADA and
drainage
requirements
Needed for ADA and
drainage
requirements
Page 33 of 43
10
'
10
'
8'3'
8'
10
'
10
'
10
'
8'7'
10'
10
'
3'
8'
10
'
10
'
11
'
8'
10'
30'
AGO AVE.
CHICAGO AVE.
LA
K
E
S
T
.
PR B-6.12 CURB AND GUTTER
PR B-6.12 CURB AND GUTTER
R
ED
EX CURB & GUTTER TO BE REMOVED
EX CURB & GUTTER TO BE
ON-STREET PARKING
PR � CHICAGO AVENUE
PR � GROVE S
PR � LAKE STREET PR RAISED ISLA
BOARDING ISLAND
PR NB BUS STOP
15'R
11
4
5
'R
60'
PR SB BUS STOP
20'R 20'R
20'R10'R
600
600
600
601
601
601
601
601
60
1
601
601
601
601
601
602
60
0
.84
60
1.05
60
1.05
60
1
.09
60
1
.18
60
1
.23
60
1.23
60
1.23
601.15
60
1
.10
60
1.08
60
1.08
600.79
60
0
.30
601.03
601.49
60
1.44
60
0
.95
60
0.63
600.61
600
.61
60
0.77
60
0.77
600.75
600.75
600.65
60
0.70
600.54
60
0
.71
600.71
600.75
60
0.76
600.78
600.75
600.75
600.92
60
1.11
60
1.40
601.37
601.37
60
1.07600.95
600.78
600.78
60
0
.82
60
0
.83 600.80
60
0
.75
600.75
600
.55
60
0.55
600
.77
600.79
600.79
600
.85
600.96
601.20
60
0
.67
600.57
600.57
600.57
600.57
60
0.63
600.90
600
.73
600.56600.44
599.90
60
0
.58
600.51
600.20
60
0
.01
60
0
.09
60
0
.16
600
.16
600.58
60
0
.59
600.42
599.92
59
9.90599.90
59
9
.89
599
.89
599.96
600.07
600
.34
600.43
600.29
600.44
600
.55
60
0
.55
60
0
.47
59
9
.75
600
.58
600.79
60
0
.4260
0.30
60
0
.10
60
0
.17
60
0
.71
60
0
.71
60
0
.64
60
0
.57
600.47
60
0.22
600.54
60
0
.84
60
0
.98
60
0
.85
60
0
.85
60
0
.88
60
0
.77
60
0
.43
60
0
.74
60
0
.74
60
0
.74
60
0
.77
60
0
.64
60
0
.70 60
0
.41
60
0
.80
60
0
.90
60
0
.88
60
0
.73
60
0
.87
60
0
.95
60
0
.95
600.03
600
.30
60
1.49
601.52
601
.55
601.65
601.68601.68
60
1.69601
.70
60
1
.68
60
1
.60
601.51
601
.41
601
.06
60
1
.32
60
1.50
60
1
.43
601
.08
600.25
600.25600
.29
600
.42
600.30
600.42
600
.50
600.45
600.59
600.65
600.52
600.51
600.51
600.50
600.77
600.63
60
1
.11
601.07
601
.28
601.27
60
0
.48
60
0
.48
601.07
600.41
60
0
.42
600.88
600.88
600.81
600.72
60
0.68
601
.24
600.86
600.96
600.03
60
1.29
601.27
601.26
601.26
60
1
.38
601.47601.54
60
1
.10
601.12
60
1.19
60
1.19
60
0
.87
60
0
.87
601.47
60
1
.69
60
1
.64
60
1
.64
60
1
.64
60
1
.08
60
1
.08
60
1
.07
60
1
.07
60
1
.61
60
1
.74
60
1
.81
60
1
.81
60
1
.93
60
2
.06
60
2
.06
60
2
.01
60
1
.74
60
1
.87
60
1
.29
60
1
.29
60
1
.31
60
1
.31
60
1
.84
60
1
.67
60
1
.33
60
1
.33
60
1
.32
60
1
.32
60
1
.70
60
1
.33
60
1
.75
60
1
.75
60
1
.86
60
1
.79
60
1
.79
60
1
.37
60
1
.41
60
1
.84
60
1
.84
60
1
.89
60
1
.98
60
2
.00
60
1
.86
60
1
.96
60
2
.02
60
1
.98
60
1
.60
60
0
.53
60
0
.53
60
0
.51
60
0
.53
60
0
.58
60
0
.58
60
0
.72
60
0
.87
60
1
.08
60
1
.18
60
1
.08
60
1
.41
60
1
.03
60
1
.07
60
1
.0760
1
.11
60
0
.98
60
0
.98
60
0
.78
60
0
.69
60
0
.69
60
0
.65
60
0
.66
60
0
.94
60
1
.19
60
1
.44
60
1
.40
60
1
.42
60
1
.12
60
1
.12
60
0
.98
60
0
.98
60
0
.90
60
0
.72
60
1
.29
60
1
.34
60
1
.10
60
0
.96
60
1
.39
60
1
.43
60
1
.45
60
1
.4560
1
.2360
1
.01 60
0
.88
60
1
.47
60
1
.47
60
1
.57
60
1
.54
60
1
.62
600
.39
60
0.82
60
1
.63
60
1
.55
60
1
.48
60
1
.71
60
1
.98
60
0
.18
60
0
.39
60
0
.72
60
0
.88
60
0
.80
60
0
.70
600
.58
600.62
60
0
.84
60
0
.83
60
0
.42
60
0
.42
600
.77
600.65
600.72
60
0.77
600.70
600.45
601.72
60
0.96
60
0
.95
60
1
.35
601.19
601.03
60
0
.95
600.30
60
1
.42
60
1
.05
601.47
601.74
601.31
601
.46
601
.82
601.11
60
1
.66
60
1
.76
60
2
.00
60
0
.96
60
0
.89
60
1
.83
72
"
S
E
W
E
R
72
"
S
E
W
E
R
BICYCLE SIGNALS TO BE ADDED
EXISTING SIGNALS TO BE MODERNIZED
CHICAGO AVE. @ GREENWOOD ST.
BICYCLE SIGNALS TO BE ADDE
EXISTING SIGNALS TO BE MOD
CHICAGO AVE. @ GROVE ST.
3
5
3
3
5
4
101
102
103
104
100+00
N
10-24-2024
LA
K
E
S
T
.
CHICAGO AVE.
Needed for ADA and
drainage
requirements
Needed for ADA and
drainage
requirements
Page 34 of 43
Local Public Agency County Section Number
Prime Consultant (Firm) Name Prepared By Date
Consultant / Subconsultant Name Job Number
Remarks
CONTRACT TERM 6 MONTHS OVERHEAD RATE 152.85%
START DATE 11/1/2026 COMPLEXITY FACTOR 0
RAISE DATE 1/1/2027 % OF RAISE 3.00%
END DATE 4/30/2027
Year First Date Last Date Months
% of
Contract
0 11/1/2026 1/1/2027 2 33.33%
1 1/2/2027 5/1/2027 4 68.67%
The total escalation =2.00%
ESCALATION PER YEAR
PAYROLL ESCALATION TABLE
EXHIBIT D
COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET
FIXED RAISE
City of Evanston Cook 21-00288-00-RS
Epstein J Karlovitz 8/31/2026
Note: This is name of the consultant the CECS is being completed
for. This name appears at the top of each tab.
Printed 8/31/2026
Page 1 of 14
BLR 05514 (Rev. 1/24/26)
ESCALATION
Page 35 of 43
Local Public Agency County Section Number
City of Evanston 21-00288-00-RS
Consultant / Subconsultant Name Job Number
MAXIMUM PAYROLL RATE 90.00
ESCALATION FACTOR 2.00%
IDOT AVG
CLASSIFICATION PAYROLL RATES CALCULATED RATE
ON FILE
Project Principal $86.00 $87.72
Senior Project Manager $80.52 $82.13
Senior Planner $44.47 $45.36
Project Engineer $48.61 $49.58
Senior Design Engineer $45.18 $46.08
Design Engineer $35.09 $35.79
Planner $28.61 $29.18
CAD Coordinator $53.28 $54.35
Administrative Assistant $32.93 $33.59
Intern $19.00 $19.38
JOB SPECIFIC - Classifications and Average Payrates need to match current payrolls submitted to the Department.
EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET FIXED RAISE
PAYROLL RATES
Cook
Printed 8/31/2026
Page 2 of 14
BLR 05514 (Rev. 1/24/26)
RATES
Page 36 of 43
Local Public Agency County Section Number
City of Evanston Cook 21-00288-00-RS
Consultant / Subconsultant Name Job Number
NAME Direct Labor Total
Contribution to
Prime Consultant
(Payroll Only)
Christopher B. Burke Engineering, Ltd. 22,256.00 2,225.60
Total 22,256.00 2,225.60
NOTE: Only subconsultants who fill out a cost estimate that splits out direct labor may be
listed on this sheet.
SUBCONSULTANTS
EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CEC S) WORKSHEET
Printed 8/31/2026
Page 3 of 14
BLR 05514 (Rev. 1/24/26)
SUBS
Page 37 of 43
Local Public Agency County Section Number
Consultant / Subconsultant Name Job Number
QUANTITY
CONTRACT
RATE TOTAL
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Lab Services Actual Cost (Provide breakdown of each cost)
Equipment and/or Specialized Equipment Rental Actual Cost (Requires 2-3 quotes with IDOT approval)
TOTAL DIRECT COSTS:
Aerial Photography and Mapping Actual Cost (Requires 2-3 quotes with IDOT approval)
Utliity Exploratory Trenching Actual Cost (Requires 2-3 quotes with IDOT approval)
Testing of Soil Samples Actual Cost
Courthouse Fees Actual Cost
Storm Sewer Cleaning and Televising Actual Cost (Requires 2-3 quotes with IDOT approval)
Traffic Control and Protection Actual Cost (Requires 2-3 quotes with IDOT approval)
Public Meeting Exhibits/Renderings & Equipment Actual Cost (Submit supporting documentation)
Recording Fees Actual Cost
Transcriptions (specific to project) Actual Cost
Web Site Actual Cost (Submit supporting documentation)
Advertisements Actual Cost (Submit supporting documentation)
Public Meeting Facility Rental Actual Cost (Submit supporting documentation)
2-Way Radio (Survey or Phase III Only) Actual Cost
Telephone Usage (Traffic System Monitoring Only) Actual Cost
CADD Actual Cost (Max $15/hour)
Project Specific Insurance Actual Cost
Monuments (Permanent) Actual Cost
Photo Processing Actual Cost
Overnight Delivery/Postage/Courier Service Actual Cost (Submit supporting documentation)
Copies of Deliverables/Mylars (In-house) Actual Cost (Submit supporting documentation)
Copies of Deliverables/Mylars (Outside) Actual Cost (Submit supporting documentation)
Parking Actual Cost
Overtime Premium portion (Submit supporting documentation)
Shift Differential Actual Cost (Based on firm's policy)
Vehicle Owned or Leased (no mileage charge allowed)$45.00/half day (4 hours or less) or $90/full day
Vehicle Rental Actual Cost (Up to $55/day)
Tolls Actual Cost
Lodging Taxes and Fees
(per Federal GSA)Actual Cost
Air Fare Coach rate, actual cost, requires minimum two weeks'
notice, with prior IDOT approval
Vehicle Mileage
(per Federal GSA)Up to Federal rate maximum
Lodging
(per Federal GSA)
Actual Cost
(Up to Federal rate maximum)
DIRECT COSTS WORKSHEET
City of Evanston Cook 21-00288-00-RS
List ALL direct costs required for this project. Those not listed on the form will not be eligible for reimbursement by the LPA on this project.
EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET
ITEM ALLOWABLE
Per Diem
(per Federal GSA)Up to federal maximum
Printed 8/31/2026
Page 4 of 14
BLR 05514 (Rev. 1/24/26)
DIRECT COSTSPage 38 of 43
Local Public Agency County Section Number
Consultant / Subconsultant Name Job Number
OVERHEAD RATE 152.85%0
TASK
DIRECT COSTS
(not included in
row totals)MANHOURS PAYROLL
OVERHEAD & FRINGE
BENEFITS FIXED FEE
SERVICES BY
OTHERS TOTAL
% OF GRAND
TOTAL
E.1 Phase I Reevaluation 16 1,404 2,145 463 4,012 3.36%
E.2 Temporary Traffic Signals 80 5,269 8,053 1,739 15,061 12.62%
E.3 CDOT Coordination 80 4,347 6,645 1,435 12,427 10.41%
E.4 Dempster IDS 120 6,511 9,951 2,148 18,610 15.59%
- - - -
C.1 Electrical-Fiber/Security 12 769 1,176 254 14,824 17,023 14.26%
C.2 Electrical - Photometrics - - - 11,600 11,600 9.72%
C.3 Additional Survey 8 369 564 122 27,168 28,223 23.65%
C.4 Civil 8 513 784 169 9,984 11,450 9.59%
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Subconsultant DL 945.34 945 0.79%
TOTALS - 324 19,182 29,318 7,275 63,576 119,351 100.00%
Fixed fee is limited to the lower of the calculated amount or 15%of the DL.
The subconsultant fee has been adjusted due to 15% fixed fee cap.
COMPLEXITY FACTOR
City of Evanston Cook 21-00288-00-RS
EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET
COST ESTIMATE WORKSHEET
Printed 8/31/2026
Page 5 of 14
BLR 05514 (Rev. 1/24/26)
COST EST
Page 39 of 43
Local Public Agency County Section Number
Consultant / Subconsultant Name Job Number
AVERAGE HOURLY PROJECT RATES
SHEET 1 OF 2
PAYROLL AVG TOTAL PROJ. RATES
HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd
CLASSIFICATION RATES Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg
Project Principal 87.72 16.0 4.94% 4.33 16 100.00% 87.72
Senior Project Manager 82.13 96.0 29.63% 24.33 40 50.00% 41.07 16 20.00% 16.43 30 25.00% 20.53
Senior Planner 45.36 0.0
Project Engineer 49.58 94.0 29.01% 14.38 40 50.00% 24.79 24 30.00% 14.87 30 25.00% 12.40
Senior Design Engineer 46.08 98.0 30.25% 13.94 0 40 50.00% 23.04 40 33.33% 15.36
Design Engineer 35.79 20.0 6.17% 2.21 20 16.67% 5.97
Planner 29.18 0.0
CAD Coordinator 54.35 0.0
Administrative Assistant 33.59 0.0
Intern 19.38 0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
TOTALS 324.0 100% $59.20 16.0 100.00% $87.72 80.0 100% $65.86 80.0 100% $54.34 120.0 100% $54.25 0.0 0% $0.00
EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET
21-00288-00-RSCook City of Evanston
E.1 Phase I Reevaluation
E.2 Temporary Traffic
Signals E.3 CDOT Coordination E.4 Dempster IDS
Printed 8/31/2026
Page 6 of 14
BLR 05514 (Rev. 1/24/26)
AVG 1
Page 40 of 43
Local Public Agency County Section Number
Consultant / Subconsultant Name Job Number
AVERAGE HOURLY PROJECT RATES
SHEET 2 OF 2
PAYROLL AVG
HOURLY Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd
CLASSIFICATION RATES Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg Part. Avg
Project Principal 87.72
Senior Project Manager 82.13 6 50.00% 41.07 4 50.00% 41.07
Senior Planner 45.36
Project Engineer 49.58
Senior Design Engineer 46.08 6 50.00% 23.04 0 8 100.00% 46.08 4 50.00% 23.04
Design Engineer 35.79
Planner 29.18
CAD Coordinator 54.35
Administrative Assistant 33.59
Intern 19.38
TOTALS 12.0 100% $64.11 0.0 0% $0.00 8.0 100% $46.08 8.0 100% $64.11 0.0 0% $0.00 0.0 0% $0.00
EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET
Cook 21-00288-00-RSCity of Evanston
C.1 Electrical-
Fiber/Security
C.2 Electrical -
Photometrics C.3 Additional Survey C.4 Civil
Printed 8/31/2026
Page 7 of 14
BLR 05514 (Rev. 1/24/26)
AVG 2
Page 41 of 43
Local Public Agency County Section Number
Consultant / Subconsultant Name Job Number
OVERHEAD RATE 145.92%0
TASK
DIRECT COSTS
(not included in
row totals)MANHOURS PAYROLL
OVERHEAD &
FRINGE BENEFITS FIXED FEE
SERVICES BY
OTHERS TOTAL
% OF GRAND
TOTAL
C.1 - Electrical - Fiber/Security 150 92 5,261 7,677 1,736 14,824 23.32%
C.2 - Electrical - Photometrics 150 72 4,105 5,990 1,355 11,600 18.25%
C.3 - Additional Survey 900 162 9,418 13,742 3,108 27,168 42.73%
C.4 - Civil 300 60 3,472 5,066 1,146 9,984 15.70%
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Subconsultant DL 0.00
TOTALS 1,500 386 22,256 32,475 7,345 - 63,576 100.00%
Direct Costs total must equal total
on Direct Costs tab
COMPLEXITY FACTOR
City of Evanston Cook
EXHIBIT D COST ESTIMATE OF CONSULTANT SERVICES (CECS) WORKSHEET
COST ESTIMATE WORKSHEET
Christopher B. Burke Engineering, Ltd.
Printed 8/31/2026
Page 1 of 1
BLR 05514 (Rev. 1/24/26)
COST EST
Page 42 of 43
CITY OF EVANSTON
CHANGE ORDER 2
Order No. 002
Date: 09/14/2026
Agreement Date: 08/26/2024
PROJECT: Chicago Avenue Corridor Improvement Project, RFQ #20-35
OWNER: City of Evanston
CONSULTANT: Epstein & Sons
The following changes are hereby made to the AGREEMENT:
Change to CONTRACT PRICE: $119,351.00
Original BASE CONTRACT PRICE: $ 1,543,999
Current CONTRACT PRICE adjusted by previous CHANGE ORDERS $ 1,696,060
Total change in CONTRACT PRICE for this CHANGE ORDER $ 119,351
The CONTRACT PRICE including this CHANGE ORDER will be $ 1,815,411
Original Date for Contract Completion 09/01/2026
Time Extension (in calendar days) 0 days
Modified Date for Contract Completion 09/01/2027
Approved by (Owner):
City of Evanston Date
Accepted by (Contractor):
[Epstein & Sons] Date