HomeMy WebLinkAboutSole Source Contract- Halloran & Yauch Inc.- Emergency Irrigation Repairs James Park $20,000 Memorandum
To: Luke Stowe, City Manager
From: Edgar Cano - Public Works Agency Director
Lara Biggs - City Engineer
Stefanie Levine – Senior Project Manager
Kenon Boehm – Landscape Architect II
Subject: Approval of Sole Source contract with Halloran and Yauch, Inc. for emergency
irrigation repairs at James Park
Date: July 29, 2026
Recommended Action:
Staff recommends the City Manager execute a contract for the Sole Source services with
Halloran and Yauch, Inc (28322 Ballard Drive, Lake Forest, IL 60045) for emergency irrigation
repairs at James Park in the amount of $20,000.00.
Funding Source:
This funding is from the Capital Improvement Fund 2026 Project Bonds. It exceeds the budget
for the James Park Playground and Pathway Improvements budget, but funding is available from
savings in Playground Safety Surfacing. This line item has a FY 2026 budget of $250,000. of
which $62,200 is remaining.
Summary:
While the City of Evanston typically solicits competitive bids for capital improvement projects, this
proposal is for a sole-source purchase to complete emergency irrigation repairs. During adjacent
water main repairs north of the existing playground, the existing irrigation system was not fully
marked and was inadvertently damaged. With the peak summer season and heavy use of the
park and athletic fields, restoring the irrigation system as quickly as possible is a priority.
Staff contacted Halloran and Yauch, the original designers and installers of the existing irrigation
system, to perform the repairs. Their familiarity with the system's design and configuration will
allow the City to expedite the repairs while minimizing the time and costs that would otherwise
be required for a new contractor to become familiar with the existing infrastructure.
Staff recommends the approval of a sole source contract to Halloran and Yauch, Inc. in the
amount of $20,000.00. Work is set to start shortly after receipt of contracts.
Approval:
______________________________
Luke Stowe, City Manager
Doc ID: fb622af3a48cb141dab6f79116c36c3f48ede777
415.40.4126.65515 Project - 535034
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
July 21, 2026
City of Evanston
Attn: Khalid Lastic
909 David Street
Evanston, IL 60201
Re: Irrigation System –
James Park Sports Field - 300 Dodge Avenue, Evanston, IL 60201
Dear Mr. Lastic,
We hereby propose to repair the broken irrigation lines and wires at ‘James Park Sports Field - 300
Dodge Avenue, Evanston, IL’ for the daily rate of $3,780.00, plus materials for a 3-man crew.
Work to be billed at prevailing wage rate. We estimate this will take approximately 5 working days,
which could total $15,000.00-$20,000.00.
Please let us know if this work is approved.
Respectfully submitted,
By: _________________________________________
Halloran & Yauch, Inc. – Patrick Halloran
Accepted: ____________________________________Date: __________
PH/ll
If agreeable, please return a signed copy of the proposal at your earliest
convenience to: secretary@hyirrigation.com
08 / 03 / 2026
Doc ID: fb622af3a48cb141dab6f79116c36c3f48ede777Doc ID: a82f4db47da4181332df2350ffc01736d380e650
SOLE/ SINGLE SOURCE JUSTIFICATION
(Requester completes Section A and B)
SECTION A – SOLE/SINGLE SOURCE PURCHASE:
Complete if sole/single source purchase is $2,500 or over, AND competition is not available.
Sole/Single Source approvals are valid one year from approval date, unless specified elsewhere.
PO No. (if applicable): Amount: | Date:
Supplies/Services Required (be specific):
Proposed Vendor Name and No:
_______________________________________
Requested by: (Name and Signature)
_________________________________________
Prepared by: (Name and Signature)
I certify that justification/ information is accurate and
complete to the best of my knowledge and that I have no
personal interests relative to this request .
Dept. Name/ Ext:
Check One: The requested supply/service is a sole/single source procurement due to:
AVAILABILITY/ONE OF A KIND No competitive product exists or is available from another vendor.
COMPATIBILITY Must match existing piece or brand of equipment and is available from only one vendor.
REPLACEMENT/MAINTENANCE Repair or maintenance for specific brand of existing equipment and
is available from only original equipment manufacturer or designated servic e dealer.
OTHER
Provide a full explanation/detail of above selection: complete descriptions, and relevant reasons to
support the justification:
SECTION B - REQUESTER CERTIFICATION: By submitting this request, I certify that the above
justification/information is accurate and complete to the best of my knowledge and that I have no
personal interests relative to this request.
___________________________________________________ ______________________________
(Name and Signature of Requester) (Date)
_________________________________________________ ______________________________
(Name and Signature of Department Director) (Date)
SECTION C - TO BE: COMPLETED BY PURCHASING MANAGER:
Based on the information provided in Section A and attached supporting documents,
I concur / do not concur (see below) with purchase to be a Sole Source.
Do not concur for the following reason(s):
(Name and Signature of Purchasing Manager or
Authorized Designee)
(Date)
x
x
07/30/26
7/30/26
Irrigation line repairs
Public Works Agency
$20,000
Boehm, Kenon
Digitally signed by Boehm, Kenon
DN: E=KBoehm@cityofevanston.org, CN="Boehm, Kenon", OU=Public Works Administration, OU=Public Works, OU=COE Users, DC=local,
DC=cityofevanston, DC=org
Date: 2026.07.30 14:24:42-05'00'
Boehm, Kenon Digitally signed by Boehm, Kenon
DN: E=KBoehm@cityofevanston.org, CN="Boehm, Kenon", OU=Public Works Administration, OU=Public Works, OU=COE Users, DC=local, DC=cityofevanston, DC=org
Date: 2026.07.30 14:25:01-05'00'
Boehm, Kenon
Digitally signed by Boehm, Kenon
DN: E=KBoehm@cityofevanston.org, CN="Boehm, Kenon", OU=Public Works Administration, OU=Public Works, OU=COE Users, DC=local,
DC=cityofevanston, DC=org
Date: 2026.07.30 14:24:48-05'00'
During adjacent
water main repairs north of the existing playground, the existing irrigation system was not fully marked and was inadvertently damaged. With the peak summer season and
heavy use of the park and athletic fields, restoring the irrigation system as quickly as possible is a priority. Staff contacted Halloran and Yauch, the original designers and
installers of the existing irrigation system, to perform the repairs. Their familiarity with the system's design and configuration will allow the City to expedite the repairs while
minimizing the time and costs that would otherwise be required for a new contractor to become familiar with the existing infrastructure.
08 / 03 / 2026
Doc ID: fb622af3a48cb141dab6f79116c36c3f48ede777
08 / 29 / 2026
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Sole Source contract with Halloran and Yauch, Inc. for...
James_-_Irr...ce_Memo.pdf and 1 other
fb622af3a48cb141dab6f79116c36c3f48ede777
MM / DD / YYYY
Signed
07 / 31 / 2026
10:42:40 UTC-5
Sent for signature to Luke Stowe (lstowe@cityofevanston.org)
from lthomas@cityofevanston.org
IP: 50.171.242.186
08 / 03 / 2026
05:46:09 UTC-5
Viewed by Luke Stowe (lstowe@cityofevanston.org)
IP: 76.136.85.191
08 / 03 / 2026
05:49:33 UTC-5
Signed by Luke Stowe (lstowe@cityofevanston.org)
IP: 76.136.85.191
The document has been completed.08 / 03 / 2026
05:49:33 UTC-5
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Approved as to form:
Alexandra B. Ruggie
Corporation Counsel
08 / 29 / 2026
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Doc ID: a82f4db47da4181332df2350ffc01736d380e650
Sole Source contract with Halloran and Yauch, Inc. for...
Sole_Source..._4___1_.pdf and 1 other
a82f4db47da4181332df2350ffc01736d380e650
MM / DD / YYYY
Signed
08 / 27 / 2026
09:36:52 UTC-5
Sent for signature to Alexandra Ruggie
(aruggie@cityofevanston.org) and Luke Stowe
(lstowe@cityofevanston.org) from lthomas@cityofevanston.org
IP: 50.171.242.186
08 / 27 / 2026
09:43:24 UTC-5
Viewed by Alexandra Ruggie (aruggie@cityofevanston.org)
IP: 50.171.242.186
08 / 27 / 2026
09:43:30 UTC-5
Signed by Alexandra Ruggie (aruggie@cityofevanston.org)
IP: 50.171.242.186
08 / 29 / 2026
16:39:33 UTC-5
Viewed by Luke Stowe (lstowe@cityofevanston.org)
IP: 76.136.85.191
08 / 29 / 2026
16:40:39 UTC-5
Signed by Luke Stowe (lstowe@cityofevanston.org)
IP: 76.136.85.191
The document has been completed.08 / 29 / 2026
16:40:39 UTC-5