Loading...
HomeMy WebLinkAboutSole Source Contract- Halloran & Yauch Inc.- Emergency Irrigation Repairs James Park $20,000 Memorandum To: Luke Stowe, City Manager From: Edgar Cano - Public Works Agency Director Lara Biggs - City Engineer Stefanie Levine – Senior Project Manager Kenon Boehm – Landscape Architect II Subject: Approval of Sole Source contract with Halloran and Yauch, Inc. for emergency irrigation repairs at James Park Date: July 29, 2026 Recommended Action: Staff recommends the City Manager execute a contract for the Sole Source services with Halloran and Yauch, Inc (28322 Ballard Drive, Lake Forest, IL 60045) for emergency irrigation repairs at James Park in the amount of $20,000.00. Funding Source: This funding is from the Capital Improvement Fund 2026 Project Bonds. It exceeds the budget for the James Park Playground and Pathway Improvements budget, but funding is available from savings in Playground Safety Surfacing. This line item has a FY 2026 budget of $250,000. of which $62,200 is remaining. Summary: While the City of Evanston typically solicits competitive bids for capital improvement projects, this proposal is for a sole-source purchase to complete emergency irrigation repairs. During adjacent water main repairs north of the existing playground, the existing irrigation system was not fully marked and was inadvertently damaged. With the peak summer season and heavy use of the park and athletic fields, restoring the irrigation system as quickly as possible is a priority. Staff contacted Halloran and Yauch, the original designers and installers of the existing irrigation system, to perform the repairs. Their familiarity with the system's design and configuration will allow the City to expedite the repairs while minimizing the time and costs that would otherwise be required for a new contractor to become familiar with the existing infrastructure. Staff recommends the approval of a sole source contract to Halloran and Yauch, Inc. in the amount of $20,000.00. Work is set to start shortly after receipt of contracts. Approval: ______________________________ Luke Stowe, City Manager Doc ID: fb622af3a48cb141dab6f79116c36c3f48ede777 415.40.4126.65515 Project - 535034 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 July 21, 2026 City of Evanston Attn: Khalid Lastic 909 David Street Evanston, IL 60201 Re: Irrigation System – James Park Sports Field - 300 Dodge Avenue, Evanston, IL 60201 Dear Mr. Lastic, We hereby propose to repair the broken irrigation lines and wires at ‘James Park Sports Field - 300 Dodge Avenue, Evanston, IL’ for the daily rate of $3,780.00, plus materials for a 3-man crew. Work to be billed at prevailing wage rate. We estimate this will take approximately 5 working days, which could total $15,000.00-$20,000.00. Please let us know if this work is approved. Respectfully submitted, By: _________________________________________ Halloran & Yauch, Inc. – Patrick Halloran Accepted: ____________________________________Date: __________ PH/ll If agreeable, please return a signed copy of the proposal at your earliest convenience to: secretary@hyirrigation.com 08 / 03 / 2026 Doc ID: fb622af3a48cb141dab6f79116c36c3f48ede777Doc ID: a82f4db47da4181332df2350ffc01736d380e650 SOLE/ SINGLE SOURCE JUSTIFICATION (Requester completes Section A and B) SECTION A – SOLE/SINGLE SOURCE PURCHASE: Complete if sole/single source purchase is $2,500 or over, AND competition is not available. Sole/Single Source approvals are valid one year from approval date, unless specified elsewhere. PO No. (if applicable): Amount: | Date: Supplies/Services Required (be specific): Proposed Vendor Name and No: _______________________________________ Requested by: (Name and Signature) _________________________________________ Prepared by: (Name and Signature) I certify that justification/ information is accurate and complete to the best of my knowledge and that I have no personal interests relative to this request . Dept. Name/ Ext: Check One: The requested supply/service is a sole/single source procurement due to: AVAILABILITY/ONE OF A KIND No competitive product exists or is available from another vendor. COMPATIBILITY Must match existing piece or brand of equipment and is available from only one vendor. REPLACEMENT/MAINTENANCE Repair or maintenance for specific brand of existing equipment and is available from only original equipment manufacturer or designated servic e dealer. OTHER Provide a full explanation/detail of above selection: complete descriptions, and relevant reasons to support the justification: SECTION B - REQUESTER CERTIFICATION: By submitting this request, I certify that the above justification/information is accurate and complete to the best of my knowledge and that I have no personal interests relative to this request. ___________________________________________________ ______________________________ (Name and Signature of Requester) (Date) _________________________________________________ ______________________________ (Name and Signature of Department Director) (Date) SECTION C - TO BE: COMPLETED BY PURCHASING MANAGER: Based on the information provided in Section A and attached supporting documents, I concur / do not concur (see below) with purchase to be a Sole Source. Do not concur for the following reason(s): (Name and Signature of Purchasing Manager or Authorized Designee) (Date) x x 07/30/26 7/30/26 Irrigation line repairs Public Works Agency $20,000 Boehm, Kenon Digitally signed by Boehm, Kenon DN: E=KBoehm@cityofevanston.org, CN="Boehm, Kenon", OU=Public Works Administration, OU=Public Works, OU=COE Users, DC=local, DC=cityofevanston, DC=org Date: 2026.07.30 14:24:42-05'00' Boehm, Kenon Digitally signed by Boehm, Kenon DN: E=KBoehm@cityofevanston.org, CN="Boehm, Kenon", OU=Public Works Administration, OU=Public Works, OU=COE Users, DC=local, DC=cityofevanston, DC=org Date: 2026.07.30 14:25:01-05'00' Boehm, Kenon Digitally signed by Boehm, Kenon DN: E=KBoehm@cityofevanston.org, CN="Boehm, Kenon", OU=Public Works Administration, OU=Public Works, OU=COE Users, DC=local, DC=cityofevanston, DC=org Date: 2026.07.30 14:24:48-05'00' During adjacent water main repairs north of the existing playground, the existing irrigation system was not fully marked and was inadvertently damaged. With the peak summer season and heavy use of the park and athletic fields, restoring the irrigation system as quickly as possible is a priority. Staff contacted Halloran and Yauch, the original designers and installers of the existing irrigation system, to perform the repairs. Their familiarity with the system's design and configuration will allow the City to expedite the repairs while minimizing the time and costs that would otherwise be required for a new contractor to become familiar with the existing infrastructure. 08 / 03 / 2026 Doc ID: fb622af3a48cb141dab6f79116c36c3f48ede777 08 / 29 / 2026 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Sole Source contract with Halloran and Yauch, Inc. for... James_-_Irr...ce_Memo.pdf and 1 other fb622af3a48cb141dab6f79116c36c3f48ede777 MM / DD / YYYY Signed 07 / 31 / 2026 10:42:40 UTC-5 Sent for signature to Luke Stowe (lstowe@cityofevanston.org) from lthomas@cityofevanston.org IP: 50.171.242.186 08 / 03 / 2026 05:46:09 UTC-5 Viewed by Luke Stowe (lstowe@cityofevanston.org) IP: 76.136.85.191 08 / 03 / 2026 05:49:33 UTC-5 Signed by Luke Stowe (lstowe@cityofevanston.org) IP: 76.136.85.191 The document has been completed.08 / 03 / 2026 05:49:33 UTC-5 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Approved as to form: Alexandra B. Ruggie Corporation Counsel 08 / 29 / 2026 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Doc ID: a82f4db47da4181332df2350ffc01736d380e650 Sole Source contract with Halloran and Yauch, Inc. for... Sole_Source..._4___1_.pdf and 1 other a82f4db47da4181332df2350ffc01736d380e650 MM / DD / YYYY Signed 08 / 27 / 2026 09:36:52 UTC-5 Sent for signature to Alexandra Ruggie (aruggie@cityofevanston.org) and Luke Stowe (lstowe@cityofevanston.org) from lthomas@cityofevanston.org IP: 50.171.242.186 08 / 27 / 2026 09:43:24 UTC-5 Viewed by Alexandra Ruggie (aruggie@cityofevanston.org) IP: 50.171.242.186 08 / 27 / 2026 09:43:30 UTC-5 Signed by Alexandra Ruggie (aruggie@cityofevanston.org) IP: 50.171.242.186 08 / 29 / 2026 16:39:33 UTC-5 Viewed by Luke Stowe (lstowe@cityofevanston.org) IP: 76.136.85.191 08 / 29 / 2026 16:40:39 UTC-5 Signed by Luke Stowe (lstowe@cityofevanston.org) IP: 76.136.85.191 The document has been completed.08 / 29 / 2026 16:40:39 UTC-5