Loading...
HomeMy WebLinkAboutResolution 167-R-26, Approval of Change Order No. 6 to the agreement with CDM Smith Inc. for the Corrosion Control Study (RFP 21 07/27/2026 167-R-26 A RESOLUTION Authorizing the City Manager to Execute Change Order No. 6 to the Agreement with CDM Smith Inc. for Professional Engineering Services for the Corrosion Control Study (RFP 21-26) WHEREAS, the City of Evanston owns and operates a public water supply system that provides safe and reliable drinking water to the residents of Evanston and several wholesale water customers; and WHEREAS, the United States Environmental Protection Agency (U.S. EPA) promulgated the Lead and Copper Rule Revisions (LCRR) to strengthen corrosion control treatment requirements and further reduce exposure to lead in drinking water; and WHEREAS, the Illinois Environmental Protection Agency (Illinois EPA) requires the City of Evanston to complete a Corrosion Control Study to identify and implement the optimal corrosion control treatment for its drinking water system in accordance with State and Federal drinking water regulations; and WHEREAS, on September 13, 2021, the City Council approved a professional services agreement with CDM Smith Inc. (RFP 21-26) to perform a comprehensive Corrosion Control Study for the City's water treatment system; and WHEREAS, the agreement has subsequently been amended through five change orders to accommodate additional laboratory testing, corrosion control evaluations, administrative funding updates, project management activities, and schedule extensions necessary to satisfy regulatory requirements; and WHEREAS, on July 9, 2026, the Illinois EPA issued a Special Exception Permit approving the results and recommendations of the Evanston Water Treatment Plant Corrosion Control Optimization Study and approving the associated technical memorandum prepared by CDM Smith; and WHEREAS, the Illinois EPA Special Exception Permit requires the City to conduct a full-scale plant pilot, submit the results of the pilot testing, and provide an Optimal Corrosion Control Treatment Recommendation to the Illinois EPA no later than Page 1 of 3 167-R-26 January 9, 2028, prior to implementing modifications to the existing phosphate feed system; and WHEREAS, the agreement with CDM Smith expired on April 30, 2026, and no work has been performed under the agreement since its expiration while the City awaited issuance of the Illinois EPA Special Exception Permit to determine the remaining regulatory requirements; and WHEREAS, sufficient funding remains within the existing contract amount of One Million Two Hundred Nineteen Thousand Dollars ($1,219,000.00) to complete the remaining scope of work, including the required full-scale plant pilot, and therefore no increase in the contract amount is required; and WHEREAS, Change Order No. 6 extends the contract completion date from April 30, 2026, to January 31, 2028, a period of 641 calendar days, to allow completion of the remaining work required by the Illinois EPA Special Exception Permit without increasing the contract amount; and WHEREAS, the City Council has determined that approving Change Order No. 6 is in the best interests of the City to maintain compliance with applicable State and Federal drinking water regulations and to protect the public health, safety, and welfare. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, COOK COUNTY, ILLINOIS: Section 1:The foregoing recitals are hereby found to be true and correct and are incorporated herein as though fully set forth. Section 2:The City Council hereby authorizes the City Manager to execute Change Order No. 6 to the agreement with CDM Smith Inc. for the Corrosion Control Study (RFP 21-26), extending the contract completion date from April 30, 2026, to January 31, 2028, without increasing the current contract amount of $1,219,000.00, in substantially the form attached hereto and approved as to form by the Corporation Counsel. Section 3: The City Manager, Corporation Counsel, City Clerk, and other appropriate City officials are hereby authorized and directed to execute all documents and take all actions necessary to carry out the intent of this Resolution. Page 2 of 3 167-R-26 Section 4: If any provision of this Resolution is declared invalid or unenforceable by a court of competent jurisdiction, such determination shall not affect the validity of the remaining provisions. Section 5: This Resolution shall be in full force and effect from and after its passage and approval in the manner provided by law. _________________________________ Daniel Biss, Mayor Attest: _________________________ Stephanie Mendoza, City Clerk Approved as to form: __________________________________ Alexandra B. Ruggie, Corporation Counsel Adopted: _________________, 2026 Page 3 of 3 July 27 CITY OF EVANSTON CHANGE ORDER Order No. 006 Date: July 14, 2026 Agreement Date: September 30, 2021 PROJECT: Corrosion Control Study RFP 21-26 OWNER: City of Evanston CONTRACTOR: CDM Smith Inc. The following changes are hereby made to the AGREEMENT: Change Order No. 6 does not increase the contract amount. Instead, it extends the contract completion date by 641 calendar days, from April 30, 2026, to January 31, 2028, allowing CDM Smith to complete the full-scale plant pilot, prepare the Optimal Corrosion Control Treatment Recommendation, continue coordination with the Illinois Environmental Protection Agency (IEPA). Change to CONTRACT PRICE: $0 Original CONTRACT PRICE: $ 974,500.00 Current CONTRACT PRICE adjusted by previous CHANGE ORDERS $ 1,219,000.00 Total change in CONTRACT PRICE for this CHANGE ORDER No. 006 $ 0 The CONTRACT PRICE including this CHANGE ORDER will be $ 1,219,000.00 Approved by (Owner): City of Evanston Date Accepted by (Contractor): CDM Smith, Inc. Date 07/14/2026