HomeMy WebLinkAboutResolution 107-R-26 (1) (1) 05/26/2026 107-R-26 A RESOLUTION Authorizing the City Manager to Execute Change Order No. 1 to the Agreement with Bolder Contractors, LLC (316 Cary Point Drive, Cary, IL 60013) for 2026 Water Main Improvements and Street Resurfacing (Bid No. 26-09) WHEREAS, the Evanston City Council believes entering into an Agreement with Bolder Contractors, LLC is in the best interests of the citizens of Evanston, NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, COOK COUNTY, ILLINOIS: SECTION 1: That the City Manager is hereby authorized and directed to sign, and the City Clerk is hereby authorized and directed to attest on behalf of the City of Evanston, an Agreement between the City and Bolder Contractors, LLC. SECTION 2: That the City Manager is hereby authorized and directed to negotiate any terms of an Agreement as may be determined to be in the best interests of the City. SECTION 3: That this Resolution shall be in full force and effect from and after its passage, approval, and publication in the manner provided by law. _______________________________ Daniel Biss, Mayor Attest: ______________________________ Stephanie Mendoza, City Clerk Adopted: __________________, 20__ Approved as to form: ______________________________ Alexandra B. Ruggie, Corporation Counsel Page 1 of 4 May 26 26 CITY OF EVANSTON CHANGE ORDER Order No. 001 Date: 05/14/2026 Agreement Date: 05/11/2026 PROJECT: 2026 Water Main Improvements and Street Resurfacing, Bid 26-09 OWNER: City of Evanston CONTRACTOR: Bolder Contractors, LLC The following changes are hereby made to the AGREEMENT: 1. ADD James Park Scope of Work as summarized in the attached proposal - $215,000.00 Change to CONTRACT PRICE: $215,000.00 Original BASE CONTRACT PRICE: $ 5,936,490.58 Current CONTRACT PRICE adjusted by previous CHANGE ORDERS $ 5,936,490.58 Total change in CONTRACT PRICE for this CHANGE ORDER $ 215,000.00 The CONTRACT PRICE including this CHANGE ORDER will be $ 6,151,490.58 Original Date for Contract Completion 11/20/2026 Time Extension (in calendar days) 0 days Modified Date for Contract Completion 11/20/2026 Approved by (Owner): City of Evanston Date Accepted by (Contractor): [Bolder Contractors, LLC] Date Page 2 of 4 Sewer, Watermain, and Road Construction 316 Cary Point Drive Cary, IL 60013 Office 847.236.0785 05/08/2026 Bridget Nash, PE Senior Project Manager Bureau of Capital Planning and Engineering Public Works Agency City of Evanston 909 Davis Street | Evanston, IL 60201 | (847) 448-8102 bnash@cityofevanston.org | cityofevanston.org Re: Lump Sum Proposal – James Park Water Main Improvements, City of Evanston, Illinois Dear Ms. Nash: Bolder Contractors is pleased to submit this lump sum proposal for water main work in the City of Evanston related to James Park Water Main Improvement project. Our price includes all labor, materials, and equipment necessary to deliver a complete, tested, and restored system per City of Evanston standards, IDOT (as applicable), and AWWA specifications. Scope of Work (included in Lump Sum price): • Installation of 40 linear feet of 16" zinc-coated ductile iron water main (DIWM) inclusive of appropriate concrete MJ Adapters for both LCP and ECP • Installation of 120 linear feet of 6” DIP CL54-Zinc water main pipe • Abandonment of 60 linear feet of existing 6" water service (WS) • Furnish and install 6" auxiliary valve in valve box • Retap existing B-box • Remove and replace existing fire hydrant (assembly, lead, and appurtenances) • Exploratory excavation (potholing/utility verification) • Connection to existing water main, including fittings, restraints, and tie-ins • Special non-hazardous waste removal and disposal (excavation, stockpiling, loading, trucking, disposal) • Trench excavation, bedding, backfill (intent to re-use existing spoil to maximum extent possible), compaction • Disinfection (swabbing and chlorination) • Utility coordination and JULIE locate compliance Price: • Total Lump Sum: $215,000 Page 3 of 4 Sewer, Watermain, and Road Construction 316 Cary Point Drive Cary, IL 60013 Office 847.236.0785 Schedule: • Anticipated start: Week of June 22nd, 2026; substantial completion within 5 calendar days, subject to permitting and utility clearances. Work hours per City ordinance. • Please be advised that our material supplier’s inventory of required items is limited. As of 05/08/2026, the necessary materials are available and can be reserved for Bolder’s use. However, any delay in the notice of award may result in depletion of the supplier’s current stock, which could cause procurement lead times of up to fourteen (14) weeks prior to project commencement. Qualifications/Assumptions: • Prevailing Wage Act compliance; certified payrolls. • Insurance and bonding per City requirements • Outages coordinated with the City and customers to maintain service • Unforeseen conditions (e.g., rock, contaminated soils beyond special non-hazard, unknown utilities) handled via change order Exclusions: • Design/engineering beyond construction means/methods • Traffic control/MOT per MUTCD and City requirements • Erosion/sediment control and environmental compliance • Surface restoration (pavement, curb, sidewalk, parkway/landscaping) • As-built documentation and closeout Proposal Validity: • Valid for 30 days from the date above. We appreciate the opportunity to propose on this project – as we have significant experience installing PCCP – and we are committed to safe, high-quality, and timely delivery and installation. Please contact me at (260) 409-9864 or jdealteris@boldercontractors.com with any questions. Sincerely, Joseph deAlteris Member Bolder Contractors 316 Cary Pt. Drive, Cary IL, 60013 Page 4 of 4