2026 MFT_Resurfacing Project BID TAB
DATE: 5/12/2026 TIME: 2:00 P.M. ATTENDED BY: Cheryl, SN, NS Item No. Items Unit Quantity Unit Price Cost UNIT PRICE TOTAL UNIT PRICE TOTAL 1 TEMPORARY FENCE FOOT 6,000 6.00$ 36,000.00$ $1.00 $6,000.00 $4.00 $24,000.00 2 TREE TRUNK PROTECTION EACH 142 140.00$ 19,880.00$ $300.00 $42,600.00 $100.00 $14,200.00 3 TREE ROOT PRUNING FOOT 4,260 6.00$ 25,560.00$ $6.00 $25,560.00 $7.00 $29,820.00 4 TREE PRUNING (OVER 10 INCH DIAMETER) EACH 107 110.00$ 11,770.00$ $300.00 $32,100.00 $300.00 $32,100.00 5 SUPPLEMENTAL WATERING UNIT 15 15.00$ 225.00$ $180.00 $2,700.00 $41.00 $615.00 6 EARTH EXCAVATION CU YD 55 60.00$ 3,274.69$ $61.00 $3,329.27 $61.00 $3,329.27 7 TRENCH BACKFILL CU YD 132 70.00$ 9,240.00$ $53.00 $6,996.00 $53.00 $6,996.00 8 POROUS GRANULAR BACKFILL TON 52 70.00$ 3,640.00$ $53.00 $2,756.00 $53.00 $2,756.00 9 TOPSOIL FURNISH AND PLACE, SPECIAL CU YD 649 60.00$ 38,950.63$ $85.00 $55,180.06 $85.00 $55,180.06 10 SODDING, SALT TOLERANT SQ YD 3,782 16.00$ 60,505.84$ $17.00 $64,287.45 $19.50 $73,741.49 11 EXPLORATION TRENCH (UP TO 8 FEET DEEP) EACH 6 500.00$ 3,000.00$ $200.00 $1,200.00 $200.00 $1,200.00 12 INLET FILTERS EACH 64 30.00$ 1,920.00$ $200.00 $12,800.00 $200.00 $12,800.00 13 AGGREGATE BASE COURSE, TYPE B 4" SQ YD 2,079 8.00$ 16,628.03$ $7.25 $15,069.15 $7.25 $15,069.15 14 AGGREGATE BASE COURSE, TYPE B 6" SQ YD 86 12.00$ 1,029.33$ $14.50 $1,243.78 $14.50 $1,243.78 15 H.E.S. PORTLAND CEMENT CONCRETE BASE COURSE WIDENING 9" SQ YD 510 80.00$ 40,828.07$ $105.00 $53,586.85 $105.00 $53,586.85 16 AGGREGATE FOR TEMPORARY ACCESS TON 30 30.00$ 900.00$ $60.00 $1,800.00 $60.00 $1,800.00 17 BITUMINOUS MATERIALS (TACK COAT) POUND 11,528 1.00$ 11,527.60$ $1.50 $17,291.40 $0.01 $115.28 18 AGGREGATE (PRIME COAT) TON 33 10.00$ 333.69$ $20.00 $667.39 $5.00 $166.85 19 MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS TON 7 500.00$ 3,500.00$ $500.00 $3,500.00 $780.00 $5,460.00 20 LEVELING BINDER (MACHINE METHOD), N50 TON 982 90.00$ 88,378.25$ $140.00 $137,477.28 $130.00 $127,657.48 21 HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT SQ YD 330 15.00$ 4,957.45$ $29.00 $9,584.40 $15.00 $4,957.45 22 TEMPORARY RAMP SQ YD 330 15.00$ 4,957.45$ $29.00 $9,584.40 $4.00 $1,321.99 23 HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 TON 1,948 95.00$ 185,064.86$ $140.00 $272,727.17 $112.00 $218,181.73 24 INCIDENTAL HOT-MIX ASPHALT SURFACING TON 7 400.00$ 2,800.00$ $500.00 $3,500.00 $325.00 $2,275.00 25 TEMPORARY HOT-MIX ASPHALT TON 60 140.00$ 8,400.00$ $150.00 $9,000.00 $160.00 $9,600.00 26 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 6 INCH SQ YD 581 80.00$ 46,448.07$ $93.00 $53,995.88 $93.00 $53,995.88 27 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH SQ YD 57 90.00$ 5,136.75$ $105.00 $5,992.87 $105.00 $5,992.87 28 PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH SQ FT 9,625 12.00$ 115,505.16$ $11.50 $110,692.45 $13.00 $125,130.59 29 DETECTABLE WARNINGS SQ FT 642 50.00$ 32,089.24$ $42.00 $26,954.96 $42.00 $26,954.96 30 HOT-MIX ASPHALT SURFACE REMOVAL (VARIABLE DEPTH) SQ YD 16,265 6.00$ 97,588.13$ $5.50 $89,455.79 $7.80 $126,864.57 31 PAVEMENT REMOVAL SQ YD 716 30.00$ 21,490.76$ $24.00 $17,192.61 $24.00 $17,192.61 32 DRIVEWAY PAVEMENT REMOVAL SQ YD 526 20.00$ 10,512.02$ $24.00 $12,614.42 $24.00 $12,614.42 33 CURB REMOVAL FOOT 2,743 8.00$ 21,943.07$ $10.00 $27,428.84 $9.00 $24,685.95 34 COMBINATION CURB AND GUTTER REMOVAL FOOT 1,926 10.00$ 19,255.74$ $9.00 $17,330.17 $9.00 $17,330.17 35 SIDEWALK REMOVAL SQ FT 84 2.00$ 168.00$ $15.00 $1,260.00 $6.00 $504.00 36 CLASS C PATCHES, SPECIAL, 9" (HES) SQ YD 196 95.00$ 18,599.73$ $105.00 $20,557.60 $105.00 $20,557.60 37 CLASS D PATCHES, SPECIAL, 9" SQ YD 930 80.00$ 74,401.17$ $100.00 $93,001.47 $75.00 $69,751.10 38 FULL DEPTH PATCHES, SPECIAL 11" SQ YD 140 100.00$ 14,000.00$ $110.00 $15,400.00 $120.00 $16,800.00 39 STORM SEWERS, 12" SPECIAL (DIP CL 50) FOOT 195 220.00$ 42,900.00$ $240.00 $46,800.00 $240.00 $46,800.00 40 STORM SEWERS, 8" SPECIAL (DIP CL 50) FOOT 9 300.00$ 2,700.00$ $160.00 $1,440.00 $160.00 $1,440.00 41 CATCH BASIN, TYPE A, 4' DIAMETER TYPE 1 FRAME, OPEN LID EACH 1 6,500.00$ 6,500.00$ $7,000.00 $7,000.00 $7,000.00 $7,000.00 42 INLETS, TYPE A, 36" DEPTH, TYPE 1 FRAME, OPEN LID EACH 3 1,800.00$ 5,400.00$ $4,200.00 $12,600.00 $5,200.00 $15,600.00 43 MANHOLES TO BE RECONSTRUCTED EACH 2 2,500.00$ 5,000.00$ $2,600.00 $5,200.00 $2,600.00 $5,200.00 44 CATCH BASIN TO BE RECONSTRUCTED EACH 3 3,000.00$ 9,000.00$ $1,800.00 $5,400.00 $1,800.00 $5,400.00 45 VALVE VAULTS TO BE RECONSTRUCTED EACH 3 2,200.00$ 6,600.00$ $2,400.00 $7,200.00 $2,400.00 $7,200.00 46 VALVE BOXES TO BE ADJUSTED EACH 11 600.00$ 6,600.00$ $2,400.00 $26,400.00 $2,400.00 $26,400.00 47 FRAMES AND GRATES TO BE ADJUSTED EACH 38 550.00$ 20,900.00$ $525.00 $19,950.00 $525.00 $19,950.00 48 FRAMES AND LIDS TO BE ADJUSTED (SPECIAL) EACH 31 600.00$ 18,600.00$ $1,100.00 $34,100.00 $1,100.00 $34,100.00 49 FRAMES AND LIDS, OPEN LID (SPECIAL) EACH 3 700.00$ 2,100.00$ $850.00 $2,550.00 $850.00 $2,550.00 50 FRAMES AND LIDS, CLOSED LID (SPECIAL) EACH 5 500.00$ 2,500.00$ $1,050.00 $5,250.00 $1,050.00 $5,250.00 51 REMOVING INLETS EACH 3 300.00$ 900.00$ $200.00 $600.00 $200.00 $600.00 52 REMOVING MANHOLES EACH 1 1,000.00$ 1,000.00$ $500.00 $500.00 $500.00 $500.00 53 CONCRETE CURB, TYPE B (AEP Modified) FOOT 770 30.00$ 23,089.50$ $24.00 $18,471.60 $24.00 $18,471.60 54 COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.12 (AEP Modified) FOOT 3,889 40.00$ 155,552.46$ $38.00 $147,774.84 $38.00 $147,774.84 55 SPEED HUMPS SQ FT 1,454 20.00$ 29,080.00$ $10.00 $14,540.00 $15.00 $21,810.00 56 SPECIAL WASTE DISPOSAL CU YD 251 120.00$ 30,060.84$ $95.00 $23,798.17 $95.00 $23,798.17 57 SOIL DISPOSAL ANALYSIS EACH 1 10,000.00$ 10,000.00$ $2,375.00 $2,375.00 $500.00 $500.00 58 NON-SPECIAL WASTE DISPOSAL CU YD 60 150.00$ 9,000.00$ $90.00 $5,400.00 $90.00 $5,400.00 59 MOBILIZATION LSUM 1 50,000.00$ 50,000.00$ $99,750.00 $99,750.00 $115,621.92 $115,621.92 60 TRAFFIC CONTROL AND PROTECTION LSUM 1 50,000.00$ 50,000.00$ $20,000.00 $20,000.00 $112,000.00 $112,000.00 61 PAVEMENT MARKING TAPE, TYPE 1 SQ FT 3,300 1.00$ 3,300.00$ $1.00 $3,300.00 $0.01 $33.00 62 SHORT TERM PAVEMENT MARKING REMOVAL SQ FT 400 1.00$ 400.00$ $4.00 $1,600.00 $0.01 $4.00 63 THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS SQ FT 100 20.00$ 2,000.00$ $15.00 $1,500.00 $5.18 $518.00 64 THERMOPLASTIC PAVEMENT MARKING - LINE 4" FOOT 2,282 1.00$ 2,281.65$ $2.50 $5,704.13 $1.50 $3,422.48 65 THERMOPLASTIC PAVEMENT MARKING - LINE 6" FOOT 1,441 2.00$ 2,881.20$ $3.75 $5,402.25 $1.75 $2,521.05 66 THERMOPLASTIC PAVEMENT MARKING - LINE 12" FOOT 92 5.00$ 459.38$ $7.50 $689.06 $3.05 $280.22 67 THERMOPLASTIC PAVEMENT MARKING - LINE 24" FOOT 215 8.00$ 1,720.00$ $15.00 $3,225.00 $5.18 $1,113.70 68 STREET SWEEPING EACH 10 400.00$ 4,000.00$ $1,500.00 $15,000.00 $100.00 $1,000.00 69 REMOVING AND RESETTING STREET SIGNS EACH 1 3,000.00$ 3,000.00$ $500.00 $500.00 $500.00 $500.00 70 REMOVING AND RESETTING PAVERS SQ FT 211 28.00$ 5,909.40$ $31.00 $6,542.55 $36.00 $7,597.80 71 REMOVING AND RESETTING DECORATIVE WOOD FOOT 52 60.00$ 3,090.00$ $96.00 $4,944.00 $70.00 $3,605.00 72 TRAFFIC LOOP DETECTOR FOOT 80 30.00$ 2,400.00$ $91.00 $7,280.00 $91.00 $7,280.00 73 LAWN SPRINKLER SYSTEM REPAIRS FOOT 60 30.00$ 1,800.00$ $95.00 $5,700.00 $65.00 $3,900.00 74 CONSTRUCTION LAYOUT LSUM 1 10,000.00$ 10,000.00$ $5,000.00 $5,000.00 $10,000.00 $10,000.00 1,591,133.18$ $1,852,457.50 $1,881,808.00 1,591,133.18$ $1,855,904.24 $1,881,689.86 CITY OF EVANSTON TABULATION OF BIDS FOR 2026 MFT STREET RESURFACING PROJECT 26-00305-00-RS BID TOTAL AS READ AS CORRECTED 935 W. chestnut Street, Suite 100 4401 Roosevelt Road Chicago IL, 60642 Hillside IL, 60162 APPROVED ENGINEER'S ESTIMATE NAME AND ADDRESS OF BIDDERS Bigane Paving Co. Builders Paving, LLC