HomeMy WebLinkAboutSection 19-00285-00-RS Project C-91-169-21 Job IKT1(871) AmendmentIllinois Department of Transportation
Office of Highways Project Implementation / Bureau of Local Roads & Streets
2300 South Dirksen Parkway / Room 205 / Springfield, Ilinois 162764
December 1, 2025
Stephanie Mendoza
City Clerk
2100 Ridge Ave.
Evanston, IL 60201
RE: LPA:
City of Evanston
Section:
19-00285-00-RS
Project:
IKT1(871)
Job:
C-91-169-21
Joint Agreement
- Amendment '
Dear Stephanie Mendoza,
An amendment to the joint agreement for the subject project was executed by the
Department on November 20, 2025.
A copy is enclosed.
Please contact Teresa Cline (Teresa. Cline@illinois.gov) if you have any questions.
Sincerely,
Greg S. Lupton, P.E.
Acting Engineer of Local Roads and Streets
Enclosure
cc: Daniel Biss, Mayor
Jose Rios - Region 1 c/o Chad Riddle - District 1
Programming c/o DOT.CO.ProoramminaCabillinois.aov
Project Control c/o Sara. Revnolds5illinois.aov
Construction c/o Stefanie. Kentna illinois.00v
Docusign Envelope ID: C8CA36C1-12D0-4831-9991-6866E612629B
'*
rh No
DePWbTWMt
of TharlspOftabon Local Public Agency Amendment # 1
LOCAL PUBLIC AGENCY
Local Public Agency County Section Number
(City of Evanston (kook II19-00285-00-RS
Fund Type ITEP, SRTS, HSIP Number(s) MPO Name MPO TIP Number
ISTU IIN/A IICMAP II02-20-0014
® Construction on State Letting ❑ Construction Local Letting ❑ Day Labor ❑ Local Administered Engineering ❑ Right -of -Way
Construction Engineering Right of Way
Job Number Project Number Job Number Project Number Job Number Project Number
IC-91-169-21IIIKTI(871) II II II II
Reason for modification of original Aqreement
The project bid was higher than the engineers estimate.
This amended Agreement, hereinafter referred to as "Amendment" is made and entered to in between the above local public agency,
hereinafter referred to as the "LPA" and the State of Illinois, acting by and through its Department of Transportation, hereinafter referred to
as "STATE". The LPA and STATE agree to revise the original Agreement by execution of this Amendment.
LOCATION
Stationing
Local Street/Road Name Key Route Length From To
(Green Bay Road IIFAU 2744 II0.75 mile _ 1107.04 1107.79
Location Termini
Ilsabella Street to McCormick Boulevard I
Current Jurisdiction Existing Structure Numbers) I Add Location
Fjty of Evanston NA Remove
LOCAL PUBLIC AGENCY APPROPRIATION
For Amendments Increasing the LPA share: By execution of this Amendment. the LPA attests that additional moneys have been
appropriated or reserved by resolution or ordinance to fund the additional share of LPA project costs. A copy of the resolution or
ordinance is attached as an addendum (required for increases to state -let contracts only).
Page i of 5 BLR 05311 (Rev 05/10/24)
Docusign Envelope ID: C8CA36C1-12D0-4831-9991-BB66E612629B
SCHEDULE
Additional information and/or stipulations are hereby attached and identified below as being a part of this Amendment.
�XI 1_iLocation Map
XI 2.lDivision of Cost
�L
BE IT MUTUALLY AGREED that all remaining provisions of the original agreement not altered by the Amendment shall remain in full
force and effect and the Amendment shall be binding upon the inure to the benefit of the parties hereto, their successor and assigns.
The LPA further agrees as a condition of payment, that it accepts and will comply with the application provisions set forth in this
Amendment and all addenda indicated above.
APPROVED
Local Public Agency
Name of Official (Print or Type Name ._
Daniel Biss
Title of Official _
Qty Mayor
Signature 8 Date
���-
0
The above signature certifies the agency's TIN number is
366005870 conducting business as a Governmental Entity
DUNS Number074390907 UEIXKVUMPN8PBN1
Page 2 of 5 BLR 05341 (Rev 05110/24)
Docusign Envelope ID: C8CA36Cl-12D0-4831-9991-B866E612629B
APPROVED
State of Illinois
Department of Transportation
Gia Biaci, Secretary of Transportation Signature & Date
l�-shi»a ny: 11/20//2525 14: 4:39 !rM CST
03530r'39eeredCa ..
Greg Lupton, Acting Engineer of Local Roads & Streets Signature & Date
N/A
Lora Rensing, Director of Highways PUigna1=.&Date
D.vfflo.d by
11/20/25 1 8:03 M CST
Michael Prater Chief Counsel Signature 8 Date _
O ufflgna by:
C-, r)�_L 11/20/25 1 11:1 AM CST
Vicki Wilson Chief Fiscal Officer Sgnature & Date
Docusgn.d by:
at
�� Lit
11/20/25 1 2:36 PM CST
aVNOTEI If the LPA signature Is by an APPOINTED official, a resolution authorizing said appointed official to execute this
agreement Is required.
Page 3 of 5 BLR 05311 (Rev 05/10124)
Docusign Envelope ID: C8CA36C1-12D0-4831-9991-B866E6126296
_GREEN BAY ROAD CORRIDOR IMPROVEMENTS
McCormick Boulevard to Isabella Strent
WUo'e rood, MalAl®
\
p11 re no'.Q
N: aeIPa,k
n
The Spice Q t6)✓e Evanston
Ackolman
Pa k
. Nk
RyJI field PJlkmyo
Rocky and 6een,(+
Miller Park
V
2772 I lump
Evan
Welsh Ryan ArenaQ
Lot 101
Ri311
I r.IJ PJdny
vies)
Ryan field Q
ktt 11: P'/.1'1
fv.JpS IArr Cenlc+O
r
f.dEa 011r,. a I,:I%
6Sllpcenle\Y
All " J8�.6 SlM1V0 9
All J IJ.IJ• PJ11W Q
❑enu:nlJn School
Go 91e "
Location Map
Kimley>» Horn
Suds Car W isb Q
IOF SlgnalizedlnterswIl
Local Public Agency
(City of Evanston
Construction
Job Number
IC-91-169-21
Project Number
IIKT1(871)
SCHEDULE NUMBER 2
County
lCook
Engineering
Job Number Project Number
Federal Funds
Type of Work Fund Type Amount
Participating Construction STU $4,292,815.00
Construction Engineering STU $514,000.00
Non -Participating Constructior
ODC Federal Funds S4,806,815.00
Federal Funds
Type of Work Fund Type Amount
(Participating Construction STU $622,512.00
Federal Funds
Amerdment# 1 $622,512.00
Add Amendment I Remove Amendment l
11
ORIGINAL DIVISION OF COST (ODC)
State Funds
Fund Type Amount
I I
ODC State Fundsl
AMENDMENT # 1
State Funds
% I Fund Type Amount
State Funds
Amendment# 1
Total Federal Fundsl $5,429.327.001 Total State Fundsl
Type of Work Fund Type
l Participating Construction STU
Construction Engineering STU
Non -Participating Constructior
CDC Federal Funds
Section Number
1119-00285-00-RS
Right of Way
Job Number Project Number
II II
Local Public Agency Funds
% Fund Type Amount %
Local $2.608,926.00 BAL
Local 1 $306,260.00 BAL
Local $2,151,650.00100%
ODC LPA Fundsl $5,066,836.00 Total
Local Public Agency Funds
% I Fund Type Amount %
Local $266.791.00
LPA Funds
Amendment# 1 $266,791.00 Total
CUMULATIVE DIVISION OF COST (CDC)
Federal Funds State Funds
Amount % Fund Type Amount %
$4,915,327.00
$514,000.00
I
$5,429.327.00 CDC State Funds l
Totals
$6,901.741.001
$820,260.001
$2,151.650.001
$9, 873,651, 001
Work Totals
$889,303.00
$889.303.00
Total LPA Fundsl $5,333,627.001TOTAL $10,762,954.001
Local Public Agency Funds
Fund Type
Amount
Local
$2,875,717.00
Local
$306,260.00
Local
$2,151,650.00
CDC LPA Funds
$5,333,627.00
1
% Totals
$7,791,044.001
$820,260.001
$2,151,650.001
Total $10,762,954.001
PAnp 4 of S RI R n57111 (A" MM)OnnN
0
0
n
�n
SCHEDULE NUMBER 2
M
Local Public Agency Count„ _
_ _ Section Number
IlCook
II19-00285-00-RS
(City of Evanston
0
Construction Engineering
Right of Way
m
Job Number Project Number Job Number Project Number _
IC-91-169-21 IIIKT1(871)
, Job Number _ Project Number _
I�
w
IS funding is not a percentage of the total place an asterisk in the space provided for the percentage and explain below
o
FHWA (STU) participation 70%, NTE $5,429,327.00 (Construction Engineering portion 70%,
NTE $514,000)
I•Maximum
Non-Participating Construction include but not limited to Watermain and Sewer replacement.
w
NOTE. The costs shown in the Division of Cost table are approximate and subject to change The final LPA share is dependent on the final Federal and State participation . The actual
costs will be used in the final division of cost for billing and reimbursement.
m
rn
m
m
m
N
N
t0