Loading...
HomeMy WebLinkAboutDecember 18 2012 EPC Agendacity of Evanston EVANSTON PRESERVATION COMMISSION Tuesday, December 18, 2012, 7:00 P.M. Lorraine H. Morton Civic Center, 2100 Ridge Avenue, Room 2200 AGENDA 1. CALL TO ORDER / DECLARATION OF QUORUM 2. APPROVAL OF MEETING MINUTES of March 20, May 15, September 18, and November 20, 2012. 3. COMMITTEE REPORTS A. Survey Sub -Committee - Phase II Grant Update 4. STAFF REPORTS 5. UNFINISHED BUSINESS A. 1622 Forest Place (L/LSHD) — Demolition of existing coach house. Construction of a new six -car coach house in place of existing coach house on alley. [Demolition/Construction]. B. 604 Judson Avenue (LSHD) Interior remodel and addition to existing 2-story + basement single family residence including new roofed porch at east side, 2-story + basement addition to the south side, 1-story addition to north side, window replacement and roof re -configuration at east side [Alteration/Construction/Demolition]. M. kiIWiTA:11111►14'%1 A. 912 Sheridan Road (LSHD) — Replacement of front wood door. [Alteration] B. 586 Ingleside Park Place (L) - Repurpose the existing back porch to become part of the kitchen. Add new back porch at location of existing stair. Add new stair to south and west of new porch. [Construction] C. 2310 Central Park Avenue (L) - Construction of a new detached frame 2-car garage, 24' x 24' with roof pitches to match existing house. [Construction] D. 2145 Sheridan Road (Landmark Lot of Record) - Construction of a six -story addition to the Technological Institute at 2145 Sheridan Road on the 1 of 2 Northwestern University Campus. The addition will occupy the space between H and K wings on the southwest side of the building that is currently occupied by a one-story addition built in 1968. The addition will be nearly identical to the two recent additions to the Technological Institute which have been recently completed. [Construction/Demolition] E. 2110 Orrington Avenue (NEHD) - Construction of a one story addition with basement to the rear (west) of the home and the construction of a side and rear porch connected to the existing front and side porch, and the repair and structural remediation of an existing 2nd story addition (also interior renovation to the basement and portions of the existing first and second floor including a full electrical renovation throughout). Requires minor zoning variation for proposed 31.3% building lot coverage where a maximum 30% is allowed. [Construction] F. 2412 Lincolnwood Drive (L) — Two-story rear addition to existing structure, demolition of existing accessory structure, construction of new accessory structure, replacement of existing windows. [Alteration/Construction/ Demolition] G. Discussion: Schedule of Special Meeting in January 2013 with Northwestern University (before the January 15, 2013 meeting) to hold a workshop session to discuss Northwestern University's North Campus Parking Garage and other project plans. 7. COMMUNICATIONS 8. ADJOURNMENT Next Meeting: TUESDAY, JANUARY 15, 2013 at 7:00 P.M. 2 of 2