HomeMy WebLinkAbout2024 Utilities Commission Annual Report
Member Term
Carl Bova 02/09/2024 (Ended term in 2024)
Michael Su on 02/14/2026
Kameeshia Lackey 07/25/2026
Steve Waters (Vice Chair) 08/08/2026
Samuel Blazey 07/24/2027
Matthew Roling 02/26/2028 (New in 2024)
Jonathan Hargrove 02/26/2028 (New in 2024)
City of Evanston U li es Commission - Approved
2024 Annual Report
PURPOSE: To protect and promote the public health, safety and welfare of the citizens,
businesses and institutions of Evanston, it is necessary to participate in the planning and
improvement of electrical, natural gas, telephone, water and sewer services in Evanston to
insure reliable and competitive service. Members of the Commission will listen to citizens'
concerns. (49 0-93) (103-0-93) (89-O-10).
COMMITTEE COMPOSITION: The Mayor appoints commission members with the advice and
consent of the City Council. In making appointments, the Mayor may consider an individual's
engineering or finance experience and their familiarity with utilities industries and regulations.
Members must be residents of the City or work in the City.
PERIODIC REVIEW OF ACCOMPLISHMENTS: Pursuant to the requirement of the ordinance
creating the Utilities Commission, the following report is prepared and presented to the City
Council through the Administration and Public Works Committee as a summary of the
accomplishments of the Commission.
Number of Members: Seven (7) members appointed by the Mayor.
Term: Four (4) year terms, members may serve no more than two (2) terms.
Mee ng Dates: 2nd or 3rd Friday of each month at 7:15 A.M.
Loca on: Evanston Water Treatment Plant (555 Lincoln St.)
Reports to: Administra ve and Public Works Commi ee
Staff Contact: Darrell King, Water Produc on Bureau Chief
Stephen McComb (Chair) 02/14/2026
Council Liaison: Council Member Jonathan Nieuwsma
2024 Planned Mee ng Dates:
January 12 July 19
February 9 August 16
March 8 September 20
April 19 October 18
May 17 November 15
June 21 December 20
2024 Cancelled Mee ngs: The following mee ngs were cancelled:
- 1/12/24– Lack of quorum
- 4/19/24– Lack of quorum
- 10/18/24 – Lack of quorum
In 2024 the Evanston U li es Commission met nine (9) mes to discuss u lity issues including
the following items on a regular basis:
- Electric system outages, basement backups, water main breaks and repairs
- Water and sewer fund capital improvement projects, including the replacement of the
1909 intake
In addi on, the Commission discussed the following issues:
- Discussed the city’s stormwater master plan and specific opportuni es iden fied in the
plan.
- Reviewed materials and discussed the concept of renewable hea ng and cooling
opportuni es including the Illinois Commerce Commission Thermal Energy Networks
Report1 and engaged with engineering consultants and service provides including
Noventa and Egg Geothermal.
- Reviewed and submi ed comments to the city on its dra Lead Service Line
Replacement plan.
- Discussed addi onal concepts to incen vize privately ini ated lead service line
replacements on private property within the city.
- Discussed communica on of water issues to all users including those in condos and
apartments who may not receive a bill directly.
- Introduce the concept of using water department energy assets to generate revenue
from electricity markets.
- Review and support for the Illinois Stretch Energy Code for new construc on.
- Review and condi onally support the dra Healthy Buildings Ordinance.
1
h ps://www.ilga.gov/reports/ReportsSubmi ed/4748RSGAEmail10049RSGAA achThermal%20Energy%20Networ
k%20Report%202024.pdf
Finally, the Commission saw one (1) departure of an exis ng member and onboarded two (2)
members leaving the year with a full complement of seven (7) possible members.
Budgetary Requirements: The Commission sought no funds in 2024.