HomeMy WebLinkAboutContract- JTP Electric- Mechanical Shades at Robert Crown South Hallways (Bid #25-42) $102,850 Memorandum
To: Honorable Mayor and Members of the City Council
CC: Members of Administration and Public Works Committee
From: Tim Kirkby, Architect
CC: Edgar Cano - Public Works Agency Director, Lara Biggs - City
Engineer, Stefanie Levine - Senior Project Manager
Subject: Approval of a Contract with JTP Electric for Mechanical Shades –
Robert Crown Center South Hallways (Bid 25-42)
Date: September 8, 2025
Recommended Action:
Staff recommends the City Council authorize the City Manager to execute an agreement with
JTP Electric (8651 W. Normal Ave., Niles, IL 60714) for the Mechanical Shades – Robert
Crown Center South Hallways (Bid 25-42) in the amount of $102,850.
Funding Source:
Funding is provided from the Capital Improvement 2025 Project Bonds (Account
HVAC Hallways Room/SW Kiln Crown 625045), item line - 416.40.4160.65515 for
Improvement. This line item has an approved FY 2025 budget of $200,000, all of which is
remaining.
CARP:
Municipal Operations
Council Action:
For Action
Summary:
The City has received complaints from users of the Robert Crown Center regarding the
overheating of the south-facing first and second floor hallway outside of the Dance and Art
rooms and preschool wing, as well as heat buildup in the 2nd floor kiln room. Staff sought
recommendations from the building’s original architect and mechanical engineer for how to
address this problem. The design consultants agreed that the hallway overheating is primarily
due to solar heat gain through the south-facing windows and recommended that the best
solution would be to install automated mechanical roller shades. It also appeared that the
heat buildup is more on the 2nd floor, so that a 2nd-floor solution needs to be prioritized. To
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
address this issue, staff prepared construction documents specifying the same mechanical
shade system used in other portions of the building.
Page 2 of 3 Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
BID 25-42 Mechanical Shades at Robert Crown South Hallways, MWEBE Waiver 09-08-2025
To: Edgar Cano, Public Works Agency Director
Lara Biggs, P.E., Bureau Chief – Capital Planning / City Engineer
Tim Kirkby, Architect
From: Tammi Nunez, Purchasing Manager
Subject: Mechanical Shades at Robert Crown South Hallways, BID 25-42
Date: September 8, 2025
The goal of the Minority, Women, Disadvantaged, and Evanston Business
Enterprise Program (M/W/D/EBE) is to assist such businesses with growth
opportunities. To help ensure such growth, the City has established a 25%
M/W/D/EBE subcontracting participation goal for general contractors.
Regarding the Contract for the Mechanical Shades at Robert Crown South
Hallways, Bid 25-42, total bid amount of $102,850.00, the primary contractor,
JTP Electric, has requested a waiver for the M/W/D/EBE participation goal. JTP
Electric is a certified expert in the installation of motorized shading systems. To
maintain the specialized nature and consistency of work with this specialized
product and the quality, they will self-perform all work on this project.
Cc: Hitesh Desai, Chief Financial Officer/ Treasurer
Memorandum
Page 3 of 3 Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
09 / 17 / 2025
Doc ID: 5048147f83ae682cc8dfecdbd1716f734c5b16eb
Contract with JTP Electric for Mechanical Shades – Robert...
Approval_of..._Hallwa.pdf and 1 other
5048147f83ae682cc8dfecdbd1716f734c5b16eb
MM / DD / YYYY
Signed
09 / 17 / 2025
09:51:12 UTC-5
Sent for signature to Alexandra Ruggie
(aruggie@cityofevanston.org) and Luke Stowe
(lstowe@cityofevanston.org) from lthomas@cityofevanston.org
IP: 66.158.65.78
09 / 17 / 2025
10:04:14 UTC-5
Viewed by Alexandra Ruggie (aruggie@cityofevanston.org)
IP: 24.13.226.57
09 / 17 / 2025
10:04:25 UTC-5
Signed by Alexandra Ruggie (aruggie@cityofevanston.org)
IP: 24.13.226.57
09 / 17 / 2025
10:10:37 UTC-5
Viewed by Luke Stowe (lstowe@cityofevanston.org)
IP: 50.171.242.186
09 / 17 / 2025
10:11:47 UTC-5
Signed by Luke Stowe (lstowe@cityofevanston.org)
IP: 50.171.242.186
The document has been completed.09 / 17 / 2025
10:11:47 UTC-5