Loading...
HomeMy WebLinkAboutContract- Alliance Contractors Inc. - Evanston Fountain Square South Plaza (Bid #25-45) $593,362 Memorandum To: Honorable Mayor and Members of the City Council CC: Members of Administration and Public Works Committee From: Chris Sous, Assistant City Engineer CC: Edgar Cano, Public Works Agency Director; Lara Biggs, City Engineer Subject: Approval of Contract with Alliance Contractors, Inc. for Evanston Fountain Square South Plaza (Bid No. 25-45) Date: October 13, 2025 Recommended Action: Staff recommends the City Council authorize the City Manager to execute an agreement with Alliance Contractors, Inc. (1166 Lake Avenue, Woodstock, IL 60098) for the Evanston Fountain Square South Plaza (Bid No. 25-45) in the amount of $593,362.00. Funding Source: Funding for this project will be partially provided from the American Rescue Plan Act (ARPA) (Account 170.99.9924.62490 – 524008) in the amount of $500,000.00. This account has a year-to-date (YTD) 2025 remaining balance of $1,974,885.23. The remaining $93,362.00 will be funded through the 2026 Project Bonds (Account 415.40.4126.65515 - 524008), which are part of the 2026 budget proposal. Approval of this project will require funding to be included as part of the 2026 adopted budget. Council Action: For Action Summary: The Fountain Square South Plaza, located in the heart of downtown Evanston, serves as a central public space for pedestrians and community gatherings. Since opening in 2019, the plaza has been heavily used for dining, festivals, and civic events. The south plaza originally featured an evergreen tree for the annual holiday display, but the tree has since been removed. The site is now temporarily covered with grass, as it was determined that the location is not suitable for the species due to street runoff, road salt, heat, and wind. The intended passive green space has also deteriorated over time due to dog waste. As a result of these lessons, the growing popularity of the space, and the City’s efforts through Evanston Thrives to enhance downtown public areas, staff consulted the original park designers, Teska Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Associates, who assisted in providing a plan set and construction documents for the proposed improvements at the Fountain Square South Plaza. Page 2 of 8 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Verification of Project Funding and Contractor Compliance Checklist Page 3 of 8 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Contract Award with Alliance Contractors, Inc. for Evanston Fountain Square South Plaza, Bid No. 25-45, M/W/D/EBE Memo 10.13.2025 To: Edgar Cano, Public Works Agency Director Lara Biggs, P.E., Bureau Chief - Capital Planning/ City Engineer Chris Sous, Assistant City Engineer From: Tammi Nunez, Purchasing Manager Subject: Contract Award with Alliance Contractors, Inc. for Evanston Fountain Square South Plaza Bid No. 25-45 Date: October 13, 2025 The goal of the Minority, Women, Disadvantaged, and Evanston Business Enterprise Program (M/W/D/EBE) is to assist such businesses with opportunities to grow. In order to help ensure such growth, the City’s goal is to have general contractors utilize M/W/D/EBEs to perform no less than 25% of the awarded contract. Regarding Evanston Fountain Square South Plaza, Bid 25-45, Alliance Contractors, Inc., the total base bid is $593,362.00, and the company is found to be in compliance with the City’s 25% goal. Name of M/W/EBE Scope of Work Contract Amount % MBE WBE DBE EBE C.R. Schmidt, Inc. 3S215 Talbot Ave., Warrenville, IL 60555 Brick Pavers $154,335.00 26% X Total M/W/D/EBE $154,335.00 26% CC: Hitesh Desai, Chief Financial Officer/Treasurer Memorandum Page 4 of 8 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Page 4 of 7Page 5 of 8 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Pa g e 5 o f 7 Pa g e 6 o f 8 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Page 6 of 7Page 7 of 8 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Page 7 of 7Page 8 of 8 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 11 / 24 / 2025 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Doc ID: 93503eee99825efedac426afaaaeeda5539a9a71 Contract with Alliance Contractors, Inc. for Evanston... Approval_of...laza__B.pdf and 2 others 93503eee99825efedac426afaaaeeda5539a9a71 MM / DD / YYYY Signed 11 / 20 / 2025 06:57:24 UTC-6 Sent for signature to Alexandra Ruggie (aruggie@cityofevanston.org) and Luke Stowe (lstowe@cityofevanston.org) from lthomas@cityofevanston.org IP: 50.171.242.186 11 / 20 / 2025 08:52:30 UTC-6 Viewed by Alexandra Ruggie (aruggie@cityofevanston.org) IP: 24.13.226.57 11 / 20 / 2025 08:52:44 UTC-6 Signed by Alexandra Ruggie (aruggie@cityofevanston.org) IP: 24.13.226.57 11 / 24 / 2025 09:58:10 UTC-6 Viewed by Luke Stowe (lstowe@cityofevanston.org) IP: 50.171.242.186 11 / 24 / 2025 09:58:47 UTC-6 Signed by Luke Stowe (lstowe@cityofevanston.org) IP: 50.171.242.186 The document has been completed.11 / 24 / 2025 09:58:47 UTC-6