HomeMy WebLinkAboutContract - Alliance Contractors Inc. - 2025 Alley & Sidewalk Improvements $3,204,481.10 (Bid #25-26) Memorandum
To: Luke Stowe, City Manager
From: Bridget Nash, Senior Project Manager
Subject: Agreement with Alliance Contractors, Inc. for the 2025 Alley and
Sidewalk Improvements (Bid No. 25-26)
Date: June 30, 2025
On June 23, 2025, City Council authorized the City Manager to execute an agreement with
Alliance Contractors, Inc. (1166 Lake Avenue, Woodstock, IL 60089) for the 2025 Alley and
Sidewalk Improvements (Bid No. 25-26) in the amount of $3,203,481.10. The Contractor
Services Agreement is attached for signature. The council memo and council action are also
attached for reference.
If you have any questions, please contact Bridget Nast at extension 8102.
Attachments:
1. Council Memo (for reference)
2. Council Action (for reference)
3. Contractor Services Agreement (for signature)
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Memorandum
To: Honorable Mayor and Members of the City Council
CC: Members of Administration and Public Works Committee
From: Bridget Nash, Senior Project Manager
CC: Edgar Cano, Public Works Agency Director; Lara Biggs, City Engineer
Subject: Approval of Contract Award with Alliance Contractors, Inc. for the 2025
Alley and Sidewalk Improvements (Bid No. 25-26)
Date: June 23, 2025
Recommended Action:
Staff recommends that City Council authorize the City Manager to execute an agreement with
Alliance Contractors, Inc. (1166 Lake Avenue, Woodstock, IL 60089) for the 2025 Alley and
Sidewalk Improvements (Bid No. 25-26) in the amount of $3,203,481.10.
Funding Source:
Funding is provided from the Capital Improvement Fund 2025 Projects Bonds in the amount
of $1,875,361.90; the Special Assessment Fund in the amount of $1,045,132.20; and the
Sewer Fund in the amount of $282,987.00. A detailed funding analysis is included in the
attached memo.
CARP:
Transportation & Mobility
Council Action:
For Action
Summary:
This project consists of alley improvements at three locations,pedestrian crossing
(ADA) Disabilities withAmericans and Act locations, four atimprovements sidewalk
improvements, including the installation of new sidewalks and the removal and replacement
of existing sidewalks, as well as the installation of traffic-calming speed humps on various
streets completed Ltd Engineering,TERRA alleys. in bumps speedand the various
construction plans and specifications for the project.
The locations included in this project and their individual scopes of work are as follows:
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
1. Special Assessment Alley – North of Payne Street, East of Crawford Avenue
Improvements to the existing unimproved alley include the installation of storm
sewers, the installation of 8-inch-thick concrete pavement, and related garage apron
restoration work.
2. Special Assessment Alley – North of Grant Street, East of Hartrey Avenue
Improvements to the existing unimproved alley include the installation of storm
sewers, the installation of 8-inch-thick concrete pavement, and related garage apron
restoration work. This project also includes a storm sewer extension from the alley
east on Colfax Street for approximately 360 feet.
3. Special Assessment Alley – North of Lincoln Street, East of Hartrey Avenue
Improvements to the existing asphalt alley include removal of the existing undersized
storm sewer, removal of the existing pavement, the installation of storm sewers, the
installation of 8-inch-thick concrete pavement, and related garage apron restoration
work.
4. Pedestrian Crossing Improvements – Dodge Avenue and Lee Street
Improvements to the existing pedestrian crossing include installation of concrete
medians, ADA ramps, installation of solar-powered light-emitting diode (LED)
pedestrian crossing signs with push buttons, installation of in-street signs, and
striping.
5. Pedestrian Crossing Improvements – Dodge Avenue and Monroe Street
Improvements to the existing pedestrian crossing include installation of concrete
medians, ADA ramps, installation of solar-powered LED pedestrian crossing signs
with push buttons, installation of in-street signs, and striping.
6. Pedestrian Crossing Improvements – Sheridan Road and Clinton Place
Improvements to the new pedestrian crossing include sidewalk removal and
replacement, ADA ramps, installation of LED pedestrian crossing signs with push
buttons, installation of static pedestrian crossing warning signs, installation of in-
street signs, and striping.
7. Pedestrian Crossing Improvements – Sheridan Road and Keeney Street
Improvements to the existing pedestrian crossing include the removal of the southern
pedestrian crossing, the installation of solar-powered LED pedestrian crossing signs
with push buttons, the installation of in-street signs, and striping.
8. Sidewalk Gap Infill – Lee Street from Dodge Avenue to Florence Avenue
Improvements include the installation of an ADA-compliant concrete sidewalk where
none currently exists, pedestrian crossing improvements, sidewalk improvements,
and associated restoration.
9. Sidewalk Gap Infill – Greenwood Street from McDaniel Avenue to Fowler Avenue
Page 2 of 15 Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Improvements include the installation of an ADA-compliant concrete sidewalk where
none currently exists, pedestrian crossing improvements, sidewalk improvements,
and associated restoration.
10. Sidewalk Gap Infill – Dempster Street Beach Office
Improvements include the installation of an ADA-compliant concrete sidewalk where
none currently exists, pedestrian crossing improvements, sidewalk improvements,
and associated restoration.
11. Downtown Sidewalk Improvements – Benson Avenue and Clark Street
Improvements include the removal of the existing brick paver sidewalk and its
replacement with an ADA-compliant concrete sidewalk featuring brick banding on
Benson Avenue, from Davis Street to Clark Street, and on Clark Street, from Benson
Avenue to Sherman Avenue, along with associated restoration.
12. Greenwood Beach Picnic Pad
Improvements include the installation of an ADA-compliant concrete sidewalk, a
concrete picnic pad, and picnic accessories.
13. Traffic Calming – Speed Humps and Alley Bumps
Improvements include the installation of traffic-calming speed humps and alley speed
bumps at various locations throughout the City.
14. Transit Stops
Improvements include the installation of ADA-compliant concrete sidewalks at transit
stops on Lake Street, from Dodge Avenue to Ridge Avenue, and on Ridge Avenue,
from Dobson Street to Lake Street.
A map of each project location is provided as an attachment.
Analysis:
This bid was advertised on Demandstar and in the Pioneer Press. Bids for the project were
received and publicly read on June 3, 2025. Three contractors submitted bids for this project
as follows:
The submitted bids cannot be withdrawn or canceled for a period of sixty (60) calendar days
following the bid opening. Bridget Nash, Senior Project Manager, reviewed the bids. The bid
tabulation, showing detailed bid results, is attached.
Page 3 of 15 Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Page 4 of 15 Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
NO
R
T
H
S
H
O
R
E
C
H
A
N
N
E
L
NORTH SHORE CHANNEL
L
A
K
E
M
I
C
H
I
G
A
N
McCORMICK BLVD
SHERIDAN RD
PARK PL
ASHLAND AVE
DODGE AVE
HURD AVE
GIRARD AVE
LEE ST
OAK AVE
SHERIDAN PL
RIDGE CT
GREEN BAY RD
THAYER ST
PRATT CT
GRANT
JENKS ST
HAVEN ST
PAYNE ST
LEON PL
POPLAR AVE
GREY AVE
HARRISON ST
PRAIRIE A
VE
REBA PL
COLFAX ST
LEMAR AVE
MARCY AVE
DAVIS ST
MAPLE AVE
HARTZELL ST
LIBRARY PL
SIMPSON ST
CLYDE AVE
BROWN AVE
GREELEY
PITNER ALY
LAUREL AVE
HINMAN AVE
DEWEY AVE
EWING AVE
COWPER AVE
KIRK ST
HOVLAND CT
JUDSON AVE
GARRETT PL
ARBOR
LN
FOREST AVE
INGLESIDE
PK
GREY AVE
ST. MARK'S
CT
EMERSON ST
CA
M
P
U
S
D
R
SH
E
R
M
A
N
A
V
E
WILDER ST
MILBURN PK
GA
R
R
I
S
O
N
A
V
E
THELIN
CT
FOREST
PL
AS
B
UR
Y
A
V
E
MICHIGAN AVE
WE
S
L
E
Y
A
V
E
LELAND AVE
CENTRAL ST
CALLAN AVE
RIDGE TER
HULL TER
HOWARD ST
ISABELLA ST
GROSS POINT RD
CUSTER AVE
EMERSON ST
LYONS ST
FO
WL
E
R
A
VE
CLARK ST
DA
R
RO
W
AV
E
PI
O
N
EE
R
R
D
HASTINGS AVE
HARTREY AVE
BRUMMEL ST
PRINCETON AVE
PR
O
S
P
E
C
T
A
V
E
HAMLIN ST
PAYNE
EL
M
A
V
E
CASE PL
RIDG
EWAY
AV
E
MULFORD ST
MICHIGAN AVE
LAW
ND
A
L
E AVE
CHURCH ST
CRAIN ST
DEMPSTER ST
JACKSON AVE
KEDZIE ST
CLINTON PL
McDANIEL AVE
EL
M
W
O
O
D
A
V
E
SEWARD ST
ROSLYN PL
EAST RAILROAD AVE
FLORENCE AVE
BE
N
S
O
N
A
VE
SHE
RMAN PL
CULVER
FORESTVIEW RD
MARTHA LN HAWTHORNE
LN
WADE
CT
BR
O
WN
A
VE
CROFT
LN
COLFAX
TER
BR
O
W
N
GREY
BRIDGE
ST
CALVIN
CIR
BROWN
AVE
RICHMOND
AVE
NORMANDY
PL
WOODLAND RD
ELINOR
PL
KEENEY ST
SOUTH BLVD
HAMILTON ST
GREENWOOD ST
UNIVERSITY PL
REE
S
E
A
V
E
AUTOBARN PL
GAFFIELD PL
LINCOLNWOOD DR
CRAWFORD AVE
LEONARD PL
CENTRAL PARK AVE
BENNETT AVE
MADISON PL
BRADLEY PL
GREENLEAF ST
WALNUT AVE
ROSALIE ST
BURNHAM PL
WARREN ST
LIVINGSTON
WASHINGTON ST
CLEVELAND ST
MONTICELLO PL
NATHANIEL PL
HARVARD TER
WOODBINE AVE
MAPLE AVE
DOBSON ST
DEWEY AVE
DARROW AVE
DEWEY AVE
INGLESIDE PL
RIDGE AVE
ASBURY AVE
FOWLER AVE
HARTREY AVE
CASE ST
SOUTH BLVD
ASHLAND AVE
SHERMAN AVE
LYONS ST
STEWART AVE
MARCY
AVE
WELLINGTON
CT
CLEVELAND ST
MONROE ST
LINDEN PL
LAKE SHORE BLVD
KNOX
CIR
HILLSIDE
LN
TRINITY
CT
SHERIDAN
SQ
EDGEMERE
CT
GREEN BAY RD
GARNETT
PL
CENTRAL ST
HARRISON
RIDGE
AVE
PAYNE ST
WESLEY AVE
CHURCH ST
HARTZELL ST
PRAIRIE AVE
DODGE AVEOAKTON ST
SOUTH BLVD
CRAIN
McDANIEL AVE
PITNER AVE
LEE ST
ASHLAND AVE
GROVE ST
FOSTER ST
ASBURY AVE
BARTON AVE
GRANT ST
BRYANT AVE
JUDSON AVE
SHERMAN AVE
COLFAX ST
ISABELLA ST
DAVIS ST
MAIN ST
RIDGE AVE
ASBURY AVE
THAYER CT
THAYER
ST
ISABELLA ST
HAYES
DARTMOUTH
PL
COLFAX
PL
THAYER
THAYER
ST
CRAWFORD
LINCOLNWOOD DR
LIVINGSTON ST
CHANCELLOR ST CHANCELLOR
LIVINGSTON
MILBURN ST
LAKESIDE
CT
EUCLID
PARK PL
WESLEY
NORWOOD CT
LYONS ST
GREY AVE
DEWEY AVE
PAYNE ST
MAIN ST
DODGE AVE
CENTRAL ST
McDA
NIEL AVE
EWING AVE
SHERIDAN RD
BRUMMEL ST
PITNER AVE
LINCOLN ST
HINMAN AVE
SEWARD ST
WESLEY AVE
CENTRAL ST
KEENEY ST
RIDGE AVE
OAK AVE
JACKSON
SHERMAN AVE
DOBSON ST
LINCOLN ST
SEWARD ST
DARROW AVE
GREY AVE
PARK PL
NOYES ST
LAKE ST
THAYER ST
WASHINGTON ST
LAKE STMcDANIEL AVE
BROWN AVE
AUSTIN ST
ASHLAND AVE
WESLEY AVE
TECH
DR
NOYES
CT
HAMPTON
PKY
OTTO
LN
BERNARD
PL
MEADOW-
LARK LN
RIDGE AVE
ELGIN RD
ELMWOOD AVE
COLFAX ST
HINMAN AVE
SIMPSON ST
WESLEY AVE
OAKTON ST
SHERIDAN RD
SHERIDAN RD
DEMPSTER ST
GREY AVE
LEE ST
SIMPSON ST
CHICAGO AVE
CHICAGO AVE
BENNETT AVE
MADISON ST
KEENEY ST
OAK
RIDGE AVE
SHERIDAN RD
GRANT ST
ASBURY AVE
GROVE ST
ELGIN RD
FLORENCE AVE
FOREST AVE
DODGE AVE
FOSTER ST
MULFORD ST
GREENLEAF ST
HILLSIDE RD
HARTREY AVE
HARTREY AVE
GREY AVE
ARNOLD
PL
PITNER AVE
LINCOLN ST
McCORMICK BLVD
FOSTER ST
GREENWOOD ST
CALLAN
PARK PL
JUDSON AVE
NOYES ST
DARROW AVE
ASHLAND AVE
HARRISON ST
HOWARD ST
NOYES
GLENVIEW RD
PRINCETON
CLIFFORD ST
HIGHLAND AVE
LAWNDALE AVE
DARTMOUTH
PL
ARTS
CIRCLE DR
ORRINGTON AVE
EASTWOOD AVE
BROADWAY AVE
WASHINGTON ST
NORTHWESTERN
PL
DRYDEN
PL
CLARK ST
700
400
500
300
600
800
200
900
100
2600
1700
3100
1200
1900
1000
1300
1400
2200
2300
1100
1800
2800
1500
3600
2000
2400
2700
3400
2100
2500
2900
1600
3000
32
0
0
33
0
0
30
0
600
2800
1900
1000
2700
400
2500
1400
800
1700
1600
700
2200
24
0
0
1400
20
0
500
14
0
0
200
2300
2000
700
800
2600
1200
22
0
0
1500
16
0
0
1200
100
1500
13
0
0
10
0
2900
1900
10
0
0
500
2100
2200
2400
11
0
0
1100
200
1300
28
0
0
1000
1200
2600
1500
2300
1800
2000
700
300
900
600
40
0
2400
25
0
0
2000
1300
1800
300
800
60
0
1100
100
500
2500
27
0
0
1600
17
0
0
35
0
0
26
0
0
1700
18
0
0
900
19
0
0
90
0
21
0
0
2300
21
0
0
400
38
0
0
37
0
0
2025 Water Main Improvements.mxd
2025 Alley and Sidewalk Improvements
City of Evanston Public Works Agency
This map is provided "as is" without warranties of any kind. See www.cityofevanston.org/mapdisclaimers.html for more information.
´
Alley Improvements
Downtown Sidewalks
Sidewalk Gap Infill
Pedestrian Crossing
Transit Stop
ADA Picnic Pad
Main Road
Local Street
Railroad
Water
City Boundary
0 0.125 0.25 0.5 0.75 1
Miles
6/6/2025
Page 5 of 15 Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
DATE: June 3, 2025
TIME: 2:15 P.M.
SA 1532 - Alley North of Payne Street, East of Crawford Avenue
TOTAL UNIT UNIT UNIT UNIT
PRICE PRICE PRICEQUANTITYPRICE
CU. YD.1 EARTH EXCAVATION 204 $70.00 14,280.00$$176.30 $35,965.20 $80.00 $16,320.00 $114.15 $23,286.60
CU. YD.2 TRENCH BACKFILL 117 $38.00 4,446.00$$80.00 $9,360.00 $5.00 $585.00 $80.00 $9,360.00
CU. YD.3 SUB-BASE GRANULAR MATERIAL, TYPE B 10 $38.00 380.00$$75.00 $750.00 $50.00 $500.00 $130.30 $1,303.00
SQ. YD.4 AGGREGATE BASE COURSE, TYPE B, 4"712 $10.00 7,120.00$$8.30 $5,909.60 $10.00 $7,120.00 $17.00 $12,104.00
TON5INCIDENTAL HOT-MIX ASPHALT SURFACING 5 $300.00 1,500.00$$450.00 $2,250.00 $250.00 $1,250.00 $450.00 $2,250.00
SQ. YD.6 PORTLAND CEMENT CONCRETE PAVEMENT, 8"687 $125.00 85,875.00$$142.35 $97,794.45 $125.00 $85,875.00 $118.55 $81,443.85
FOOT7STORM SEWERS, SPECIAL, 8" (D.I.P. / CL 50)386 $145.00 55,970.00$$254.00 $98,044.00 $47.62 $18,381.32 $254.00 $98,044.00
FOOT8STORM SEWERS, SPECIAL, 10" (D.I.P. / CL 50)12 $165.00 1,980.00$$285.00 $3,420.00 $200.00 $2,400.00 $285.00 $3,420.00
EACH9INLETS, TYPE A, TYPE 1 FRAME, OPEN LID 2 $4,250.00 8,500.00$$3,604.00 $7,208.00 $4,250.00 $8,500.00 $3,604.00 $7,208.00
10 CATCH BASINS, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, OPEN LID EACH 1 $7,450.00 7,450.00$$7,461.00 $7,461.00 $7,550.00 $7,550.00 $7,461.00 $7,461.00
11 MANHOLES, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, OPEN LID EACH 1 $6,500.00 6,500.00$$9,176.00 $9,176.00 $6,750.00 $6,750.00 $9,176.00 $9,176.00
12 COMBINATION CONCRETE CURB AND GUTTER, TYPE B 6.12 FOOT 100 $50.00 5,000.00$$46.65 $4,665.00 $52.00 $5,200.00 $65.05 $6,505.00
13 $50.00 2,500.00$50FOOTCONCRETE CURB, TYPE B $43.20 $2,160.00 $62.00 $3,100.00 $61.90 $3,095.00
14 $35.00 1,330.00$38SQ. YD.PAVEMENT REMOVAL $71.50 $2,717.00 $30.00 $1,140.00 $24.05 $913.90
15 $25.00 2,350.00$94SQ. YD.DRIVEWAY PAVEMENT REMOVAL $71.50 $6,721.00 $26.00 $2,444.00 $20.45 $1,922.30
16 $7.00 70100FOOTCOMBINATION CURB AND GUTTER REMOVAL 0.00$$43.00 $4,300.00 $5.00 $500.00 $9.70 $970.00
17 $4.00 292.00$73SQ. FT.SIDEWALK REMOVAL $7.00 $511.00 $4.00 $292.00 $3.00 $219.00
18 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT - 6"SQ. YD.107 $90.00 9,630.00$$84.25 $9,014.75 $88.00 $9,416.00 $95.25 $10,191.75
19 $173PORTLAND CEMENT CONCRETE SIDEWALK - 5"SQ. FT.5.00 1,095.00$$8.65 $631.45 $14.00 $1,022.00 $12.50 $912.50
20 $3.00 2,382.00$794PROTECTIVE SEALER SQ. YD.$0.01 $7.94 $2.00 $1,588.00 $2.00 $1,588.00
21 $50.00 1,000.00$20CRUSHED STONE, CA-16 TON $61.00 $1,220.00 $27.00 $540.00 $62.10 $1,242.00
22 $10.0105FURNISHING AND PLACING TOPSOIL, 3"SQ. YD.0 1,050.00$$17.00 $1,785.00 $8.00 $840.00 $17.00 $1,785.00
23 $18.00 1,890.00$105SODDING, SALT TOLERANT SQ. YD.$34.00 $3,570.00 $20.00 $2,100.00 $34.00 $3,570.00
24 $TREE REMOVAL (6 TO 15 UNITS DIAMETER)UNIT DIA.12 125.00 1,500.00$$65.00 $780.00 $65.00 $780.00 $65.00 $780.00
25 $35.00 630HOT-MIX ASPHALT SURFACE REMOVAL 18SQ. YD..00$$71.50 $1,287.00 $50.00 $900.00 $25.00 $450.00
26 $5.00 750.00$TEMPORARY FENCE 150FOOT $6.00 $900.00 $1.00 $150.00 $12.00 $1,800.00
27 CONSTRUCTION LAYOUT AND STAKING LUMP SUM 1 $7,500.00 7,500.00$$2,089.00 $2,089.00 $17,500.00 $17,500.00 $2,225.00 $2,225.00
28 STREET SWEEPING $400.00 1,200.00$3EACH $100.00 $300.00 $100.00 $300.00 $1,500.00 $4,500.00
29 CLOSED CIRCUIT TV INSPECTION LUMP SUM 1 $5,500.00 5,500.00$$2,900.00 $2,900.00 $4,500.00 $4,500.00 $2,900.00 $2,900.00
30 PRE-CONSTRUCTION SURFACE VIDEO TAPING LUMP SUM 1 $2,000.00 2,000.00$$1,150.00 $1,150.00 $1,500.00 $1,500.00 $232.00 $232.00
31 REMOVING AND RESETING PAVERS 159SQ. FT.$30.00 4,770.00$$35.00 $5,565.00 $32.00 $5,088.00 $30.00 $4,770.00
32 EPOXY PAVEMENT MARKING LINE - 6" YELLOW 80FOOT $50.00 4,000.00$$4.50 $360.00 $60.00 $4,800.00 $7.00 $560.00
$251,070.00 $329,972.39 $218,932.25 $306,187.90
$218,931.32
6231 N. Pulaski Road
Chicago, IL 60646
TOTAL
Woodstock, IL 60098
CITY OF EVANSTON
TABULATION OF BIDS FOR
2025 Alley and Sidewalk Improvements
BID NO: 25-26
Landmark Contractors, Inc.
NAME AND ADDRESS OF BIDDERS
TOTAL
TOTAL BID AS READ
AS CORRECTED
ITEM
NUMBER UNITITEM TOTAL
11916 W. Main St.
Huntley, IL 60142
TOTAL
APPROVED
ENGINEER'S
ESTIMATE
Alliance Contractors, Inc.
1166 Lake Avenue
Capitol Cement Company, Inc.
1 of 9
Pa
g
e
6
o
f
1
5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
DATE: June 3, 2025
TIME: 2:15 P.M.
SA 1533 - Alley North of Grant Street, East of Hartrey Avenue
TOTAL UNIT UNIT UNIT
PRICE PRICEQUANTITYPRICE
CU. YD.EARTH EXCAVATION 432 $70.00 30,240.00$1 $176.30 $76,161.60 $80.00 $34,560.00 $114.15 $49,312.80
CU. YD.TRENCH BACKFILL 420 $38.00 15,960.00$2 $80.00 $33,600.00 $5.00 $2,100.00 $80.00 $33,600.00
CU. YD.SUB-BASE GRANULAR MATERIAL, TYPE B 15 $38.00 5370.00$$75.00 $1,125.00 $50.00 $750.00 $116.35 $1,745.25
TONGRANULAR CRADLE MATERIAL, CA-11 110 $36.00 3,960.040$$0.01 $1.10 $40.00 $4,400.00 $0.01 $1.10
AGGREGATE BASE COURSE, TYPE B, 4"$10.05SQ. YD.1,120 0 11,200.00$$8.30 $9,296.00 $10.00 $11,200.00 $17.00 $19,040.00
INCIDENTAL HOT-MIX ASPHALT SURFACING $300.00 3,6 TON 10 000.00$$450.00 $4,500.00 $250.00 $2,500.00 $450.00 $4,500.00
PORTLAND CEMENT CONCRETE PAVEMENT, 8"$7 SQ. YD.1,102 125.00 137,750.00$$139.65 $153,894.30 $125.00 $137,750.00 $110.90 $122,211.80
STORM SEWERS, SPECIAL, 8" (D.I.P. / CL 50)$8 142FOOT 145.00 20,590.00$$254.00 $36,068.00 $47.62 $6,762.04 $254.00 $36,068.00
STORM SEWERS, 12", TYPE 2 (R.C.P. / CL III)9 420FOOT $145.00 60,900.00$$203.00 $85,260.00 $225.00 $94,500.00 $203.00 $85,260.00
INLETS, TYPE A, TYPE 1 FRAME, OPEN LID $4,250101EACH.00 4,250.00$$3,604.00 $3,604.00 $4,250.00 $4,250.00 $2,604.00 $2,604.00
11 CATCH BASINS, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, OPEN LID EACH 1 $7,450.00 7,450.00$$7,461.00 $7,461.00 $7,550.00 $7,550.00 $7,461.00 $7,461.00
12 MANHOLES, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, OPEN LID EACH 2 $6,500.00 13,000.00$$8,100.00 $16,200.00 $6,750.00 $13,500.00 $8,100.00 $16,200.00
13 COMBINATION CONCRETE CURB AND GUTTER, TYPE B 6.12 FOOT 200 $50.00 10,000.00$$46.65 $9,330.00 $52.00 $10,400.00 $65.04 $13,008.00
14 $50.00 5,000.00$100FOOTCONCRETE CURB, TYPE B $43.20 $4,320.00 $62.00 $6,200.00 $61.46 $6,146.00
15 $35.00 3,640.00$104SQ. YD.PAVEMENT REMOVAL $71.50 $7,436.00 $30.00 $3,120.00 $29.25 $3,042.00
16 $25.00 5,625.00225SQ. YD.DRIVEWAY PAVEMENT REMOVAL $$71.50 $16,087.50 $26.00 $5,850.00 $22.15 $4,983.75
17 $7.00 1,200FOOTCOMBINATION CURB AND GUTTER REMOVAL 400.00$$43.00 $8,600.00 $5.00 $1,000.00 $13.40 $2,680.00
18 $7.00 700.00$$100FOOTCURB REMOVAL 43.00 $4,300.00 $5.00 $500.00 $9.70 $970.00
19 $4.00 1,240.00$310SQ. FT.SIDEWALK REMOVAL $7.00 $2,170.00 $4.00 $1,240.00 $3.75 $1,162.50
20 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT - 6"SQ. YD.335 $90.00 30,150.00$$84.25 $28,223.75 $88.00 $29,480.00 $95.25 $31,908.75
21 310SQ. FT.PORTLAND CEMENT CONCRETE SIDEWALK - 5"$15.00 4,650.00$$8.65 $2,681.50 $14.00 $4,340.00 $12.45 $3,859.50
22 PROTECTIVE SEALER $3.00 4,311.00$SQ. YD.1,437 $0.01 $14.37 $2.00 $2,874.00 $2.00 $2,874.00
23 CRUSHED STONE, CA-16 $50.00 1,500.00$TON 30 $61.00 $1,830.00 $30.00 $900.00 $59.45 $1,783.50
24 FURNISHING AND PLACING TOPSOIL, 3"$10.0SQ. YD.140 0 1,400.00$$17.00 $2,380.00 $8.00 $1,120.00 $17.00 $2,380.00
25 SODDING, SALT TOLERANT $18.00 2,520.00$SQ. YD.140 $34.00 $4,760.00 $20.00 $2,800.00 $34.00 $4,760.00
26 DETECTABLE WARNINGS $55.00 4,400.00$SQ. FT.80 $30.00 $2,400.00 $70.00 $5,600.00 $36.15 $2,892.00
27 TREE REMOVAL (6 TO 15 INCH DIA.)$125.00UNIT DIA.5 625.00$$85.00 $425.00 $85.00 $425.00 $85.00 $425.00
28 HOT-MIX ASPHALT SURFACE REMOVAL $35.00 1,0SQ. YD.30 50.00$$71.50 $2,145.00 $50.00 $1,500.00 $25.00 $750.00
29 TEMPORARY FENCE $5.00 750.00$FOOT 150 $6.00 $900.00 $1.00 $150.00 $12.00 $1,800.00
30 CONSTRUCTION LAYOUT AND STAKING LUMP SUM 1 $7,500.00 7,500.00$$2,089.00 $2,089.00 $25,000.00 $25,000.00 $2,225.00 $2,225.00
31 STREET SWEEPING EACH $400.00 1,200.00$3 $100.00 $300.00 $100.00 $300.00 $1,500.00 $4,500.00
32 CLOSED CIRCUIT TV INSPECTION LUMP SUM 1 $5,500.00 5,500.00$$3,900.00 $3,900.00 $5,500.00 $5,500.00 $3,900.00 $3,900.00
33 PRE-CONSTRUCTION SURFACE VIDEO TAPING LUMP SUM 1 $2,000.00 2,000.00$$1,150.00 $1,150.00 $1,500.00 $1,500.00 $232.00 $232.00
34 REMOVING AND RESETTING PAVERS $30.00 600.020SQ. FT.0$$35.00 $700.00 $32.00 $640.00 $30.00 $600.00
35 EPOXY PAVEMENT MARKING LINE - 6" YELLOW $50.90FOOT 00 4,500.00$$4.50 $405.00 $60.00 $5,400.00 $7.00 $630.00
$435,661.38$533,718.12$409,131.00 $475,515.95
$435,661.04
Capitol Cement Company, Inc.
6231 N. Pulaski Road
Chicago, IL 60646 Huntley, IL 60142
ITEM
NUMBER UNITITEM TOTAL TOTAL
TABULATION OF BIDS FOR
2025 Alley and Sidewalk Improvements
TOTAL
BID NO: 25-26
APPROVED
ENGINEER'S
ESTIMATE
NAME AND ADDRESS OF BIDDERS
Alliance Contractors, Inc.Landmark Contractors, Inc.
1166 Lake Avenue 11916 W. Main St.
Woodstock, IL 60098
CITY OF EVANSTON
TOTAL BID AS READ
AS CORRECTED
2 of 9
Pa
g
e
7
o
f
1
5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
DATE: June 3, 2025
TIME: 2:15 P.M.
SA 1534 - Alley North of Lincoln Street, East of Hartrey Avenue
TOTAL UNIT UNIT UNIT
PRICE PRICEQUANTITYPRICE
CU. YD.1 EARTH EXCAVATION $14,840.00 $176.30 $$70.00212 37,375.60 $80.00 $16,960.00 $114.15 $24,199.80
CU. YD.2 TRENCH BACKFILL $30,096.00 $80.00 $63$38.00792 ,360.00 $5.00 $3,960.00 $80.00 $63,360.00
CU. YD.3 SUB-BASE GRANULAR MATERIAL, TYPE B $$38.0015 570.00 $75.00 $1,125.00 $50.00 $750.00 $116.35 $1,745.25
TON4GRANULAR CRADLE MATERIAL, CA-11 $6,372.$36.00177 00 $0.01 $1.77 $40.00 $7,080.00 $0.01 $1.77
5 AGGREGATE BASE COURSE, TYPE B, 4"$10.0SQ. YD.1,154 $11,540.00 $8.30 $9,578.20 $10.00 $11,540.00 $17.00 $19,0 618.00
6 INCIDENTAL HOT-MIX ASPHALT SURFACING $3$300.00TON10 ,000.00 $450.00 $4,500.00 $250.00 $2,500.00 $450.00 $4,500.00
7 PORTLAND CEMENT CONCRETE PAVEMENT, 8"$SQ. YD.1,134 $141,750.00 $139.50 $158,193.00 $125.00 $141,750.125.00 00 $106.15 $120,374.10
8 STORM SEWER REMOVAL 8"$15,875.00 $56.0$25.00635FOOT 0 $35,560.00 $20.00 $12,700.00 $56.00 $35,560.00
9 REMOVING MANHOLES $2,400.00 $1,932.00 $$1,200.002EACH 3,864.00 $1,250.00 $2,500.00 $1,932.00 $3,864.00
10 REMOVING CATCH BASINS $2,400.00 $1,93$1,200.002EACH 2.00 $3,864.00 $1,250.00 $2,500.00 $1,932.00 $3,864.00
11 STORM SEWERS, SPECIAL, 8" (D.I.P. / CL 50)338FOOT $49,010.00 $254.00 $85,852.00 $47.62 $16,095.56 $$145.00 254.00 $85,852.00
12 STORM SEWERS, 12", TYPE 2 (R.C.P. / CL III)39FOOT $57,130.00 $203.00 $79,982.00 $175.00 $68,950.0$145.004 0 $203.00 $79,982.00
13 STORM SEWERS, 15", TYPE 2 (R.C.P. / CL III)23FOOT $35,700.00 $229.00 $54,502.00 $200.00 $47,600.0$150.008 0 $229.00 $54,502.00
14 INLETS, TYPE A, TYPE 1 FRAME, OPEN LID $4,2501EACH $4,250.00 $3,604.00 $3,604.00 $4,250.00 $4,250.00 $3,.00 604.00 $3,604.00
15 CATCH BASINS, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, OPEN LID EACH 1 $7,450.00 $7,450.00 $7,461.00 $7,461.00 $7,550.00 $7,550.00 $7,461.00 $7,461.00
16 MANHOLES, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, OPEN LID EACH 4 $6,500.00 $26,000.00 $8,100.00 $32,400.00 $6,750.00 $27,000.00 $8,100.00 $32,400.00
17 MANHOLES, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, CLOSED LID EACH 1 $6,500.00 $6,500.00 $8,100.00 $8,100.00 $3,750.00 $3,750.00 $8,100.00 $8,100.00
18 COMBINATION CONCRETE CURB AND GUTTER, TYPE B 6.12 FOOT 100 $50.00 $5,000.00 $46.65 $4,665.00 $52.00 $5,200.00 $67.50 $6,750.00
19 $43.20 $$1,000.00$50.00FOOTCONCRETE CURB, TYPE B 20 $1,220.00$1,240.00$62.00864.00 $61.00
20 $35.00PAVEMENT REMOVAL SQ. YD.1,314 $45,990.00 $71.50 $93,951.00 $30.00 $39,420.00 $29.25 $38,434.50
21 $25.00DRIVEWAY PAVEMENT REMOVAL $19,175.SQ. YD.767 00 $71.50 $54,840.50 $26.00 $19,942.00 $22.15 $16,989.05
22 $7.00COMBINATION CURB AND GUTTER REMOVAL FOOT 100 $7 $970.0000.00 $43.00 $4,300.00 $5.00 $500.00 $9.70
23 $4.00SIDEWALK REMOVAL SQ. FT.440 $1,760.00 $7.00 $3,0 $1,320.0080.00 $4.00 $1,760.00 $3.00
24 PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT - 6"SQ. YD.818 $90.00 $73,620.00 $84.25 $68,916.50 $88.00 $71,984.00 $97.75 $79,959.50
25 SQ. FT.PORTLAND CEMENT CONCRETE SIDEWALK - 5"440 $$5$14.00 $6,160.0015.00 $6,600.00 $8.65 $12.45$3,806.00 ,478.00
26 PROTECTIVE SEALER $3.00 $5,856.00 $0.01 $SQ. YD.1,952 $3,904.00$2.00 $3,904.00 $2.0019.52
27 CRUSHED STONE, CA-16 $50.00 $1,500.00 $61.00 $1,TON 30 $2,173.50$35.00 $1,050.00 $72.45830.00
28 FURNISHING AND PLACING TOPSOIL, 3"$10.0SQ. YD.120 $2,040.0$8.00 $960.000$1,200.00 $17.00 $17.00$2,040.00 0
29 SODDING, SALT TOLERANT $18.00 $2,160.00 $3SQ. YD.120 $4,080.00$20.00 $2,400.004.00 $34.00$4,080.00
30 DETECTABLE WARNINGS $55.00 $1,100.00 $30.00SQ. FT.20 $723.00$70.00 $1,400.00 $36.15$600.00
31 HOT-MIX ASPHALT SURFACE REMOVAL $35.00 $52SQ. YD.15 $375.00$50.00 $750.005.00 $71.50 $25.00$1,072.50
32 TEMPORARY FENCE $1.$5.00 $600.00 $6.00 $720.00FOOT120 $1,440.0000$120.00 $12.00
33 CONSTRUCTION LAYOUT AND STAKING LUMP SUM 1 $7,500.00 $7,500.00 $2,089.00 $2,089.00 $27,500.00 $27,500.00 $2,225.00 $2,225.00
34 STREET SWEEPING EACH 3 $400.00 $1,200.00 $100.00 $300.00 $100.00 $300.00 $1,500.00 $4,500.00
35 CLOSED CIRCUIT TV INSPECTION LUMP SUM 1 $5,500.00 $5,500.00 $6,650.00 $6,650.00 $5,500.00 $5,500.00 $6,650.00 $6,650.00
36 PRE-CONSTRUCTION SURFACE VIDEO TAPING LUMP SUM 1 $2,000.00 $2,000.00 $1,150.00 $1,150.00 $1,500.00 $1,500.00 $232.00 $232.00
37 REMOVING AND RESETING PAVERS $4,20$30.00140SQ. FT.$4,200.00$4,900.00 $4,480.00$32.00$35.000.00 $30.00
38 CLASS B PATCHES, SPECIAL 9" (HES)$150.0015SQ. YD.$2,250.00 $350.00 $5,250.00 $175.00 $2,625.00 $371.65 $5,574.75
39 EPOXY PAVEMENT MARKING LINE - 6" YELLOW $50.60FOOT 00 $3,000.00 $4.50 $270.00 $60.00 $3,600.00 $7.00 $420.00
$607,319.00 $854,716.59 $579,731.37 $738,646.22
$579,730.56
Capitol Cement Company, Inc.
6231 N. Pulaski Road
Chicago, IL 60646Woodstock, IL 60098 Huntley, IL 60142
CITY OF EVANSTON
TABULATION OF BIDS FOR
2025 Alley and Sidewalk Improvements
BID NO: 25-26
APPROVED
ENGINEER'S
ESTIMATE
NAME AND ADDRESS OF BIDDERS
Alliance Contractors, Inc.Landmark Contractors, Inc.
1166 Lake Avenue 11916 W. Main St.
TOTAL
TOTAL BID AS READ
AS CORRECTED
ITEM
NUMBER ITEM UNIT TOTALTOTAL
3 of 9
Pa
g
e
8
o
f
1
5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
DATE: June 3, 2025
TIME: 2:15 P.M.
Colfax Street Sewer Extension
TOTAL UNIT UNITUNIT UNIT
PRICEPRICE PRICEQUANTITYPRICE
CU. YD.1 TRENCH BACKFILL 446 $38.00 $16,948.00 $80.00 $35,680.00 $35.00 $15,610.00 $80.00 $35,680.00
TON2GRANULAR CRADLE MATERIAL, CA-11 90 $36.00 $3,240.0 $0.01 $0.90$3,600.00$40.00$0.90$0.010
3 HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 TON 38 $110.00 $4,180.00 $450.00 $17,100.00 $245.00 $9,310.00 $450.00 $17,100.00
4 358STORM SEWERS, 12", TYPE 2 (R.C.P. / CL III)FOOT $145.00 $51,910.00 $203.00 $72,674.00 $185.00 $66,230.00 $203.00 $72,674.00
5 48 $1STORM SEWERS, SPECIAL, 8" (D.I.P. / CL 50)FOOT 45.00 $6,960.00 $254.00 $12,192.00 $47.62 $2,285.76 $254.00 $12,192.00
6 45 $50.00REMOVE STORM SEWER 8"FOOT $2,250.00 $47.00 $2 $2,115.00,115.00 $20.00 $900.00 $47.00
7 MANHOLES, TYPE A, 4'-DIAMETER, TYPE 1 FRAME, CLOSED LID EACH 2 $6,500.00 $13,000.00 $8,010.00 $16,020.00 $6,750.00 $13,500.00 $8,010.00 $16,020.00
8 CLASS B PATCHES, SPECIAL 9" (HES)SQ. YD.328 $150.00 $49,200.00 $195.15 $64,009.20 $150.00 $49,200.00 $250.00 $82,000.00
9 ADJUSTING SANITARY SEWER SERVICE LINE EACH 6 $1,500.00 $9,000.00 $2,432.00 $14,592.00 $2,500.00 $15,000.00 $2,432.00 $14,592.00
10 CONSTRUCTION LAYOUT AND STAKING LUMP SUM 1 $7,500.00 $7,500.00 $2,089.00 $2,089.00 $25,000.00 $25,000.00 $2,225.00 $2,225.00
11 STREET SWEEPING $EACH 2 $400.00 $200.00$800.00 $100.00 500.00 $1,000.00 $1,500.00 $3,000.00
12 PRE AND POST CONSTRUCTION SUB-SURFACE VIDEOTAPING LUMP SUM 1 $5,000.00 $5,000.00 $3,900.00 $3,900.00 $3,000.00 $3,000.00 $4,900.00 $4,900.00
13 CLOSED CIRCUIT TV INSPECTION LUMP SUM 1 $5,000.00 $5,000.00 $2,900.00 $2,900.00 $5,500.00 $5,500.00 $2,900.00 $2,900.00
$210,135.88$243,472.10$174,988.00 $265,398.90
$210,135.76
6231 N. Pulaski Road
Chicago, IL 60646
Capitol Cement Company, Inc.
ITEM
NUMBER UNITITEM TOTAL TOTAL TOTAL
TOTAL BID AS READ
AS CORRECTED
CITY OF EVANSTON
TABULATION OF BIDS FOR
2024 Alley and Sidewalk Improvements
BID NO: 25-26
APPROVED
ENGINEER'S
ESTIMATE
NAME AND ADDRESS OF BIDDERS
Alliance Contractors, Inc.Landmark Contractors, Inc.
1166 Lake Avenue 11916 W. Main St.
Woodstock, IL 60098 Huntley, IL 60142
TOTAL
4 of 9
Pa
g
e
9
o
f
1
5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
DATE: June 3, 2025
TIME: 2:15 P.M.
Pedestrian Crossings
TOTAL UNIT UNIT UNIT UNIT
PRICE PRICE PRICEQUANTITYPRICE
CU.YD.5 $70.00 $350.00 $176.30 $881.501EARTH EXCAVATION $80.00 $400.00 $191.70 $958.50
SQ.YD.100 $10.00 $1,000.2 TOPSOIL FURNISH AND PLACE 3"00 $17.00 $1,700.00 $8.00 $800.00 $17.00 $1,700.00
SQ.YD.100 $18.00 $1,800.00 $34.03SODDING SALT TOLERANT 0 $3,400.00 $20.00 $2,000.00 $34.00 $3,400.00
SQ.YD.230 $10.00 $2,4 AGGREGATE BASE COURSE, TYPE B 4"300.00 $8.30 $1,909.00 $10.00 $2,300.00 $25.45 $5,853.50
TON 10 $350.00 $35INCIDENTAL HOT-MIX ASPHALT SURFACING ,500.00 $450.00 $4,500.00 $250.00 $2,500.00 $450.00 $4,500.00
6 PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH SQ.FT.550 $15.00 $8,250.00 $20.75 $11,412.50 $14.00 $7,700.00 $15.45 $8,497.50
7 DETECTABLE WARNINGS SQ.FT.100 $55.00 $5,500.00 $30.00 $$36.15$7,000.003,000.00 $70.00 $3,615.00
8 PAVEMENT REMOVAL SQ.YD.185 $35.00 $6,475.00 $184.50 $34,132.50 $30.00 $5,550.00 $31.40 $5,809.00
9 COMBINATION CURB AND GUTTER REMOVAL FOOT 40 $7.00 $280 $498.00$12.45$200.00$5.00$3,800.00$95.00.00
10 SIDEWALK REMOVAL SQ. FT.395 $4.00 $3,7$9.60$1,580.00 $1,639.25$4.15$1,580.00$4.0092.00
11 CLASS B PATCHES, SPECIAL 9" HES SQ.YD.15 $150.00 $2,250.00 $350.00 $5,250.00 $200.00 $3,000.00 $259.50 $3,892.50
12 FRAMES AND GRATES TO BE ADJUSTED EACH 1 $500.00 $500.00 $1,614.00 $1,614.00 $1,250.00 $1,250.00 $710.35 $710.35
13 CONCRETE CURB, TYPE B FOOT 355 $50.00 $17,750.00 $50.20 $17,821.00 $62.00 $22,010.00 $72.60 $25,773.00
14 COMB. CONC. CURB & GUTTER, TYPE B6.12 FOOT 180 $50.00 $14,3$79.85$9,000.00 $53.65 $9,657.00 $52.00 $9,360.00 73.00
15 CONCRETE MEDIAN SURFACE 4"SQ.FT.1,005 $20.00 $20,100.00 $16.65 $16,733.25 $22.50 $22,612.50 $13.00 $13,065.00
16 CONSTRUCTION LAYOUT LSUM 1 $7,500.00 $7,500.00 $2,089.00 $2,089.00 $25,000.00 $25,000.00 $2,225.00 $2,225.00
17 STREET SWEEPING EACH 4 $400.00 $1,600.00 $100.00 $400.00 $100.00 $400.00 $1,500.00 $6,000.00
18 SOLAR-POWERED ASSEMBLY (COMPLETE)EACH 4 $20,000.00 $80,000.00 $16,795.30 $67,181.20 $64,074.00 $256,296.00 $16,795.30 $67,181.20
19 RELOCATE SIGN ASSEMBLY - TYPE A EACH 1 $300.00 $300.00 $250.00 $250.00 $250.00 $250.00 $250.00 $250.00
20 REMOVE AND RETURN SIGN PANEL ASSEMBLY EACH 2 $300.00 $600.00 $250.00 $500.00 $250.00 $500.00 $250.00 $500.00
21 TUBULAR FLEXIBLE DELINEATOR EACH 8 $200.00 $1,600.00 $110.00 $880.00 $110.00 $880.00 $280.75 $2,246.00
22 THERMOPLASTIC PAVEMENT MARKING LINE - 12"FOOT 370 $20.00 $7,400.00 $9.00 $3,330.00 $24.00 $8,880.00 $8.00 $2,960.00
23 $1THERMOPLASTIC PAVEMENT MARKING LINE - 8"200FOOT 5.00 $3.60 $720$2,400.00$12.00$1,200.00$6.00$3,000.00 .00
24 THERMOPLASTIC PAVEMENT MARKING LINE - 6"FOOT 150 $10.00 $1,500.00 $4.50 $675.00 $8.00 $1,200.00 $2.35 $352.50
25 THERMOPLASTIC PAVEMENT MARKING LINE— 4"FOOT 265 $10.00 $2,650.00 $3.00 $795.00 $4.00 $1,060.00 $1.80 $477.00
26 PAVEMENT MARKING REMOVAL - WATER BLASTING SQ.FT.300 $15.00 $4,500.00 $11.00 $3,300.00 $11.00 $3,300.00 $15.00 $4,500.00
$200,202.95 $181,696.30$191,285.00 $388,428.50
Capitol Cement Company, Inc.
6231 N. Pulaski Road
Chicago, IL 60646
CITY OF EVANSTON
TABULATION OF BIDS FOR
2025 Alley and Sidewalk Improvements
BID NO: 25-26
APPROVED
ENGINEER'S
ESTIMATE
NAME AND ADDRESS OF BIDDERS
Alliance Contractors, Inc.Landmark Contractors, Inc.
1166 Lake Avenue 11916 W. Main St.
Woodstock, IL 60098 Huntley, IL 60142
ITEM
NUMBER UNITITEM TOTAL TOTAL TOTAL
TOTAL BID AS READ
AS CORRECTED
TOTAL
5 of 9
Pa
g
e
1
0
o
f
1
5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
DATE: June 3, 2025
TIME: 2:15 P.M.
Sidewalk Gap Infills
TOTAL UNIT UNITUNIT UNIT
PRICEPRICE PRICEQUANTITYPRICE
1 $12UNIT DIA.60TREE REMOVAL (LESS THAN 15 INCH DIA)$7,500.00 $36.00 $2,160.00 $36.00 $2,160.00 $36.00 $25.00 ,160.00
2 $11,400.00 $6.00 $5,700.$12.00TEMPORARY FENCE 950FOOT 00 $1.00 $950.00 $12.00 $11,400.00
3 $5,000.00 $5.00 $1,000$25.00TREE ROOT PRUNING 200FOOT .00 $5.00 $1,000.00 $5.00 $1,000.00
4 $10,500.00 $176.30 $$70.00EARTH EXCAVATION 150CU. YD.26,445.00 $80.00 $12,000.00 $121.50 $18,225.00
5 $18.00TOPSOIL FURNISH AND PLACE, 3"300SQ. YD.$5,40 $8.00$17.00 $17.00 $5,100.000.00 $5,100.00 $2,400.00
6 $22.00SODDING, SALT TOLERANT 300SQ. YD.$34$6,600.00 $20.00.00 $34.00 $10,200.00$10,200.00 $6,000.00
7 TREE, AESCULUS FLAVA (BUCKEYE), 2" CALIPER, BALLED AND BURLAPPED EACH 1 $1,500.00 $1,500.00 $960.00 $960.00 $1,000.00 $1,000.00 $960.00 $960.00
8 SQ. YD.1,046AGGREGATE BASE COURSE, TYPE B 4"$10.00 $10,460.00 $24.05 $25,1$10,460.00 $8.30 $8,681.80 $10.00 56.30
9 $250.00 $61.00 $305.00CRUSHED STONE, CA-16 $50.005TON $40.00 $72.20$200.00 $361.00
10 INCIDENTAL HOT-MIX ASPHALT SURFACING $350.009TON $3,150.00 $450.00 $4,050.00 $250.00 $2,250.00 $450.00 $4,050.00
11 PCC DRIVEWAY PAVEMENT, 6 INCH $90.0078SQ. YD.$7,020.00 $89.50 $6,981.00 $88.00 $6,864.00 $102.65 $8,006.70
12 PORTLAND CEMENT CONCRETE SIDEWALK, 5 INCH SQ. FT.9,156 $15.00 $137,340.00 $9.80 $89,728.80 $14.00 $128,184.00 $18.70 $171,217.20
13 $55.00SQ. FT.DETECTABLE WARNINGS 235 $12,925.00 $30.00 $7,050.00 $70.00 $16,450.00 $36.15 $8,495.25
14 $30.00SQ. YD.DRIVEWAY PAVEMENT REMOVAL 118 $3,540.00 $61.20 $7,221.60 $26.00 $3,068.00 $25.50 $3,009.00
15 $35.00SQ. YD.HOT-MIX ASPHALT SURFACE REMOVAL 42 $1,470.00 $61.20 $2,570.40 $50.00 $2,100.00 $25.00 $1,050.00
16 $12.00FOOTCOMBINATION CURB AND GUTTER REMOVAL 581 $6,972.00 $30.50 $17,720.50 $5.00 $2,905.00 $12.45 $7,233.45
17 $7.00FOOTCURB REMOVAL 25 $175.00 $30.50 $762.50 $5.00 $125.00 $12.45 $311.25
18 $4.00SIDEWALK REMOVAL $16,800.00 $7.00 $SQ. FT.4,200 29,400.00 $4.00 $16,800.00 $5.40 $22,680.00
19 $50.COMB. CONC. CURB & GUTTER, TYPE B-6.12 FOOT 581 00 $29,050.00 $50.65 $29,427.65 $52.00 $30,212.00 $86.45 $50,227.45
20 $50.00CONCRETE CURB, TYPE B FOOT 55 $2,750.00 $47.20 $2,596.00 $52.00 $2,860.00 $79.15 $4,353.25
21 $55.00NON-SPECIAL WASTE DISPOSAL CU. YD.150 $8,250.00 $100.00 $15,000.00 $5.00 $750.00 $200.35 $30,052.50
22 $2,500.00SOIL DISPOSAL ANALYSIS EACH 3 $7,500.00 $1,500.00 $4,500.00 $100.00 $300.00 $1,500.00 $4,500.00
23 CONSTRUCTION LAYOUT LUMP SUM 1 $7,500.00 $7,500.00 $2,089.00 $2,089.00 $25,000.00 $25,000.00 $2,225.00 $2,225.00
24 STREET SWEEPING $1,200.00 $100.00 $300.03EACH$400.00 0 $100.00 $300.00 $1,500.00 $4,500.00
25 FENCE REMOVAL 150FOOT $50.00 $1,500.0$10.00$7,500.00 $24.60 $3,690.00$5,250.00$35.000
26 THERMOPLASTIC PAVEMENT MARKING LINE - 6"190FOOT $10.00 $4.00 $760.00$1,520.00$8.00$855.00$4.50$1,900.00
27 PAVEMENT MARKING REMOVAL - WATER BLASTING SQ. FT.63 $15.00 $945.00 $11.00 $693.00 $11.00 $693.00 $50.00 $3,150.00
$314,597.00 $404,073.35$282,997.25 $281,801.00
Capitol Cement Company, Inc.
6231 N. Pulaski Road
Chicago, IL 60646
TOTALUNITTOTALTOTAL
TOTAL BID AS READ
AS CORRECTED
CITY OF EVANSTON
TABULATION OF BIDS FOR
2025 Alley and Sidewalk Improvements
BID NO: 25-26
APPROVED
ENGINEER'S
ESTIMATE
NAME AND ADDRESS OF BIDDERS
Alliance Contractors, Inc.Landmark Contractors, Inc.
1166 Lake Avenue 11916 W. Main St.
Woodstock, IL 60098 Huntley, IL 60142
TOTALITEM
NUMBER ITEM
6 of 9
Pa
g
e
1
1
o
f
1
5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
DATE: June 3, 2025
TIME: 2:15 P.M.
Downtown Sidewalk Improvements
TOTAL UNIT UNITUNITUNIT
PRICEPRICEPRICEQUANTITYPRICE
UNIT DIA.90TREE REMOVAL (LESS THAN 15 INCH DIA)1 $125.00 $11,250.00 $36.00 $3,240.00 $36.00 $3,240.00 $36.00 $3,240.00
TREE TRUNK PROTECTION2 $200.00 $8,200.00 $200.0041EACH $8,200.00 $200.00 $8,200.00 $200.00 $8,200.00
TREE ROOT PRUNING3 $25.00100FOOT $500.0$5.00$2,500.00 $500.00$5.00$500.00$5.000
TOPSOIL FURNISH AND PLACE, 3"4 $18.00109SQ. YD.$1,96 $1,853.00$17.00$872.00$8.00$1,853.00$17.002.00
SODDING, SALT TOLERANT5 $22.00109SQ. YD.$34$2,398.00 $3,706.00$34.00$2,180.00$20.00$3,706.00.00
6 TREE, PRUNUS SARGENTII (SARGENT CHERRY), 2" CALIPER, BALLED AND BURLAPPED EACH 6 $1,500.00 $9,000.00 $890.00 $5,340.00 $1,750.00 $10,500.00 $890.00 $5,340.00
7 TREE, GYMNOCLADUS DIOCUS (KENTUCKY COFFEE), 2" CALIPER, BALLED AND BURLAPPED EACH 1 $1,500.00 $1,500.00 $835.00 $835.00 $1,000.00 $1,000.00 $835.00 $835.00
8 TREE, CELTIS OCCIDENTALIS (HACKBERRY), 2" CALIPER, BALLED AND BURLAPPED EACH 2 $1,500.00 $3,000.00 $860.00 $1,720.00 $1,000.00 $2,000.00 $860.00 $1,720.00
9 $10.00SQ. YD.2,538AGGREGATE BASE COURSE, TYPE B 4"$25,380.00 $8.30 $21,065.40 $10.00 $25,380.00 $26.65 $67,637.70
10 $350.00INCIDENTAL HOT-MIX ASPHALT SURFACING $72TON00.00 $450.00 $900.00 $250.00 $900.00$450.00$500.00
11 $125.00PCC DRIVEWAY PAVEMENT, 8 INCH SQ. YD.1,485 $185,625.00 $1.00 $1,485.00 $125.00 $185,625.00 $122.45 $181,838.25
12 PORTLAND CEMENT CONCRETE SIDEWALK, 5 INCH SQ. FT.17,548 $15.00 $263,220.00 $10.25 $179,867.00 $14.00 $245,672.00 $12.10 $212,330.80
13 $55.00290SQ. FT.DETECTABLE WARNINGS $15,950.00 $30.00 $8,700.00 $70.00 $20,300.00 $36.15 $10,483.50
14 $30.00DRIVEWAY PAVEMENT REMOVAL SQ. YD.1,485 $44,55 $38,610.00 $37.05 $55,019.25$1,485.000.00 $1.00 $26.00
15 $500.00FRAMES AND GRATES TO BE ADJUSTED EACH 16 $8,000.00 $1,138.00 $18,208.00 $1,250.00 $20,000.00 $710.65 $11,370.40
16 $12.00COMBINATION CURB AND GUTTER REMOVAL FOOT 29 $348.00 $52.50 $1,522.50 $5.00 $145.00 $719.20$24.80
17 $50.0COMB. CONC. CURB & GUTTER, TYPE B-6.12 FOOT 71 0 $3,550.00 $73.15 $5,193.65 $62.00 $4,402.00 $4,62$65.15 5.65
18 $50.00CONCRETE CURB, TYPE B FOOT 12 $600.00 $69.70 $836.40 $62.00 $744.00 $795.00$66.25
19 CONSTRUCTION LAYOUT LUMP SUM 1 $7,500.00 $7,500.00 $2,089.00 $2,089.00 $25,000.00 $25,000.00 $2,225.00 $2,225.00
20 STREET SWEEPING EACH 2 $400.00 $800.00 $100.00 $200.00 $500.00 $1,000.00 $1,500.00 $3,000.00
21 BRICK PAVER BANDING $20.00SQ. FT.3,412 $68,240.00 $30.95 $105,601.40 $25.00 $85,300.00 $33.40 $113,960.80
22 TREE GRATES AND FRAMES $5,400.00 $97,200.00 $4EACH18,875.00 $87,750.00 $5,500.00 $99,000.00 $5,130.00 $92,340.00
23 REMOVE EXISTING BRICK PAVERS $10.00 $2SQ. FT.22,507 25,070.00 $5.75 $129,415.25 $9.00 $202,563.00 $4.75 $106,908.25
24 SUPPLEMENTAL WATERING $100.00 $1,000.00 $40.00UNIT10 $400.00 $100.00 $1,000.00 $40.00 $400.00
$987,543.00 $590,112.60 $983,733.00 $889,947.80
Capitol Cement Company, Inc.
TOTAL
TOTAL BID AS READ
AS CORRECTED
CITY OF EVANSTON
TABULATION OF BIDS FOR
2025 Alley and Sidewalk Improvements
BID NO: 25-26
APPROVED
ENGINEER'S
ESTIMATE
NAME AND ADDRESS OF BIDDERS
Alliance Contractors, Inc.Landmark Contractors, Inc.
1166 Lake Avenue 11916 W. Main St.
Woodstock, IL 60098 Huntley, IL 60142
6231 N. Pulaski Road
Chicago, IL 60646
TOTALITEM
NUMBER TOTALUNITITEM TOTAL
7 of 9
Pa
g
e
1
2
o
f
1
5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
DATE: June 3, 2025
TIME: 2:15 P.M.
Greenwood Park Picnic Pad
TOTAL UNITUNITUNITUNIT
PRICEPRICEPRICEQUANTITYPRICE
1 TEMPORARY FENCE FOOT 500 $12.00 $6,000.00 $6.00 $3,000.00 $1.00 $500.00 $12.00 $6,000.00
2 TREE ROOT PRUNING FOOT 100 $25.00 $2,500.00 $5.00 $500.00 $5.00 $500.00 $5.00 $500.00
3 EARTH EXCAVATION CU . YD.34 $75.00 $2,550.00 $176.30 $5,994.20 $80.00 $2,720.00 $129.75 $4,411.50
4 TOPSOIL FURNISH AND PLACE, 3"SQ. YD.200 $18.00 $3,60 $8.00$17.00 $1,600.00 $17.00 $3,400.00$3,400.000.00
5 SEEDING, CLASS 2A SQ. YD.56 $5.00 $16.00 $896.0$280.00 $12.00 $672.00 $16.00 $896.000
6 SODDING, SALT TOLERANT SQ. YD.200 $22.00 $34$4,400.00 $20.00.00 $4,000.00 $34.00 $6,800.00$6,800.00
7 AGGREGATE BASE COURSE, TYPE B 4"SQ. YD.167 $15.00 $2 $10.00$8.30 $1,670.00 $21.65 $3,615.55$1,386.10,505.00
8 CRUSHED STONE, CA-16 TON 5 $50.00 $61.00 $305.00$250.00 $40.00 $200.00 $263.40 $1,317.00
9 PORTLAND CEMENT CONCRETE SIDEWALK, 5 INCH SQ. FT.1,020 $15.00 $15,300.00 $13.40 $13,668.00 $14.00 $14,280.00 $12.00 $12,240.00
10 PORTLAND CEMENT CONCRETE SIDEWALK, 6 INCH SQ. FT.479 $15.00 $7,185.00 $14.10 $6,753.90 $15.00 $7,185.00 $12.90 $6,179.10
11 DETECTABLE WARNINGS SQ. FT.10 $55.00 $3$30.00$550.00 $36.15 $361.50$700.00$70.0000.00
12 SIDEWALK REMOVAL SQ. FT.936 $4.00 $6,5$7.00$3,744.00 $1.90 $1,778.40$3,744.00$4.0052.00
13 NON-SPECIAL WASTE DISPOSAL CU . YD.34 $55.00 $1,870.00 $100.00 $3,400.00 $5.00 $170.00 $152.15 $5,173.10
14 SOIL DISPOSAL ANALYSIS EACH 1 $2,500.00 $2,500.00 $1,500.00 $1,500.00 $100.00 $100.00 $1,500.00 $1,500.00
15 CONSTRUCTION LAYOUT LUMP SUM 1 $5,000.00 $5,000.00 $2,089.00 $2,089.00 $20,000.00 $20,000.00 $2,225.00 $2,225.00
16 STREET SWEEPING $400.00 $100.00 $100.00 $$400.001EACH $100.00 $1,500.00 $1,500.00100.00
17 THERMOPLASTIC PAVEMENT MARKING LINE - 4"$1131FOOT $1,310.00 $3.00 $393.00 $6.000.00 $786.00$786.00 $6.00
18 PAVEMENT MARKING REMOVAL - WATER BLASTING SQ. FT.28 $15.00 $420.00 $11.00 $308.00 $20.00 $560.00 $112.50 $3,150.00
19 METAL POST - TYPE B FOOT 16 $20.00 $320.00 $18.00 $288.$288.00$18.0000$18.00 $288.00
20 SIGN PANEL - TYPE 2 SQ. FT.4 $20.00 $80.00 $45.00 $180 $180.00$45.00.00 $45.00 $180.00
21 ADA PICNIC TABLE EACH 1 $2,000.00 $2,000.00 $2,275.00 $2,275.00 $3,000.00 $3,000.00 $2,950.00 $2,950.00
22 ADA CHARCOAL GRILL EACH 1 $2,000.00 $2,000.00 $1,165.00 $1,165.00 $3,000.00 $3,000.00 $1,280.00 $1,280.00
23 OUTDOOR TRASH BIN EACH 1 $1,000.00 $1,000.00 $2,040.00 $2,040.00 $3,000.00 $3,000.00 $2,410.65 $2,410.65
24 OUTDOOR RECYCLING BIN EACH 1 $1,000.00 $1,000.00 $2,040.00 $2,040.00 $3,000.00 $3,000.00 $2,410.65 $2,410.65
$66,764.00 $65,333.20 $71,955.00 $71,352.45
DATE: June 3, 2025
TIME: 2:15 P.M.
Traffic Calming Speed Humps and Alley Bumps
TOTAL UNIT UNIT UNIT UNIT
PRICE PRICE PRICEQUANTITYPRICE
FOOT 400 $50,000SPEED HUMPS (VARIOUS STREETS)1 $125.00 .00 $10.00 $4,000.00 $150.00 $60,000.00 $70.40 $28,160.00
FOOT 80 $10,000.0SPEED BUMPS (VARIOUS ALLEYS)2 $125.00 0 $10.00 $800.00 $150.00 $12,000.00 $70.40 $5,632.00
3 SPEED HUMPS AND BUMPS REMOVAL AND REPLACEMENT (ASPHALT)FOOT 250 $150.00 $37,500.00 $20.00 $5,000.00 $200.00 $50,000.00 $35.00 $8,750.00
$9,800.00 $122,000.00 $42,542.00$97,500.00
ITEM
NUMBER TOTALTOTALITEMUNIT TOTAL
TOTAL BID AS CORRECTED
CITY OF EVANSTON
TABULATION OF BIDS FOR
2025 Alley and Sidewalk Improvements
BID NO: 25-26
APPROVED
ENGINEER'S
ESTIMATE
NAME AND ADDRESS OF BIDDERS
Alliance Contractors, Inc.Landmark Contractors, Inc.
1166 Lake Avenue 11916 W. Main St.
Woodstock, IL 60098 Huntley, IL 60142
AS READ
Capitol Cement Company, Inc.
6231 N. Pulaski Road
Chicago, IL 60646
TOTAL
TOTAL BID AS READ
AS CORRECTED
CITY OF EVANSTON
TABULATION OF BIDS FOR
2025 Alley and Sidewalk Improvements
BID NO: 25-26
APPROVED
ENGINEER'S
ESTIMATE
NAME AND ADDRESS OF BIDDERS
Alliance Contractors, Inc.Landmark Contractors, Inc.
1166 Lake Avenue 11916 W. Main St.
Huntley, IL 60142Woodstock, IL 60098
Capitol Cement Company, Inc.
6231 N. Pulaski Road
Chicago, IL 60646
TOTAL
TOTAL
ITEM
NUMBER TOTALITEMUNITTOTAL
8 of 9
Pa
g
e
1
3
o
f
1
5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
DATE: June 3, 2025
TIME: 2:15 P.M.
Transit Stops
TOTAL UNITUNITUNIT
PRICEPRICEQUANTITYPRICE
FOOT1TREE ROOT PRUNING 100 $25.00 $500.0$5.00$2,500.00 $5.00 $500.00$5.00$500.000
CU. YD.2 EARTH EXCAVATION 60 $75.00 $4,500.00 $176.30 $10,578.00 $80.00 $4,800.00 $194.00 $11,640.00
SQ. YD.3 TOPSOIL FURNISH AND PLACE, 4"170 $20.00 $3,40 $17.00 $2,890.00$17.00$1,700.00$10.000.00 $2,890.00
SQ. YD.4 SODDING, SALT TOLERANT 170 $22.00 $34$3,740.00 .00 $5,780.00$34.00$3,400.00$20.00$5,780.00
SQ. YD.5 AGGREGATE BASE COURSE, TYPE A 4"383 $6.00 $2,$8.30 $10,226.10$26.70$3,830.00$10.00298.00 $3,178.90
6 PORTLAND CEMENT CONCRETE SIDEWALK, 5 INCH SQ. FT.3,500 $12.00 $42,000.00 $11.10 $38,850.00 $14.00 $49,000.00 $12.80 $44,800.00
7 SIDEWALK REMOVAL SQ. FT.1,500 $3.00 $4,500.00 $14.50 $2 $3.95$4.001,750.00 $6,000.00 $5,925.00
8 SIGN PANEL - TYPE 1 $40.00 $1,600.00 $36.00 $SQ. FT.40 $36.00$36.001,440.00 $1,440.00 $1,440.00
9 RELOCATE SIGN ASSEMBLY - TYPE A $175.00EACH6 $1,050.00 $250.00 $1,500.00 $250.00 $1,500.00 $250.00 $1,500.00
10 RELOCATE SIGN ASSEMBLY - TYPE B $350.00EACH3 $1,050.00 $300.00 $900.00 $300.00 $900.00 $300.00 $900.00
11 RELOCATE SIGN PANEL - TYPE 1 $50.00SQ. FT.4 $200.00 $100.00$25.00 $100.00$25.00$100.00$25.00
12 METAL POST - TYPE A $30.00FOOT200 $3$18.00$6,000.00 ,600.00 $3,600.00$18.00$3,600.00$18.00
13 CONSTRUCTION LAYOUT LUMP SUM 1 $7,500.00 $7,500.00 $2,089.00 $2,089.00 $20,000.00 $20,000.00 $2,225.00 $2,225.00
$91,526.10$96,770.00$93,155.90$80,338.00
TOTAL
TOTAL BID AS READ
AS CORRECTED
CITY OF EVANSTON
TABULATION OF BIDS FOR
2025 Alley and Sidewalk Improvements
BID NO: 25-26
APPROVED
ENGINEER'S
ESTIMATE
NAME AND ADDRESS OF BIDDERS
Alliance Contractors, Inc.Landmark Contractors, Inc.
1166 Lake Avenue 11916 W. Main St.
Woodstock, IL 60098 Huntley, IL 60142
Capitol Cement Company, Inc.
6231 N. Pulaski Road
Chicago, IL 60646
ITEM
NUMBER ITEM TOTAL TOTALUNIT
9 of 9
Pa
g
e
1
4
o
f
1
5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
BID 25-26 2025 Alley and Sidewalk Improvements, M/W/D/EBE Memo 06.23.2025
To: Edgar Cano, Public Works Agency Director
Lara Biggs, Capital Planning and Engineering Bureau Chief/City Engineer
Bridget Nash, Senior Project Manager
From: Tammi Nunez, Purchasing Manager
Subject: BID 25-26 2025 Alley and Sidewalk Improvements
Date: June 23, 2025
ProgramEnterpriseBusiness EvanstonandMinority,theofgoalThe Women
(M/W/D/EBE) is to assist such businesses with opportunities to grow. In order to help
ensure such growth, the City’s goal is to have genera l contractors utilize M/W/D/EBEs
to perform no less than 25% of the awarded contract. With regard to BID 25-26 2025
Alley Improvements,Sidewalk and Contractors,Alliance Inc,. base isbid total
$3,203,481.10 and they are found to be in compliance with the City’s 25% goal.
Name of M/W/EBE
Scope of
Work
Contract
Amount
%
MBE
WBE DBE
EBE
Archon Construction Co. Inc.
563 S. Route 53
Addison, IL 60101
Underground $868,509.77 27% X
Smith Maintenance Company
2221 W Walnut Unit #2
Chicago, IL 60612
Traffic
Control
$51,618.00 2% X
Total M/W/D/EBE $920,127.77 29%
CC: Hitesh Desai, Chief Financial Officer/ City Treasurer
Memorandum
Page 15 of 15 Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Page 2 ACTIONS June 23, 2025
Item Item Description Motion Disposition
A3
Approval of Contract Award with Alliance
Contractors, Inc. for the 2025 Alley and
Sidewalk Improvements (Bid No. 25-26)
Staff recommended that City Council authorize the
City Manager to execute an agreement with Alliance
Contractors, Inc. (1166 Lake Avenue, Woodstock, IL
60089) for the 2025 Alley and Sidewalk
Improvements (Bid No. 25-26) in the amount of
$3,203,481.10.
Funding is provided from the Capital Improvement
Fund 2025 Projects Bonds in the amount of
$1,875,361.90; the Special Assessment Fund in the
amount of $1,045,132.20; and the Sewer Fund in the
amount of $282,987.00. A detailed funding analysis
is included in the attached memo.
Approved for Action
7-1-1
Ayes: Burns, Davis,
Rodgers, Geracaris,
Harris, Iles,
Nieuwsma
Nayes: Kelly
Absent: Suffredin
A4
Approval of a Contract Award with CDM
Smith Incorporated for 2025 Chlorine
Conversion Feasibility Study Service (RFP#
25-13)
Staff recommended that the City Council authorize
the City Manager to execute an agreement with CDM
Smith Incorporated (125 S. Wacker Drive, Suite
2510, Chicago, IL 60606) to provide Chlorine
Conversion Feasibility Study services in the
not-to-exceed amount of $61,980.00.
Funding is provided by the Water Fund (Account #
510.40.4200.62185), which has an approved FY
2025 budget amount of $300,000, all of which
remains unallocated.
Approved on
Consent Agenda for
Action
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
07 / 01 / 2025
Doc ID: 02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
Contract with Alliance Contractors, Inc. for the 2025 Alley...
Bid_25-26_Contrac...for_Signature.pdf
02dcdce022c9518d7c5ec0e78f193ca5f5c4dca5
MM / DD / YYYY
Signed
06 / 30 / 2025
10:54:10 UTC-5
Sent for signature to Alexandra Ruggie
(aruggie@cityofevanston.org) and Luke Stowe
(lstowe@cityofevanston.org) from lthomas@cityofevanston.org
IP: 50.171.242.186
06 / 30 / 2025
12:51:34 UTC-5
Viewed by Alexandra Ruggie (aruggie@cityofevanston.org)
IP: 174.208.224.120
06 / 30 / 2025
12:51:53 UTC-5
Signed by Alexandra Ruggie (aruggie@cityofevanston.org)
IP: 174.208.224.120
07 / 01 / 2025
05:45:26 UTC-5
Viewed by Luke Stowe (lstowe@cityofevanston.org)
IP: 76.136.85.191
07 / 01 / 2025
05:46:29 UTC-5
Signed by Luke Stowe (lstowe@cityofevanston.org)
IP: 76.136.85.191
The document has been completed.07 / 01 / 2025
05:46:29 UTC-5