Loading...
HomeMy WebLinkAbout66-O-25 PD Ord (605 Davis) FINAL - 11.14.2510/27/2025 66-O-25 AN ORDINANCE Approving A Special Use Permit For a New Twenty-Nine-Story Mixed- Use Residential Planned Development at 601-615 Davis Street and 1604-1608 Chicago Avenue in the D3 Downtown Core District WHEREAS, the City of Evanston is a home-rule municipality pursuant to Article VII of the Illinois Constitution of 1970; and WHEREAS, as a home rule unit of government, the City has the authority to adopt ordinances and to promulgate rules and regulations that protect the public health, safety, and welfare of its residents; and WHEREAS, Article VII, Section (6)a of the Illinois Constitution of 1970, which states that the “powers and functions of home rule units shall be construed liberally,” was written “with the intention that home rule units be given the broadest powers possible” (Scadron v. City of Des Plaines, 153 Ill.2d 164); and WHEREAS, it is a well-established proposition under all applicable case law that the power to regulate land use through zoning regulations is a legitimate means of promoting the public health, safety, and welfare; and WHEREAS, Division 13 of the Illinois Municipal Code (65 ILCS 5/11-13-1, et seq.) grants each municipality the power to establish zoning regulations; and 1 of 49 66-O-25 WHEREAS, pursuant to its home rule authority and the Illinois Municipal Code, the City has adopted a set of zoning regulations, set forth in Title 6 of the Evanston City Code of 2012, as amended, (“the Zoning Ordinance”); and WHEREAS, Kerry Dickson of Davis Street Development Company 2015, LLC (the “Applicant,”), for the property located in the D3 Downtown Core District at 601- 15 Davis Street and 1604-1608 Chicago Avenue, Evanston, Illinois (the “Subject Property”), legally described in Exhibit A, which is attached hereto and incorporated herein by reference, applied, pursuant to the provisions of the Zoning Ordinance , to permit the construction of a 31-story mixed-use residential planned development with 3,200 square feet of ground floor commercial space, 430 dwelling units and 194 parking spaces (80 onsite and 114 offsite) located at the Subject Property (the “Original Development Plan”); and WHEREAS, Applicant petitioned the Land Use Commission for recommended approval of the following (collectively, the “Zoning Approval”): A. A Special Use Permit for a Planned Development on the Subject Property per Section 6-3-6 of the Zoning Ordinance. B. The following Site Development Allowances as permitted by Section 6 - 3-6 of the Zoning Ordinance: a. Dwelling Units: Three hundred-six (306) dwelling units where a maximum of ninety two (92) dwelling units are allowed. 2 of 49 66-O-25 b. Height: A three hundred eight foot (308’) building height where maximum building heights are limited to eighty-five (85) feet in the D3 Downtown Core District. c. Parking: A total of one hundred ninety-four (194) parking spaces where two hundred forty three (243) parking spaces are required. d. Ziggurat setback: No ziggurat setback along Davis Street between forty-two (42) feet and one hundred thirty-one (131) feet in height where a forty (40) foot ziggurat setback is required and a thirty-three (33) ziggurat foot setback along Davis Street from one hundred thirty-one (131) feet in height to the top of the building where a forty (40) foot ziggurat setback is required. e. Upper story setback: No upper story setback between forty -two (42) feet and one hundred thirty-one (131) feet in height along a street side lot line (Davis Street) where a thirty (30) foot upper story setback above forty-two (42) feet is required and a 15.25 foot upper story setback above forty-two (42) feet in height along an interior side yard property line (north) where a twenty-five (25) foot upper story setback above forty-two (42) in height is required. f. Floor Area Ratio: A 12.9 floor area ratio (FAR) where a maximum FAR of 6.5 is permitted. 3 of 49 66-O-25 all to allow the construction and operation of a 31 -story, 430-unit mixed-use residential planned development with 3,200 square feet of ground floor commercial space and 194 parking spaces, located at the Subject Property. WHEREAS, on July 23, 2025, August 13, 2025, and August 27, 2025, in compliance with the provisions of the Illinois Open Meetings Act (5 ILCS 120/1 et seq.) and the Zoning Ordinance, the Land Use Commission (“LUC”) held public hearings, pursuant to proper notice, regarding case no. 25PLND-0019 to consider Applicant’s application for a Special Use Permit for a Planned Development with Site Development Allowances on the Subject Property, heard testimony and public comment and made written minutes, findings, and recommendations; and WHEREAS, after having considered the evidence presented, including the exhibits and materials submitted, and public testimony provided, the LUC made the following findings per Section 6-3-5-10 of the Zoning Ordinance: 1. Is one of the listed special uses for the zoning district in which the property lies: It is permitted under the D3 District so the standard is met. 2. Complies with the purposes and the policies of the Comprehensive General Plan and the Zoning ordinance as amended from time to time: The current Comprehensive General Plan considers housing and density within Downtown Evanston, so the standard is met. 3. Will not cause a negative cumulative effect, when its effect is considered in conjunction with the cumulative effect of various special uses of all types on the immediate neighborhood and the effect of the proposed type of special use upon the City as a whole: The scale of the development is such where the commission believes it will have a negative cumulative effect on the neighborhood compared to a smaller building, and so this standard has not been met. 4 of 49 66-O-25 4. Does not interfere with or diminish the value of property in the neighborhood: The proposed development will add vibrancy and density to the downtown neighborhood, and is a better use than its current use as a vacant lot, whereby meeting the standard. 5. Is adequately served by public facilities and services: The commission believes the Subject Property can be adequately served by public facilities and services and found this standard to be met. 6. Does not cause undue traffic congestion: The site has been designed to address traffic congestion around the Subject Property without creating undue traffic congestion, so the standard is met. 7. Preserves significant historical and architectural resources: Including the University building in the development will preserve that building, so the standard is met. 8. Preserves significant natural and environmental resources: The standard is not applicable. 9. Complies with all other applicable regulations of the district in which it is located and other applicable ordinances, except to the extent such regulations have been modified through the planned development process or the grant of a variation: The Commission believes the standard is met. WHEREAS, after having considered the evidence presented, including the exhibits and materials submitted, and public testimony provided, the LUC made the following findings per Section 6-3-6-9 of the Zoning Ordinance: 1. The requested Site Development Allowance(s) will not have a substantial adverse impact on the use, enjoyment or property values of adjoining properties that is beyond a reasonable expectation given the scope of the applicable Site Development Allowance(s) of the Planned Development location: The standard is not met because of the excess beyond height and FAR site development allowance thresholds. 2. The proposed development is compatible with the overall character of existing development in the immediate vicinity of the subject property: The standard is not met due to the height of the building . 5 of 49 66-O-25 3. The development site circulation is designed in a safe and logical manner to mitigate potential hazards for pedestrians and vehicles at the site and in the immediate surrounding area: The Commission found that the standard is met. 4. The proposed development aligns with the current and future climate and sustainability goals of the City: There was not testimony to the contrary so the standard was met. 5. Public benefits that are appropriate to the surrounding neighborhood and the City as a whole will be derived from the approval of the requested Site Development Allowance(s): The building will generate a lot of affordable housing so the standard is met. WHEREAS, the Land Use Commission recommended against approval with three (3) “yay” votes cast in favor of approval and four (4) “nay” votes cast against approval, with two commissioners absent, of the application for a Special Use Permit for a Planned Development with Site Development Allowances for the Subject Property; and WHEREAS, on September 29, 2025, the Planning and Development Committee of the City Council held a meeting, in compliance with the provisions of the Open Meetings Act and the Zoning Ordinance, received input from the public, carefully considered and reviewed the findings and recommendation of the Land Use Commission in case no. 25PLND-0019, and recommended City Council approval thereof; and WHEREAS, on September 29, 2025, the City Council held a meeting, in compliance with the provisions of the Open Meetings Act and the Zoning Ordinance, received input from the public, carefully considered and reviewed the findings and recommendation of the Planning & Development Committee and the Land Use 6 of 49 66-O-25 Commission in case no. 25PLND-0019, and tabled consideration of the Zoning Approval until their meeting on October 27, 2025; and WHEREAS, subsequent to the September 29, 2025, meeting with the City Council, the Applicant revised the Original Development Plan to propose the construction of a 29-story mixed-use residential planned development with 2,920 square feet of ground floor commercial space, 419 dwelling units and 193 parking spaces (40 onsite and 153 offsite) located at the Subject Property (the “Development Plan”); and WHEREAS, the existing two-story building at the northwest corner of Chicago Avenue and Davis Street (the “University Building”) will be preserved as part of this application; and WHEREAS, pursuant to the revised Development Plan, the Applicants petition requests approval from the City Council of Evanston of the following (collectively, the “Zoning Approval”): C. A Special Use Permit for a Planned Development on the Subject Property per Section 6-3-6 of the Zoning Ordinance. D. The following Site Development Allowances as permitted by Section 6 - 3-6 of the Zoning Ordinance: a. Dwelling Units: Two hundred ninety-nine (299) dwelling units where a maximum of ninety two (92) dwelling units are allowed. 7 of 49 66-O-25 b. Height: A two hundred eighty-eight foot (288) building height where maximum building heights are limited to eighty -five (85) feet in the D3 Downtown Core District. c. Parking: A total of one hundred ninety-three (193) parking spaces where two hundred forty two (242) parking spaces are required. d. Ziggurat setback: No ziggurat setback along Davis Street between twenty-nine (29) feet and one hundred thirty-one (131) feet in height where a forty (40) foot ziggurat setback is required and a thirty-three (33) foot ziggurat setback along Davis Street from one hundred thirty-one (131) feet in height to the top of the building where a forty (40) foot ziggurat setback is required. e. Upper story setback: No upper story setback between forty -two (42) feet and one hundred thirty-one (131) feet in height along a street side lot line (Davis Street) where a thirty (30) foot upper story setback above forty-two (42) feet is required and a 15.25 foot upper story setback above forty-two (42) feet in height along an interior side yard property line (north) where a twenty-five (25) foot upper story setback above forty-two (42) in height is required. f. Floor Area Ratio: A 12.9 floor area ratio (FAR) where a maximum FAR of 6.5 is permitted. 8 of 49 66-O-25 all to allow the construction and operation of a 29 -story, 419-unit mixed-use residential planned development with 2,920 square feet of ground floor commercial space and 193 parking spaces, located at the Subject Property. WHEREAS, pursuant to Subsection 6-3-6-5 of the Zoning Ordinance, the City Council may allow Site Development Allowances from the normal district regulations established in the Zoning Ordinance; and WHEREAS, at its meetings of September 29, 2025, October 27, 2025, and November 10, 2025, held in compliance with the Open Meetings Act and the Zoning Ordinance, the City Council considered the recommendations of the Planning and Development Committee, received additional public comment, made certain findings, and adopted said recommendations; and WHEREAS, it is well-settled law that the legislative judgment of the City Council must be considered presumptively valid (see Glenview State Bank v. Village of Deerfield, 213 Ill.App.3d 747) and is not subject to courtroom fact -finding (see National Paint & Coating Ass’n v. City of Chicago, 45 F.3d 1124), NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, COOK COUNTY, ILLINOIS, THAT: SECTION 1: The foregoing recitals are found as fact and incorporated herein by reference. 9 of 49 66-O-25 SECTION 2: Pursuant to the terms and conditions of this ordinance, the City Council hereby grants the Special Use Permit for a Planned Development applied for in case no. 25PLND-0019, to allow the construction of a new 29-story 419-unit residential planned development located at the Subject Property. SECTION 3: The City Council hereby grants the following Site Development Allowances: a. Dwelling Units: Two hundred ninety-nine (299) dwelling units (including 10% on-site inclusionary) and one hundred twenty (120) bonus units for a total of four hundred nineteen (419) dwelling units, where a maximum of ninety-two (92) dwelling units is allowed. Provided, however, that the applicant may voluntarily elect to provide twenty percent of the total number of 419 dwelling units as affordable (i.e. 84 affordable dwelling units). b. Height: 288 foot building height where maximum building heights are limited to 85 feet in the D3 Downtown Core District. c. Parking: 193 parking spaces where 242 parking spaces are required. d. Floor Area Ratio: A 12.9 floor area ratio (FAR) where a maximum FAR of 6.5 is permitted. e. Ziggurat Setback: No ziggurat setback along Davis Street between 29 feet and 131 feet in height where a 40 foot ziggurat 10 of 49 66-O-25 setback is required and a 33 ziggurat foot setback along Davis Street from 131 feet in height to the top of the building where a 40 foot ziggurat setback is required. f. Upper Story Setback: No upper story setback between 42 feet and 131 feet in height along a street side lot line (Davis Street) where a 30 foot upper story setback above 42 feet is required and a 15.25 foot upper story setback above 42 feet in height along an interior side yard property line (north) where a 25 foot upper story setback above 42 feet in height is required. SECTION 4: The City Council hereby imposes the following conditions, violation of any of which shall constitute grounds for penalties or revocation thereof pursuant to Subsections 6-3-10-5 and 6-3-10-6 of the Zoning Code: A. Compliance with Applicable Requirements: The Applicants shall develop and operate the Planned Development authorized by the terms of this ordinance in substantial compliance with the following: the terms of this ordinance; the Development Plan in Exhibit B, attached hereto and incorporated herein by reference; all applicable City Code requirements; the Applicants’ testimony and representations and documents to the Land Use Commission, the P&D Committee, and the City Council. B. That the Applicant provide an electronic information kiosk displaying CTA, Metra, and Pace arrival and departure times for transit stops/stations in Downtown Evanston, which shall be viewable from both the building lobby and the building exterior. C. The Applicant is encouraged to make available to tenants of the building, at no cost, up to 50 unlimited ride tickets/passes for use on the CTA, Metra, and Pace transit systems. D. The proposed building shall obtain LEED Gold Certification as per the standards of LEED v5. 11 of 49 66-O-25 E. The Applicant shall construct a layby parking area on the north side of Davis Street abutting the Subject Property that accommodates up to four (4) passenger vehicles. Future modifications to the layby lane shall be allowed at the discretion of the City. F. Prior to issuance of a Certificate of Occupancy for the proposed building, the Applicant shall execute a lease with the City for a minimum of 153 parking stalls within one (or multiple) of the City-owned garage facilities within 1,000 feet of the subject property. Parking stalls shall be leased at the standard monthly fee so that the total parking supply for the development shall at all times be 193 parking spaces (40 provided onsite and 153 provided off-site); G. Pursuant to Section 5-7 of the Evanston City Code, the proposed development is a “covered development” and the Applicant shall comply with the Inclusionary Housing Ordinance. In particular, the subject property shall be operated in substantial compliance with the following: 1. Inclusionary Housing Application: Deemed compliant on October 20, 2025 and is subject to the Inclusionary Housing Ordinance that was in effect on December 17, 2024. The Applicant proposes eighty-four (84) Inclusionary Housing units, thirty (30) required by the Inclusionary Housing Ordinance and fifty-four (54) as a public benefit. 2. Modifications: The Applicant may comply with the Inclusionary Housing Ordinance in another manner than above if an updated Inclusionary Housing Application is submitted and deemed compliant. Modifications to overall project plans may require the Applicant to resubmit an updated Inclusionary Housing Application; 3. Building Permit Fees: The Applicant shall forego deferral of building permit fees as allowed by Section 5-7-9(B). H. The proposed building shall be constructed as a fully electric building in compliance with the year 2050 requirements of the Health Buildings Ordinance at time of occupancy; I. The Applicant shall install the high-visibility ladder style crosswalks at all legs of the intersection of Church Street and Orrington Avenue as identified in the 6/13/25 Traffic Impact Study prepared by KLOA; J. Prior to issuance of a building permit, the Applicant shall execute and record a Zoning Control Agreement in substantial compliance with the draft agreement marked “25832642v9” and submitted as part of application 25PLND-0019; 12 of 49 66-O-25 K. The Applicant shall work with the City to finalize adequate exterior safety features for cars exiting the 40-space onsite parking garage, which may include, but is not limited to, warning lights/sounds and/or mirrors; L. The art installation which is proposed as a public benefit to be located within the ground floor residential lobby shall be in a prominent location for visibility from the exterior of the building, and the lobby shall be open to the public when front desk staff is available. The Applicant shall hire an Evanston-based artist, or an artist with strong ties to the Evanston community, for creation of the proposed art; M. Any above ground electrical service infrastructure needed in the refuse/loading area on the north side of the University Building shall not disrupt refuse collection, loading, building egress, and parking functions within refuse/loading area. Any such equipment shall be screened from view as feasible; N. Applicant shall work on acceptable electrical service to the site given that the overhead pole and wires supplying electrical service to the University Building is on the tower site and will be removed. If feasible, electric service to the University Building should be below grade; O. Composting shall be made available for all commercial and residential building tenants; P. The Applicant shall fully remove and reconstruct with concrete the full width of the alley abutting the development site from Davis Street to the northern property boundary. Additionally, the Applicant shall fully remove and replace with concrete the following sections of the alley between Davis Street and Church Street: 1. The full width of the alley from the northern property boundary for a length of 10’. 2. An approximately 10’ x 84’ section on the western side of the alley generally abutting 1629 Orrington Avenue. 3. The full width of the alley from Church Street south for approximately 111’. Prior to any repairs within the alley, the Applicant shall provide a topographic survey and a proper analysis of drainage and grades shall be done in order to ensure all drainage onto the alley can be properly routed and accommodated by existing storm structures within the alley. Any improvement within the alley in which there are inlet structures, utilities, etc., that will be impacted, these elements must be adjusted or reconstructed as necessary and graded to ensure they are placed at the proper elevation. Q. The Applicant shall make a $100,000 contribution to the City’s alley fund to be used for repair of alleys throughout the City. 13 of 49 66-O-25 R. Residential tenants will be prohibited from obtaining on-street residential parking passes for street parking in the vicinity of the subject property. S. Employees of the commercial unit(s) within the building shall be prohibited from utilizing on-street metered parking spaces during work shifts. T. The proposed layby parking area along Davis Street shall not be used for loading/unloading by the commercial unit(s) on the subject property and shall not be used for move-ins or move-outs by residential tenants of the subject property. The loading zone shall be continuously monitored by building management to ensure these activities are not occurring. Deliveries to the residential tenants shall be left within the lobby and delivery drivers shall not deliver products directly to each unit. U. Residential move-ins/move-outs shall be scheduled with building management and shall not occur between the hours of 7am -9am and 4pm-6pm Mondays through Fridays. V. Deliveries to the commercial unit(s) on the subject property shall be prohibited between the hours of 7am-9am and 4pm-6pm Mondays through Fridays. W. Prior to building permit issuance for any site demolition or new building construction on the subject property, the Applicant shall sign and agree to a Construction Management Plan (CMP) with the City of Evanston. The CMP shall include but is not limited to the following: construction staging plan, on -street and on-site construction parking restrictions, hours of operation, a plan including cross sections showing pedestrian access around the site with the use of curb ramps, signage and/or striping, foundation survey of surrounding structures including weekly reporting of seismographs for the duration of construction, submittal of environmental testing report prior to construction, visibility diagram for all construction site access points, proposed schedule for street opening for utility connections with cross section details, and project updates via monthly newsletter and project website; X. The Applicant shall explore the feasibility of incorporating an extensive green roof system on the 29th floor rooftop. Y. Recordation: Pursuant to Subsection 6-3-6-10 of the Zoning Ordinance, the Applicant shall, at its cost, record a certified copy of this ordinance, including all exhibits attached hereto, with the Cook County Recorder of Deeds, and provide proof of such recordation to the City, before the City may issue any permits pursuant to the Planned Development authorized by the terms of this ordinance. Z. Workforce Development: The Applicant shall support workforce development through collaboration with the Trade Collective, including financial support of $75,000 over two years. 14 of 49 66-O-25 SECTION 5: If any provision of this ordinance or application thereof to any person or circumstance is held unconstitutional or otherwise invalid, such invalidity shall not affect other provisions or applications of this ordinance that can be given effect without the invalid application or provision, and each invalid provision or invalid application of this ordinance is severable. SECTION 6: This ordinance shall be in full force and effect from and after its passage, approval and publication in the manner provided by law. SECTION 7: The Zoning Ordinance grants the Applicant twelve (12) months after the effective date of this Ordinance to obtain a building permit to allow for the construction of the 29-story mixed-use residential planned development with 2,920 square feet of ground floor commercial space, 419 dwelling units and 193 parking spaces (40 onsite and 153 offsite) located at the Subject Property. Pursuant to and in accordance with Section 6-11-1-10(A).4 of the Zoning Ordinance, the Applicant has requested an additional twelve (12) months, allowing a total of twenty -four (24) months from the effective date of this Ordinance, to obtain said building permit. Failure to obtain said building permit within this twenty-four (24) month time period, or failure to extend the twenty-four (24) month time period pursuant to Section 6 -11-1-10(A).4 of the Zoning Ordinance, shall render the Special Use for the Planned Development null and void. 15 of 49 66-O-25 SECTION 8: The findings and recitals contained herein are declared to be prima facie evidence of the law of the City and shall be received in evidence as provided by the Illinois Compiled Statutes and the courts of the State of Illinois. Introduced: _______________, 2025 Adopted: _________________, 2025 Approved: ___________________________, 2025 ________________________________ Daniel Biss, Mayor Attest: ______________________________ Stephanie Mendoza, City Clerk Approved as to form: ________________________________ Alexandra Ruggie, Corporation Counsel 16 of 49 66-O-25 EXHIBIT A LEGAL DESCRIPTION PARCEL 1: THE EASTERLY 60 FEET OF LOTS 10 AND 11 IN BLOCK 19. IN EVANSTON, IN SECTION 18, TOWNSHIP 41 NORTH, RANGE 14, EAST OF THE THIRD PRINCIPAL MERIDIAN, IN COOK COUNTY, ILLINOIS. PARCEL 2A: THE WESTERLY 60 FEET OF THE EASTERLY 120 FEET OF LOTS 10 AND 11 (EXCEPT THE NORTH 16 FEET OF SAID LOT 11 FOR ALLEY) IN BLOCK 19 IN EVANSTON IN SECTION 18, TOWNSHIP 41 NORTH, RANGE 14 EAST OF THIRD PRINCIPAL MERIDIAN, IN COOK COUNTY, ILLINOIS (A/K/A THE EASTERLY 60 FEET OF LOT 1 IN THE CONSOLIDATION OF PART OF LOTS 10 AND 11 IN BLOCK 19 IN EVANSTON, IN SECTION 18, TOWNSHIP 41 NORTH, RANGE 14, LYING EAST OF THE THIRD PRINCIPAL MERIDIAN, IN COOK COUNTY, ILLINOIS). PARCEL 2B: THE NORTHERLY 16 FEET OF THE WESTERLY 60 FEET OF THE EASTERLY 120 FEET OF LOT 11 IN BLOCK 19 IN EVANSTON IN SECTION 18, TOWNSHIP 41 NORTH, RANGE 14 EAST OF THE THIRD PRINCIPAL MERIDIAN, IN COOK COUNTY, ILLINOIS. PARCEL 3: LOT 1 (EXCEPT THE EAST 60 FEET) IN THE CONSOLIDATION OF LOTS 10 AND 11 IN BLOCK 19 IN EVANSTON, IN SECTION 18, TOWNSHIP 41 NORTH, RANGE 14, LYING EAST OF THE THIRD PRINCIPAL MERIDIAN, IN COOK COUNTY, ILLINOIS. PARCEL 4: THE WESTERLY 50 FEET OF LOTS 10 AND 11 IN BLOCK 19 IN THE CITY OF EVANSTON, IN SECTION 18, TOWNSHIP 41 NORTH, RANGE 14 EAST OF THE THIRD PRINCIPAL MERIDIAN, IN COOK COUNTY, ILLINOIS. PINs: 11-18-306-021-0000 11-18-306-026-0000 11-18-306-029-0000 11-18-306-030-0000 11-18-306-040-0000 Commonly Known As: 601-615 Davis Street and 1604-1608 Chicago Avenue, Evanston, Illinois. 17 of 49 66-O-25 EXHIBIT B Development Plan 18 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design SITE PLAN PROPERTY LINE RECYCLETRASH PROPERTY LINE N EXISTING 2 STORY UNIVERSITY BUILDING COMMERCIAL First Floor: 6,660 SF Second Floor: 5,730 SF TOTAL: 12,390 SF 29 STORY MIXED USE BUILDING TYPE 1A CONSTRUCTION FOOTPRINT @ GRADE: 19,931 SF TOTAL: 399,596 SF 605 DAVIS STREET 27,840.62 SF 210.53' 210.56' 13 2 . 2 8 ' 13 2 ' - 0 " 149'-0" 60'-9" 11 5 ' - 9 " 13 2 . 1 8 ' CH I C A G O A V E N U E DAVIS STREET RETAIL FIRE PUMP WATER METER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCEL LOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM 72 SPACES RECYCLETRASH PROPERTY LINE DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH STAIR STAIR ELEV. ELEV. ELEV. ELEV. TRASH COMPOST AREA 0 10'30'60' 19 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design RETAIL FIRE PUMP WATER METER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCEL LOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM 55 SPACES RECYCLETRASH PROPERTY LINE DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH STAIR STAIR ELEV. ELEV. ELEV. ELEV. TRASH COMPOST AREA E- B I K E E- B I K E Ch a r g i n g Zo n e E- B I K E E- B I K E E- B I K E RESIDENTIAL ENTRANCE RETAIL ENTRY GROUND FLOOR PLAN 2 STORY UNIVERSITY BUILDING CH I C A G O A V E N U E DAVIS STREET BIKE LANE 14' MIN CLEAR OVERHEAD OPENINGSEE EXHIBITS 'B1&B2' FOR LOADING AUTO-TURN 8'-2" MIN CLEAR OVERHEAD OPENING LAY BY CANOPY ABOVE PARKING SPACESPARKING SPACES LOADING ACCESS PARKING OUT PARKING IN N RETAIL FIRE PUMP WATER METER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCEL LOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM 72 SPACES RECYCLETRASH PROPERTY LINE DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH STAIR STAIR ELEV. ELEV. ELEV. ELEV. TRASH COMPOST AREA 0 10'30'60' 20 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design LEVEL 2 PARKING N RETAIL FIRE PUMP WATER METER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCEL LOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM 72 SPACES RECYCLETRASH PROPERTY LINE DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH STAIR STAIR ELEV. ELEV. ELEV. ELEV. TRASH COMPOST AREA 0 10'30'60' 40 SPACES STAIR STAIR ELEV. ELEV. ELEV. ELEV. ADA ADA STOR. STOR.STOR. MECH. STOR. 8'-2" CLEAR BIKE PARKING BIKE PARKING 41 BIKES E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE 41 BIKES AD A 21 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design 2 STORY UNIVERSITY BUILDING CH I C A G O A V E N U E DAVIS STREET LEVEL 3 TIER 1 TELE.STAIR STAIR ELEC. ELEV. ELEV.ELEV. TRASH30"x 4 8 " T R 30"x 4 8 " T R MECH. GREEN ROOF TERRACE TERRACE GREEN ROOF TERRACE RETAIL FIRE PUMP WATER METER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCEL LOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM 72 SPACES RECYCLETRASH PROPERTY LINE DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH STAIR STAIR ELEV. ELEV. ELEV. ELEV. TRASH COMPOST AREA 0 10'30'60' 1 BEDROOM JUNIOR 1 BED JUNIOR 1 BED JUNIOR 1 BEDROOM JUNIOR 1 BEDROOM 1 BEDROOM 2 BEDROOM 2 BEDROOM 3 BEDROOM 2 BEDROOM 2 BEDROOM 1 BEDROOM 1 BEDROOM STUDIO STUDIO STUDIO AMENITY N 22 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design TELE.STAIR STAIR ELEC. ELEV. ELEV.ELEV. TRASH30"x 4 8 " T R 30"x 4 8 " T R MECH.2 STORY UNIVERSITY BUILDING CH I C A G O A V E N U E DAVIS STREET LEVEL 4 TIER 1 TELE.STAIR STAIR ELEC. ELEV. ELEV.ELEV. TRASH30"x 4 8 " T R 30"x 4 8 " T R MECH. N RETAIL FIRE PUMP WATER METER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCEL LOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM 72 SPACES RECYCLETRASH PROPERTY LINE DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH STAIR STAIR ELEV. ELEV. ELEV. ELEV. TRASH COMPOST AREA 0 10'30'60' 1 BEDROOM JUNIOR 1 BED JUNIOR 1 BED JUNIOR 1 BED JUNIOR 1 BEDROOM JUNIOR 1 BEDROOM 1 BEDROOM 2 BEDROOM 2 BEDROOM 3 BEDROOM 2 BEDROOM 1 BEDROOM 1 BEDROOM STUDIO STUDIO STUDIO 2 BEDROOM 23 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design 2 STORY UNIVERSITY BUILDING CH I C A G O A V E N U E DAVIS STREET LEVELS 5-12 TIER 1 TELE.STAIR STAIR ELEC. ELEV. ELEV.ELEV. TRASH30"x 4 8 " T R 30"x 4 8 " T R MECH. N RETAIL FIRE PUMP WATER METER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCEL LOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM 72 SPACES RECYCLETRASH PROPERTY LINE DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH STAIR STAIR ELEV. ELEV. ELEV. ELEV. TRASH COMPOST AREA 0 10'30'60' 1 BEDROOM JUNIOR 1 BED JUNIOR 1 BED JUNIOR 1 BED JUNIOR 1 BEDROOM JUNIOR 1 BEDROOMJUNIOR 1 BEDROOM 1 BEDROOM 2 BEDROOM 2 BEDROOM 2 BEDROOM 2 BEDROOM 1 BEDROOM 1 BEDROOM STUDIO STUDIO STUDIO 2 BEDROOM 24 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design F.C. TELE.STAIR STAIR ELEC. ELEV. ELEV.ELEV. TRASH30"x 4 8 " T R 30"x 4 8 " T R MECH.2 STORY UNIVERSITY BUILDING CH I C A G O A V E N U E DAVIS STREET LEVEL 13 AMENITY N RETAIL FIRE PUMP WATER METER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCEL LOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM 72 SPACES RECYCLETRASH PROPERTY LINE DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH STAIR STAIR ELEV. ELEV. ELEV. ELEV. TRASH COMPOST AREA 0 10'30'60' AMENITY TERRACE TERRACE 25 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design 2 STORY UNIVERSITY BUILDING CH I C A G O A V E N U E DAVIS STREET LEVEL 14-27 TIER 2 TELE.STAIR STAIR ELEC. ELEV. ELEV.ELEV. TRASH30"x 4 8 " T R 30"x 4 8 " T R N RETAIL FIRE PUMP WATER METER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCEL LOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM 72 SPACES RECYCLETRASH PROPERTY LINE DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH STAIR STAIR ELEV. ELEV. ELEV. ELEV. TRASH COMPOST AREA 0 10'30'60' 1 BEDROOM JUNIOR 1 BEDROOM JUNIOR 1 BEDROOMJUNIOR 1 BEDROOM 1 BEDROOM 2 BEDROOM 2 BEDROOM 2 BEDROOM 2 BEDROOM1 BEDROOM 1 BEDROOM STUDIO STUDIO STUDIO STUDIO STUDIO 26 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design 2 STORY UNIVERSITY BUILDING CH I C A G O A V E N U E DAVIS STREET LEVEL 28-29 TIER 3 TELE.STAIR STAIR ELEC. ELEV. ELEV.ELEV. TRASH30"x 4 8 " T R 30"x 4 8 " T R N RETAIL FIRE PUMP WATER METER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCEL LOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM 72 SPACES RECYCLETRASH PROPERTY LINE DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH STAIR STAIR ELEV. ELEV. ELEV. ELEV. TRASH COMPOST AREA 0 10'30'60' 1 BEDROOM 1 BEDROOM 1 BEDROOM3 BEDROOM 2 BEDROOM 3 BEDROOM 3 BEDROOM 3 BEDROOM 3 BEDROOM 27 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design 2 STORY UNIVERSITY BUILDING CH I C A G O A V E N U E DAVIS STREET MECH PENTHOUSE PLAN COOLING TOWERS ELEVATOR OVERRUN MECHANICAL PENTHOUSE ROOF STAIR SCREEN WALL & MECHANICAL ROOM ENCLOSURE N RETAIL FIRE PUMP WATER METER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCEL LOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM 72 SPACES RECYCLETRASH PROPERTY LINE DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH STAIR STAIR ELEV. ELEV. ELEV. ELEV. TRASH COMPOST AREA 0 10'30'60' 28 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design PROPOSED ZONING • Height Reduction Of 31 Feet (Approximately 3 Residential Stories) • Removal Of One Residential Floor • Removal Of One Parking Level 40 Parking Spaces Provided On Site 153 Parking Spaces To Be Leased From The City Of Evanston $211,140 Annual Income To City • Lower Typical Floor-To-Floor Height Of 9’-6” In Lieu Of 9’-8” • Reduction In Setback At Northwest Corner • Elimination Of Setback In Northeast Corner • Widened The 12-Story Portion Of The Building At The Davis Lot Line By 6’ • No Change To Height Of The 12-Story Portion Of The Building At The Davis Lot Line • No Change To North Setback • No Change To Height Of Building Along Davis Lot Line • Increased Setback Of Retail Storefront To 4’-6” • Increased Setback Of Residential Entry To 10’-0” • Increased The Drop-Off Space In Front Of The Building To Hold Four Cars. Five Public Parking Spaces Will Remain On Davis Street. • Number Of Apartments Reduced To 419 While Increasing The Number Of Two-Bedroom Apartments • Inclusionary Housing Percentage Is Unchanged At 20%, 84 IHO Apartments • Far Unchanged At 12.9 29 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design PROPOSED PROJECT SITE SITE AREA 12.9 288' (EXCLUDING 1 PARKING LEVEL -11') PARKING SPACES BICYCLE PARKING LOADING BERTHS 2 BERTHS 10'X35' 137 BIKES 40 SPACES SUSTAINABILITY ZONING HEIGHT 299 ' - 0 " FAR MIXED USE RESIDENTIAL BUILDING WITH GROUND FLOOR RETAIL AND PARKING. UNIVERSITY BUILDING TO REMAIN. 605 DAVIS STREET, EVANSTON, IL 27,845 SF (INCLUDING UNIVERSITY BUILDING) PROPOSED PROPOSED ZONING LEED GOLD (INCLUDING UNIV. BLDG) 419UNITS D3DISTRICT 30 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design FAR AREA DIAGRAMS PARKING LEVEL 2 FAR AREA: 2,223 SF NON FAR AREA: 17,573 SF TOTAL GROSS: 19,796 SF GROUND LEVEL FAR AREA: 12,906 SF NON FAR AREA: 7,025 SF TOTAL GROSS: 19,931 SF RESIDENTIAL TIER 1 FAR AREA: 13,559 SF NON FAR AREA: 1,023 SF TOTAL GROSS: 14,582 SF RESIDENTIAL TIER 3 FAR AREA: 11,502 SF NON FAR AREA: 954 SF TOTAL GROSS: 12,204 SF RESIDENTIAL LEVEL 4 FAR AREA: 13,559 SF NON FAR AREA: 1,023 SF TOTAL GROSS: 14,582 SF RESIDENTIAL LEVEL 3 FAR AREA: 13,559 SF NON FAR AREA: 1,023 SF TOTAL GROSS: 14,582 SF RESIDENTIAL TIER 2 FAR AREA: 11,502 SF NON FAR AREA: 954 SF TOTAL GROSS: 12,456 SF AMENITY LEVEL FAR AREA: 9,057 SF NON FAR AREA: 946 SF TOTAL GROSS: 10,003 SF RETAIL FIRE PUMP WATERMETER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCELLOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM55 SPACES DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH TRASH COMPOSTAREA E- B I K E E- B I K E Ch a r g i n g Zo n e E- B I K E E- B I K E E- B I K E 30"x48" T R 30"x48" T R BIKE PARKING BIKE PARKING 45 BIKES E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE E-BIKE 45 BIKES 30"x48" T R 30"x48" T R 30"x48" T R 30"x48" T R 30"x48" T R 30"x48" T R 30"x48" T R 30"x48" T R 30"x48" T R 30"x48" T R 605 FAR AREA: 343,808 SF UNIVERSITY BUILDING FAR AREA: 12,390 SF TOTAL FAR AREA: 356,198 SF 31 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design PROGRAM SUMMARY DETAILED AREA TABULATION UNIT MIX RESIDENTIAL UNIT SUM PARKING PARKING BIKE TOTAL STUDIO JR1BED 1BED 2BED 3BED Total FL USE GSF NSF EFF UNITS GSF GSF GSF SPACES SPACES GSF GSF FLOORS USE 450-500 550-650 700-775 950-1,100 1,350-1,550 MECH 4,750 4,750 29 RESIDENTIAL 12,456 10,977 88.1%9 12,456 29 RESIDENTIAL 3 1 5 9 28 RESIDENTIAL 12,456 10,977 88.1%9 12,456 28 RESIDENTIAL 3 1 5 9 27 RESIDENTIAL 12,456 10,809 86.8%16 12,456 27 RESIDENTIAL 5 3 4 4 16 26 RESIDENTIAL 12,456 10,809 86.8%16 12,456 26 RESIDENTIAL 5 3 4 4 16 25 RESIDENTIAL 12,456 10,809 86.8%16 12,456 25 RESIDENTIAL 5 3 4 4 16 24 RESIDENTIAL 12,456 10,809 86.8%16 12,456 24 RESIDENTIAL 5 3 4 4 16 23 RESIDENTIAL 12,456 10,809 86.8%16 12,456 23 RESIDENTIAL 5 3 4 4 16 22 RESIDENTIAL 12,456 10,809 86.8%16 12,456 22 RESIDENTIAL 5 3 4 4 16 21 RESIDENTIAL 12,456 10,809 86.8%16 12,456 21 RESIDENTIAL 5 3 4 4 16 20 RESIDENTIAL 12,456 10,809 86.8%16 12,456 20 RESIDENTIAL 5 3 4 4 16 19 RESIDENTIAL 12,456 10,809 86.8%16 12,456 19 RESIDENTIAL 5 3 4 4 16 18 RESIDENTIAL 12,456 10,809 86.8%16 12,456 18 RESIDENTIAL 5 3 4 4 16 17 RESIDENTIAL 12,456 10,809 86.8%16 12,456 17 RESIDENTIAL 5 3 4 4 16 16 RESIDENTIAL 12,456 10,809 86.8%16 12,456 16 RESIDENTIAL 5 3 4 4 16 15 RESIDENTIAL 12,456 10,809 86.8%16 12,456 15 RESIDENTIAL 5 3 4 4 16 14 RESIDENTIAL 12,456 10,809 86.8%16 12,456 14 RESIDENTIAL 5 3 4 4 16 13 AMENITY 10,003 .10,003 13 AMENITY 0 12 RESIDENTIAL 14,582 12,762 87.5%18 14,582 12 RESIDENTIAL 3 6 4 5 18 11 RESIDENTIAL 14,582 12,762 87.5%18 .14,582 11 RESIDENTIAL 3 6 4 5 18 10 RESIDENTIAL 14,582 12,762 87.5%18 14,582 10 RESIDENTIAL 3 6 4 5 18 9 RESIDENTIAL 14,582 12,762 87.5%18 14,582 9 RESIDENTIAL 3 6 4 5 18 8 RESIDENTIAL 14,582 12,762 87.5%18 14,582 8 RESIDENTIAL 3 6 4 5 18 7 RESIDENTIAL 14,582 12,762 87.5%18 14,582 7 RESIDENTIAL 3 6 4 5 18 6 RESIDENTIAL 14,582 12,762 87.5%18 14,582 6 RESIDENTIAL 3 6 4 5 18 5 RESIDENTIAL 14,582 12,762 87.5%18 14,582 5 RESIDENTIAL 3 6 4 5 18 4 RESIDENTIAL 14,582 12,771 87.6%17 14,582 4 RESIDENTIAL 3 5 4 4 1 17 3 RESIDENTIAL 14,582 12,071 82.8%16 587 14,582 3 RESIDENTIAL 3 4 4 4 1 16 2 PARKING 1,238 16,600 40 82 1,958 19,796 2 PARKING 1 LOBBY/ BOH/ PARKING 7,120 2,920 2,340 55 7,551 19,931 1 LOBBY/ BOH Totals 345,116 300,218 419 18,948 2,920 18,940 40 137 14,259 399,596 Scheme Counts 100 99 102 106 12 419 SUMMARY FAR SUMMARY Total Stories 29 Building Height 299.0 FT Existing University Building: First Floor FAR Area 6,660 SF Total Building GSF 399,596 GSF Second Floor FAR Area 5,730 SF Total Residential GSF 378,323 GSF Existing University Building FAR Area 12,390 SF Total Residential NSF 300,218 NSF Residential Efficiency 79.4%Proposed Building FAR Area 343,808 SF Total Residential Units 419 TOTAL PROJECT FAR AREA 356,198 SF Average Unit Size 717 NSF Total Parking GSF 18,940 SF Site Area (Including University Building)27,845 SF Residential Cars 40 ACTUAL FAR (Including University Building)12.8 Bike Space 137 Bike Ratio 0.3 Car / Unit 0.10 AMENITY/ LOBBY RETAIL MECH/ LOADING/ BOH 32 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design SOUTH ELEVATION ARCHITECTURAL METAL PANEL WITH MECHANICAL LOUVER GLASS RAILING ARCHITECTURAL CANOPY PAINTED CMU WALL WITH MECHANICAL LOUVERS VISION GLASS VISION/SPANDREL GLASS ARCHITECTURAL METAL PANEL ARCHITECTURAL METAL PANEL ARCHITECTURAL METAL PANEL ARCHITECTURAL SCREEN WALL SIGNAGE LOCATION SIGNAGE LOCATIONS MASONRY WALL UNIVERSITY BUILDING TO REMAIN ELECTRIC VAULT ACCESS DOOR BUILDING HEIGHT 299' - 0" LEVEL 13 131' - 0" LEVEL 3 29' - 0" GROUND 0' - 0" EAST ELEVATION ELEVATIONS 33 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design NORTH ELEVATION WEST ELEVATION ARCHITECTURAL METAL PANEL WITH MECHANICAL LOUVER GLASS RAILING VISION/SPANDREL GLASS ARCHITECTURAL SCREEN WALL ARCHITECTURAL METAL PANEL ARCHITECTURAL METAL PANEL ARCHITECTURAL METAL PANEL SIGNAGE LOCATION CMU WALL MECHANICAL LOUVERS VEHICLE ENTRANCE (RECESSED OUTDOOR) DOG RUN AREA WITH FENCE LOADING DOCK DOOR MASONRY WALL BUILDING HEIGHT 299' - 0" LEVEL 13 131' - 0" LEVEL 3 29' - 0" GROUND 0' - 0" ELEVATIONS 34 of 49 Vermilion Development605 DavisEvanston, IL 04.18.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design SUSTAINABILITY • THIS PROJECT WILL TARGET GREEN GLOBES -THREE GLOBES (OR EQUIVALENT). • THIS PROJECT WILL MEET STANDARDS ANTICIPATED TO BE INCLUDED IN THE COMING ILLINOIS STRETCH ENERGY CODE. THIS INCLUDES SPECIFYING ALL IN-UNIT FIXTURES TO BE FULLY ELECTRIC. • ENERGY EFFICIENT PROGRAM COLLABORATION WITH COMED. • GREEN ROOF DECREASE URBAN HEAT ISLAND EFFECT. • HIGH-EFFICIENCY HEATING, AC, VENTILATION AND APPLIANCES WILL BE IMPLEMENTED. • ENERGY STAR KITCHEN APPLIANCES WILL BE SPECIFIED. • LOW FLOW WATER SAVING PLUMBING FIXTURES WILL BE SPECIFIED. • LED LIGHTING FIXTURES WILL BE SPECIFIED. • SITE IS CLOSE TO PUBLIC TRANSPORTATION ANDEXISTING PARKING GARAGES . • PROMOTE TENANT BICYCLE USE, WORK SPACE, LOUNGE AND STORAGE . • PUBLIC TRANSPORTATION DIGITAL SCREEN IN LOBBY ADVERTISES LIVE TRAIN AND BUS TIMES. • EV CHARGING STATIONS Vermilion Development605 DavisEvanston, IL 02.06.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design SUSTAINABILITY • THIS PROJECT WILL TARGET LEED GOLD. • THIS PROJECT WILL MEET STANDARDS ANTICIPATED TO BE INCLUDED IN THE COMING ILLINOIS STRETCH ENERGY CODE. THIS INCLUDES SPECIFYING ALL IN-UNIT FIXTURES TO BE FULLY ELECTRIC. • ENERGY EFFICIENT PROGRAM COLLABORATION WITH COMED. • GREEN ROOF DECREASE URBAN HEAT ISLAND EFFECT. • HIGH-EFFICIENCY HEATING, AC, VENTILATION AND APPLIANCES WILL BE IMPLEMENTED. • ENERGY STAR KITCHEN APPLIANCES WILL BE SPECIFIED. • LOW FLOW WATER SAVING PLUMBING FIXTURES WILL BE SPECIFIED. • LED LIGHTING FIXTURES WILL BE SPECIFIED. • SITE IS CLOSE TO PUBLIC TRANSPORTATION AND EXISTING PARKING GARAGES . • PROMOTE TENANT BICYCLE USE, WORK SPACE, LOUNGE AND STORAGE . • PUBLIC TRANSPORTATION DIGITAL SCREEN IN LOBBY ADVERTISES LIVE TRAIN AND BUS TIMES. • EV CHARGING STATIONS 35 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design LANDSCAPE / STREETSCAPE PLAN 36 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design 3RD FLOOR AMENITY DECK 37 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design 13TH FLOOR AMENITY DECK 38 of 49 39 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design RETAIL FIRE PUMP WATER METER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCEL LOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM 55 SPACES RECYCLETRASH PROPERTY LINE DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH TRASH COMPOST AREA E- B I K E E- B I K E Ch a r g i n g Zo n e E- B I K E E- B I K E E- B I K E CIRCULATION PATTERN & IMPROVEMENTS PLAN RESIDENTIAL ENTRANCE 2 STORY UNIVERSITY BUILDING CH I C A G O A V E N U E LOADING ACCESS PARKING ACCESS BIKE ACCESS NEW BIKE RACK IMPROVEMENTS ZONE NEW SITE TREES DAVIS STREET BIKE LANE BIKE LANE LEGEND PARKING SPACES LAY BY PARKING SPACES LOADING ACCESS PARKING IN PARKING OUT LOBBY ARTWORK TBD N 40 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design LEGEND LEGEND ctd. RETAIL FIRE PUMP WATER METER LOBBY FDC 8% SLOPE 16% SLOPE COMED VAULTSWITCH GEAR PACKAGE/ PARCEL LOCKERS EMPLOYEE/ WORKSHOP MAIL BIKE ROOM 55 SPACES DOG RUN PET SPA MDFBOH TRASH LEASING OFFICE BOH BOH LOADING BOH STAIR STAIR ELEV. ELEV. ELEV. ELEV. TRASH COMPOST AREA E- B I K E E- B I K E Ch a r g i n g Zo n e E- B I K E E- B I K E E- B I K E 29 STORY MIXED-USE RESIDENTIAL BUILDING WITH GROUND FLOOR RETAIL AND PARKING APPROXIMATE LOCATION OF STORM DETENTION VAULT THE PROJECT WILL MEET THE REQUIREMENTS OF THE EVANSTON STORMWATER CONTROL ORDINANCE. ESTIMATED STORMWATER CALCULATIONS: .18 AC-FT OF DETENTION FINAL STORMWATER CONTROL AND DETENTIONCALCULATIONS WILL BE REFINED AS PROJECT IS FURTHER UTILITY PLAN 41 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design +330' PREVIOUS HEIGHT -31' +299' REVISED HEIGHT RESIDENTIAL BUILDING VIEW LOOKING EAST ON DAVIS STREET FROM FOUNTAIN SQUARE 42 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design LOOKING EAST ON DAVIS STREET 43 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design DAVIS ST. PODIUM ELEVATION 44 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design VIEW LOOKING EAST ALONG DAVIS ST. 45 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design VIEW LOOKING EAST ALONG DAVIS ST. 46 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design VIEW LOOKING WEST ALONG DAVIS ST. 47 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design VIEW LOOKING SOUTHWEST AT CHICAGO AVE. & CHURCH 48 of 49 Vermilion Development605 Davis StreetEvanston, IL 10.20.20252024147 SCBSCBArchitecture, Planning,Architecture, Planning,Interior and Urban DesignInterior and Urban Design VIEW LOOKING SOUTHEAST AT ORRINGTON AVE. & CHURCH ST. 49 of 49