Loading...
HomeMy WebLinkAboutOrdinance 35-O-25, Granting Major Variations to Allow Construction of a Five-Story Multi-Family Development with 30 units and 29 On-Site Parking Spaces at 2206 Maple Avenue04/14/2025 35-O-25 AN ORDINANCE Approving Major Variations for the Properties Located at 2206 Maple Avenue and 2215-2219 Maple Avenue & 916 ½ Noyes Street in the R5 General Residential District WHEREAS, the City of Evanston is a home-rule municipality pursuant to Article VII of the Illinois Constitution of 1970; and WHEREAS, as a home rule unit of government, the City has the authority to adopt legislation and to promulgate rules and regulations that protect the public health, safety, and welfare of its residents; and WHEREAS, Article VII, Section 6(a) of the Illinois Constitution of 1970, states that the “powers and functions of home rule units shall be construed liberally,” was written “with the intention that home rule unit be given the broadest powers possible” (Scadron v. City of Des Plaines, 153 Ill.2d 164, 174-75 (1992)); and WHEREAS, it is a well-established proposition under all applicable case law that the power to regulate land use through zoning regulations is a legitimate means of promoting the public health, safety, and welfare; and, WHEREAS, Division 13 of the Illinois Municipal Code (65 ILCS 5/11 -13-1, et seq.) grants each municipality the power to establish zoning regulations; and, WHEREAS, pursuant to its home rule authority and the Illinois Municipal Code, the City has adopted a set of zoning regulations, set forth in Title 6 of the Evanston City Code of 2012, as amended (“Zoning Ordinance”); and WHEREAS, Paul Harb of 2206 Map LLC, (the “Applicant”) requests Major Variations to allow construction of a five (5) story multi-family residential development Page 1 of 23 35-O-25 with thirty (30) dwelling units and twenty-nine (29) parking spaces in the R5 General Residential District, located at the property commonly known as 2206 Maple Avenue (“Maple Property”), a property currently developed with a parking lot, legally described and attached by reference herein as Exhibit A; and, WHEREAS, pursuant to Subsection 6-8-7-2, multiple family dwellings are a permitted use in the R5 General Residential District; and WHEREAS, Applicant has requested a major variation to allow twenty-four (24) dwelling units (including six (6) on-site inclusionary units) and six (6) market rate bonus units for thirty (30) total dwelling units where a maximum of nineteen (19) dwelling units is allowed pursuant to Zoning Ordinance Subsection 6-8-7-4; and WHEREAS, Applicant has requested a major variation to allow twenty (20) off-street parking spaces (18 onsite and 2 offsite) where the Zoning Ordinance requires a minimum of twenty-seven (27) off-street parking spaces pursuant to Section 6-16-3-5, Table 16-B; and WHEREAS, Applicant has requested a major variation to allow a 9.5’ x 25’ short loading berth where Section 6-16-4-4 of the Zoning Ordinance requires a 10’ x 35’ short loading berth; and WHEREAS, Applicant has requested a major variation to allow 72% rear yard coverage with parking and loading uses, where Section 6 -4-6-3(A)(1) of the Zoning Ordinance restricts maximum rear yard coverage to 40% for these uses in a residential district; and WHEREAS, in order to allow removal of the existing parking lot on the property at 2206 Maple Avenue, Javier Viera, (“Co-Applicant”), of the Garrett Evangelical ~2~ Page 2 of 23 35-O-25 Theological Seminary, requests an additional Major Variation for the property at 2215 - 2219 Maple Avenue and 916 ½ Noyes Street (“Garrett Property”) in the R5 General Residential District, legally described and attached by reference herein as Exhibit B; and WHEREAS, Co-Applicant has requested a major variation to allow sixteen (16) off-street parking spaces (with eleven (11) of those sixteen (16) spaces provided at 2206 Maple Avenue) where Section 6-16-3-5, Table 16-B of the Zoning Ordinance requires a minimum of twenty-eight (28) off-street parking spaces; and WHEREAS, following due and proper publication of notice in the Chicago Sun-Times, not less than fifteen (15) nor more than thirty (30) days prior thereto, and following written notice to all property owners within 500 feet of the Maple Property and Garrett Property (“the Subject Property”), and following the placement of signs on the Subject Property not less than ten (10) days prior thereto, the Evanston Land Use Commission (“LUC”) conducted a public hearing on March 26, 2025, in compliance with the provisions of the Illinois Open Meetings Act (5 ILCs 120/1 et seq.) on the application for Major Variations, filed as zoning case no. 25ZMJV-0003; and WHEREAS, the LUC received extensive testimony, heard public comment, and made findings pursuant to Subsection 6-3-8-12, of the Zoning Ordinance, and by a vote of seven (7) “yays” and zero (0) “nays” with two (2) Commissioners absent, moved this matter to City Council with a positive recommendation with the below findings incorporated into the record: 1. The requested variation will not have a substantial adverse impact on the use, enjoyment or property values of adjoining properties: A multi-family residential building has value in the community, so the standard is met. 2. The requested variation is in keeping with the intent of the zoning ordinance: The Commission believes the standard is met. ~3~ Page 3 of 23 35-O-25 3. The alleged hardship or practical difficulty is peculiar to the property: The Commission believes the standard is met. 4. The property owner would suffer a particular hardship or practical difficulty as distinguished from a mere inconvenience if the strict letter of the regulations were to be carried out: The Commission believes the standard is met. 5. Either the purpose of the variations is not based exclusively upon a desire to extract additional income from the property, or, while the granting of the variations will result in additional income to the applicant and while the applicant for the variation may not have demonstrated that the application is not based exclusively upon a desire to extract additional income from the property, the Land Use Commission or the City Council, depending on final jurisdiction under Section 6-3-8-2 of this Chapter, has found that public benefits to the surrounding neighborhood and the City as a whole will be derived from approval of the variation, that include, but are not limited to, any of the standards of Section 6-3-6-3 of this Chapter: The Commission believes the standard is met. 6. The alleged difficulty or hardship has not been created by any person having an interest in the property: The standard is met. 7. The requested variations requires the least deviation from the applicable regulation among the feasible options identified before the Land Use Commission issues its decision or recommendation to the City Council regarding said variations: The Commission believes the standard is met. WHEREAS, on April 14, 2025, the Planning and Development (“P&D”) Committee of the City Council held a meeting, in compliance with the provision s of the Open Meetings Act and the Zoning Ordinance, received input from the public, carefully considered the findings and the recommendations of the LUC, and recommended approval thereof by the City Council; and WHEREAS, at its meetings on April 14, 2025 and April 28, 2025, held in compliance with the Open Meetings Act and the Zoning Ordinance, the City Council considered the recommendations of the LUC and the P&D Committee, received additional public comment, and made certain findings; and WHEREAS, it is well-settled law that the legislative judgment of the City Council must be considered presumptively valid (see Glenview State Bank v. Village of ~4~ Page 4 of 23 35-O-25 Deerfield, 213 Ill. App.3d 747) and is not subject to courtroom fact-finding (see National Paint & Coating Ass’n v. City of Chicago, 45 F.3d 1124). NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, COOK COUNTY, ILLINOIS, THAT: SECTION 1: The foregoing recitals are found as fact and incorporated herein by reference. SECTION 2: Pursuant to the terms and conditions of this ordinance, the City Council hereby approves the Major Variations, as applied for in zoning case no. 25ZMJV-0003 as follows: 1) To allow twenty-four (24) dwelling units (including six (6) on-site inclusionary units) and six (6) market rate bonus units for thirty (30) total dwelling units where a maximum of nineteen (19) dwelling units is allowed by the Zoning Ordinance; 2) To allow twenty (20) off-street parking spaces (18 onsite and 2 offsite) where the Zoning Ordinance requires a minimum of twenty-seven (27) off-street parking spaces; 3) To allow a 9.5’ x 25’ short loading berth where the Zoning Ordinance requires a 10’ x 35’ short loading berth, and; 4) To allow 72% rear yard coverage with parking and loading uses, where the Zoning Ordinance restricts maximum rear yard coverage to 40% for these uses in a residential district; 5) To allow sixteen (16) off-street parking spaces (with eleven (11) of those sixteen (16) spaces provided at 2206 Maple Avenue) where the Zoning Ordinance requires a minimum of twenty-eight (28) off-street parking spaces. SECTION 3: Pursuant to Subsection 6-3-8-14 of the Zoning Ordinance, the City Council imposes the following conditions on the aforementioned zoning relief granted hereby, being Major Variations listed above as requested under zoning case no. 25ZMJV- 0003, which may be amended by future ordinance(s), and violation of any of which shall constitute grounds for penalties or revocation of said Major Variations pursuant to Subsections 6-3-10-5 and 6-3-10-6 of the Zoning Ordinance: ~5~ Page 5 of 23 35-O-25 1.The Applicant shall provide, in perpetuity, access for the Maple Property to use two parking stalls located at 2205 Maple Avenue (PIN 11-07-120-005-0000,) for the parking of tenants or guests. Evidence of a recorded agreement, for review and approval by the City, must be provided prior to building permit issuance for the proposed structure. 2.The Applicant shall provide, in perpetuity, access for usage of the eleven (11) parking stalls proposed on the exterior of the building at the rear of the Maple Property to residents or guests of the Garrett Property. Any rent charged for usage of these eleven (11) spaces shall be no more than is charged for parking within the garage as may be charged to residents of the thirty (30) dwelling units on the Maple Property. Evidence of a recorded agreement, for review and approval by the City, must be provided prior to building permit issuance for the proposed structure. 3.Residential tenants of the Maple Property will be prohibited from obtaining on- street residential parking passes for street parking in the vicinity of the Subject Property. 4.The Applicant shall continue to work with the property owner to the west (PIN 11- 07-119-003-0000) to relocate the dumpsters, and if feasible, shall make accommodations at the rear of the Maple Property to facilitate the storage of the dumpsters on the east side of the alley. 5.Any large ground mounted mechanical or electrical equipment proposed during building permit review shall be appropriately located and properly screened, to the satisfaction of City staff. 6.The Applicant shall be required to revise their storm sewer connection to discharge towards Maple Avenue instead of into the storm sewer in the alley. 7.Pursuant to Section 5-7 of the Evanston City Code, the proposed development on the Maple Property is a “covered development” and the Applicant shall comply with the Inclusionary Housing Ordinance. In particular, the Maple Property shall be operated in substantial compliance with the following: a.Inclusionary Housing Application: Deemed compliant on January 28, 2025 and is subject to the Inclusionary Housing Ordinance effective on that date. The applicant proposes six (6) Inclusionary Housing units, three (3) required by the Inclusionary Housing Ordinance and three (3) as a public benefit. b.Modifications: The Applicant may comply with the Inclusionary Housing Ordinance in another manner than above if an updated Inclusionary Housing Application is submitted and deemed compliant. Modifications to overall project plans may require the Applicant to resubmit an updated Inclusionary Housing Application. 8.The Applicant shall sign and agree to a Construction Management Plan (CMP) with the City of Evanston prior to issuance of a building permit. The CMP shall include, but is not limited to, the following: construction phasing/staging plans; construction hours; site access including traffic and pedestrian safety plans; contractor parking; damage control and vibration monitoring (if warranted); construction exhibits; and project communications/signage. 9.Substantial Compliance with Applicable Requirements: The applicants shall develop and operate the use authorized by the terms of this ordinance in substantial compliance with the following: the terms of the ordinance; all applicable ~6~ Page 6 of 23 35-O-25 City Code requirements; the Development Plans in Exhibit C, the Applicant's testimony and representations to the Land Use Commission, the Planning & Development Committee, and the City Council. 10. The Applicant must record this ordinance with the Cook County Recorder of Deeds. SECTION 4: When necessary to effectuate the terms, conditions, and purposes of this ordinance, “Applicant”, “Co-Applicant”, or “Applicants” shall be read as including that entity’s tenants, agents, assignees, and successors in interest. SECTION 5: This ordinance shall be in full force and effect from and after its passage, approval, and publication in the manner provided by law. SECTION 6: All ordinances or parts of ordinances in conflict herewith are hereby repealed. SECTION 7: If any provision of this ordinance or application thereof to any person or circumstance is ruled unconstitutional or otherwise invalid, such invalidity shall not affect other provisions or applications of this ordinance that can be given effect without the invalid application or provision, and each invalid provision or invalid application of this ordinance is severable. SECTION 8: The findings and recitals contained herein are declared to be prima facie evidence of the law of the City and shall be received in evidence as provided by the Illinois Compiled Statutes and the courts of the State of Illinois. ~7~ Page 7 of 23 35-O-25 Introduced: April 14, 2025 Approved: Adopted: April 28, 2025 __________________________, 2025 _______________________________ Daniel Biss, Mayor Attest: _______________________________ Stephanie Mendoza, City Clerk Approved as to form: ______________________________ Alexandra Ruggie, Corporation Counsel ~8~ Page 8 of 23 35-O-25 EXHIBIT A LEGAL DESCRIPTION OF MAPLE PROPERTY ~9~ Page 9 of 23 35-O-25 EXHIBIT B LEGAL DESCRIPTION OF GARRETT PROPERTY ~10~ Page 10 of 23 35-O-25 EXHIBIT C DEVELOPMENT PLANS ~11~ Page 11 of 23 Sheet No.Drawn By A 0.0 22 0 6 M a p l e A v e n u e E v a n s t o n I L No.DATE ISSUE NOTE Project ID 24-10 COVER SHEET NOT FORCONSTRUCTION N o .D A T E RE VISIO N N O T E 4/2/25 O C G G 18106.39 sq ft 2206 MAPLE AVE 137'9.24" 12 3 ' 3 . 2 4 " 156'0" 124'6.524" 232425 192021 26 91011121314 15 16 6 7 8 27 28 29 22 1 2 17 18 3 4 5 ELEV LOBBY ENTRY LOBBY ELEV RM SERVICE RM FIRE SP. & WTR SERVICE GARAGE BLDG OFFICE MECH RM ELEC. RM JAN. GENERATOR ELEV TR A S H CORRIDOR VESTIBULE BIKE RM 24 BIKES STAIR 1 STAIR 2 WC TR A S H COMMUNITY RM BIKE RM 10 BIKES MAIL PROPOSED SITE PLAN Scale: 1/16" = 1'-0"1 137'-9 1/4" 5' - 3 3 / 8 " 3' - 6 3 / 4 " 27'-2 3/4"24'-8" 5' - 3 3 / 4 " 24'-8" 27'-11"29'-6" 11 2 ' - 4 " 39 ' - 2 " 73 ' - 2 " 90'-4" 156'-0" MA P L E A V E N U E 40'-4" PROPOSED 5-STORY APARTMENT BUILDING ENTRY WALK CONC. DRIVE CONC. DRIVE 24 ' - 0 " LANDSCAPING 5' - 0 " CONC. WALKWAY LANDSCAPING LANDSCAPING LA N D S C A P I N G 5' - 7 1 / 4 " 9' - 6 " 24'-6" AVRG SETBACK 28'-7" PROPOSED APARTMENT BUILDING 2206 MAPLE AVENUE EVANSTON IL 60201 PROPOSED BUILDING FLOOR AREAS RM / AREA Number Floor Area SF 1st FLR LOBBY 100 559.816 sq ft 1st FLR SERV SPACES 101 320.762 sq ft COMMUNITY RM 102 288.266 sq ft TOILET RM 103 63.747 sq ft 1st FLR BIKE RM 104 100.743 sq ft ELEV MECH. RM 105 66.069 sq ft 1st FLR CORRIDOR 106 222.426 sq ft 1st BLDG OFFICE 107 122.408 sq ft 1st FLR GEN. RM 108 211.248 sq ft 1st FLR BIKE RM 109 221.307 sq ft 1st FLR METER RM 110 137.817 sq ft 1st FLR MECH RM 111 203.831 sq ft 1st FLR PARKING 112 6884.597 sq ft 2ND FLOOR 200 9103.09 sq ft 3RD FLOOR 300 9103.09 sq ft 4TH FLOOR 400 9103.09 sq ft 5TH FLOOR 500 9103.09 sq ft TOTAL AREA 45815.399 DRAWINGS LIST A 0 COVER SHEET A 1.01 EXTERIOR VIEWS A 1.03 AREAS DIAGRAMS & CALCS A 2.1 GROUND FLOOR PLAN A 2.2 2nd FLOOR PLAN A 2.3 3, 4 & 5TH FLOOR PLANS A 2.4 ROOF/PENTHOUSE PLAN A 3.1 EXTERIOR ELEVATIONS A 4.1 EAST ELEVATION A 4.2 WEST ELEVATION A 5.1 BUILDING SECTIONS A 5.2 PARTIAL SECTIONS /ELEVATIONS PROPOSED BUILDING EXTERIOR Pa g e 1 2 o f 2 3 Sheet N o .D ra wn By A 1 .0 1 2 2 0 6 M A P L E A V E E V A N S T O N , I L L I N O I S Pro jec t ID 24- 10 TH I S D R A W I N G S E T I N D I C A T E S G E N E R A L S C O P E O F T H E P R O J E C T I N T E R M S O F D I M E N S I O N S O F T H E BU I L D I N G , M A J O R A R C H I T E C T U R A L E L E M E N T S A N D T H E T Y P E O F S T R U C T U R A L S Y S T E M S , M E C H A N I C A L & EL E C T R I C A L S Y S T E M S . A S S C O P E D O C U M E N T S T H E S E D R A W I N G S D O N O T N E C E S S A R I L Y I N D I C A T E O R DE S C R I B E A L L T H E W O R K R E Q U I R E D F O R F U L L P E R F O R M A N C E A N D C O M P L E T I O N O F T H E R E Q U I R E M E N T S O F TH E C O N T R A C T D O C U M E N T S . O N T H I S B A S I S T H E G E N E R A L C O N T R A C T O R A N D A L L S U B C O N T R A C T O R S S H A L L FU R N I S H A L L I T E M S R E Q U I R E D F O R T H E P R O P E R E X E C U T I O N A N D C O M P L E T I O N O F T H E W O R K S H O W N AN D / O R R E Q U I R E D B Y L O C A L C O D E R E G U L A T I O N S . TH E S E P L A N S A N D D R A W I N G S A R E P R O T E C T E D U N D E R T H E C O P Y R I G H T L A W S O F T H E U N I T E D S T A T E S A N D FO R E I G N C O U N T R I E S , A N D A R E T O B E U S E D O N L Y F O R C O N S T R U C T I N G A N D / O R R E P A I R I N G T H E S T R U C T U R E OR S T R U C T U R E S D E F I N E D I N T H E C O N T R A C T B E T W E E N T H E A R C H I T E C T A N D T H E O W N E R . A N Y U S E O F TH E S E P L A N S T O C O N S T R U C T O R R E P A I R A D D I T I O N A L S T R U C T U R E S C O N S T I T U T E S A V I O L A T I O N O F T H E AR C H I T E C T ' S C O P Y R I G H T I N T H E S E P L A N S A N D I S P R O H I B I T E D I HEREBY CERTIFY THAT THESE PLANS WERE PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND TO BEST OF MY KNOWLEDGE CONFIRM TO THE PERTINENT LOCAL BUILDING CODE AND REGULATIONS GREGORY GESLICKI, NCARB, REGISTERED ARCHITECT ILLINOIS LICENSE NO. 001-015801, LICENSE EXP.: 11/30/2026 OCGG ARCHITECTS REG NO. 84008016-0001, EXP. 04/30/2025 PRE LIM IN A RY N O T F O R C O N S T RU C T IO N 3/4/25 A r c h i t e c t s GR E G O R Y G E S L I C K I , A R C H I T E C T 31 0 0 C H I N O H I L L S P K W Y N o . 4 2 2 CH I N O H I L L S C A 9 1 7 0 9 Ph o n e 8 4 7 4 8 0 2 2 1 2 Em a i l o c g g @ o c g g a r c h i t e c t s . c o m ww w . o c g g a r c h i t e c t s . c o m O C G G D e s i g n 3 1/6/2025 ZONING REVIEW REPLY 4 2/7/2025 FIRST FLOOR PLAN REVISIONS 5 3/4/2025 PRO REVIEW REPLAY PRO PO S E D BU ILD IN G S T RE E T V IE WPRO PO S E D BU ILD IN G S T RE E T V IE W PRO PO S E D BU ILD IN G RE A R V IE WPRO PO S E D BU ILD IN G RE A R V IE W Sheet No.Drawn By A 1.01 22 0 6 M a p l e A v e n u e E v a n s t o n I L No.DATE ISSUE NOTE Project ID 24-10 PROJECT IMAGES NOT FORCONSTRUCTION N o .D A T E RE VISIO N N O T E 4/2/25 O C G G Pa g e 1 3 o f 2 3 SITE OPEN AREA S O A 1 7624.507 sq ftArea: BUILDING LOT COVERAGE Scale: 1/16" = 1'-0"1 BLDG COVERAGE B C A 1 10481.882 sq ftArea: SITE OPEN AREA S O A 1 7624.507 sq ftArea: Sheet No.Drawn By A 1.03 22 0 6 M a p l e A v e n u e E v a n s t o n I L No.DATE ISSUE NOTE Project ID 24-10 AREASDIAGAMS &CALCS NOT FORCONSTRUCTION N o .D A T E RE VISIO N N O T E 4/2/25 O C G G #2#201 202 #2#203204 #2 # 20 8 20 9 #2#207 206 #2#205 301 #2#302 303#2#304 307 #2#306 305 #2#401 402 #2#403404 #2#407 406 #2#405 501 #2#502 5023 #2#507 506 #2#505 504 BEDRM 1 BATH 1 BATH 2 LIVING/ DINING BEDRM 3 LIVING/ DINING BEDRM 2 BEDRM 1 BATH 3 BEDRM 1 BEDRM 2BEDRM 3STUDIO BATH 1 BEDRM 1 DEN BATH 1 BATH 2 LIVING/ DINING BEDRM 1BEDRM 2BATH 2 KITCHENKITCHEN KITCHEN KITCHEN KITCHEN DEN 2 DEN CLOSET W/D BATH 1 BATH 1 BATH 3 CLST CL S T CLST LIVING/ DINING LIVING/ DINING CL S T CLOSETLIVING/ DINING KITCHEN BEDRM 1 DEN BATH 1 BATH 2 CL S T DEN 1 CL S T CL S T BATH 2 CLOSET BATH 2 CL S T KITCHEN CLST CLST BEDRM 1 BEDRM 2 BATH 1 KITCHEN CL S T LIVING/ DINING BATH 2 CL S T STUDIO KITCHEN CLST BATH CL S T ELEV LOBBY CL S T CL S T BATH BEDRM 2 W/D CLST W/D W/D W/D W/D W/D W/D W/D WH WH WHWH WH WH CL S T WH WH CL S T WH 2ND FLR UNITS AREAS Scale: 1/16" = 1'-0"3 UNIT 201 3B L2 201 UNIT 202 2B L2 202 UNIT 203 3B L2 203UNIT 204 2B L2 204 UNIT 205 1B L2 205 UNIT 206 1B L2 206 UNIT 207 2B L2 207 UNIT 209 STUDIO L2 209 UNIT 208 STUDIO L2 208 UNIT 301 3B L3 301 UNIT 302 2B L3 302 UNIT 303 4B L3 303 UNIT 304 3B L3 304 UNIT 305 1 B L3 305 UNIT 306 1 B L3 306 UNIT 307 2 B L3 307 UNIT 401 3B L4 401 UNIT 402 2B L4 402 UNIT 403 4B L4 403 UNIT 404 3B L4 404 UNIT 405 1B L4 405 UNIT 406 1B L4 406 UNIT 407 2B L4 407 UNIT 502 2B L5 502 UNIT 505 1B L5 505 UNIT 504 3B L5 504 UNIT 503 4B L5 5023 UNIT 506 1B L5 506 UNIT 507 2B L5 507 UNIT 501 3B L5 501 WALK 2 PERM W 2 125.188 sq ftArea: LANDSCAPING 1 G 1 898.539 sq ftArea: LANDSCAPING 2 G 2 2513.476 sq ftArea: WALK 1 PERM W 1 122.733 sq ftArea: ENTRY STOOP ES 1 53.227 sq ftArea: DRIVE 1 D 1 841.366 sq ftArea: PARKING 1 PERM P 1 623.242 sq ftArea: DRIVE 2 D 2 345.186 sq ftArea: LANDSCAPING 3 G 3 1009.016 sq ftArea: LANDSCAPING 4 G 4 116.583 sq ftArea: PARKING3 PERM P 2 1195.202 sq ftArea: LANDSCAPING 5 G 5 266.85 sq ftArea: WALK 3 PERM W 3 10 sq ftArea: WALK 4 PERM W 4 10 sq ftArea: IMPERVIOUS SURFACE COVERAGE Scale: 1/16" = 1'-0"2 FIRST FLR BLDG B 1 9976.368 sq ftArea: PARKING3 PERM P 2 1195.202 sq ftArea: DRIVE 1 D 1 841.366 sq ftArea: PARKING 1 PERM P 1 623.242 sq ftArea: LANDSCAPING 1 G 1 898.539 sq ftArea: LANDSCAPING 4 G 4 116.583 sq ftArea: LANDSCAPING 5 G 5 266.85 sq ftArea: LANDSCAPING 2 G 2 2513.476 sq ftArea: LANDSCAPING 3 G 3 1009.016 sq ftArea:WALK 2 PERM W 2 125.188 sq ftArea: WALK 1 PERM W 1 122.733 sq ftArea:DRIVE 2 D 2 345.186 sq ftArea: WALK 3 PERM W 3 10 sq ftArea: WALK 4 PERM W 4 10 sq ftArea: ENTRY STOOP ES 1 53.227 sq ftArea: BEDRM 1 BATH 1 LIVING/ DINING BEDRM 3 LIVING/ DINING BEDRM 2 BEDRM 1 BATH 3 BEDRM 1 BEDRM 2BEDRM 3BEDRM 4 BEDRM 1 BATH 1 BATH 2 LIVING/ DINING BEDRM 1BEDRM 2BATH 2 KITCHENKITCHEN KITCHEN KITCHEN KITCHEN KITCHEN DEN 2 DEN CLOSET BATH 2 BATH 1 CLST BATH 2 CL S T CLST LIVING/ DINING LIVING/ DINING LIVING/ DINING CL S T CLOSETLIVING/ DINING KITCHEN BEDRM 1 BATH 1 BATH 2 CL S T CLOSET CL S T CL S T BATH 1 DEN 1 BATH 3 CL S T BEDRM 3BEDRM 2 BEDRM 1 BATH 2 CLST CLST CL S T CL S T PWDR RM DEN BATH 1 BATH 2 ELEV LOBBY BATH 3 CL S T BATH 1 CLST CLST BEDRM 2 W/D W/D W/D W/D W/D W/D W/D DEN WH WH WH WH WH WH WH CL S T CL S T CLST 3RD FLR UNITS AREAS Scale: 1/16" = 1'-0"4 BEDRM 1 BATH 1 LIVING/ DINING BEDRM 3 LIVING/ DINING BEDRM 2 BEDRM 1 BATH 3 BEDRM 1 BEDRM 2BEDRM 3BEDRM 4 BEDRM 1 BATH 1 BATH 2 LIVING/ DINING BEDRM 1BEDRM 2BATH 2 KITCHENKITCHEN KITCHEN KITCHEN KITCHEN KITCHEN DEN 2 DEN CLOSET BATH 2 BATH 1 CLST BATH 2 CL S T CLST LIVING/ DINING LIVING/ DINING LIVING/ DINING CL S T CLOSETLIVING/ DINING KITCHEN BEDRM 1 BATH 1 BATH 2 CL S T CLOSET CL S T CL S T BATH 1 DEN 1 BATH 3 CL S T BEDRM 3BEDRM 2 BEDRM 1 BATH 2 CLST CLST CL S T CL S T PWDR RM DEN BATH 1 BATH 2 ELEV LOBBY BATH 3 CL S T BATH 1 CLST CLST BEDRM 2 W/D W/D W/D W/D W/D W/D W/D DEN WH WH WH WH WH WH WH CL S T CL S T CLST 4TH FLR UNITS AREAS Scale: 1/16" = 1'-0"5 BEDRM 1 BATH 1 LIVING/ DINING BEDRM 3 LIVING/ DINING BEDRM 2 BEDRM 1 BATH 3 BEDRM 1 BEDRM 2BEDRM 3BEDRM 4 BEDRM 1 BATH 1 BATH 2 LIVING/ DINING BEDRM 1BEDRM 2BATH 2 KITCHENKITCHEN KITCHEN KITCHEN KITCHEN KITCHEN DEN 2 DEN CLOSET BATH 2 BATH 1 CLST BATH 2 CL S T CLST LIVING/ DINING LIVING/ DINING LIVING/ DINING CL S T CLOSETLIVING/ DINING KITCHEN BEDRM 1 BATH 1 BATH 2 CL S T CLOSET CL S T CL S T BATH 1 DEN 1 BATH 3 CL S T BEDRM 3BEDRM 2 BEDRM 1 BATH 2 CLST CLST CL S T CL S T PWDR RM DEN BATH 1 BATH 2 ELEV LOBBY BATH 3 CL S T BATH 1 CLST CLST BEDRM 2 W/D W/D W/D W/D W/D W/D W/D DEN WH WH WH WH WH WH WH CL S T CL S T CLST 5TH FLR UNITS AREAS Scale: 1/16" = 1'-0"6 PROPOSED BUILDING COVERAGE AREA Number Area SF BLDG COVERAGE B C A 1 10481.882 sq ft SITE OPEN AREA S O A 1 7624.507 sq ft TOTAL AREA 18106.389 PROPOSED IMPERVIOUS SITE AREAS Number Area SF DRIVE 1 D 1 841.366 sq ft DRIVE 2 D 2 345.186 sq ft ENTRY STOOP ES 1 53.227 sq ft FIRST FLR BLDG B 1 9976.368 sq ft PARKING 1 PERM P 1 623.242 sq ft PARKING3 PERM P 2 1195.202 sq ft WALK 1 PERM W 1 122.733 sq ft WALK 2 PERM W 2 125.188 sq ft WALK 3 PERM W 3 10 sq ft WALK 4 PERM W 4 10 sq ft TOTAL AREA 13302.512 PROPOSED PERVIOUS SITE AREAS Number Area SF LANDSCAPING 1 G 1 898.539 sq ft LANDSCAPING 2 G 2 2513.476 sq ft LANDSCAPING 3 G 3 1009.016 sq ft LANDSCAPING 4 G 4 116.583 sq ft LANDSCAPING 5 G 5 266.85 sq ft TOTAL AREA 4804.463 PROPOSED UNITS FLOOR AREAS Area SF UNIT 201 3B L2 1368.545 sq ft UNIT 202 2B L2 1438.266 sq ft UNIT 203 3B L2 1126.025 sq ft UNIT 204 2B L2 926.205 sq ft UNIT 205 1B L2 999.253 sq ft UNIT 206 1B L2 969.295 sq ft UNIT 207 2B L2 799.92 sq ft UNIT 208 STUDIO L2 378.931 sq ft UNIT 209 STUDIO L2 402.367 sq ft UNIT 301 3B L3 1368.545 sq ft UNIT 302 2B L3 1438.266 sq ft UNIT 303 4B L3 1500.207 sq ft UNIT 304 3B L3 1329.815 sq ft UNIT 305 1 B L3 999.253 sq ft UNIT 306 1 B L3 969.295 sq ft UNIT 307 2 B L3 799.92 sq ft UNIT 401 3B L4 1368.545 sq ft UNIT 402 2B L4 1438.266 sq ft UNIT 403 4B L4 1503.609 sq ft UNIT 404 3B L4 1329.815 sq ft UNIT 405 1B L4 999.253 sq ft UNIT 406 1B L4 969.295 sq ft UNIT 407 2B L4 799.92 sq ft UNIT 501 3B L5 1368.545 sq ft UNIT 502 2B L5 1438.266 sq ft UNIT 503 4B L5 1504.956 sq ft UNIT 504 3B L5 1329.815 sq ft UNIT 505 1B L5 999.253 sq ft UNIT 506 1B L5 969.295 sq ft UNIT 507 2B L5 799.92 sq ft TOTAL AREA 33632.863 PROPOSED BALCONY FLOOR AREAS Room Number Floor Area SF BLCONY L2 1 BL2 1 135.626 sq ft BLCONY L2 2 BL2 2 136.5 sq ft BLCONY L2 3 BL2 3 136.5 sq ft BLCONY L2 4 BL2 4 138.249 sq ft BLCONY L3 1 BL3 1 135.626 sq ft BLCONY L3 2 BL3 2 136.5 sq ft BLCONY L3 3 BL3 3 136.499 sq ft BLCONY L3 4 BL3 4 138.249 sq ft BLCONY L4 1 BL4 1 135.626 sq ft BLCONY L4 2 BL4 2 136.5 sq ft BLCONY L4 3 BL4 3 136.499 sq ft BLCONY L4 4 BL4 4 204.772 sq ft BLCONY L5 1 BL5 1 136.048 sq ft BLCONY L5 2 BL5 2 136.478 sq ft BLCONY L2 3 BL5 3 136.499 sq ft BLCONY L2 4 BL5 4 146.789 sq ft TOTAL AREA 2262.958 18106.39 sq ft 2206 MAPLE AVE 137'9.24" 12 3 ' 3 . 2 4 " 156'0" 124'6.524" PROPOSED PERVIOUS SITE AREAS Number Area SF LANDSCAPING 1 G 1 898.539 sq ft LANDSCAPING 2 G 2 2513.476 sq ft LANDSCAPING 3 G 3 1009.016 sq ft LANDSCAPING 4 G 4 116.583 sq ft LANDSCAPING 5 G 5 266.85 sq ft TOTAL AREA 4804.463 PROPOSED IMPERVIOUS SITE AREAS Number Area SF DRIVE 1 D 1 841.366 sq ft DRIVE 2 D 2 345.186 sq ft ENTRY STOOP ES 1 53.227 sq ft FIRST FLR BLDG B 1 9976.368 sq ft PARKING 1 PERM P 1 623.242 sq ft PARKING3 PERM P 2 1195.202 sq ft WALK 1 PERM W 1 122.733 sq ft WALK 2 PERM W 2 125.188 sq ft WALK 3 PERM W 3 10 sq ft WALK 4 PERM W 4 10 sq ft TOTAL AREA 13302.512 PROPOSED BUILDING COVERAGE AREA Number Area SF BLDG COVERAGE B C A 1 10481.882 sq ft SITE OPEN AREA S O A 1 7624.507 sq ft TOTAL AREA 18106.389 1st FLR BIKE RM 104 100.743 sq ftArea:ELEV MECH. RM 105 66.069 sq ftArea: COMMUNITY RM 102 288.266 sq ftArea: ELEV LOBBY ENTRY LOBBY ELEV RM SERVICE RM FIRE SP. & WTR SERVICE GARAGE BLDG OFFICE MECH RM ELEC. RM JAN. GENERATOR ELEV TR A S H CORRIDOR VESTIBULE BIKE RM 24 BIKES STAIR 1 STAIR 2 WC TR A S H COMMUNITY RM BIKE RM 10 BIKES MAIL 18106.39 sq ft 2206 MAPLE AVE 137'9.24" 12 3 ' 3 . 2 4 " 156'0" 124 '6.524" PROPOSED PERVIOUS SITE AREAS Number Area SF LANDSCAPING 1 G 1 898.539 sq ft LANDSCAPING 2 G 2 2513.476 sq ft LANDSCAPING 3 G 3 1009.016 sq ft LANDSCAPING 4 G 4 116.583 sq ft LANDSCAPING 5 G 5 266.85 sq ft TOTAL AREA 4804.463 PROPOSED IMPERVIOUS SITE AREAS Number Area SF DRIVE 1 D 1 841.366 sq ft DRIVE 2 D 2 345.186 sq ft ENTRY STOOP ES 1 53.227 sq ft FIRST FLR BLDG B 1 9976.368 sq ft PARKING 1 PERM P 1 623.242 sq ft PARKING3 PERM P 2 1195.202 sq ft WALK 1 PERM W 1 122.733 sq ft WALK 2 PERM W 2 125.188 sq ft WALK 3 PERM W 3 10 sq ft WALK 4 PERM W 4 10 sq ft TOTAL AREA 13302.512 PROPOSED BUILDING COVERAGE AREA Number Area SF BLDG COVERAGE B C A 1 10481.882 sq ft SITE OPEN AREA S O A 1 7624.507 sq ft TOTAL AREA 18106.389 1st FLR BIKE RM 104 100.743 sq ftArea:ELEV MECH. RM 105 66.069 sq ftArea: COMMUNITY RM 102 288.266 sq ftArea: ELEV LOBBY ENTRY LOBBY ELEV RM SERVICE RM FIRE SP. &WTR SERVICE GARAGE BLDG OFFICE MECH RM ELEC. RM JAN. GENERATOR ELEV TR A S H CORRIDOR VESTIBULE BIKE RM 24 BIKES STAIR 1 STAIR 2 WC TR A S H COMMUNITY RM BIKE RM 10 BIKES MAIL Pa g e 1 4 o f 2 3 112 111 110 101 C-1 ST 2 1st FLR BIKE RM 109 221.307 sq ftArea: 1st FLR GEN. RM 108 211.248 sq ftArea: 1st FLR CORRIDOR 106 222.426 sq ftArea: 100 1st FLR BIKE RM 104 100.743 sq ftArea:ELEV MECH. RM 105 66.069 sq ftArea: COMMUNITY RM 102 288.266 sq ftArea: 1st FLR PARKING 112 6884.597 sq ftArea: 1st BLDG OFFICE 107 122.408 sq ftArea: 1st FLR SERV SPACES 101 320.762 sq ftArea: CORE L1 C-1 338.954 sq ftArea: 1st FLR LOBBY 100 559.816 sq ftArea: 1st FLR CORRIDOR 106 222.426 sq ftArea: 1st FLR GEN. RM 108 211.248 sq ftArea: 1st FLR BIKE RM 109 221.307 sq ftArea: COMMUNITY RM 102 288.266 sq ftArea: TOILET RM 103 63.747 sq ftArea: 1st FLR MECH RM 111 203.831 sq ftArea: 1st FLR METER RM 110 137.817 sq ftArea: 1st FLR BIKE RM 104 100.743 sq ftArea: ELEV MECH. RM 105 66.069 sq ftArea: STAIR 2 L1 ST 2 217.337 sq ftArea: Sheet No.Drawn By A 2.1 22 0 6 M a p l e A v e n u e E v a n s t o n I L No.DATE ISSUE NOTE Project ID 24-10 GROUND FLOOR PLAN NOT FORCONSTRUCTION N o .D A T E RE VISIO N N O T E 4/2/25 O C G G 11 2 ' - 4 " 232425 192021 26 91011121314 15 16 6 7 8 27 28 29 22 1 2 17 18 3 4 5 ELEV LOBBY ENTRY LOBBY ELEV RM SERVICE RM FIRE SP. & WTR SERVICE GARAGE BLDG OFFICE MECH RM ELEC. RM JAN. GENERATOR ELEV TR A S H CORRIDOR VESTIBULE BIKE RM 24 BIKES STAIR 1 STAIR 2 WC TR A S H COMMUNITY RM BIKE RM 10 BIKES MAIL 18106.39 sq ft 2206 MAPLE AVE 137'9.24" 12 3 ' 3 . 2 4 " 156'0" 124'6.524" GROUND FLOOR PLAN Scale: 1/8" = 1'-0"1 4'-0"14'-4"27'-6"25'-6"13'-9" 22 ' - 7 1 / 2 " 27 ' - 1 " 22 ' - 7 " 12 ' - 1 0 1 / 2 " 12 ' - 9 1 / 2 " 11 1 ' - 0 " 90'-4" 24'-0" 24 ' - 0 " 18 ' - 0 " 6' - 4 " 8' - 6 " 8' - 6 " 9' - 0 " 4'-0"18'-0" 8'-0"17'-0" 18'-0" 25'-6" 34'-0" 5' - 3 3 / 4 " 5'-8 1/4" 9' - 8 " 5' - 7 3 / 8 " 28'-0 3/4" 5' - 3 5 / 8 " 28'-7"25'-6" 82'-0"24'-6 1/2" 24'-6 1/2" 24'-6 1/2" 5' - 8 " 40'-4 3/8" 3' - 6 3 / 4 " 1' - 1 0 " 8' - 6 " 8' - 6 " 8' - 6 " 8' - 6 " 18 ' - 2 3 / 4 " 3'-0 1/2" 3'-0" 24 ' - 0 " 18 ' - 0 " 18 ' - 0 " 18'-0"8'-10 3/4" 27'-11" 25 ' - 6 " 17'-0"17'-0"17'-0" 18 ' - 0 " 5' - 0 " 8' - 6 " 8' - 6 " 8'-6"8'-6" 7'-2" 1 2 3 5 6 7 8 A B C D E F G 94 13 ' - 0 1 / 2 " 4'-0" 3'-0" 3'-7" 41'-1 1/2" 27'-2 3/4" 18 ' - 0 " 5' - 0 " PROPOSED BUILDING FLOOR AREAS RM / AREA Number Floor Area SF 1st FLR LOBBY 100 559.816 sq ft 1st FLR SERV SPACES 101 320.762 sq ft COMMUNITY RM 102 288.266 sq ft TOILET RM 103 63.747 sq ft 1st FLR BIKE RM 104 100.743 sq ft ELEV MECH. RM 105 66.069 sq ft 1st FLR CORRIDOR 106 222.426 sq ft 1st BLDG OFFICE 107 122.408 sq ft 1st FLR GEN. RM 108 211.248 sq ft 1st FLR BIKE RM 109 221.307 sq ft 1st FLR METER RM 110 137.817 sq ft 1st FLR MECH RM 111 203.831 sq ft 1st FLR PARKING 112 6884.597 sq ft 2ND FLOOR 200 9103.09 sq ft 3RD FLOOR 300 9103.09 sq ft 4TH FLOOR 400 9103.09 sq ft 5TH FLOOR 500 9103.09 sq ft TOTAL AREA 45815.399 ELEV LOBBY ENTRY LOBBY ELEV RM SERVICE RM FIRE SP. & WTR SERVICE GARAGE BLDG OFFICE MECH RM ELEC. RM JAN. GENERATOR ELEV TR A S H CORRIDOR VESTIBULE BIKE RM 24 BIKES STAIR 1 STAIR 2 WC TR A S H COMMUNITY RM BIKE RM 10 BIKES MAIL 1ST FLOOR AREAS Scale: 1/16" = 1'-0"2 Pa g e 1 5 o f 2 3 Sheet No.Drawn By A 2.2 22 0 6 M a p l e A v e n u e E v a n s t o n I L No.DATE ISSUE NOTE Project ID 24-10 2nd FLOOR PLAN NOT FORCONSTRUCTION N o .D A T E RE VISIO N N O T E 4/2/25 O C G G BEDRM 1 BATH 1 BATH 2 LIVING/ DINING BEDRM 3 LIVING/ DINING BEDRM 2 BEDRM 1 BATH 3 BEDRM 1 BEDRM 2BEDRM 3STUDIO BATH 1 BEDRM 1 DEN BATH 1 BATH 2 LIVING/ DINING BEDRM 1BEDRM 2BATH 2 KITCHENKITCHEN KITCHEN KITCHEN KITCHEN DEN 2 DEN CLOSET W/D BATH 1 BATH 1 BATH 3 CLST CL S T CLST LIVING/ DINING LIVING/ DINING CL S T CLOSETLIVING/ DINING KITCHEN BEDRM 1 DEN BATH 1 BATH 2 CL S T DEN 1 CL S T CL S T BATH 2 CLOSET BATH 2 CL S T KITCHEN CLST CLST BEDRM 1 BEDRM 2 BATH 1 KITCHEN CL S T LIVING/ DINING BATH 2 CL S T STUDIO KITCHEN CLST BATH CL S T ELEV LOBBY CL S T CL S T BATH BEDRM 2 W/D CLST W/D W/D W/D W/D /DW W/D W/D WH WH WHWH WH WH CL S T WH WH CL S T WH 2nd FLOOR PLAN Scale: 1/8" = 1'-0"2 90'-8" 11 2 ' - 4 " 28'-11"25'-10" 11 2 ' - 4 " 27'-11" 23 ' - 8 " 26 ' - 0 " 23 ' - 8 " 39 ' - 0 " 82'-8" 23 ' - 8 " 26 ' - 0 " 23 ' - 8 " 39 ' - 0 " 5'-3"5'-3" TRASH RM ELEV STAIR 1 2 3 5 6 7 8 A B C D E F G 94 Pa g e 1 6 o f 2 3 Sheet No.Drawn By A 2.3 22 0 6 M a p l e A v e n u e E v a n s t o n I L No.DATE ISSUE NOTE Project ID 24-10 3, 4 & 5TH FLOOR PLANS NOT FORCONSTRUCTION N o .D A T E RE VISIO N N O T E 4/2/25 O C G G BEDRM 1 BATH 1 LIVING/ DINING BEDRM 3 LIVING/ DINING BEDRM 2 BEDRM 1 BATH 3 BEDRM 1 BEDRM 2BEDRM 3BEDRM 4 BEDRM 1 BATH 1 BATH 2 LIVING/ DINING BEDRM 1BEDRM 2BATH 2 KITCHENKITCHEN KITCHEN KITCHEN KITCHEN KITCHEN DEN 2 DEN CLOSET BATH 2 BATH 1 CLST BATH 2 CL S T CLST LIVING/ DINING LIVING/ DINING LIVING/ DINING CL S T CLOSETLIVING/ DINING KITCHEN BEDRM 1 BATH 1 BATH 2 CL S T CLOSET CL S T CL S T BATH 1 DEN 1 BATH 3 CL S T BEDRM 3BEDRM 2 BEDRM 1 BATH 2 CLST CLST CL S T CL S T PWDR RM DEN BATH 1 BATH 2 ELEV LOBBY BATH 3 CL S T BATH 1 CLST CLST BEDRM 2 W/D W/D W/D W/D W/D W/D W/D DEN WH WH WH WH WH WH WH CL S T CL S T CLST 3rd, 4th & 5th FLOOR PLANS Scale: 1/8" = 1'-0"1 TRASH RM ELEV STAIR 1 2 3 5 6 7 8 A B C D E F G 94 BEDRM 3 LIVING/ DINING BEDRM 1 BATH 3 BEDRM 1 CLOSET BATH 2 CL S T CL S T CL S T 4th FLOOR 401 BALCONY PLAN Scale: 1/8" = 1'-0"2 6 7 8 A B C D 9 BEDRM 3 LIVING/ DINING BEDRM 1 BATH 3 BEDRM 1 CLOSET BATH 2 CL S T CL S T CL S T 5th FLOOR 501 BALCONY PLAN Scale: 1/8" = 1'-0"3 6 7 8 A B C D 9 Pa g e 1 7 o f 2 3 ERV ROOF PLAN Scale: 1/8" = 1'-0"1 27'-11" ROOF DECK 730 SF MAX OCCUPANCY 49 PERSON VESTIBULE SOLAR PANELS SOLAR PANELS ELEV 32 ' - 0 " 27'-11" 18 ' - 0 " 9' - 1 1 " 24 ' - 0 " HVAC SYSTEM HEAT PUMP INVERTERS AREA STAIR HVAC SYSTEM ERV UNIT 1 2 3 6 7 8 B C D E F G 94 A 5 Sheet No.Drawn By A 2.4 22 0 6 M a p l e A v e n u e E v a n s t o n I L No.DATE ISSUE NOTE Project ID 24-10 ROOF/PENTHOU SE PLAN NOT FORCONSTRUCTION N o .D A T E RE VISIO N N O T E 4/2/25 O C G G Pa g e 1 8 o f 2 3 Sheet No.Drawn By A 3.1 22 0 6 M a p l e A v e n u e E v a n s t o n I L No.DATE ISSUE NOTE Project ID 24-10 EXTERIOR ELEVATIONS NOT FORCONSTRUCTION N o .D A T E RE VISIO N N O T E 4/2/25 O C G G EAST ELEVATION Scale: 1/8" = 1'-0"1 T/ ROOF DECK 53'-7 1/2" 1ST FLOOR 0" 2ND FLOOR 11'-0" 3ND FLOOR 21'-7 7/8" 4TH FLOOR 32'-3 3/4" 5TH FLOOR 42'-11 5/8" T/ ROOF DECK 61'-0" 1 0 ' - 7 7 / 8 " 1 0 ' - 7 7 / 8 " 7 ' - 4 1 / 2 " 1 1 ' - 0 " 5 6 ' - 6 " 6 1 ' - 6 " ABCDEFG 1 0 ' - 7 7 / 8 " 1 0 ' - 7 7 / 8 " WEST ELEVATION Scale: 1/8" = 1'-0"2 5 6 ' - 6 " 1 1 ' - 0 " 1 0 ' - 9 " 1 0 ' - 9 " 1 0 ' - 9 " 1 0 ' - 9 " T/ ROOF DECK 53'-7 1/2" 1ST FLOOR 0" 2ND FLOOR 11'-0" 3ND FLOOR 21'-7 7/8" 4TH FLOOR 32'-3 3/4" 5TH FLOOR 42'-11 5/8" T/ ROOF DECK 61'-0" 2 ' - 6 " 61 ' - 6 " A B C D E F G SOUTH ELEVATION Scale: 1/8" = 1'-0"3 1 2 3 5 6 7 8 94 NORTH ELEVATION Scale: 1/8" = 1'-0"4 123567894 Pa g e 1 9 o f 2 3 Sheet No.Drawn By A 4.1 22 0 6 M a p l e A v e n u e E v a n s t o n I L No.DATE ISSUE NOTE Project ID 24-10 EAST ELEVATION NOT FORCONSTRUCTION N o .D A T E RE VISIO N N O T E 4/2/25 O C G G PROPOSED MAPLE AVE ELEVATION Scale: 3/16" = 1'-0"1 T/ 5TH FLR DECK +42'-11 5/8" T/ 4TH FLR DECK +32'-3 3/4" T/ 3RD FLR DECK +21'-7 7/8" T/ 2ND FLR DECK +11'-0" T/ 1ST FLR SLAB 0" T/ ROOF DECK +53'-7 1/2" T/ ROOF DECK +61'-0" Pa g e 2 0 o f 2 3 Sheet No.Drawn By A 4.2 22 0 6 M a p l e A v e n u e E v a n s t o n I L No.DATE ISSUE NOTE Project ID 24-10 WEST ELEVATION NOT FORCONSTRUCTION N o .D A T E RE VISIO N N O T E 4/2/25 O C G G PROPOSED WEST ELEVATION Scale: 3/16" = 1'-0"1 T/ 5TH FLR DECK +42'-11 5/8" T/ 4TH FLR DECK +32'-3 3/4" T/ 3RD FLR DECK +21'-7 7/8" T/ 2ND FLR DECK +11'-0" T/ 1ST FLR SLAB 0" T/ ROOF DECK +53'-7 1/2" T/ ROOF DECK +61'-0" Pa g e 2 1 o f 2 3 Sheet No.Drawn By A 5.1 22 0 6 M a p l e A v e n u e E v a n s t o n I L No.DATE ISSUE NOTE Project ID 24-10 BUILDING SECTIONS NOT FORCONSTRUCTION N o .D A T E RE VISIO N N O T E 4/2/25 O C G G BUILDING SECTION Scale: 1/8" = 1'-0"1 T/ ROOF DECK 53'-7 1/2" 1ST FLOOR 0" 2ND FLOOR 11'-0" 3ND FLOOR 21'-7 7/8" 4TH FLOOR 32'-3 3/4" 5TH FLOOR 42'-11 5/8" T/ ROOF DECK 61'-0" 1 0 ' - 7 7 / 8 " 7 ' - 5 " 1 1 ' - 0 " 8 ' - 1 0 7 / 8 " 8 ' - 1 0 7 / 8 " 8 ' - 1 0 7 / 8 " 8 ' - 1 0 7 / 8 " 6 ' - 7 " 8 ' - 1 0 3 / 8 " A B C D E F G 1 0 ' - 7 7 / 8 " 1 0 ' - 7 7 / 8 " 1 0 ' - 7 7 / 8 " BUILDING SECTION Scale: 1/8" = 1'-0"2 56 ' - 6 " 123567894 8' - 1 0 7 / 8 " BUILDING SECTION Scale: 1/8" = 1'-0"3 61 ' - 6 " 7' - 0 " 123567894 Pa g e 2 2 o f 2 3 Sheet No.Drawn By A 5.2 22 0 6 M a p l e A v e n u e E v a n s t o n I L No.DATE ISSUE NOTE Project ID 24-10 PARTIALSECTIONS/ELEVATIONS NOT FORCONSTRUCTION N o .D A T E RE VISIO N N O T E 4/2/25 O C G G PARTIAL ELEVATION Scale: 1/4" = 1'-0"1PARTIAL ELEVATION Scale: 1/4" = 1'-0"3PARTIAL ELEVATION Scale: 1/4" = 1'-0"5 MASONRY BASE: BELDEN BRICK - CARBON BLACK VELOUR FIBER CEMENT VERTICAL ACCCENT PANELS: SWISSPEARL GRAVIAL OR EQ. NATURALLY DRIED FIBER CEMENT PANEL WITH A LINEAR MILLED SURFACE STRUCTURE AND TRANSLUCENT COATING FIBER CEMENT SIDING PANELS : SWISS PEARL PATINA ROUGH NXT OR EQ. THROUGH COLOURED FIBER CEMENT PANEL METAL PANEL, TRIM & WINDOWS FRAME CLADDING: BRONZE, GRAY AND SILVER BALCONY RAILING PANELS : PERFORATED METAL PANEL WITH OUTER FRAME WALL SEC @ BALCONIES Scale: 1/4" = 1'-0"2 T/ 5TH FLR DECK +42'-11 5/8" T/ 4TH FLR DECK +32'-3 3/4" T/ 3RD FLR DECK +21'-7 7/8" T/ 2ND FLR DECK +11'-0" T/ 1ST FLR SLAB 0" T/ ROOF DECK +53'-7 1/2" T/ ROOF DECK +61'-0" BENT SHEET METAL PANEL CORNICE PAINTED STEEL STRUCTURE PERFORATED/MESH PANEL BALUSTRADE ALUM. CLAD DOORS & WINDOWS PERFORATED/MESH PANEL BALUSTRADE PAINTED METAL TRIM & BASE LONG BRICK MASONRY BASE PAINTED FIBERCEMENT PANELS PAINTED METAL TRIM 7 8 9 TYPICAL WALL SECTION Scale: 1/4" = 1'-0"4 T/ 5TH FLR DECK +42'-11 5/8" T/ 4TH FLR DECK +32'-3 3/4" T/ 3RD FLR DECK +21'-7 7/8" T/ 2ND FLR DECK +11'-0" T/ 1ST FLR SLAB 0" T/ ROOF DECK +53'-7 1/2" T/ ROOF DECK +61'-0" BENT SHEET METAL PANEL CORNICE PAINTED FIBERCEMENT PANELS ALUM. CLAD WINDOWS PAINTED METAL TRIM & BASE LONG BRICK MASONRY BASE PAINTED METAL TRIM & BASE 7 8 9 WALL SEC @ BALCONIES Scale: 1/4" = 1'-0"6 T/ 5TH FLR DECK +42'-11 5/8" T/ 4TH FLR DECK +32'-3 3/4" T/ 3RD FLR DECK +21'-7 7/8" T/ 2ND FLR DECK +11'-0" T/ 1ST FLR SLAB 0" T/ ROOF DECK +53'-7 1/2" T/ ROOF DECK +61'-0" BENT SHEET METAL PANEL CORNICE PAINTED FIBERCEMENT PANELS PERFORATED/MESH PANEL BALUSTRADE ALUM. CLAD WINDOWS PAINTED METAL TRIM & BASE LONG BRICK MASONRY BASE 7 8 9 Pa g e 2 3 o f 2 3