HomeMy WebLinkAboutConnelly Electric - Service Building Uninterrupted Power Supply (UPS) Installation To: Edgar Cano, Public Works Director From: Darrell A. King, Water Production Bureau Chief Subject: Service Building Uninterrupted Power Supply (UPS) Installation Date: March 14, 2024 Recommended Action: Staff recommends the Public Works Director approve an agreement with Connelly Electric (40 S. Addison Road, Suite 100, Addison, IL 60101) for the installation of the Service Building UPS in the amount of $7,800.00. Funding Source: Funding in the amount of $7,800.00 will be from the Water Fund account number 510.40.4210.62245, which has a FY 2024 budget of $198,000.00. This account has a year-to-date balance of $173,000.01. Summary: On August 26, 2023, the fire alarm was triggered at the water plant. The on-duty operators contacted the fire department. Upon the fire department’s arrival, they identified the alarm was coming from the service building UPS room where it was determined by staff that the UPS equipment in the service building closet had a major fault and part of it had blown. The service building UPS has been de-energized and removed from service. The service building is now being backed up by the pumping division's UPS. The service building UPS is not repairable and must be replaced. Due to a flooding incident that occurred at the water plant on November 3, 2023, the UPS equipment that was originally purchased to replace the service building UPS, was used to replace the filtration building UPS. Staff procured a second UPS that is now on site and ready to be installed in the service building. Financial Analysis: Staff received the following quotes from contractors to install the service building UPS: Memorandum Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Contractor Location Cost Connelly Electric Addison, IL $7,800.00 Continental Electrical Construction Company Oak Brook, IL $11,481.00 Homestead Electrical Contracting LLC Ingleside, IL $7,996.00 Jamerson & Bauwens Electrical Contractors Northbrook, IL Non-responsive APPROVED BY: ___________________________ ___________________ Edgar Cano Date Public Works Director Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Signer ID: PAMCLEJ2M9... 15 Mar 2024, 14:42:11, CDT 03/15/2024 Evanston" AGREEMENT (Goods and Services between $10,000 to $20,000) The Parties to this Agreement are the City of Evanston and Vendor,This Agreement,consisting of the signature page and numbered sections listed below and any attachments referenced in this Agreement,constitutes the entire Agreement between the Partes concerning the subject matter of the Agreement,and supersedes all prior proposals,Agreements and understandings between the Parties concerning the subject matter of the Agreement.This Agreement can be signed in multiple counterparts and signature may be electronic or digital upon agreement of the Parties, 1.TERM AND TERMINATION DESCRIPTION OF SUPPLIES AND SERVICES PRICING STANDARD BUSINESS TERMS AND CONDITIONS STANDARD CERTIFICATIONS DISCLOSURES AND CONFLICTS OF INTEREST SUPPLEMENTAL PROVISIONS 2. 3. 4. 5. 6. 7. In consideration of the mutual covenants and agreements contained in this Agreement,and for other good and valuable consideration,the receipt and sufficiency of which are hereby acknowledged,the Parties agree to the terms and conditions set forth herein and have caused this Agreement to be executed by their duly authorized representatives on the dates shown below. VENDOR (Vendor Name)Connelly Electric Co. Signature A William T.Connelly,Inc.dba CITY OF EVANSTON (Procuring Department Name)Public Works Agency \S Official Signature Dan DivanePrintedName VP Aviation,Transportation &Public Works 3/14/24TitleDate Date 40 S.Addison Rd.,Suite 100 1AddressDesigneeSignature Printed Name Darrell A.KinoAddison,IL 60101 630.543.9059 Fax 630.543.9077Phone Title Water Production Bureau Chief da.divane@connellyelectric.comE-mail Address Evanston Water Utility.555 Lincoln Street .Evanston,IL 60201 CITY USE ONLY NOT PART OF CONTRACTUAL PROVISIONS Protect Title Contractu Procurement Method f /FB.RFP.Small,etcl: Ref.it Publication Dale:Award Code: Subcontractor Utilization?C~Yes E No Subcontractor Disclosure?H.Yes Cl No Funding Source Obligation # Approval: Signature Date/Printed Name Phone E-mail Revision 10/2011 Page 1 Printed Name Edgar Cano Title Public Works Director Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Signer ID: PAMCLEJ2M9... 15 Mar 2024, 14:42:11, CDT Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 X 555 Lincoln St. - Evanston, IL 60201$7,800.00 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 xxx xx N/A Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Director Signer ID: PAMCLEJ2M9... 15 Mar 2024, 14:42:11, CDT 03/15/2024 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8 Signature Certificate Envelope Ref:6b3cc762b4e383b30b562b2092193a9c60b5e2a8 Author: Paulina Albazi Creation Date: 15 Mar 2024, 10:01:46, CDT Completion Date: 15 Mar 2024, 14:42:11, CDT Document Details: Name: Service Building UPS. Installation Memo and agreement Type: Document Ref: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa21 4aa8 Document Total Pages: 26 Document Signed By: Name: Edgar Cano Email: ecano@cityofevanston.org IP: 66.158.65.76 Location: EVANSTON, IL (US) Date: 15 Mar 2024, 14:42:11, CDT Consent: eSignature Consent Accepted Security Level: Email Signer ID :PAMCLEJ2M9... 15 Mar 2024, 14:42:11, CDT Document History: Envelope Created Paulina Albazi created this envelope on 15 Mar 2024, 10:01:46, CDT Invitation Sent Invitation sent to Edgar Cano on 15 Mar 2024, 10:05:04, CDT Invitation Accepted Invitation accepted by Edgar Cano on 15 Mar 2024, 14:41:21, CDT Signed by Edgar Cano Edgar Cano signed this Envelope on 15 Mar 2024, 14:42:11, CDT Executed Document(s) successfully executed on 15 Mar 2024, 14:42:11, CDT Signed Document(s) Link emailed to ecano@cityofevanston.org Signed Document(s) Link emailed to palbazi@cityofevanston.org