HomeMy WebLinkAboutConnelly Electric - Service Building Uninterrupted Power Supply (UPS) Installation
To: Edgar Cano, Public Works Director
From: Darrell A. King, Water Production Bureau Chief
Subject: Service Building Uninterrupted Power Supply (UPS) Installation
Date: March 14, 2024
Recommended Action:
Staff recommends the Public Works Director approve an agreement with Connelly
Electric (40 S. Addison Road, Suite 100, Addison, IL 60101) for the installation of the
Service Building UPS in the amount of $7,800.00.
Funding Source:
Funding in the amount of $7,800.00 will be from the Water Fund account number
510.40.4210.62245, which has a FY 2024 budget of $198,000.00. This account has a
year-to-date balance of $173,000.01.
Summary:
On August 26, 2023, the fire alarm was triggered at the water plant. The on-duty
operators contacted the fire department. Upon the fire department’s arrival, they
identified the alarm was coming from the service building UPS room where it was
determined by staff that the UPS equipment in the service building closet had a major
fault and part of it had blown. The service building UPS has been de-energized and
removed from service. The service building is now being backed up by the pumping
division's UPS. The service building UPS is not repairable and must be replaced. Due to
a flooding incident that occurred at the water plant on November 3, 2023, the UPS
equipment that was originally purchased to replace the service building UPS, was used
to replace the filtration building UPS. Staff procured a second UPS that is now on site
and ready to be installed in the service building.
Financial Analysis:
Staff received the following quotes from contractors to install the service building UPS:
Memorandum
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Contractor Location Cost
Connelly Electric Addison, IL $7,800.00
Continental Electrical
Construction Company
Oak Brook, IL $11,481.00
Homestead Electrical
Contracting LLC
Ingleside, IL $7,996.00
Jamerson & Bauwens
Electrical Contractors
Northbrook, IL Non-responsive
APPROVED BY:
___________________________ ___________________
Edgar Cano Date
Public Works Director
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Signer ID: PAMCLEJ2M9...
15 Mar 2024, 14:42:11, CDT
03/15/2024
Evanston"
AGREEMENT
(Goods and Services between $10,000 to $20,000)
The Parties to this Agreement are the City of Evanston and Vendor,This Agreement,consisting of the signature page and numbered sections listed
below and any attachments referenced in this Agreement,constitutes the entire Agreement between the Partes concerning the subject matter of the
Agreement,and supersedes all prior proposals,Agreements and understandings between the Parties concerning the subject matter of the
Agreement.This Agreement can be signed in multiple counterparts and signature may be electronic or digital upon agreement of the Parties,
1.TERM AND TERMINATION
DESCRIPTION OF SUPPLIES AND SERVICES
PRICING
STANDARD BUSINESS TERMS AND CONDITIONS
STANDARD CERTIFICATIONS
DISCLOSURES AND CONFLICTS OF INTEREST
SUPPLEMENTAL PROVISIONS
2.
3.
4.
5.
6.
7.
In consideration of the mutual covenants and agreements contained in this Agreement,and for other good and valuable consideration,the receipt
and sufficiency of which are hereby acknowledged,the Parties agree to the terms and conditions set forth herein and have caused this Agreement to
be executed by their duly authorized representatives on the dates shown below.
VENDOR
(Vendor Name)Connelly Electric Co.
Signature A
William T.Connelly,Inc.dba CITY OF EVANSTON
(Procuring Department Name)Public Works Agency
\S Official Signature
Dan DivanePrintedName
VP Aviation,Transportation &Public Works 3/14/24TitleDate Date
40 S.Addison Rd.,Suite 100 1AddressDesigneeSignature
Printed Name Darrell A.KinoAddison,IL 60101
630.543.9059 Fax 630.543.9077Phone Title Water Production Bureau Chief
da.divane@connellyelectric.comE-mail Address Evanston Water Utility.555 Lincoln Street .Evanston,IL 60201
CITY USE ONLY NOT PART OF CONTRACTUAL PROVISIONS
Protect Title
Contractu Procurement Method f /FB.RFP.Small,etcl:
Ref.it Publication Dale:Award Code:
Subcontractor Utilization?C~Yes E No Subcontractor Disclosure?H.Yes Cl No
Funding Source Obligation #
Approval:
Signature Date/Printed Name
Phone E-mail
Revision 10/2011 Page 1
Printed Name Edgar Cano
Title Public Works Director
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Signer ID: PAMCLEJ2M9...
15 Mar 2024, 14:42:11, CDT
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
X
555 Lincoln St. - Evanston, IL 60201$7,800.00
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
xxx
xx
N/A
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Director
Signer ID: PAMCLEJ2M9...
15 Mar 2024, 14:42:11, CDT
03/15/2024
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Document ID: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa214aa8
Signature Certificate
Envelope Ref:6b3cc762b4e383b30b562b2092193a9c60b5e2a8
Author: Paulina Albazi Creation Date: 15 Mar 2024, 10:01:46, CDT Completion Date: 15 Mar 2024, 14:42:11, CDT
Document Details:
Name: Service Building UPS. Installation Memo and agreement
Type:
Document Ref: ad88395d73eac43102aaee96b0db770654132eac36e65b97a4ffdbbeaa21
4aa8
Document Total Pages: 26
Document Signed By:
Name: Edgar Cano
Email: ecano@cityofevanston.org
IP: 66.158.65.76
Location: EVANSTON, IL (US)
Date: 15 Mar 2024, 14:42:11, CDT
Consent: eSignature Consent Accepted
Security Level: Email
Signer ID :PAMCLEJ2M9...
15 Mar 2024, 14:42:11, CDT
Document History:
Envelope Created Paulina Albazi created this envelope on 15 Mar 2024, 10:01:46, CDT
Invitation Sent Invitation sent to Edgar Cano on 15 Mar 2024, 10:05:04, CDT
Invitation Accepted Invitation accepted by Edgar Cano on 15 Mar 2024, 14:41:21, CDT
Signed by Edgar Cano Edgar Cano signed this Envelope on 15 Mar 2024, 14:42:11, CDT
Executed Document(s) successfully executed on 15 Mar 2024, 14:42:11, CDT
Signed Document(s) Link emailed to ecano@cityofevanston.org
Signed Document(s) Link emailed to palbazi@cityofevanston.org