Loading...
HomeMy WebLinkAbout10.16.23AGENDA Special City Council Monday, October 16, 2023 Lorraine H. Morton Civic Center, James C. Lytle City Council Chambers, Room 2800 6:00 PM Join Zoom Meeting https://us06web.zoom.us/j/89198003010?pwd=N3Jwb2tyOHFUeVY1RDdLQURWL1c0dz0 9 Meeting ID: 891 9800 3010 Passcode: 070286 Those wishing to make public comments for this City Council meeting may submit written comments in advance or sign up to provide public comment by phone or video during the meeting by completing the City Clerk's Office's online form at www.cityofevanston.org/government/city-clerk/public-comment-sign-up or by calling/texting 847-448-4311. Community members may watch the City Council meeting online at www.cityofevanston.org/channel16 or on Cable Channel 16 Page (I)ROLL CALL - COUNCILMEMBER REVELLE (II)PUBLIC COMMENT Page 1 of 66 Members of the public are welcome to speak at City Council meetings. As part of the Council agenda, a period for public comments shall be offered at the commencement of each regular Council meeting. Public comments will be noted in the City Council Minutes and become part of the official record. Those wishing to speak should sign their a on addressed be topic non-agenda to item agenda the and name or designated participation sheet. If there are five or fewer speakers, fifteen minutes shall be provided for Public Comment. If there are more than five speakers, a period of forty-five minutes shall be provided for all comment, and no individual shall speak longer than three minutes. The Mayor will allocate time among the speakers to ensure that Public Comment does not exceed forty-five minutes. The business of the City Council shall commence forty-five minutes after the beginning of Public Comment. Aldermen do not respond during Public Comment. Public Comment is intended to foster dialogue in a respectful and civil manner. Public comments are requested to be made with these guidelines in mind. (III)SPECIAL ORDERS OF BUSINESS SP1.FY 2024 Proposed Budget Overview and FY 2024 Library Proposed Budget Overview Staff Seeks Direction on the FY 2024 Proposed Budget For Discussion FY 2024 Proposed Budget Overview and FY 2024 Library Proposed Budget Overview 4 - 40 SP2.2024 Proposed Capital Improvement Program - Criteria for Prioritization Staff will present information on the use of criteria to set priorities for the 2024 Capital Improvement Program for discussion with the City Council. For Discussion 2024 Proposed Capital Improvement Program - Criteria for Prioritization 41 - 66 (IV)EXECUTIVE SESSION (V)CALL OF THE WARDS shall be called upon by Mayor to announce or provide (Councilmembers the information about any Ward or City matter which a Councilmember desires to bring before the Council.) {Council Rule 2.1(10)} (VI)ADJOURNMENT Page 2 of 66 Memorandum To: Honorable Mayor and Members of the City Council From:Hitesh Desai, Chief Financial Officer/Treasurer CC:Clayton Black, Budget Manager Subject:FY 2024 Proposed Budget Overview and FY 2024 Library Proposed Budget Overview Date: October 16, 2023 Recommended Action: Staff Seeks Direction on the FY 2024 Proposed Budget Council Action: For Discussion Summary: The 2024 Proposed Budget was published on the City's website on Friday, October 6. The budget can be viewed online at 2024 Proposed Budget. Additional budget information can be found on the City's website: cityofevanston.org/budget. Library The staff of the Evanston Public Library serves the information needs of our community both within the walls of our two locations and throughout the City by bringing our programs and services to locations where our community members gather. The budgeted operating expenditures are projected to increase to $9.94M in FY2024. This is due to increased personnel costs for existing AFSCME and non-union position salaries and benefits negotiated and approved in FY2023. The Library is not adding any additional personnel positions in FY2024. The non-personnel expenditures are projected to stay flat in FY2024. FY2024 Library Operating Budget Expenditures Amount Early Learning and Literacy $1,047,429 Lifelong Learning and Literacy $1,671,553 SP1.Page 4 of 66 Access Services $1,560,504 Engagement Services $1,278,478 Innovation & Digital Learning $1,076,613 Maintenance $1,346,307 Administration $1,960,264 TOTAL $9,941,147 The budgeted operating revenue is projected to increase to $9.17M in FY2024. This represents a 9.0% increase over FY2023 in the property tax levy for the Library Fund. The projected $770,477 deficit will reduce the fund balance to $3.0M at the end of FY2024. 2024 Library Operating Revenue Amount Property Taxes $8,213,664 Non-tax Revenue $957,006 TOTAL $9,170,670 Attachments: 2024 Budget Presentation for 10-10-23.pptx (2) Page 2 of 37 SP1.Page 5 of 66 City Manager’s Office October 18, 2023 2024 Proposed Budget Overview 1Page 3 of 37SP1.Page 6 of 66 City Manager’s Office ●Overall Budget ●2023 General Fund Projections ●2024 Proposed General Fund Budget ○Revenues and Expenses ○Budget Balancing ○Future Projections ●Tax and Fee Increases ○Property Taxes ○Ambulance Fees ○Water Rates ○Solid Waste ●Proposed New Positions ●Capital Improvement Program ●Fund Balances and Projections 2 TopicsPage 4 of 37SP1.Page 7 of 66 City Manager’s Office 3 Total Proposed Budget = $449,008,728 ●Increase from 2023 Adopted Budget = $51.8 million ○Salaries and Wages + $19.4 million ○Capital Fund + $15.2 million ○Additional increases in Water, MFT, and ARPA ($12.6 million) Overall BudgetPage 5 of 37SP1.Page 8 of 66 City Manager’s Office 4 Overall Budget - City Council Goals The City Council has set the following goals for 2023 to 2025. As part of each goal, the City Council has emphasized that equity be a key objective in achieving each objective. ●Housing — Expand the supply of safe and affordable housing in every neighborhood of Evanston. ●CARP — Achieve Evanston’s 2025 Climate Action and Resilience Plan goals. ●Economic Development — Invest in and bolster Evanston’s unique identity and culture. Foster growth and stability for existing and new Evanston businesses. Ensure pathways to economic growth for residents. ●Finance — Responsible and sustainable stewardship of city assets. ●Public Safety — Ensure Evanston is safe and welcoming to all. Implement best practices and policies and develop coordinated alternative public safety responses. ●Public Health — Make significant and measurable progress toward addressing E-plan priorities.Page 6 of 37SP1.Page 9 of 66 City Manager’s Office 5 Overall BudgetPage 7 of 37SP1.Page 10 of 66 City Manager’s Office 6 Overall BudgetPage 8 of 37SP1.Page 11 of 66 City Manager’s Office 2023 General Fund ProjectionsPage 9 of 37SP1.Page 12 of 66 City Manager’s Office 8 2023 General Fund Projections - RevenuesPage 10 of 37SP1.Page 13 of 66 City Manager’s Office 9 Item Cost Use of Fund Balance to Balance 2023 General Fund ($10,085,454) Item Cost Cover Overage on Animal Shelter Project ($1,500,000) Cover Overage on Skate Park Project ($92,266) Cover Overage on Oakton Corridor Project ($806,960) Cover Overage due to Inflation on Main St Project ($865,000) Cover Overage on 2023 Water Main Improvement ($137,792) Cover Unbudgeted Ambulance Purchase ($237,001) Higher than Budgeted Wage Increase (Fire)($1,400,000) Higher than Budgeted Wage Increase (Police)($1,600,000) Higher than Budgeted AFSCME Wage Increases ($1,700,000) Higher than Budgeted Non-Union Wage Increases ($350,000) ($8,689,019) Budgeted Approved Additional Spending 2023 General Fund Projections - ExpensesPage 11 of 37SP1.Page 14 of 66 City Manager’s Office 10 2023 General Fund ProjectionsPage 12 of 37SP1.Page 15 of 66 City Manager’s Office 11 2024 Proposed General Fund Budget - RevenuesPage 13 of 37SP1.Page 16 of 66 City Manager’s Office 12 •Wage Increases - Nearly $12 million in increases to salaries in 2024 compared to 2023 budget given approved collective bargaining contracts. •New Positions - 15.6 new positions included in the proposed General Fund budget •Transfer to Fleet Fund - Impact of inflation on vehicles parts, labor, and fuel. •Public Safety Pensions - $5 million of additional contributions will come from sources identified in the policy including property tax levy, PPRT, and General Fund balance. •Operating Requests 2024 Proposed General Fund Budget - ExpensesPage 14 of 37SP1.Page 17 of 66 City Manager’s Office 13 2024 Baseline Budget 2024 Proposed Budget General Fund Operating Revenue $130,375,535 $130,375,535 Use of Reserves $10,350,000 Increase to Net Property Tax Levy $3,745,401 Increase to Transfers $389,441 Increase in Ambulance Fees $700,000 General Fund Total Revenue $130,375,535 $145,560,377 General Fund Operating Expenses $124,991,558 $124,991,558 Salary Increases $12,246,229 New Positions $1,734,096 Operating Requests $2,710,697 Transfer to Fleet Fund $695,100 Full Funding of Public Safety Pensions $4,975,079 Vacancy Adjustment ($1,852,608) General Fund Total Expenses $124,991,558 $145,500,151 General Fund Net $5,383,977 $60,266 2024 Proposed General Fund – Budget BalancingPage 15 of 37SP1.Page 18 of 66 City Manager’s Office 14 2024 Proposed General Fund – Fund Balance General Fund Forecast With Proposed Tax Levy Increase in FY 2024Page 16 of 37SP1.Page 19 of 66 City Manager’s Office 15 2024 Proposed General Fund – Fund BalancePage 17 of 37SP1.Page 20 of 66 City Manager’s Office 16 2024 Proposed General Fund – Fund Balance General Fund Forecast Without Proposed Tax Levy Increase in FY 2024Page 18 of 37SP1.Page 21 of 66 City Manager’s Office 17 2024 Proposed General Fund – Fund BalancePage 19 of 37SP1.Page 22 of 66 City Manager’s Office 18 2022 Adopted Net Levy 2023 Proposed Net Levy Change ($) Increase as a % of Total Net Levy General Fund Tax Levy 9,057,297 12,802,697 3,745,401 45.9% Human Services Fund 3,110,000 3,360,000 250,000 8.0% General Assistance Fund 1,300,000 1,050,000 (250,000) -19.2% Library Fund 7,535,472 8,213,664 678,192 9.0% Solid Waste Fund 1,332,500 1,332,500 - 0.0% Debt Service (City)12,878,258 12,766,093 (112,165)-0.9% Debt Service (Library)507,913 574,677 66,764 13.1% Fire Pension Fund 9,598,610 9,598,610 0 0.0% Police Pension Fund 10,391,495 10,391,495 0 0.0% Total Net Levy $ 55,711,545 $ 60,089,737 $ 4,378,192 7.9% 2024 Proposed Budget – Property Tax LevyPage 20 of 37SP1.Page 23 of 66 City Manager’s Office 19 2024 Proposed Budget – Property Tax Levy Notes: EAV has been adjusted by Homeowners exemption by $10,000. These are based on Tax Year 2021 numbers including Library.Page 21 of 37SP1.Page 24 of 66 City Manager’s Office 20 For every dollar you pay in property tax, the City receives 17 cents. 2024 Proposed Budget – Property Tax LevyPage 22 of 37SP1.Page 25 of 66 City Manager’s Office 21 *Average composite rate per PIN. Individual rate may be higher or lower depending on combination of taxing districts servicing a property. 2024 Proposed Budget – Property Tax LevyPage 23 of 37SP1.Page 26 of 66 City Manager’s Office 22 Increase to Ambulance Fees •Increase from $1,500 to $2,000 ($1,900 area average) per transport to cover cost of ALS 360 lease. 17.55% increase to Water Rate •Covers cost of the water main and lead pipe replacement. •This amounts to $69.93 more per year or $11.66 per bi-monthly bill 10% to 15.8% increase to Solid Waste Fees 2024 Proposed Budget – Other Fee Increases Rate Increase 65 gallon 95 gallon 10.8%$12.40 $19.59 15.8%$27.99 $44.22Page 24 of 37SP1.Page 27 of 66 City Manager’s Office 23 2024 Proposed Budget – Public Safety PensionsPage 25 of 37SP1.Page 28 of 66 City Manager’s Office 24 Fund FTE Added General Fund 15.6 Water Fund 2.0 Water & Sewer Funds (50%-50%)1.0 Solid Waste Fund 1.0 Library 2.81 TOTAL 22.41 2024 Proposed Budget – New PositionsPage 26 of 37SP1.Page 29 of 66 City Manager’s Office 25 Department New Positions (General Fund) Administrative Services Facilities Maintenance Worker II (Laborer) City Council City Council Admin City Manager’s Office Economic Development Coordinator* HR Generalist* Class and Compensation Specialist* Cultural Arts Coordinator (0.6) Equity Professional Learning Specialist Community Development Planning & Policy Supervisor Health and Human Services Disease Intervention Specialist Law Safety Assistant Parks & Recreation Food Service Coordinator* Police Police Commander Property Aide Public Works Tree Preservation Coordinator* Assistant City Engineer Landscape Architect *Already approved by City Council in 2023 2024 Proposed Budget – New Positions (General Fund)Page 27 of 37SP1.Page 30 of 66 City Manager’s Office 26 Fund New Positions Water Fund Water Plant Operator (x2) Water & Sewer Funds (50%-50%)NPDES Compliance Coordinator Solid Waste Crew Leader Library Social Worker* Security Monitors (1.81)* *Already Approved by City Council or Library Board in 2023 2024 Proposed Budget – New Positions (Other Funds)Page 28 of 37SP1.Page 31 of 66 City Manager’s Office 2024 Proposed Capital Improvement Plan by Fund 27Page 29 of 37SP1.Page 32 of 66 City Manager’s Office •Friday, October 6: Proposed Budget available on City website •Tuesday, October 10: Budget Discussion at Finance and Budget Committee •Monday, October 16: Budget Discussion at City Council •Monday, October 23: Budget Public Hearing at City Council •Thursday, October 26: Budget Town Hall (Spanish) •October - November: Budget Discussion at Ward Meetings •Thursday, November 2: Budget Town Hall (Tentative) •Monday, November 6: Truth in Taxation Public Hearing at City Council •November 27: Anticipated budget adoption date •December 26: Tax levy filing deadline •December 31: Budget approval deadline 28 2024 Proposed Budget – CalendarPage 30 of 37SP1.Page 33 of 66 City Manager’s Office 29 Fund Balances - As of 8/31/2023 *Cash basis.Page 31 of 37SP1.Page 34 of 66 City Manager’s Office 30 Fund Balances - As of 8/31/2023Page 32 of 37SP1.Page 35 of 66 City Manager’s Office 31 Fund Balances - As of 8/31/2023Page 33 of 37SP1.Page 36 of 66 City Manager’s Office 32 Fund Balances Page 34 of 37SP1.Page 37 of 66 City Manager’s Office 33 Fund Balances Projections- As of 8/31/2023 *Cash basis.Page 35 of 37SP1.Page 38 of 66 City Manager’s Office 34 Fund Balances Projections- As of 8/31/2023Page 36 of 37SP1.Page 39 of 66 City Manager’s Office 35 Fund Balances Projections- As of 8/31/2023Page 37 of 37SP1.Page 40 of 66 Memorandum To: Honorable Mayor and Members of the City Council From:Lara Biggs, Capital Planning & Engineering Bureau Chief CC:Edgar Cano - Public Works Agency Director Subject:2024 Proposed Capital Improvement Program - Criteria for Prioritization Date: October 16, 2023 Recommended Action: Staff will present information on the use of criteria to set priorities for the 2024 Capital Improvement Program for discussion with the City Council. Council Action: For Discussion Summary: On September 18, 2023, staff presented information on the draft 2024 Capital Improvement Program (CIP) to receive feedback on City Council priorities. Members of the City Council requested that the criteria developed to rate the 2023 CIP be used to prioritize the 2024 CIP. This information included: CIP projects that occur annually CIP projects that have already started and are ongoing Need for projects Projects receiving outside non-city loan/grant funding Projects aligning with CARP goals In 2023, the criteria were applied at an equal weighting. The proposed list of projects was smaller, and the criteria effectively provided some guidance. Overall, though, not many projects were eliminated. This resulted in an adopted 2023 CIP that exceeded the capacity of the staff to implement, and many projects were not able to be started. The list of needs in the proposed 2024 CIP is larger. When staff applied the criteria with equal weighting, adding the scores together did not provide useful information. Utilizing the scores meant that projects that provide critical infrastructure repairs, such as roof replacement, were not making the list of selected projects. SP2.Page 41 of 66 Revised Evaluation Criteria: Staff reviewed the criteria closely and is making the following recommendations for the selection of projects. 1. Immediate Life Safety Concerns 2. Regulatory Requirements 3. Annual Projects 4. Ongoing Projects 5. General Obligation (GO) Bond Funding 6. Building Envelope Repairs A detailed discussion of these recommendations is included below. Updates to the Proposed 2024 CIP A number of adjustments in proposed project funding are recommended. The suggested adjustments are shown in the table below. These adjustments are included in the tables under discussion tonight but are not uploaded into the proposed City budget under discussion, and they are not included in the information on the website. Immediate Life Safety Concerns Projects that are needed to mitigate an immediate danger to staff or members of the public should be prioritized. Page 2 of 26 SP2.Page 42 of 66 Regulatory Requirements Projects that the City is doing to meet a legal requirement should be prioritized. As an example, these include projects to meet requirements related to the Americans with Disabilities Act and Lead Service Line Replacement. Ongoing CIP Project Phase Many CIP projects take multiple years to develop and complete. Staff recommends projects be prioritized when they have expended significant resources or when public engagement has occurred. This would include projects in the following phases: Construction Page 3 of 26 SP2.Page 43 of 66 Design Planning, but only when public engagement has occurred Using this criteria, the following projects are recommended. The 2024 budget for each project is included (Note that this does not include carryover funding, where a contract is already underway, but not all of the funding budgeted for 2023 will be spent in 2023; it only includes new funding for 2024). A summary of the funding requirements for this list is shown below: Page 4 of 26 SP2.Page 44 of 66 Annual Investment Projects The following is a list of projects that occur annually in the CIP and provide regular planned investment to keep infrastructure in safe, usable condition. Each of the projects in this list occurs every year at a similar level of funding. Most are planned and designed using in-house staff. Projects that are in bold are new in 2024 but are intended to continue as annual projects. Page 5 of 26 SP2.Page 45 of 66 Page 6 of 26 SP2.Page 46 of 66 Non-GO Bond Funding City Council has frequently expressed concern about the amount of debt issued to fund capital improvement projects. Historically, the annual target amount for this funding has been set at $10M - $12M. Projects that do not rely entirely on G.O. Bonds should be considered a higher priority. Page 7 of 26 SP2.Page 47 of 66 Building Envelope Projects: The above list does not prioritize projects to stabilize building envelopes (e.g., walls and roofs). Since water leaking into a building can cause long-term damage to other building systems as well as health and safety concerns, consideration should be given to adding these projects. In particular, Fire Station 5 is leaking substantial water through the east wall of the building and should be prioritized. Page 8 of 26 SP2.Page 48 of 66 Sub-Total: Using the new priorities results in a CIP with the following funding needs: The summary of prioritized projects and those projects that are not yet prioritized is included as an attachment. Library Projects: The Library staff and Library Board oversee the recommendations of projects related to the Main Library and the branch at the Robert Crown Center. These projects are not included in this analysis. Additional Staff Recommendations: The staff has the following additional recommendations. Note that these items are not yet included on the Prioritized Projects list: 1. Citywide Building Automation System (BAS) Upgrade - The BAS is used to monitor the building system (such as HVAC and Fire Suppression Systems) status at different City facilities. This allows staff to change settings on different systems remotely and receive alarms when systems are not functioning. It is particularly important for managing building emergencies. Unfortunately, different facilities are on different versions of software, and older versions are no longer being supported. Staff Page 9 of 26 SP2.Page 49 of 66 recommends moving forward with this upgrade. The estimated cost to add this would be $250,000 in 2024 GO Bonds. 2. Legacy Parks - Staff recommends moving forward with the consulting services to start working on the next round of Legacy Park Improvements. The estimated cost to add these would be $465,000 in 2024 GO Bonds. Adding these projects would have the following impact: Parks and Recreation Board Recommendations The Parks and Rec Board reviewed the proposed 2024 CIP and provided the following recommendations (some of these overlap with already prioritized projects): Page 10 of 26 SP2.Page 50 of 66 CARP Alignment: Staff reviewed the CIP projects for alignment with CARP and presented the analysis to the Environment Board on 9/21/23. Information on the alignment is included as an attachment. Next Steps: While a base evaluation of the CIP has been provided, it still needs further refinement. Staff is seeking feedback from the City Council on the criteria used and if the priorities of specific projects should be adjusted. Based on feedback received, staff will make further adjustments to the CIP. Attachments: 2024 CIP - Prioritized Projects 2024 CIP - Projects Not Yet Prioritized CARP Evaluation Checklist 2024 CIP - CARP Alignment Page 11 of 26 SP2.Page 51 of 66 City of Evanston 2024 Capital Improvement Program Priorized Projects Ward 2023 GO Bonds 2024 GO Bonds Other Funding TOTAL FUNDING Reason for Inclusion Major Projects Street Resurfacing Street Resurfacing, Construction --1,395,000 1,395,000 Water Main Water Main, Construction --6,751,000 6,751,000 Sewer Rehabilitation Street Resurfacing, Water Main, and Sewer 450,000 1,834,000 25,031,000 27,315,000 Chicago Ave, Howard to Davis, Phase II 3, 4, 1 450,000 600,000 -1,050,000 Ongoing Church St Corridor Improvements, Phase II 2,5 -550,000 -550,000 Ongoing Green Bay Road, McCormick to Isabella, Construction 7 --7,400,000 7,400,000 Ongoing Green Bay Road, McCormick to Isabella, Phase III 7 -500,000 560,000 1,060,000 Ongoing Oakton Corridor Traffic Calming Improvements, Construction 8,9 -100,000 -100,000 Ongoing Oakton Corridor Traffic Calming Improvements, Phase III 8,9 -60,000 -60,000 Ongoing Old Glenview Rd Capital Investment, Construction 6 -24,000 -24,000 Ongoing Annual Investment Emergency Water Main Repair, Construction TBD --100,000 100,000 Life-safety Lead Service Line Replacement Annual Program, Construction TBD --3,805,000 3,805,000 Regulatory Lead Service Line Replacement Annual Program, Consulting TBD --300,000 300,000 Regulatory LSLR (Outreach and Comms), Consulting TBD --200,000 200,000 Regulatory LSLR (Program Development and Management), Consulting TBD --200,000 200,000 Regulatory LSLR Pilot, Construction 5, 8 --1,700,000 1,700,000 Regulatory LSLR Pilot, Consulting TBD --550,000 550,000 Regulatory Annual Investment CIPP Rehabilitation, Construction All --775,000 775,000 Annual Investment CSO Outlet Rehab, Consulting 5, 2 --200,000 200,000 Non-GO bond funding Davis St Alley Repair (Ongoing), Construction 4 --150,000 150,000 Non-GO bond funding Drainage Structure Lining, Construction All --175,000 175,000 Annual Investment Emergency Sewer Repairs, Construction TBD --100,000 100,000 Life-safety Repairs for Water Main Improvements, Construction 4,6,7,8 --210,000 210,000 Annual Investment Sewer Extension for Alley Improvements, Construction 2,5,7 --160,000 160,000 Annual InvestmentPage 12 of 26SP2.Page 52 of 66 City of Evanston 2024 Capital Improvement Program Priorized Projects Ward 2023 GO Bonds 2024 GO Bonds Other Funding TOTAL FUNDING Reason for Inclusion Major Projects Street Resurfacing, Water Main, and Sewer 450,000 1,834,000 25,031,000 27,315,000 Chicago Ave, Howard to Davis, Phase II 3, 4, 1 450,000 600,000 -1,050,000 Ongoing Stormwater Master Plan Improvements, Construction TBD -300,000 300,000 Non-GO bond funding Bus Stop ADA Improvements, Construction TBD -50,000 -50,000 Regulatory Bus Stop ADA Improvements, Phase III TBD -50,000 -50,000 Regulatory Church/Dodge Lighting Modernization, Construction 2,5 --365,000 365,000 Ongoing Davis/Lake Street Viaduct, Construction 4 -125,000 -125,000 Ongoing Fiber Optic System Upgrades, Construction -500,000 -500,000 Annual Investment Street Evaluation and Rating, Phase I All --150,000 150,000 Non-GO bond funding Traffic Signal, Central and Central Park, Construction 6 -350,000 -350,000 Ongoing Traffic Signal, Central and Central Park, Phase III 6 -50,000 -50,000 Ongoing Bridge Inspection, Consulting All -10,000 -10,000 Regulatory Crosswalk Improvements, Construction TBD --210,000 210,000 Non-GO bond funding General Phase I Engineering, Phase I TBD -30,000 60,000 90,000 Annual Investment Streetlight LED Conversion, Construction TBD --150,000 150,000 Annual Investment Streetlight Pole and Fixture Replacement, Construction TBD -300,000 -300,000 Annual Investment Traffic Calming, Bicycle & Ped Improvements, Construction TBD -250,000 -250,000 Annual Investment Annual Investment Sidewalk - Safe Routes to School, Construction 2,3,4,6,7 ,8,9 -65,000 250,000 315,000 Non-GO bond funding Sidewalk - Safe Routes to School, Phase III 2,3,4,6,7 ,8,9 -90,000 -90,000 Non-GO bond funding Sidewalk Gap Infill, Construction TBD -300,000 -300,000 Annual Investment Sidewalk Improvement Program, Construction TBD -300,000 100,000 400,000 Annual Investment Other Transportation -2,922,500 3,237,500 6,160,000 Major Projects Annual Projects Alley Paving, Construction, SUBTOTAL -452,500 952,500 1,405,000 Sidewalk ProjectsPage 13 of 26SP2.Page 53 of 66 City of Evanston 2024 Capital Improvement Program Priorized Projects Ward 2023 GO Bonds 2024 GO Bonds Other Funding TOTAL FUNDING Reason for Inclusion Major Projects Street Resurfacing, Water Main, and Sewer 450,000 1,834,000 25,031,000 27,315,000 Chicago Ave, Howard to Davis, Phase II 3, 4, 1 450,000 600,000 -1,050,000 Ongoing Sidewalk/Streetlight Improvements - Hartrey and Greenleaf, Construction 2 --1,000,000 1,000,000 Ongoing Beck Park Expansion/Shore School, Consulting 5 -90,000 -90,000 Ongoing Dog Beach ADA Accessibility, Construction 1 -500,000 -500,000 Regulatory Fountain Square Improvements, Construction 1 -2,800,000 -2,800,000 Ongoing Pooch Park Capital Investment, Construction N/A -120,000 120,000 Ongoing Independence Park, Construction 7 -1,700,000 500,000 2,200,000 Ongoing Larimer Park, Construction 4 -1,500,000 -1,500,000 Ongoing ADA Improvements in Parks, Construction All -100,000 -100,000 Regulatory Court Rehabilitation, Construction TBD -200,000 -200,000 Annual Investment Fence Replacement (Various Parks), Construction TBD -100,000 -100,000 Annual Investment Parks Contingency, Construction All -100,000 -100,000 Annual Investment Pathway improvements, Construction TBD -300,000 -300,000 Annual Investment Playground Equipment Replacement, Construction TBD 600,000 450,000 1,050,000 Annual Investment Ecology Center - Renovation, Construction 7 -2,100,000 -2,100,000 Life-safety Service Center - North Island Fuel System Replacement, Construction 5 -1,700,000 -1,700,000 Ongoing Service Center - Various Roofs, Construction 5 1,600,000 1,600,000 Building Envelope Service Center - Structural Repairs, Construction 5 -180,000 -180,000 Life-safety Service Center - Structural Repairs, Consulting 5 -50,000 -50,000 Life-safety Parks -8,110,000 950,000 9,060,000 Facilities -8,780,000 -8,780,000 Community Parks Neighborhood Parks - Legacy Neighborhood Parks Investment and Modernization Facilities - LegacyPage 14 of 26SP2.Page 54 of 66 City of Evanston 2024 Capital Improvement Program Priorized Projects Ward 2023 GO Bonds 2024 GO Bonds Other Funding TOTAL FUNDING Reason for Inclusion Major Projects Street Resurfacing, Water Main, and Sewer 450,000 1,834,000 25,031,000 27,315,000 Chicago Ave, Howard to Davis, Phase II 3, 4, 1 450,000 600,000 -1,050,000 Ongoing Facilities - Non-Legacy Investment and Modernization Chandler - Building Envelope Rehabilitation, Construction 7 -400,000 -400,000 Building Envelope Fleetwood - Envelope Repairs, Construction 350,000 350,000 Building Envelope -600,000 600,000 Building Envelope ADA Improvements, Construction TBD -300,000 -300,000 Regulatory Citywide Roof Repairs (locations to be determined), Construction TBD -600,000 -600,000 Annual Investment Facilities Contingency, Construction All -600,000 -600,000 Annual Investment Lighting Modernization, Construction TBD -300,000 -300,000 Annual Investment City Fleet Charging Infrastructure, Construction -450,000 -450,000 Annual Investment Public Art, Construction -30,000 -30,000 Annual Investment Public Vehicle Charging Stations, Construction -100,000 -100,000 Annual Investment 36"/42" Intake Replacement, Construction --39,079,000 39,079,000 Ongoing 36"/42" Intake Replacement, Consulting All --600,000 600,000 Ongoing Boiler Rehabilitation, Construction All --120,000 120,000 Non-GO bond funding CMMS System, Construction All --200,000 200,000 Non-GO bond funding Corrosion Control Improvements, Consulting All --200,000 200,000 Non-GO bond funding East Filter Plant Reliability, Consulting All --1,000,000 1,000,000 Non-GO bond funding East Filter Safety Rails, Construction All --250,000 250,000 Non-GO bond funding Fire Sprinkler System Upgrade 1, Construction All --75,000 75,000 Life-safety Generator and Switchgear Rehab , Consulting All --300,000 300,000 Ongoing Generator and Switchgear Rehab, Construction All --2,000,000 2,000,000 Ongoing HL 7 Engine Replacement, Construction All --1,000,000 1,000,000 Non-GO bond funding 5 Fire Station 5 - Building Envelope Repairs, Construction 6 Miscellaneous -580,000 -580,000 Water Treatment, Billing and Storage --49,294,000 49,294,000Page 15 of 26SP2.Page 55 of 66 City of Evanston 2024 Capital Improvement Program Priorized Projects Ward 2023 GO Bonds 2024 GO Bonds Other Funding TOTAL FUNDING Reason for Inclusion Major Projects Street Resurfacing, Water Main, and Sewer 450,000 1,834,000 25,031,000 27,315,000 Chicago Ave, Howard to Davis, Phase II 3, 4, 1 450,000 600,000 -1,050,000 Ongoing Retail Water Meter Replacement Program Phase 2 & MIU, Construction --2,420,000 2,420,000 Non-GO bond funding Shoreline Improvements, Consulting 7 --200,000 200,000 Non-GO bond funding Shorewell Safety Rails, Consulting All --50,000 50,000 Non-GO bond funding Standpipe Water Quality, Construction 6, 9 --1,200,000 1,200,000 Non-GO bond funding Standpipe Water Quality, Consulting 6, 9 --300,000 300,000 Non-GO bond funding West Plant Dehumidificatinon, Construction All -300,000 300,000 Non-GO bond funding Street Resurfacing 450,000 1,834,000 25,031,000 27,315,000 Other Transportation -2,922,500 3,237,500 6,160,000 Parks -8,110,000 950,000 9,060,000 Facilities Projects -8,780,000 -8,780,000 Miscellaneous -580,000 -580,000 Water Treatment, Billing and Storage --49,294,000 49,294,000 SUB -TOTAL 450,000 22,226,500 78,512,500 100,000 100,000 200,000 200,000 200,000 200,000 50,000 50,000 SUB -TOTAL -550,000 -550,000 TOTAL (Including Library Projects)450,000 22,776,500 78,512,500 101,189,000 101,739,000 SUMMARY LIBRARY (not evaluated)550,000 Main Library Exterior Stonework Restoration, Construction 3 Main Library Fire System Upgrade, Construction 3 Main Library Interior Painting, Construction 3 Robert Crown Branch Library Interior Reorganization, Construction 4Page 16 of 26SP2.Page 56 of 66 City of Evanston 2024 Capital Improvement Program Projects Not Yet Priorized Ward 2023 GO Bonds 2024 GO Bonds Other Funding TOTAL FUNDING Reason for Inclusion Major Projects Community Parks Neighborhood Parks - Legacy Neighborhood Parks Facilities - Legacy Facilities - Non-Legacy Street Resurfacing, Water Main, and Sewer -460,000 -460,000 Parks -1,755,000 -1,755,000 - Facilities -7,620,000 90,000 9,150,000 Lincoln Street, Sheridan to Green Bay Rd, Ped and Bike Impr, Phase I 7 -300,000 -300,000 Not Prioritized Main Street, Hartrey to Asbury, Phase II 4, 9, 3 -160,000 -160,000 Not Prioritized Canal Park Environmental Assessment, Consulting 2, 5, 7 -50,000 -50,000 Not Prioritized Clark Square Dog Park, Construction 3 -400,000 -400,000 Not Prioritized James Park - Fencing, Construction 8 -120,000 -120,000 Not Prioritized James Park - PIckleball Courts, Construction 8 -350,000 -350,000 Not Prioritized Lovelace Park Parking Lot Expansion, Consulting 6 -40,000 -40,000 Not Prioritized Cartright Park - Improvements, Consulting 6 -150,000 -150,000 Not Prioritized Chandler Tot Lot, Construction 7 -150,000 -150,000 Not Prioritized Fitzsimons Park Renovations, Consulting 4 -100,000 -100,000 Not Prioritized Philbrick Park Renovation, Consulting 5 -115,000 -115,000 Not Prioritized Grey Park - Dog Park Installation, Construction 4 -280,000 -280,000 Not Prioritized Civic Center Improvements, Consulting 5 -1,500,000 -1,500,000 Not Prioritized Police Fire HQ - Chiller Replacement, Construction 4 -500,000 -500,000 Not Prioritized Police/Fire HQ Improvements, Consulting 4 -1,500,000 -1,500,000 Not Prioritized Service Center - Renovations, Consulting 5 -800,000 -800,000 Not Prioritized Service Center - Various Roofs, Construction 5 160,000 -1,600,000 Not Prioritized Not PrioritizedPage 17 of 26SP2.Page 57 of 66 City of Evanston 2024 Capital Improvement Program Projects Not Yet Priorized Ward 2023 GO Bonds 2024 GO Bonds Other Funding TOTAL FUNDING Reason for Inclusion Major Projects Street Resurfacing, Water Main, and Sewer -460,000 -460,000 Bent Park Fieldhouse Improvements, Construction 6 -510,000 90,000 600,000 Not Prioritized Bent Park Fieldhouse Improvements, Consulting 6 -100,000 -100,000 Not Prioritized Chandler - Gym Upgrades, Construction 7 -400,000 -400,000 Not Prioritized Citywide Building Automation System Upgrade, Construction TBD -250,000 -250,000 Not Prioritized Fire Station 3 - Interior Renovations (Kitchen, Finishes), Construction 7 -400,000 -400,000 Not Prioritized Fire Stations 1 & 3 Locker Room Improvements, Construction 5, 7 -350,000 -350,000 Not Prioritized Fleetwood - East/North Site Improvements, Construction 5 -400,000 -400,000 Not Prioritized Fleetwood Jourdain Study, Consulting 5 -250,000 -250,000 Not Prioritized Levy Center - Kitchen Renovation, Construction 8 -400,000 -400,000 Not Prioritized Municipal Storage Center - Renovation, Consulting 8 -100,000 -100,000 Not Prioritized City Solar Infrastructure, Construction -100,000 -100,000 Not Prioritized Environmental Justice Initiative Study, Study All -100,000 -100,000 Not Prioritized Street Resurfacing -460,000 - Other Transportation Parks -1,755,000 - Facilities -7,620,000 90,000 Miscellaneous -200,000 - Water Treatment, Billing and Storage --- TOTAL -90,00010,035,000 Miscellaneous -200,000 - SUMMARYPage 18 of 26SP2.Page 58 of 66 Reduce municipal carbon footprint, water use and waste Increase municipal renewable energy, recycling and composting rates Promote right-sizing, green infrastructure, natural landscaping and trees Align planning, purchasing, investment and advocacy decisions with CARP Promote net zero emissions building standards and energy codes, retro-commissioning and energy audit policies, energy and water benchmarking, residential and nonresidential energy and water efficiency initiatives, and related incentive programs citywide Promote community choice aggregation, community solar, and other renewable energy generation projects and incentives citywide Prevent waste generation and reduce the amount of materials destined for landfills Increase donations, repair, reuse, recycling and composting Expand safe, convenient and complete networks for bicycles, pedestrians and transit Revise building code to reduce parking Promote mixed use zoning; electric vehicle charging station installation Reduce vehicle miles traveled and vehicle idling Promote all-electric vehicle acquisition for transit and rideshare companies Phase out the use of gas- and propane-powered equipment Promote tree planting on public and private property; protect, conserve, preserve and expand natural areas throughout the city; promote ecological land management practices Reduce pesticide and chemical fertilizer use Promote environmental education and community gardens Support CARP-related sustainable businesses recognition, citywide participatory data collection, awareness campaigns and fundraising efforts MUNICIPAL OPERATIONS RENEWABLE ENERGY BUILDING EFFICIENCY ZERO WASTE TRANSPORTATION & MOBILITY URBAN CANOPY & GREEN SPACE EDUCATION & OUTREACH EVANSTON CLIMATE ACTION AND RESILIENCE PLAN (CARP) PRINCIPLES Page 19 of 26 SP2.Page 59 of 66 Educate residents about the local impacts of climate change Enhance community networks and connections for vulnerable populations Enhance stormwater systems and eliminate combined sewer overflows Invest in green infrastructure and investigate incentives Promote native landscaping, tree planting, habitat restoration and conservation Encourage rain gardens on private property; avoid turf grass Establish cooling centers Improve access to cooling assets like parks and beaches; plant shade trees Educate the public about the dangers of extreme heat Improve indoor air quality Incorporate climate resilient strategies in City policies and practices Reduce vulnerability to flooding Revise building codes to reduce threats to wildlife Allow for non-potable water reuse Maintain a community resilience plan Improve the resilience of emergency response and communications systems Ensure facilities that serve vulnerable populations are resilient to climate hazards Identify current and future vulnerable populations Identify ways the City can help vulnerable populations access resources for household energy efficiency improvements and protection from financial strain caused by climate hazards Promote environmental justice Conduct outreach Increase City personnel dedicated to sustainability Provide community updates on CARP implementation Explore innovative financing Expand communitywide partnerships GREEN INFRASTRUCTURE RESILIENCE REGULATIONS HEALTH IMPACTS OF EXTREME HEAT COMMUNITY NETWORKS EMERGENCY PREPAREDNESS & MANAGEMENT VULNERABLE POPULATIONS IMPLEMENTATION, ACCOUNTABILITY & PARTNERSHIPS EVANSTON CLIMATE ACTION AND RESILIENCE PLAN (CARP) PRINCIPLES Page 20 of 26 SP2.Page 60 of 66 1 Proposed 2024 Capital Improvement Program CARP Alignment - Preliminary Analysis Climate Mitigation Climate Resilience LEGEND TOTAL FUNDING Supports a CARP Goal MO BE RE ZW T&M UC&GS EO GI HI RR CN EPM VP IAP Major Projects 3 300,000 4 450,000 4 550,000 4 160,000 4 1,060,000 4 7,400,000 4 300,000 4 3,350,000 2 24,000 Street Resurfacing 233,000 Water Main -- -- -- -- 3 100,000 -- -- 4 641,000 Sewer Rehabilitation 4 200,000 MO = Municipal Operations T&M = Trans & Mobility GI = Green Infrastructure EPM = Emergency Preparedness BE = Building Efficiency UC&GS = Urban Canopy HI = Health Impacts & Management RE = Renewable Energy & Green Space RR = Resilience Regulations VP = Vulnerable Populations ZW = Zero Waste EO = Education & Outreach CN = Community Networks IAP = Implement, Account, Partner 1 300,000 Yes X X X 2 Chicago Ave, Howard to Davis, Phase II 450,000 Yes X X X X 3 Church St Corridor Improvements, Phase II 550,000 Yes X X X X 4 Main Street, Hartrey to Asbury, Phase II 160,000 Yes X X X X 5 1,060,000 Yes X X X X 6 7,400,000 Yes X X X X 7 300,000 Yes X X X X 8 3,350,000 Yes X X X X 24,000 Yes X X 9 Street Resurfacing, Construction 233,000 Yes X 1 10 LSLR (Outreach and Comms), Consulting 200,000 11 200,000 12 LSLR Pilot, Consulting 550,000 13 300,000 14 Emergency Water Main Repair, Construction 100,000 Yes X X X 15 LSLR Pilot, Construction 1,700,000 16 3,805,000 17 Water Main, Construction 641,000 Yes X X X X 18 CSO Outlet Rehab, Consulting 200,000 Yes X X X X Lincoln Street, Sheridan to Green Bay Rd, Ped an Green Bay Road, McCormick to Isabella, Phase I Green Bay Road, McCormick to Isabella, Constru Oakton Corridor Traffic Calming Improvements, P Oakton Corridor Traffic Calming Improvements, C Old Glenview Rd Capital Investment, Constructio LSLR (Program Development and Management), Lead Service Line Replacement Annual Program Lead Service Line Replacement Annual Program Octo Total Goals Met Spend on CARP Aligned Projects Street Resurfacing, Water Main, and SewerPage 21 of 26SP2.Page 61 of 66 2 Proposed 2024 Capital Improvement Program CARP Alignment - Preliminary Analysis Climate Mitigation Climate Resilience LEGEND TOTAL FUNDING Supports a CARP Goal MO BE RE ZW T&M UC&GS EO GI HI RR CN EPM VP IAP MO = Municipal Operations T&M = Trans & Mobility GI = Green Infrastructure EPM = Emergency Preparedness BE = Building Efficiency UC&GS = Urban Canopy HI = Health Impacts & Management RE = Renewable Energy & Green Space RR = Resilience Regulations VP = Vulnerable Populations ZW = Zero Waste EO = Education & Outreach CN = Community Networks IAP = Implement, Account, Partner Octo Total Goals Met Spend on CARP Aligned Projects 19 CIPP Rehabilitation, Construction 775,000 Yes X X X X 20 Davis St Alley Repair (Ongoing), Construction 150,000 Yes X X X 21 Drainage Structure Lining, Construction 175,000 Yes X X X X 22 Emergency Sewer Repairs, Construction 100,000 Yes X X 23 210,000 Yes X X X 24 160,000 Yes X X X 25 300,000 Yes X X X 26 Street Evaluation and Rating, Phase I 150,000 27 Bus Stop ADA Improvements, Phase III 50,000 Yes X X 29 Bus Stop ADA Improvements, Construction 50,000 Yes X X 30 215,000 Yes X X X 31 Davis/Lake Street Viaduct, Construction 75,000 Yes X X 32 Fiber Optic System Upgrades, Construction 500,000 Yes X 28 Traffic Signal, Central and Central Park, Phase III 50,000 Yes X X X 33 350,000 Yes X X X 34 General Phase I Engineering, Phase I 80,000 Yes X X X 35 Bridge Inspection, Consulting 10,000 Yes X X 36 Crosswalk Improvements, Construction 210,000 Yes X X 37 Streetlight LED Conversion, Construction 50,000 Yes X X 38 120,000 Yes X X 39 225,000 Yes X X Repairs for Water Main Improvements, Construc Sewer Extension for Alley Improvements, Constr Stormwater Master Plan Improvements, Constru Church/Dodge Lighting Modernization, Construc Traffic Signal, Central and Central Park, Construc Streetlight Pole and Fixture Replacement, Constr Traffic Calming, Bicycle & Ped Improvements, Co 4 775,000 3 150,000 4 175,000 2 100,000 3 210,000 3 160,000 3 300,000 Major Projects -- -- 2 50,000 2 50,000 3 215,000 2 75,000 1 500,000 3 50,000 3 350,000 Annual Projects 3 80,000 2 10,000 2 210,000 2 50,000 2 120,000 2 225,000 Other TransportationPage 22 of 26SP2.Page 62 of 66 3 Proposed 2024 Capital Improvement Program CARP Alignment - Preliminary Analysis Climate Mitigation Climate Resilience LEGEND TOTAL FUNDING Supports a CARP Goal MO BE RE ZW T&M UC&GS EO GI HI RR CN EPM VP IAP MO = Municipal Operations T&M = Trans & Mobility GI = Green Infrastructure EPM = Emergency Preparedness BE = Building Efficiency UC&GS = Urban Canopy HI = Health Impacts & Management RE = Renewable Energy & Green Space RR = Resilience Regulations VP = Vulnerable Populations ZW = Zero Waste EO = Education & Outreach CN = Community Networks IAP = Implement, Account, Partner Octo Total Goals Met Spend on CARP Aligned Projects 40 Alley Paving, Construction 750,000 Yes X X X 41 Sidewalk - Safe Routes to School, Phase III 90,000 Yes X 42 Sidewalk - Safe Routes to School, Construction 50,000 Yes X 43 Sidewalk Gap Infill, Construction 600,000 Yes X X 44 Sidewalk Improvement Program, Construction 650,000 Yes X 45 1,000,000 Yes X X 46 Beck Park Expansion/Shore School, Consulting 205,000 Yes X X X X X X X X 47 50,000 48 40,000 Yes X X 49 Clark Square Dog Park, Construction 400,000 Yes X 50 Dog Beach ADA Accessibility, Construction 500,000 Yes X X X X X X X X 51 Fountain Square Improvements, Construction 2,800,000 Yes X 52 James Park - Fencing, Construction 120,000 53 James Park - Pickleball Courts, Construction 350,000 54 Pooch Park Capital Investment, Construction 120,000 Yes X 55 Cartright Park - Improvements, Consulting 150,000 Yes X X X X X X X 56 Fitzsimons Park Renovations, Consulting 100,000 Yes X X X X X X 57 Philbrick Park Renovation, Consulting 115,000 Yes X X X X X X 58 Chandler Tot Lot, Construction 150,000 Yes X X 59 Independence Park, Construction 2,200,000 Yes X X X X X X X Sidewalk/Streetlight Improvements - Hartrey and Canal Park Environmental Assessment, Consulti Lovelace Park Parking Lot Expansion, Consulting 3 750,000 Sidewalk Projects 1 90,000 1 50,000 2 600,000 1 650,000 2 1,000,000 Community Parks 8 205,000 -- 2 40,000 1 400,000 8 500,000 1 2,800,000 -- -- 1 120,000 Neighborhood Parks - Legacy 7 150,000 6 100,000 6 115,000 2 150,000 7 2,200,000 Parks -Page 23 of 26SP2.Page 63 of 66 4 Proposed 2024 Capital Improvement Program CARP Alignment - Preliminary Analysis Climate Mitigation Climate Resilience LEGEND TOTAL FUNDING Supports a CARP Goal MO BE RE ZW T&M UC&GS EO GI HI RR CN EPM VP IAP MO = Municipal Operations T&M = Trans & Mobility GI = Green Infrastructure EPM = Emergency Preparedness BE = Building Efficiency UC&GS = Urban Canopy HI = Health Impacts & Management RE = Renewable Energy & Green Space RR = Resilience Regulations VP = Vulnerable Populations ZW = Zero Waste EO = Education & Outreach CN = Community Networks IAP = Implement, Account, Partner Octo Total Goals Met Spend on CARP Aligned Projects 60 Larimer Park, Construction 1,500,000 Yes X X X X X X X 61 Grey Park - Dog Park Installation, Construction 280,000 Yes X 62 ADA Improvements in Parks, Construction 100,000 Yes X X X X 63 Court Rehabilitation, Construction 200,000 64 100,000 65 Parks Contingency, Construction 100,000 Yes X 66 Pathway improvements, Construction 300,000 Yes X X X X 67 1,050,000 Yes X 68 Civic Center Improvements, Consulting 1,500,000 Yes X X X X X X 69 Ecology Center - Renovation, Construction 1,500,000 Yes X X X 70 Police/Fire HQ Improvements, Consulting 1,500,000 Yes X X X X X X 71 Service Center - Structural Repairs, Consulting 50,000 Yes X X X 72 500,000 Yes X X 73 1,700,000 Yes X X X 74 Service Center - Renovations, Consulting 200,000 Yes X X X X X 75 180,000 Yes X X X 76 Service Center - Various Roofs, Construction 1,600,000 Yes X X 77 Bent Park Fieldhouse Improvements, Consulting 100,000 Yes X X X 78 600,000 Yes X X X Fence Replacement (Various Parks), Constructio Playground Equipment Replacement, Constructio Police Fire HQ - Chiller Replacement, Constructio Service Center - North Island Fuel System Replac Service Center - Structural Repairs, Construction Bent Park Fieldhouse Improvements, Constructio 7 1,500,000 Neighborhood Parks - Non-Legacy 1 280,000 Investment and Modernization 4 100,000 -- -- 1 100,000 4 300,000 1 1,050,000 Facilities - Legacy 6 1,500,000 3 1,500,000 6 1,500,000 3 50,000 2 500,000 3 1,700,000 5 200,000 3 180,000 2 1,600,000 Facilities - Non-Legacy 3 100,000 3 600,000 FacilitiesPage 24 of 26SP2.Page 64 of 66 5 Proposed 2024 Capital Improvement Program CARP Alignment - Preliminary Analysis Climate Mitigation Climate Resilience LEGEND TOTAL FUNDING Supports a CARP Goal MO BE RE ZW T&M UC&GS EO GI HI RR CN EPM VP IAP MO = Municipal Operations T&M = Trans & Mobility GI = Green Infrastructure EPM = Emergency Preparedness BE = Building Efficiency UC&GS = Urban Canopy HI = Health Impacts & Management RE = Renewable Energy & Green Space RR = Resilience Regulations VP = Vulnerable Populations ZW = Zero Waste EO = Education & Outreach CN = Community Networks IAP = Implement, Account, Partner Octo Total Goals Met Spend on CARP Aligned Projects 79 400,000 Yes X X 80 Chandler - Gym Upgrades, Construction 400,000 81 250,000 Yes X X 82 400,000 Yes X X X X 83 Fleetwood - Envelope Repairs, Construction 350,000 Yes X X X 84 Fleetwood Jourdain Study, Consulting 250,000 Yes X X X X 85 400,000 Yes X X 86 600,000 Yes X X X 87 350,000 Yes X X 88 Levy Center - Kitchen Renovation, Construction 400,000 Yes X X 89 100,000 Yes X X X X 90 ADA Improvements, Construction 300,000 Yes X 91 600,000 Yes X X X 92 Facilities Contingency, Construction 600,000 93 Lighting Modernization, Construction 300,000 Yes X X 94 City Fleet Charging Infrastructure, Construction 100,000 Yes X X X X X X 95 City Solar Infrastructure, Construction 200,000 Yes X X X X X 96 Environmental Justice Initiative Study, Study 100,000 Yes X X X X X 97 Public Vehicle Charging Stations, Construction 100,000 Yes X X X X 98 Public Art, Construction 30,000 99 36"/42" Intake Replacement, Consulting 600,000 Yes X X Chandler - Building Envelope Rehabilitation, Cons Citywide Building Automation System Upgrade, C Fleetwood - East/North Site Improvements, Cons Fire Station 3 - Interior Renovations (Kitchen, Fin Fire Station 5 - Building Envelope Repairs, Constr Fire Stations 1 & 3 Locker Room Improvements, Municipal Storage Center - Renovation, Consultin Citywide Roof Repairs (locations to be determine 2 400,000 -- 2 250,000 4 400,000 3 350,000 4 250,000 2 400,000 3 600,000 2 350,000 2 400,000 4 100,000 Investment and Modernization 1 300,000 3 600,000 -- 2 300,000 6 100,000 5 200,000 5 100,000 4 100,000 -- 2 600,000 Miscellaneous Water Treatment, Billing and StoragePage 25 of 26SP2.Page 65 of 66 6 Proposed 2024 Capital Improvement Program CARP Alignment - Preliminary Analysis Climate Mitigation Climate Resilience LEGEND TOTAL FUNDING Supports a CARP Goal MO BE RE ZW T&M UC&GS EO GI HI RR CN EPM VP IAP MO = Municipal Operations T&M = Trans & Mobility GI = Green Infrastructure EPM = Emergency Preparedness BE = Building Efficiency UC&GS = Urban Canopy HI = Health Impacts & Management RE = Renewable Energy & Green Space RR = Resilience Regulations VP = Vulnerable Populations ZW = Zero Waste EO = Education & Outreach CN = Community Networks IAP = Implement, Account, Partner Octo Total Goals Met Spend on CARP Aligned Projects 100 36"/42" Intake Replacement, Construction 39,079,000 Yes X X 101 Boiler Rehabilitation, Construction 120,000 Yes X 102 CMMS System, Construction 200,000 Yes X 103 Corrosion Control Improvements, Consulting 200,000 Yes X X X 104 East Filter Plant Reliability, Consulting 1,000,000 Yes X X 105 East Filter Safety Rails, Construction 250,000 Yes X 106 Fire Sprinkler System Upgrade 1, Construction 75,000 Yes X 107 Generator and Switchgear Rehab , Consulting 300,000 Yes X X 108 Generator and Switchgear Rehab, Construction 2,000,000 Yes X X 109 HL 7 Engine Replacement, Construction 1,000,000 Yes X X X 110 2,420,000 Yes X 111 Shoreline Improvements, Consulting 200,000 Yes X X X 112 Shorewell Safety Rails, Consulting 50,000 Yes X 113 Standpipe Water Quality, Consulting 300,000 Yes X X 114 Standpipe Water Quality, Construction 1,200,000 Yes X X 115 West Plant Dehumidificatinon, Construction 300,000 Yes X 116 100,000 Yes X X 117 Main Library Fire System Upgrade, Construction 200,000 Yes X X 118 Main Library Interior Painting, Construction 200,000 119 50,000 Retail Water Meter Replacement Program Phase Main Library Exterior Stonework Restoration, Con Robert Crown Branch Library Interior Reorganiza 2 39,079,000 1 120,000 1 200,000 3 200,000 2 1,000,000 1 250,000 1 75,000 2 300,000 2 2,000,000 3 1,000,000 1 2,420,000 3 200,000 1 50,000 2 300,000 2 1,200,000 1 300,000 2 100,000 2 200,000 -- -- - Library TOTAL 105,102,000 103 42 2 3 2 39 8 2 18 36 39 6 57 42 4 0 96,097,000Page 26 of 26SP2.Page 66 of 66