Loading...
HomeMy WebLinkAbout09.18.23 AGENDA City Council Monday, September 18, 2023 Lorraine H. Morton Civic Center, James C. Lytle City Council Chambers, Room 2800 6:00 PM Join Zoom Meeting: https://us06web.zoom.us/j/84172405332?pwd=Y0xMYU5lejR6ZW8rVFZ4cW9KdGV6QT09 Meeting ID: 841 7240 5332 Passcode: 162092 Those wishing to make public comments at the Administrative & Public Works Committee, Planning & Development Committee or City Council meetings may submit written comments in advance or sign up to provide public comment by phone or video during the meeting by completing the City Clerk's Office's online form at www.cityofevanston.org/government/city- clerk/public-comment-sign-up or by calling/texting 847-448-4311. Community members may watch the City Council meeting online at www.cityofevanston.org/channel16 or on Cable Channel 16. Page (I) ROLL CALL - COUNCILMEMBER NIEUWSMA (II) MAYOR PUBLIC ANNOUNCEMENTS AND PROCLAMATIONS Parks and Recreation Board CIP Presentation (III) CITY MANAGER PUBLIC ANNOUNCEMENTS (IV) COMMUNICATIONS: CITY CLERK Page 1 of 40 (V) PUBLIC COMMENT Members of the public are welcome to speak at City Council meetings. As part of the Council agenda, a period for public comments shall be offered at the commencement of each regular Council meeting. Public comments will be noted in the City Council Minutes and become part of the official record. Those wishing to speak should sign their name and the agenda item or non -agenda topic to be addressed on a designated participation sheet. If there are five or fewer speakers, fifteen minutes shall be provided for Public Comment. If there are more than five speakers, a period of forty-five minutes shall be provided for all comment, and no individual shall speak longer than three minutes. The Mayor will allocate time among the speakers to ensure that Public Comment does not exceed forty-five minutes. The business of the City Council shall commence forty-five minutes after the beginning of Public Comment. Councilmembers do not respond during Public Comment. Public Comment is intended to foster dialogue in a respectful and civil manner. Any person who makes such remarks, or who utters loud, threatening, personal or abusive language, or engages in any other disorderly conduct which disrupts, disturbs or otherwise impedes the orderly conduct of a meeting shall, at the discretion of the mayor or presiding officer, be barred from further participation during that meeting. Public comments are requested to be made with these guidelines in mind. (VI) SPECIAL ORDERS OF BUSINESS SP1. Capital Improvement Program Funding Staff is requesting the City Council provide specific direction on funding ongoing capital improvement projects and projects going into the future. The attached memo includes a summary of potential funding sources that could be used to fund projects, including issuance of General Obligation Bonds, use of a line of credit, or other revenue sources. For Discussion Capital Improvement Program Funding 4 - 6 SP2. Water Fund Update Staff requests that the City Council provide direction on the next steps related to maintaining an appropriate fund balance in the Water Fund, increasing the water rate in order to generate additional revenue for lead service line replacements, and doubling the amount of annual water main replacements. For Discussion Water Fund Update 7 - 17 Page 2 of 40 SP3. Update on the 2023 Capital Improvement Program Staff will provide an update on the 2023 Capital Improvement Program to accept and place on file. For Action: Accept and Place on File 2023 CIP Status Update 18 - 26 SP4. Proposed 2024 Capital Improvement Program Staff will provide an overview of the proposed 2024 Capital Improvement Program for discussion. For Discussion Proposed 2024 Capital Improvement Program 27 - 40 (VII) CALL OF THE WARDS (Councilmembers shall be called upon by the Mayor to announce or provide information about any Ward or City matter which a Councilmember desires to bring before the Council.) {Council Rule 2.1(10)} (VIII) EXECUTIVE SESSION (IX) ADJOURNMENT Page 3 of 40 Memorandum To: Honorable Mayor and Members of the City Council From: Hitesh Desai, Chief Financial Officer/Treasurer Subject: Capital Improvement Program Funding Date: September 18, 2023 Recommended Action: Staff is requesting the City Council provide specific direction on funding ongoing capital improvement projects and projects going into the future. The attached memo includes a summary of potential funding sources that could be used to fund projects, incl uding issuance of General Obligation Bonds, use of a line of credit, or other revenue sources. Council Action: For Discussion Summary: Over the past two years, the City Council has approved two bond reimbursement resolutions allowing the City to spend money on CIP projects from potential future bond issuances. These resolutions totaled $28,634,000 and were intended as a temporary measure to allow the City to time the purchase of General Obligation (GO) bonds in order to get a good interest rate or identify an alternative funding source. These resolutions are summarized below: The City has not issued GO bonds since August 2021, but the projects approved by the City Council as a part of the 2022 and 2023 budgets are ongoing. In most cases, significant payments have been made to the contractors/vendors towards the projects' costs. This has greatly impacted the cash flow of some of the funds. In a memo dated August 29, 2023, to the Finance and Budget Committee, staff indicated that $6.6 million and $12.5 million are needed for the capital improvement projects awarded in FY2022 and FY2023. Thus far, the City Council SP1.Page 4 of 40 has not approved a different funding source for these projects other than the eventual sale of GO bonds. As of July 31, the Capital Improvement Fund has a fund balance of $2,077,967 and a cash balance of $8,028,532. A portion of these balances, $3,264,226, are funds restricted to four projects awarded in 2023 that were approved over budget and had a transfer from the General Fund for the excess cost; this cash transfer to fund the cost overage was deposited in the Capital Improvement Fund and is artificially propping up the cash balance. This leaves a negative actual fund balance of ($1,186,259). The Capital I mprovement Fund has a fund balance policy requiring that a reserve be maintained equal to 25% of expenses. The policy further states that this reserve balance "shall be used for the startup costs of the current year capital projects" until bonds are issued. With a negative actual fund balance of ($1,186,259), the current fund balance is well below the reserve of $5.6 million and will only continue to fall further below this reserve until such time that bonds are issued or alternative funding sources are identified. To fund the FY2022 and FY2023 Capital Improvement projects and bring the Capital Improvement Fund reserve amount back to $5.6 million, the staff is recommending the issuance of approximately $25 million in General Obligation bonds. Additionally, the bond issue should also include the bonds necessary to fund 2024 Capital Improvement projects. Since the City Council is currently determining what projects to include in the 2024 CIP, this dollar amount is unknown at this time. Staff recommends that bonds be sold in March 2024 when, hopefully, a better interest rate will be realized as interest rates are currently declining. Possible Funding Sources: The following sources have been considered potential funding sources: Line of Credit: Currently, the City has a line of credit with Byline Bank of $15M with a current rate of 6.52%. This line of credit would allow the City to delay issuing bonds until March 2024 with the hope that interest rates will be lower at that time. General Obligation Bonds: The current true interest cost is estimated at 4.20%. By the end of 2023, the City will have paid $34,090,000 in principal amount and retired the associated debt since bonds were last issued in August 2021. The previous GO Bond payment history from 1/1/21 to 12/31/23 is as follows: General Fund Balance: Based on the last audited report as of December 31, 2022, GF fund balance is at $57M. City Council had approved a balanced 2023 General Fund budget by using Page 2 of 3 SP1.Page 5 of 40 $10M of fund balance. Additionally, throughout 2023, the City Council has approved $8.2M towards unbudgeted CIP project costs and wage increases. Given the wage increases that have been approved by the City Council as well as the new pension policy that will redirect $5 million that was previously available to the General Fund, staff cautions against using excess General Fund reserves as they will be needed to balance the 2024 General Fund budget. Other Source of Revenues: The City Council could direct a new fee/tax or increase any existing fees to go towards funding capital projects. Page 3 of 3 SP1.Page 6 of 40 Memorandum To: Honorable Mayor and Members of the City Council From: Darrell King, Water Production Bureau Chief CC: Edgar Cano, Public Works Agency Director Subject: Water Fund Update Date: September 18, 2023 Recommended Action: Staff requests that the City Council provide direction on the next steps related to maintaining an appropriate fund balance in the Water Fund, increasing the water rate in order to generate additional revenue for lead service line replacements, and doublin g the amount of annual water main replacements. CARP: Municipal Operations Council Action: For Discussion Summary: The Water Production Bureau of the Public Works Agency has been using a cost -of-service rate model to monitor the Water Fund and Sewer Fund since 2009. This model was developed by a consultant when they prepared the Water & Sewer Cost of Service Rate and Fee Study Report dated April 2009. Since then, employees in the Bureau have been updating the model with current information related to both revenues and expenditures and future capital improvement projects. The current financial goals of the water fund are to maintain a minimum cash balance of $4,000,000, keep the debt service expenses to less than 25% of the operating capital while maintaining the water treatment plant in good operating condition and replace or rehabilitate 1% (1.5 miles) of the water distribution system annually. As staff continues to input data into the cost of service model, the model indicates that the Water Fund will be in serious financial trouble within a few years. There are several factors that are placing the financial burden on the water fund, all of which are related to the distribution system: • The cost of water main and lead service line replacement must be borne by the Evanston retail customers. • The need to replace the aging water mains. • The need to replace lead service lines as part of the water main projects. • The need to replace all 11,000+ lead service lines between 2027 and 2047. SP2.Page 7 of 40 • The increased cost of water main construction. FINANCIAL RESPONSIBILITY OF WATER MAIN & LEAD SERVICE LINE REPLACEMENT The distribution system consists of approximately 156 miles of water main, of which 99% is 18" in diameter and smaller and serves only the Evanston retail customers, and all of the lead service lines are only used by Evanston retail customers. Therefore, the cost of replacing this infrastructure must be borne by the Evanston retail customers and ca n not be charged to the wholesale water customers. NEED FOR WATER MAIN REPLACEMENT A significant portion of the Evanston water distribution system was in operation by 1907. These older water mains are generally constructed of heavy wall cast iron pipe and have a maximum life expectancy of 120 years. The newer water mains are constructed of ductile iron pipe and have an anticipated lifespan of 100 years. The illustration below graphically demonstrates the age of Evanston's water mains throughout the distribution system. Page 2 of 11 SP2.Page 8 of 40 As Table 1 below indicates, in 2022, there is only 1.1 miles of water main that is over 120 years of age. However, if the City continues to replace only 1.5 miles of water main annually, by 2042, there will be 26.7 miles of water main over 120 years of age. To prevent having so many miles of water main that are older than the industry-expected life of cast / ductile iron water main, Page 3 of 11 SP2.Page 9 of 40 staff highly recommends changing the goal of annual water main replacement from 1.5 miles to 3.2 miles. Table 1 - Miles of Pipe in Each Age Category (By Year 2042) INCREASED COST OF REPLACING WATER MAINS Table 2 indicates that there was a 41% cost increase for installing water mains between 2019 to 2023. TABLE 2 - 2019 to 2023 Water Main per lineal foot (LF) Cost Increases Staff is also concerned about the replacement of lead service lines that are connected to water mains that are 100+ years old and how this work may cause undesirable water main failures. Experience has indicated that a water main that is disturbed by excavation is far more likely to break than when it is left undisturbed. Excavating 100+-year-old water mains to replace the lead service lines will likely cause frequent water main failures. NEED TO REPLACE LEAD SERVICE LINES The Lead Service Line Replacement and Notification Act adopted by the State of Illinois went into effect on January 1, 2022. This act had an immediate impact on the Water Fund by requiring the replacement of any damaged lead service lines and the full replacement of lead service lines during the installation of new water mains. The act will also have a significant long-term impact on the water fund as well because it requires the replacement of all 11,000+ lead service lines throughout the City over a twenty-year period beginning in 2027. FUNDING WATER MAIN REPLACEMENT AND LEAD SERVICE LINES Page 4 of 11 SP2.Page 10 of 40 Funding for the replacement of water mains and lead service lines will be accomplished through the following sources: 1. Rate increases 2. IEPA State Revolving Fund Loans 3. Bonds abated by the water fund 4. Grants/Principal Loan Forgiveness (not guaranteed) 5. Cash It is imperative that the Water Fund maintains a healthy reserve each year in order to receive low-interest loans from the IEPA for funding critical projects as well as qualifying for the potential LSLR grant funding/principal loan forgiveness (contingent on qualifying for the loan program). As part of the IEPA loan application process, the City has to provide a 5 -year Water Fund projection that is healthy. This includes being able to consistently have a positive balance in the Water Fund adequate to meet the reserve requirements. In addition, without the infusion of bond funds, the staff is unable to provide the IEPA with a Water Fund projection that demonstrates sound financial planning. The Water Fund planned to sell bonds in 2022 and 2023. Neither of these bond issues occurred because they are tied to the sale of GO Bonds, which has been deferred by the City Council. The budgeted bond sale amounts were $6,410,000 in 2022 and $4,933,000 in 2023 (the actual need for 2023 due to bid prices received in 2023 is $6,900,000). This is a total of $13,310,000 for both 2022 & 2023. As a result of the City not selling bonds during 2022 and 2023, the cash reserves in the Water Fund have fallen below the minimum reserve target of $4,000,000 in 2023. In 2024, it turns negative and continues to go further negative each year. The following graph summarizes the impact on the Water Fund as a result of not issuing Water Fund abated bonds during 2022 and 2023 in the amount of $13.3M. The following graph summarizes the impact on the Water Fund had the bonds been issued during 2022 and 2023. Page 5 of 11 SP2.Page 11 of 40 During the September 12, 2023, Finance and Budget committee meeting, staff recommended selling Water Fund abated bonds no later than March of 2024 in the amount of $26.3M (this would include $13.3M for both 2022 and 2023 as well as an additional $13M for 2024). As a result of feedback provided by the Finance and Budget committee, staff has revised the bond amount request for 2024 to $18.1M instead of $26.3M in an effort to prevent the minimum cash reserve of $5.8M from significantly increasing above that level which occurred in the example above that summarized the impact had bonds been issued during 2022 and 2023. The following graph summarizes a fairly consistent fund balance of $5.8M as a result of adjusting the 2024 proposed bond amount and the water rate each year. Page 6 of 11 SP2.Page 12 of 40 REVISED WATER FUND GOALS Staff recommends that the future financial goals of the water fund be modified to: 1. Maintain a minimum cash balance of $5,800,000, which is based on the adopted budget fund policy for the Water Fund (a minimum of 16.6% of expenses shall be maintained as a reserve; in addition, a sufficient reserve shall be maintained to meet debt requirements. A portion of the fund reserve shall be used to fund depreciation and capital improvement needs). 2. Keep debt service expenses associated with the distribution system to less than 25% of the operating capital. 3. Maintain the water treatment plant in good operating condition. 4. Replace or rehabilitate approximately 2% (3.2 miles) of the water distribution system annually. 5. Replace approximately 500 lead service lines each year beginning in 2027. Using the cost-of-service model, staff analyzed several different scenarios of adjusting the water rate to meet these goals. However, because the needed rate increase is so great, the only practical recommendation was to suggest a 13.5% water rate increase each year for the next six years, followed by annual rate increases of 3.5%. This recommendation generates the anticipated revenue to accomplish the revised Water Fund Goals. The proposed bonding amount and water rate increases are listed in Table 3 below. Table 3 - Proposed Bond and Water Rate Increase Page 7 of 11 SP2.Page 13 of 40 NOTES: 1. Rate increase was previously approved for LSLR Workforce Development 2. Part of this rate increase (9.8%) is offset by an equivalent decrease in the sewer rate, resulting in zero impact on the overall utility bill for this portion of the water rate increase. FINANCIAL IMPACT TO RETAIL CUSTOMERS Evanston's water and sewer rates are based on one hundred cubic feet units because its water meters measure water in cubic feet. Municipalities bill in different units, including 100 cubic feet, 1,000 cubic feet, and 1,000 gallons. The rates included in Table 5 in blue indicate cost per 1,000 gallons. The impact of the proposed water rate increases on the average retail customer is shown in Table 4 below. Table 4 - Utility Cost Impact of Rate Increases Page 8 of 11 SP2.Page 14 of 40 CCF= 100 Cubic Feet, kgal = 1,000 Gallons Notes: 1. Calculated based on an average annual residential metered usage of 120 CCF (89,760 gallons) of water with the shown water and sewer rates applied to all usage. 2. Based on six bills per year (bi-monthly billing) This data indicates that the average retail customer will experience a 68% increase in their annual water/sewer bill from 2023 to 2029 when the last 13.5% proposed rate increase is Page 9 of 11 SP2.Page 15 of 40 implemented. The bi-monthly bill will increase from $128.20 to $215.55, and the annual payment will increase from $769.20 to $1,293.30. Community members who qualify for the affordable water and sewer rate will not be impacted by the proposed utility rate increases summarized above. The affordable rate will be reviewed every three years to ensure that the rate remains affordable. Table 5 below compares the proposed Evanston 2024 rate to the 2023 rates in other municipalities. Table 5 - Evanston Combined Water & Sewer Rate Comparison Page 10 of 11 SP2.Page 16 of 40 Page 11 of 11 SP2.Page 17 of 40 1 2023 Capital Improvement Program Project Status Update 9/13/23 Projects Contract Type Year of First Contract Current Project Phase 2023 Budget Notes Street Resurfacing, Water Main, and Sewer Major Projects 1 30" Transmission Main Construction 2017 Complete 7,500 Project complete. 2 Chicago Ave, Howard to Davis Phase II 2020 Planning 450,000 Project started in 2020. The design approval has been given by IDOT, currently awaiting ESR Approval 3 Church St Corridor Improvements Construction 2020 Planning Project ongoing. 4 Green Bay Road, McCormick to Isabella Construction 2019 Design Project ongoing. 5 Main Street, Maple to Hinman Construction 2018 Construction 2,714,500 Construction awarded by IDOT will not start until Spring 2024 to allow time to procure long-lead time materials.6 Main Street, Maple to Hinman Phase III 2018 Construction 267,000 7 Oakton Corridor Traffic Calming Improvements Construction 2020 Construction 3,350,000 Construction ongoing through Spring 2024.8 Oakton Corridor Traffic Calming Improvements Phase III 2020 Construction 300,000 Street Resurfacing 9 Street Resurfacing - Bennett, Colfax to Central Construction 2022 Construction 233,000 Project complete. 10 Street Resurfacing - Central Park, Central to Isabella Construction 2022 Construction 364,000 Project complete. 11 Street Resurfacing - Dobson, Ridge to Elmwood Construction 2022 Construction 93,000 Project complete. 12 Street Resurfacing - Foster, Sherman to Orrington Construction 2022 Construction 109,000 Project complete. 13 Street Resurfacing - Grant, Central Park to Lawndale Construction 2022 Construction 114,000 Project complete. 14 Street Resurfacing - Hartrey, Lyons to Church Construction 2022 Construction 144,000 Project complete. 15 Street Resurfacing - Thayer, Gross Point Rd to Highland Construction 2022 Construction 152,000 Project complete.SP3.Page 18 of 40 2 2023 Capital Improvement Program Project Status Update 9/13/23 Projects Contract Type Year of First Contract Current Project Phase 2023 Budget Notes Water Main 16 Water Main - Brown, Lee to Greenleaf Construction 2022 Construction 641,000 Construction ongoing. 17 Water Main - Chicago, Hamilton to Main Construction 2022 Construction 1,459,000 Construction ongoing. 18 Water Main - Crain, Ridge to Sherman Construction 2022 Construction 1,080,000 Delayed to 2024 because of cost overages in other projects. 19 Water Main - Custer, Oakton to Mulford Construction 2022 Construction 1,194,000 Delayed to 2024 because of cost overages in other projects. 20 Water Main - Dodge, Main to Cleveland Construction 2022 Construction 1,365,000 Construction ongoing. 21 Water Main - Green Bay(Central to Lincoln Construction 2022 Construction 510,000 Project complete. 22 Water Main - Grey, Lee to Greenleaf Construction 2022 Construction 464,000 Construction ongoing. 23 Water Main - Lumberyard Easement, Sherman to Custer Construction 2022 Design 190,000 Delayed to 2024 because of cost overages in other projects. 24 Lead Service Line Replacement for Annual WM Construction 2022 Construction 1,800,000 Construction ongoing. 25 Lead Service Line Replacement Pilot Construction 2021 Design 5,360,000 Waiting for State of Illinois to release approved funding, which needs to happen prior to construction contract being awarded. 26 Lead Service Line Replacement Annual Program Construction 2022 Construction 625,000 Construction ongoing. Sewer Rehabilitation 27 Sewer - CIPP Rehabilitation Construction 2022 Complete 750,000 Project complete. 28 Sewer - Emergency Sewer Repairs Construction Not started 75,000 Used only in emergency. 29 Sewer - Repairs on Street Improvements Construction 2022 Construction 210,000 Construction ongoing.SP3.Page 19 of 40 3 2023 Capital Improvement Program Project Status Update 9/13/23 Projects Contract Type Year of First Contract Current Project Phase 2023 Budget Notes 30 Sewer - Sewer Extension for Alley Improvements Construction 2022 Construction 155,000 Construction ongoing. 31 Sewer - Drainage Structure Lining Construction Not started 175,000 Project on hold due to staff vacancies. 32 Sewer - Stormwater Master Plan Improvements Construction 2020 Planning 300,000 As stormwater model was completed, no critical short-term improvements identifed. 33 Howard Water Main Project - Sewer Repairs for Sep (IDOT)Construction 2017 Complete 540,000 Project complete. 34 Davis St Alley Repair Construction Not started 150,000 Project on hold due to staff vacancies. 35 CSO Outlet Rehab Consulting Not started 200,000 Project on hold due to staff vacancies. Total Street Resurfacing, Water Main, and Sewer Projects 25,541,000 Other Transportation Major Projects 36 Bus Stop ADA Improvements Phase II 2023 Design 75,000 Contract ongoing. 37 Church/Dodge Lighting Modernization Construction 2021 Design 215,000 Project received no bidders, and costs obtained to complete as a change order to existing contract was very high. Project will be rebid late fall for spring construction. 38 Davis/Lake Street Viaduct Construction 2021 Design 75,000 Project received no bidders, and costs obtained to complete as a change order to existing contract was very high. Project will be rebid late fall for spring construction. 39 Lincoln Street Bridge Phase I 2023 Planning 350,000 392,000 STP-BR Funding 40 Ridge Avenue Intersection Improvements Construction 2019 Construction - Construction is expected to be completed in September. 41 Ridge Avenue Signal Retiming Construction 2019 Construction 70,000 Contract awarded. Work to be completed late 2023. 42 Traffic Signal, Central and Central Park Phase II 2023 Design 50,000 Contract ongoing.start 9/25 Annual ProjectsSP3.Page 20 of 40 4 2023 Capital Improvement Program Project Status Update 9/13/23 Projects Contract Type Year of First Contract Current Project Phase 2023 Budget Notes 43 Alley Paving - N. of Chancellor, E. of Asbury Construction 2023 Construction 750,000 Construction ongoing. 44 Alley Paving - N. of Linden Place, E. of Custer Construction 2023 Construction 220,000 Construction ongoing. 45 Alley Paving - N. of Mulford, E. of Elmwood Construction 2023 Construction 240,000 Construction ongoing. 46 Alley Paving - N. of Washington, E. of Sherman Construction 2023 Construction 310,000 Construction ongoing. 47 Alley Paving - N. of Lyons, W. of Ashland Construction 2023 Construction 350,000 Construction ongoing. 48 Bridge Inspection Consulting 2022 Study 10,000 Annual inspection occurs in December. 49 General Phase I Engineering Phase I 2023 Planning 80,000 Purchases ongoing. 50 Streetlight Pole and Fixture Replacement Construction 2023 Construction 120,000 Purchases ongoing. 51 Streetlight LED Conversion Construction 2023 Construction 50,000 Purchases ongoing. 52 Traffic Calming, Bicycle & Ped Improvements Construction Various Various 225,000 Purchases ongoing. Sidewalk Projects 53 Sidewalk/Streetlight Improvements - Hartrey and Greenleaf Construction 2022 Planning 1,000,000 Have completed public engagement. Finalizing recommended alternate and moving forward with preparation of contract documents. 54 Sidewalk Gap Infill Construction 2022 Construction 600,000 Construction ongoing. 55 Sidewalk Improvement Program Construction 2023 Construction 650,000 Construction ongoing. 56 Sidewalk - Safe Routes to School Consulting 2023 Planning 50,000 Contract ongoing. Total Other Transportation Projects 5,490,000 Parks 57 Arrington Lagoon - Retaining Wall Construction 2023 Complete 200,000 Construction complete. 58 Alexander Park - Minor Repairs Construction Not started 20,000 Work not started due to staff vacancies in Public Services Bureau.SP3.Page 21 of 40 5 2023 Capital Improvement Program Project Status Update 9/13/23 Projects Contract Type Year of First Contract Current Project Phase 2023 Budget Notes 59 Beck Park Expansion/Shore School Consulting 2022 Planning 205,000 Contract ongoing. 60 Cartright Park Drainage Impr Consulting Not started 100,000 Project on hold due to staff vacancies. 61 Dog Beach/Dog Park Accessibility Consulting 2022 Design 66,480 Contract ongoing. 62 Fitzsimmons Park Renovations Consulting Not started 125,000 Project on hold due to staff vacancies. 63 Independence Park Renovations 2022 Design Contract ongoing. 64 James Park - Athletic Lighting North Fields Construction 2018 Construction 1,500,000 Contract awarded. Onsite construction will occur in Winter 2023/2024 once long-lead time materials are delivered onsite. 65 James Park - Fencing for Public Works Storage Construction Not started 100,000 Work not started due to staff vacancies in Public Services Bureau. 66 James Park - Pathway Lighting Construction Not started 50,000 Project on hold due to staff vacancies. 67 James Park - Pathway Reconstruction Consulting 2023 Design 300,000 Construction contract award in process. 68 Larimer Park Renovations Consulting 2022 Design 75,000 Contract ongoing. 69 Mason Park/Davis St Extension Construction 2022 Planning 250,000 Contract temporarily on hold while awaiting verification from Illinois Department of Natural Resources regarding the ability to use this project as a property conversion for the loss of Foster Field due to the 5th Ward School construction. 70 Mulford Viaduct Art Park Consulting Planning 100,000 71 Parks Contingency Construction Various Various 100,000 Purchases ongoing. 72 Public Canoe Launch (incl. Eco Cntr Parking Lot) - Phase II Consulting Svcs Consulting 2020 Planning 40,000 Project ongoing. Currently reviewing concept plan with EEA. Will need additional soils testing. 73 Raymond Park Construction 2021 Complete Project complete. 74 Parks and Greenspace Strategic Plan Consulting 2022 Study Project ongoing. 75 Twiggs Park - Skate Park Construction 2021 Construction 1,665,000 Construciton ongoing.SP3.Page 22 of 40 6 2023 Capital Improvement Program Project Status Update 9/13/23 Projects Contract Type Year of First Contract Current Project Phase 2023 Budget Notes Total Parks Projects 4,671,480 Facilities 76 Animal Shelter Renovations Construction 2020 Construction 5,180,000 Construction ongoing. 77 Bent Park Fieldhouse Construction 2022 Planning -On hold due to staff vacancies. 78 Crown - Glass Replacement Construction 2022 Various 50,000 Original construction complete. Additional work getting under contract for construction later this year. 79 Crown - Gym Sound Attenuation Construction 2022 Complete 50,000 Construction complete. 80 Crown - Lobby Floor Crack Sealing Construction Not started 50,000 Project cancelled. 81 Crown - LED Sign Upgrade Construction Not started 50,000 Project cancelled. 82 Ecology Center - Renovation Construction 2022 Design 1,500,000 Design ongoing. Construction planned to begin Winter 2023/2024. 83 Facilities Contingency Construction Various Various 600,000 Projects ongoing. 84 Police Fire HQ Elevator Modernization Construction 2022 Construction 120,000 Contract ongoing but taking longer than expected due to structural failures in elevator shaft. 85 Roof Replacement (Ackerman, Baker, Dempster, Fire 5, Police Station)Construction 2022 Complete 350,000 To fit funding, project rescoped to Police Station and Ladd Arboretum gazebo only. Construction complete. 86 Service Center - North Island Fuel System Replacement Construction 2023 Design 1,700,000 Design ongoing. Construction planned to begin Winter 2023/2024. 87 Service Center - Renovations Consulting Planning 200,000 On hold due to staff vacancies. Total Facilities Projects 9,850,000 Miscellaneous 88 ADA Improvements Construction 2023 Various 300,000 Limited projects ongoing, but most funding not being used due to staff vacancies. Total Miscellaneous Projects 300,000SP3.Page 23 of 40 7 2023 Capital Improvement Program Project Status Update 9/13/23 Projects Contract Type Year of First Contract Current Project Phase 2023 Budget Notes Sustainability 89 Lighting Modernization at City Facilities and Parks Construction 2022 Design 100,000 Funding will be used for Ecology Center lighting upgrades to be included in the construction contract for the Ecology Center Renovatation. 90 City Fleet Charging Infrastructure Consulting 2023 Construction 100,000 Construction ongoing. 91 Public Vehicle Charging Stations Construction 2023 Planning 100,000 Staff is researching the most cost-effective solution for the community. 92 City Solar Infrastructure Construction 2023 Planning 200,000 RFP issued to engage provider. Construction anticipated to start in Winter/Spring 2023/2024 93 Environmental Justice Initiative Study Consulting Study 100,000 City has received proposals and they are under evaluation. 94 CARP Dashboard Development Consulting 2023 Study 30,000 Implementation ongoing. Total Sustainability Projects 630,000 Water Treatment, Billing and Storage 95 Dist Sys - Retail Water Meter Stage II and MIU Stage I Replacement Program Construction 2023 Planning 660,000 Project advertising in October 2023 96 WTP - 36/42 Intake Replacement Construction 2019 Construction 39,450,000 Construction ongoing. 97 WTP - 36/42 Intake Replacement Phase III 2019 Construction 667,000 Construction ongoing. 98 WTP - CMMS System Construction 2023 Study 150,000 Proposals received and under review. 99 WTP - Corrosion Control Study Construction 2021 Study 275,000 Study ongoing. 100 WTP - East Filter Safety Rails Phase II 2022 Complete 30,000 Complete. Construction will be included in future water plant project.101 WTP - East Filter Safety Rails Construction 2022 On hold 150,000 102 WTP - Fire Sprinkler System Upgrade 1 Phase III Not started 75,000 On hold due to staff vacancies. 103 WTP - Generator and Switchgear Rehab Phase III 2022 Design 450,000 Design ongoing. Construction delayed to 2024 because of significant increase in scope requiring additional engineering. Will bid in 2023 once IEPA funding is awarded.SP3.Page 24 of 40 8 2023 Capital Improvement Program Project Status Update 9/13/23 Projects Contract Type Year of First Contract Current Project Phase 2023 Budget Notes 104 WTP - Generator and Switchgear Rehab Construction 2022 Design 500,000 Design ongoing. Construction delayed to 2024 because of significant increase in scope requiring additional engineering. Will bid in 2023 once IEPA funding is awarded. 105 WTP - Lead Paint Removal and Repainting Construction 2023 Design 300,000 Completed a preliminary inventory. Priority repainting will be incorporated into a future water plant project. 106 WTP - Low Lift 4/5/6 Pump Improvements Phase III Not started 200,000 Project postponed to cover cost increases in engineering services for East Filter Plant Electrical Reliability. 107 WTP - Low Lift Pump MCC Phase III Not started 125,000 Project postponed to cover cost increases in engineering services for East Filter Plant Electrical Reliability. 108 WTP - PFAS Study Construction Study 500,000 Study ongoing. 109 WTP - Pump Station Dehumidification Construction 2023 Construction 220,000 Project award proposed for October 2023. 110 WTP - Roof Improvements Construction 2023 Complete 1,000,000 Construction complete. 111 WTP - Security - First Floor Windows Construction 2022 Construction 100,000 Construction ongoing. 112 WTP - Security - Improvements Construction Not started 100,000 Project postponed to cover cost increases in engineering services for East Filter Plant Electrical Reliability. 113 WTP - Standpipe Water Quality Phase III 2022 Planning 50,000 Study is complete. Currently negotiating engineering costs for Phase II design. Project is somewhat delayed by staff vacancies.114 WTP - Standpipe Water Quality Construction 2022 Planning 150,000 115 WTP - Thermal Security Camera Installation Phase III Not started 50,000 Project on hold due to staff vacancies. Total Water Treatment, Billing and Storage Projects 45,202,000 Library 116 Boiler Replacement Construction 2023 Construction 700,000 Construction ongoing.SP3.Page 25 of 40 9 2023 Capital Improvement Program Project Status Update 9/13/23 Projects Contract Type Year of First Contract Current Project Phase 2023 Budget Notes 117 Building LED Lighting Upgrade Construction 2023 Complete 250,000 Project complete. Total Library Projects 950,000SP3.Page 26 of 40 Memorandum To: Honorable Mayor and Members of the City Council From: Lara Biggs, Capital Planning & Engineering Bureau Chief CC: Edgar Cano - Public Works Agency Director Subject: Proposed 2024 Capital Improvement Program Date: September 18, 2023 Recommended Action: Staff will provide an overview of the proposed 2024 Capital Improvement Program for discussion. Council Action: For Discussion Summary: The City’s annual Capital Improvement Program (CIP) is organized into multiple sections for ease of accessing the information: • Street Resurfacing, Water Main, and Sewer • Other Transportation • Parks • Facilities • Miscellaneous • Water Treatment, Billing, and Storage • Library In 2023, Sustainability was a separate category. Because so many projects include sustainability characteristics, this category was eliminated. The current proposed 2024 CIP is a list of immediate infrastructure improvement needs. Staff is requesting City Council direction on priorities in order to reduce the overall number of projects, as the current staffing and identified funding would not be able to support the full implementation of the proposed program. A summary of the project needs is as follows: SP4.Page 27 of 40 Funding: A critical portion of organizing the CIP is determining the appropriate funding. The City utilizes many different types of funding for the implementation of the CIP. Most of the funding types have significant limitations in how they can be used, as shown in the table below: Page 2 of 14 SP4.Page 28 of 40 As projects are identified, the funding source is determined. City-provided funds have annual limits, and the needs far outweigh the available funding. Because of this, staff actively seeks out grants and tries to leverage the available City resources to complete larger projects for less cost. Outside grants and loans are most available for the funding of streets, transportation, water, and sewer projects. Infrequently, a grant is awarded for parks projects. Facilities projects almost never receive grant funding and usually must be funded solely by City funds. Parks and Page 3 of 14 SP4.Page 29 of 40 Facilities projects are also not eligible for most City funding sources and, therefore, generally funded entirely by general obligation bonds. Of all the funding sources, issuing general obligation bonds is of particular concern. The City works to manage the volume of bonds issued, but bonds are the current choice when no other funding source is available. Generally, the staff works to keep approximately the same levels of funding each year in order to assist in stabilizing the budget. 2024 CIP Challenges: In developing the 2024 CIP, staff has identified three challenges, all of which are related to the overall funding of the CIP and would require a significant expansion in the amount of infrastructure work being completed in the next five years. These challenges include: • Water Main Replacement/Lead Service Line Regulatory Requirements • Legacy Park Infrastructure Needs • Legacy Facilities Infrastructure Needs Challenge 1 - Water Main Replacement/Lead Service Line Regulatory Requirements A water main has a typical lifespan of 100 to 120 years. Therefore, the City targets the replacement of 1% of the system per year or a pproximately 1.5 miles. However, so much of the water main is over 100 years in age that the system is aging faster than it can be replaced. Rising materials costs and the addition of new regulations regarding lead service line replacement are also having a significant impact on the City’s ability to maintain a reasonable water main replacement program within the current budget. This challenge will be addressed in detail as part of a separate discussion, but it is creating a significant impact related to th e CIP. Challenge 2 - Legacy Park Infrastructure Needs The City of Evanston operates and maintains 88 parks, totaling approximately 266 acres. The park system is made up of a wide variety of amenities and infrastructure elements, from playgrounds and active sports fields to decorative fountains and contemplative landscapes. Evanston parks can be divided into two categories: 1. Community Parks - Parks that are destination spaces regularly used by people outside of the immediate neighborhood. These parks have a variety of amenities and receive so much use they typically need continuous investment to stay in a safe and usable condition. Examples of community parks include: o Crown Park o James Park o Lovelace Park o Lakefront Parks/Beaches o Canal Parks 2. Neighborhood Parks - Parks that, while occasionally visited by other community members, are most frequently used by people within the immediate neighborhood. Examples of neighborhood parks include: Page 4 of 14 SP4.Page 30 of 40 o Independence Park o Larimer Park o Cartwright Park o Fitzsimmons Park While an individual park may have a variety of amenities, each amenity has a different expected life. The following table provides examples of park amenities: Over the last 20 years, the City’s investment in parks has been substantially underfunded. This has resulted in infrastructure needs that far exceed the available funding and available staff resources. Consequently, parks do not make it onto the CIP when one or two amenities start to fail; instead, they tend to only become a priority when the entire park is degraded. Because amenities fail at different rates, some of the amenities may be many years past their useful life before the park degrades to the point of being a red flag as a whole. Unfortunately, community members are still using those amenities even in their degraded condition (please note that amenities are addressed with temporary patches or removal if they become a safety issue). Of the neighborhood parks, 11 have had no appreciable infrastructure investment for at least 26 years. These “Legacy Parks” are experiencing so much deterioration that the entire park needs to be renovated. The renovation of these 11 parks has been placed on the five -year CIP to be addressed. However, for parks that are not yet fully deteriorated, staff recommends that the City begin a program of regular investment and modernization. For example, the City should be budgeting funding each year for playground equipment replacement in parks that are not yet fully deteriorated. Funding should also be budgeted for other items, such as court resurfacing, lighting modernization, pathway resurfacing, etc. Investing in smaller, regularly scheduled improvements will keep parks in better overall condition. However, to be effective, this funding would need to begin now in order to prevent the next generation of parks from becoming Legacy Parks. This requires extra funding over the next five years. In order to better illustrate the funding needs, the 2024 CIP for Parks has been divided into categories: • Community Parks • Neighborhood Parks - Legacy • Neighborhood Parks - Non-Legacy Page 5 of 14 SP4.Page 31 of 40 • Investment and Modernization In the 2024 CIP, initial levels for Investment and Modernization have been proposed. The City is currently in the process of completing a parks and natural areas strategic plan. As this project is completed in 2024, staff will work with the consultant to identify appropriate funding levels for Investment and Modernization. Challenge 3 - Legacy Facilities Infrastructure Needs The City owns over 50 facilities, ranging from public-facing recreation centers, park fieldhouses, and municipal buildings (such as the Civic Center) to facilities that provide a critical infrastructure need, such as fire stations and the Service Center. The City has chronically underfunded infrastructure projects at facilities, even though the needs have been well-known for decades. An example of this is the Civic Center, which has been known to need substa ntial investment since the City began a public discussion in 1998 (25 years ago). The City currently has six Legacy Facilities that are undergoing substantial failures in multiple building systems. In each case, the City has engaged a consultant over the last three years to provide more detailed solutions for how to proceed. While the reports are still in draft form, enough information is available to begin placing the improvement or replacement of these facilities into the budget. As the detailed reports are finalized and presented to the City Council over the next few months, they will also be made available to the public. A summary of the Legacy Facilities is as follows: Page 6 of 14 SP4.Page 32 of 40 Similar to Parks, there is another generation of buildings that will become Leg acy Facilities without regular investment. Typical improvements that the City should be investing in regularly include: • Roofing • Tuckpointing • Flooring • Interior space renovations such as kitchens, locker rooms, and restrooms • ADA improvements • CARP implementation (lighting modernization, vehicle charging, electrification) • Evolving operational needs This creates an operational challenge, as current funding levels do not support the annual investment needs, much less addressing the challenges of the Legacy Facilities. Because of the current state of the Legacy Facilities, staff recommends working towards a goal of resolving the Legacy Facilities over the next 5-8 years while simultaneously funding a regular annual program of investment and modernization. In order to better illustrate the funding needs, the 2024 CIP for Facilities has been divided into categories: • Facilities - Legacy • Facilities - Non-Legacy • Investment and Modernization Staffing: Implementing the annual CIP is a team effort, involving not only Public Works staff but also relying heavily on support from the operations and maintenance staff in every City department. However, the primary responsibility for project development, implementation, and management falls to civil engineers, architects, and landscape architects in the Bureau of Capital Planning. Of the 20 employees in this bureau, there are 13 staff whose primary responsibility is project implementation and management. Currently, work on the Parks CIP is implemented by a 0.5 FTE landscape architect, supplemented by a 0.5 FTE civil engineer helping with drainage challenges, pathways, and court resurfacing. With increased parks capital needs in recent years, this is inadequate to implement the existing Parks CIP, even without a potential realignment. Staff is recommending the 2024 budget include a new landscape architect position (1 FTE). If funding for the Parks and/or Facilities CIP is increased and the implementation stra tegies realigned, additional architect and landscape architect positions will be needed in future years. Feedback from Boards and Commissions: Staff is actively seeking feedback from several City boards. The proposed CIP has been reviewed with the Finance and Budget Committee and the Parks and Recreation Board. Staff will also be meeting with the Environment Board this month to discuss CARP goal compliance. Next Steps: Page 7 of 14 SP4.Page 33 of 40 Staff is requesting feedback on realigning the CIP strategies related to the drin king water distribution system, parks, and facilities. Staff is also requesting feedback on 2024 project priorities to align the size of the CIP with funding and staff resources. Attachments: Proposed 2024 Capital Improvement Program Page 8 of 14 SP4.Page 34 of 40 1 City of Evanston Capital Improvement Program FY 2024 2023 GO Bonds 2024 GO Bonds Water Fund Reserves Sewer Fund Reserves IEPA SRF Subtotal MFT CDBG TIF Subtotal Other Pass-Through Grants TOTAL FUNDING NOTES Major Projects 450,000 2,220,000 2,200,000 -1,800,000 -360,000 3,600,000 10,630,000 Street Resurfacing ---554,000 -841,000 1,395,000 Street Resurfacing, Construction, SUBTOTAL -----554,000 --841,000 -1,395,000 Rebuild Illinois $841,000 Water Main -760,000 5,111,000 4,875,000 900,000 960,000 1,000,000 13,606,000 Water Main, Construction, SUBTOTAL --4,061,000 -770,000 900,000 -260,000 --6,751,000 Water IEPA SRF $770,000; Chicago Main TIF $260,000 Street Resurfacing, Water Main, and Sewer 450,000 2,980,000 7,311,000 2,070,000 4,875,000 3,254,000 -960,000 2,201,000 3,600,000 27,701,000 Lincoln Street, Sheridan to Green Bay Rd, Ped and Bike Impr, Phase I -300,000 ---300,000 Chicago Ave, Howard to Davis, Phase II 450,000 550,000 ---1,000,000 Church St Corridor Improvements, Phase II -550,000 ---550,000 ITEP Main Street, Hartrey to Asbury, Phase II -160,000 ---160,000 Green Bay Road, McCormick to Isabella, Phase III -500,000 200,000 --360,000 1,060,000 Other Non-Bond Funding $360,000 STP funding Oakton Corridor Traffic Calming Improvements, Phase III -60,000 ---60,000 Green Bay Road, McCormick to Isabella, Construction --2,000,000 -1,800,000 --3,600,000 7,400,000 STP funding Oakton Corridor Traffic Calming Improvements, Construction -100,000 ---100,000 LSLR (Outreach and Comms), Consulting --200,000 ---200,000 LSLR (Program Development and Management), Consulting --200,000 ---200,000 LSLR Pilot, Consulting --550,000 ---550,000 Lead Service Line Replacement Annual Program, Consulting --300,000 --300,000 Water IEPA SRF $300,000 Emergency Water Main Repair, Construction --100,000 ---100,000 LSLR Pilot, Construction ---700,000 1,000,000 1,700,000 West Evanston TIF $700,000; Rebuild Illinois $1,000,000 Lead Service Line Replacement Annual Program, Construction --3,805,000 --3,805,000 Water IEPA SRF $3,805,000 Ashland from Lyons to Emerson ---115,000 --115,000 Bryant from Chancellor to Dead End ---133,000 --133,000 Burnham from Michigan to Sheridan ----108,000 108,000 Rebuild Illinois $108,000 Foster from Orrington to Sheridan ---142,000 --142,000 Garrett from Sheridan to East End ---25,000 -57,000 82,000 Rebuild Illinois $57,000 Lee from Florence to Asbury ----279,000 279,000 Rebuild Illinois $279,000 Leon from Simpson to Ridge ----397,000 397,000 Rebuild Illinois $397,000 Noyes from Green Bay to Wesley ---139,000 --139,000 Central from Prairie to Poplar -760,000 190,000 50,000 ---1,000,000 Water IEPA SRF $50,000 Crain from Ridge to Sherman --1,280,000 120,000 300,000 --1,700,000 Water IEPA SRF $120,000 Custer from Mulford to Oakton --1,960,000 340,000 400,000 --2,700,000 Water IEPA SRF $340,000 Lumberyard Easement from Sherman to Custer ---260,000 -260,000 Chicago Main TIF $260,000Page 9 of 14SP4.Page 35 of 40 2 City of Evanston Capital Improvement Program FY 2024 2023 GO Bonds 2024 GO Bonds Water Fund Reserves Sewer Fund Reserves IEPA SRF Subtotal MFT CDBG TIF Subtotal Other Pass-Through Grants TOTAL FUNDING NOTES Park from McDaniel to Walnut --631,000 260,000 200,000 --1,091,000 Water IEPA SRF $260,000 N of Colfax, E of Bryant ----410,000 410,000 Special Assessment Fund $410,000 N of Lake, E of Darrow ---290,000 --290,000 N of Leonard Pl, E of Green Bay Rd ----495,000 495,000 Special Assessment Fund $495,000 N of Simpson, E of Ashland ---210,000 --210,000 Sewer Rehabilitation ---2,070,000 -----2,070,000 Major Projects -1,155,000 -150,000 365,000 270,000 1,940,000 Annual Projects -590,000 40,000 -160,000 510,000 -1,115,000 2,415,000 Alley Paving, Construction, SUBTOTAL ------500,000 -905,000 -1,405,000 Special Assessment Fund $905,000 Sidewalk Projects -755,000 -100,000 1,000,000 -250,000 2,105,000 CSO Outlet Rehab, Consulting --200,000 ---200,000 CIPP Rehabilitation, Construction --775,000 ---775,000 Davis St Alley Repair (Ongoing), Construction ---150,000 -----150,000 Drainage Structure Lining, Construction --175,000 ---175,000 Emergency Sewer Repairs, Construction --100,000 ---100,000 Repairs for Water Main Improvements, Construction --210,000 ---210,000 Sewer Extension for Alley Improvements, Construction --160,000 ---160,000 Stormwater Master Plan Improvements, Construction --300,000 ---300,000 Lincoln Street Bridge, Phase I ------ Street Evaluation and Rating, Phase I ---150,000 --150,000 Bus Stop ADA Improvements, Phase III -50,000 ---50,000 Traffic Signal, Central and Central Park, Phase III -50,000 ---50,000 Bus Stop ADA Improvements, Construction -80,000 --270,000 350,000 Other Non-Bond Funding $270,000 $240k grant from CMAP, $30k RTA Access to Transit Church/Dodge Lighting Modernization, Construction ---365,000 -365,000 West Evanston TIF $365,000 Davis/Lake Street Viaduct, Construction -125,000 ---125,000 Fiber Optic System Upgrades, Construction -500,000 ---500,000 Traffic Signal, Central and Central Park, Construction -350,000 ---350,000 General Phase I Engineering, Phase I -30,000 40,000 -10,000 10,000 --90,000 Bridge Inspection, Consulting -10,000 ---10,000 Crosswalk Improvements, Construction ----210,000 210,000 Other Non-Bond Funding $210,000 ARPA Funds Streetlight LED Conversion, Construction ---150,000 --150,000 Streetlight Pole and Fixture Replacement, Construction -300,000 ---300,000 Traffic Calming, Bicycle & Ped Improvements, Construction -250,000 ---250,000 Other Transportation -2,500,000 40,000 -310,000 610,000 1,365,000 1,385,000 250,000 6,460,000Page 10 of 14SP4.Page 36 of 40 3 City of Evanston Capital Improvement Program FY 2024 2023 GO Bonds 2024 GO Bonds Water Fund Reserves Sewer Fund Reserves IEPA SRF Subtotal MFT CDBG TIF Subtotal Other Pass-Through Grants TOTAL FUNDING NOTES Sidewalk - Safe Routes to School, Phase III -90,000 ---90,000 Sidewalk - Safe Routes to School, Construction -65,000 ---250,000 315,000 $250k STRS grant for construction Sidewalk Gap Infill, Construction -300,000 ---300,000 Sidewalk Improvement Program, Construction -300,000 -100,000 --400,000 Sidewalk/Streetlight Improvements - Hartrey and Greenleaf, Construction ---1,000,000 -1,000,000 West Evanston TIF $1,000,000 Beck Park Expansion/Shore School, Consulting -90,000 ---90,000 Canal Park Environmental Assessment, Consulting -50,000 ---50,000 Required by MWRD lease Lovelace Park Parking Lot Expansion, Consulting -40,000 ---40,000 Clark Square Dog Park, Construction -400,000 ---400,000 Dog Beach ADA Accessibility, Construction -200,000 ---200,000 Fountain Square Improvements, Construction -2,800,000 ---2,800,000 James Park - Fencing, Construction -120,000 ---120,000 James Park - PIckleball Courts, Construction -350,000 ---350,000 Pooch Park Capital Investment, Construction -120,000 ---120,000 Cartright Park - Improvements, Consulting -150,000 ---150,000 Fitzsimons Park Renovations, Consulting -100,000 ---100,000 Philbrick Park Renovation, Consulting -115,000 ---115,000 Chandler Tot Lot, Construction -150,000 ---150,000 Independence Park, Construction -1,700,000 --500,000 2,200,000 Other Non-Bond Funding $500,000 $500k ARPA funds through Evanston Thrives Larimer Park, Construction -1,500,000 ---1,500,000 Grey Park - Dog Park Installation, Construction -400,000 ---400,000 ADA Improvements in Parks, Construction -100,000 ---100,000 Court Rehabilitation, Construction -200,000 ---200,000 Fence Replacement (Various Parks), Construction -100,000 ---100,000 Parks Contingency, Construction -100,000 ---100,000 Pathway improvements, Construction -300,000 ---300,000 Playground Equipment Replacement, Construction -600,000 -450,000 --1,050,000 $200k Chandler, $400k TBD; $450k CDBG Twiggs Parks -9,685,000 -450,000 -500,000 10,635,000 Facilities -16,240,000 --90,000 16,330,000 Community Parks -4,170,000 ---4,170,000 Neighborhood Parks - Legacy -3,715,000 --500,000 4,215,000 Neighborhood Parks -400,000 ---400,000 Investment and Modernization -1,400,000 -450,000 --1,850,000 Facilities - Legacy -9,930,000 ---9,930,000Page 11 of 14SP4.Page 37 of 40 4 City of Evanston Capital Improvement Program FY 2024 2023 GO Bonds 2024 GO Bonds Water Fund Reserves Sewer Fund Reserves IEPA SRF Subtotal MFT CDBG TIF Subtotal Other Pass-Through Grants TOTAL FUNDING NOTES Civic Center Improvements, Consulting -1,500,000 ---1,500,000 Ecology Center - Renovation, Construction -2,100,000 ---2,100,000 Police/Fire HQ Improvements, Consulting -1,500,000 ---1,500,000 Service Center - Structural Repairs, Consulting -50,000 ---50,000 Police Fire HQ - Chiller Replacement, Construction -500,000 ---500,000 Service Center - North Island Fuel System Replacement, Construction -1,700,000 ---1,700,000 Service Center - Renovations, Consulting -800,000 ---800,000 Service Center - Structural Repairs, Construction -180,000 ---180,000 Service Center - Various Roofs, Construction -1,600,000 ---1,600,000 Bent Park Fieldhouse Improvements, Consulting -100,000 ---100,000 Fleetwood Jourdain Study, Consulting -250,000 ---250,000 Municipal Storage Center - Renovation, Consulting -100,000 ---100,000 Bent Park Fieldhouse Improvements, Construction -510,000 --90,000 600,000 Other Non-Bond Funding $90,000 $90k insurance reimbursement Chandler - Building Envelope Rehabilitation, Construction -400,000 ---400,000 Chandler - Gym Upgrades, Construction -400,000 ---400,000 Citywide Building Automation System Upgrade, Construction -250,000 ---250,000 Fire Station 3 - Interior Renovations (Kitchen, Finishes), Construction -400,000 ---400,000 Fire Station 5 - Building Envelope Repairs, Construction -600,000 ---600,000 Fire Stations 1 & 3 Locker Room Improvements, Construction -350,000 ---350,000 Fleetwood - East/North Site Improvements, Construction -400,000 ---400,000 Fleetwood - Envelope Repairs, Construction -350,000 ---350,000 Levy Center - Kitchen Renovation, Construction -400,000 ---400,000 ADA Improvements, Construction -300,000 ---300,000 Citywide Roof Repairs (locations to be determined), Construction -600,000 ---600,000 Facilities Contingency, Construction -600,000 ---600,000 Lighting Modernization, Construction -300,000 ---300,000 City Fleet Charging Infrastructure, Construction -450,000 -------450,000 City Solar Infrastructure, Construction --------100,000 100,000 Sustainability Fund $100,000 Environmental Justice Initiative Study, Construction ----100,000 100,000 Sustainability Fund $100,000 Public Vehicle Charging Stations, Construction --------100,000 100,000 Sustainability Fund $100,000 Facilities - Non-Legacy -4,510,000 --90,000 4,600,000 Investment and Modernization -1,800,000 ---1,800,000 Miscellaneous -480,000 ------300,000 780,000Page 12 of 14SP4.Page 38 of 40 5 City of Evanston Capital Improvement Program FY 2024 2023 GO Bonds 2024 GO Bonds Water Fund Reserves Sewer Fund Reserves IEPA SRF Subtotal MFT CDBG TIF Subtotal Other Pass-Through Grants TOTAL FUNDING NOTES Circularity Warehouse, Consulting ---------- Public Art, Construction -30,000 -------30,000 36"/42" Intake Replacement, Consulting ----600,000 600,000 WIFIA $600,000 Corrosion Control Improvements, Consulting --200,000 ---200,000 East Filter Plant Reliability, Consulting --1,000,000 ---1,000,000 Generator and Switchgear Rehab , Consulting --300,000 --300,000 Water IEPA SRF $300,000 Shoreline Improvements, Consulting --200,000 ---200,000 Shorewell Safety Rails, Consulting --50,000 ---50,000 Standpipe Water Quality, Consulting --300,000 ---300,000 36"/42" Intake Replacement, Construction --19,293,000 -19,786,000 39,079,000 Water IEPA SRF $19,293,000; WIFIA $19,786,000 Boiler Rehabilitation, Construction --120,000 ---120,000 CMMS System, Construction --200,000 ---200,000 East Filter Safety Rails, Construction --250,000 ---250,000 Fire Sprinkler System Upgrade 1, Construction --75,000 ---75,000 Generator and Switchgear Rehab, Construction --2,000,000 --2,000,000 Water IEPA SRF $2,000,000 HL 7 Engine Replacement, Construction --1,000,000 ---1,000,000 Retail Water Meter Replacement Program Phase 2 & MIU, Construction --2,420,000 ---2,420,000 Standpipe Water Quality, Construction --1,200,000 ---1,200,000 West Plant Dehumidificatinon, Construction --300,000 ---300,000 Main Library Exterior Stonework Restoration, Construction -100,000 ---100,000 Main Library Fire System Upgrade, Construction -200,000 ---200,000 Main Library Interior Painting, Construction -200,000 ---200,000 Robert Crown Branch Library Interior Reorganization, Construction -50,000 ---50,000 Water Treatment, Billing and Storage --7,315,000 21,593,000 -20,386,000 49,294,000 Library -550,000 ---550,000Page 13 of 14SP4.Page 39 of 40 6 City of Evanston Capital Improvement Program FY 2024 2023 GO Bonds 2024 GO Bonds Water Fund Reserves Sewer Fund Reserves IEPA SRF Subtotal MFT CDBG TIF Subtotal Other Pass-Through Grants TOTAL FUNDING NOTES SUMMARY Street Resurfacing, Water Main, and Sewer 450,000 2,980,000 7,311,000 2,070,000 4,875,000 3,254,000 -960,000 2,201,000 3,600,000 27,701,000 Other Transportation -2,500,000 40,000 -310,000 610,000 1,365,000 1,385,000 250,000 6,460,000 Parks -9,685,000 -450,000 -500,000 10,635,000 Facilities -16,240,000 --90,000 16,330,000 Miscellaneous -480,000 ------300,000 780,000 Water Treatment, Billing and Storage --7,315,000 21,593,000 -20,386,000 49,294,000 Library -550,000 ---550,000 TOTAL (ALL CATEGORIES)450,000 32,435,000 14,666,000 2,070,000 26,468,000 3,564,000 1,060,000 2,325,000 24,862,000 3,850,000 111,750,000 Major Projects 450,000 2,220,000 2,200,000 -1,800,000 -360,000 3,600,000 10,630,000 Street Resurfacing ---554,000 -841,000 1,395,000 Water Main -760,000 5,111,000 4,875,000 900,000 960,000 1,000,000 13,606,000 Sewer Rehabilitation ---2,070,000 -----2,070,000 Major Projects -1,155,000 -150,000 365,000 270,000 1,940,000 Annual Projects -590,000 40,000 -160,000 510,000 -1,115,000 2,415,000 Sidewalk Projects -755,000 -100,000 1,000,000 -250,000 2,105,000 Community Parks -4,170,000 ---4,170,000 Neighborhood Parks - Legacy -3,715,000 --500,000 4,215,000 Neighborhood Parks -400,000 ---400,000 Investment and Modernization -1,400,000 -450,000 --1,850,000 Facilities - Legacy -9,930,000 ---9,930,000 Facilities - Non-Legacy -4,510,000 --90,000 4,600,000 Investment and Modernization -1,800,000 ---1,800,000Page 14 of 14SP4.Page 40 of 40