HomeMy WebLinkAboutChange Order No. 3 - for 5KV Motor Control Center Replacement(M OF E06F- NSTMI t.;B-SANGE ORDER Oder No. 003 ][Date; June 27, 2012 Agreement ]Date: November 14, 2011 PROJECT: 5 kV Motor Control Center Replacement (Bid 12-59) OWNER: City of Evanston CONTRACTOR: Broadway Electric, Inc. The following changes are hereby made to the AGREEMENT: Time extension of 61 calendar days due to increase in equipment lead times. This is the second delay from the manufacturer. The new Date for Substantial Completion is September 13, 2012. The new Date for Final Completion is October 13, 2012. There is no change in the total contract value included as part of_this change order_ _ Chance to CONTRACT PRICE: $ 0.00 Original CONTRACT PRICE: Current CONTRACT PRICE adjusted by previous CHANGE ORDERS Total change in CONTRACT PRICE for this CHANGE ORDER No. 003 The CONTRACT PRICE including this CHANGE ORDER will be Original Date for Substantial Completion Modified Date for Substantial Completion Original Date for Final Completion Modified Date for Final Completion Approved by (Owner): rty of Evan Accepted by (Contractor): 01oadway E12cfPic 394,74 5.00 403,668.00 0,00 403,668.00 June 15, 2012 Sept 13, 2012 July 15, 2012 October 13, 2012 —? -(3'1 ;1- Dale 0"20/.3- Date Broadway Ellet> t riteg 1Cne. REQUEST FOR INFORMATION Noe 00004 831 Oakton Street Phone: 847-593-0001 Elk Grove Village, IL 60007 Fzs: 847-593-0010 Tf'1C')LE: Drawing E-5 Keynote 7 DATE: 5/18/2012 PROJECT: Evanston 5KV Motor Control Center JOB: PO - 13612 000 TO: Attn: Michael Kahn CDNI Smith STARTED: COMPLETED: D$EQIUt1REl D: 5/25/2012 Please refer to Drawing E-5 to keyed note '1 which states "Provide a control relay in Section 15 that is connected to the generator start signal output of the DP 4000 Unit in the Main Contactor No.2 section. Provide wiring from the relay contact to the low voltage cabinet located behind the existing 5kV MCC and cornice( it to the generator start circuit. Field Verity the connection ofthis signal." Are there any specific wiring diagrams for the control relay in section 15 that will be connecting the generator start signal to? Requesled 8 :13roadway Etc file. ,1;�' Date: 5/18/2012 Signed:, .�m��✓'`%!/ �,:a7idn��,%'�'�"°'�'` Kurt Campbell e ANSWER: There are no wiring diagrams for the control relay. Below is a more complete description of the functionality of this control relay: Upon a loss of power detected by the potential transformers, the DP4000 will go into alarm and energize the lockout (86) relay in Main Contactor No. 2. The lockout (86) relay shall have two normally open contacts. One contact shall trip the Main Contactor and the other contact shall energize the control relay (Auxiliary Relay #2). Auxiliary Relay #2 shall have a DC coil and four normally open contacts. Contact #1 shall energize the "3 Phase Voltage Failure" indicating light on the door of Main Contactor No. 2. Contact #4 shall be a spare. Contact #2 and Contact #3 shall be wired to the low voltage cabinet behind the existing MCC. The conduit between the Main Contactor No. 2 section and the low voltage cabinet shall be changed to a 3/4"C, 4#14, 1#14 GND. It is presently shown as a 3/4"C, 2#14, 1#14 GND. The City of Evanston will terminate the #14 wires in the low voltage cabinet behind the MCC and connect the wires to the engine start circuits. Leave the #14 wires coiled up in the low voltage cabinet for termination and connection by the City of Evanston. Answered By:CDM Smith Dnte: 5/24/2012 signed,, Michael Kahn �i ichnel Kalto Eaton Corporation 210 Windy Point Drive Glendale Heights, IL 60139 tel. (630) 260-6492 fax: (630) 260-6234 May 29, 2012 Broadway Electric, Inc C/o Patrick Mckevitt 831 Oakton Street Elk Grove Village, IL 60007 Reference: MCG0005498 City of Evanston, IL 5KV MCC Replacement Dear Patrick: On the above mentioned project, Eaton Corporation has re -scheduled the equipment to ship on 7/20/2012 at this point in time. As agreed upon at time of release we will also supply revised construction drawings to reflect changes made during the approval and engineering process. These drawing should be available approximately 4 weeks prior to shipment targeting 6/22/2012 currently. Please contact me with any questions or concerns. Regards, James P. Bower Sales Engineer Memorandum ILY of To: Wally Bobkiewicz, City Manager Grant Farrar, City Attorney/Corporation Counsel From: David Stoneback, Utilities Director Lara Biggs, Superintendent — Construction and Field Svcs Subject: 5kV MCC Replacement — Change Order 3 for Execution Date: July 12, 2012 On July 9, the City Council approved execution of Change Order 3 with Broadway Electric on the 5KV Motor Control Center Replacement project. Attached is the change order for execution. If you wish to execute this, please sign where indicated. Call Lara Biggs at x. 8210 if you have any questions.