MINUTES OF FLOOD AND POLLUTION CONTROL COMMISSION
March 19, 1986
Members Present: Alderwoman Margaret Wold, Chairman
Alderwoman Roberta Warshaw
Members Absent: Alderman John Bleaveans
Alderwoman Bath Davis
Ms. Sherry Bradford
Dr. Jerry Handler
Dr.. Michael Goodkind
Staff Present: Stephen T. Pudloski, Director of Public docks
Richard J. Figurelli, Supt. of Water i Sewers
James Tonkinson, City Engineer
The meeting was called to order at 6:00 P.M. The Chair stated
that we could not approve the minutes of November 13, 1905
without a quorum, but she had not seen the need for any
corrections.
Downspout Disconnection Program
Status report was accepted. The Chair noted that the program
was near completion and reminded staff to inform the Commission
when the Appeals Board finished its work so that proper
recognition can be given.
Sewer Construction - 1986
Steve Pudloski discussed the sewer TV report on streets to be
resurfaced in the 1986 Motor Fuel Tax (M.F.T) street program,
following a policy of T.V. inspecting sewers in all streets that
are to be resurfaced or repaved. The sewer work or repairs
necessary on these streets have been included in the resurfacing
contract. This refurfacing program will be presented to the City
Council on March 24, 1986 for approval and includes $444,000
worth of sewer work.
The budget report for sewer improvements and repairs was
discussed. The 7425.50300 account has a budgeted amount of
$660,000 and funded by reve-mue from the Northwest Water
commission. The 7420.50300 account is $100,000 for emergency
repair of sewers that are in danger of collapse. Projects will
be funded from both accounts. Foster Street is a re -surfacing
project with sections of sewer about to collapse. Case Street is
a re -surfacing project and the whole sewer is in bad shape and in
need of replacement. Elmwood and Hawthorne Lane are unpaved
streets to be paved by special assessment. Both have sewers in
very poor condition. Funds have been set aside for the sewer to
be replaced. Maple Avenue in Downtown 11 was not originally
included in the budget. There is about $549,000 of sewer
construction with 5480,000 to be funded from the Capital
Development Bond Funds and the remainder from sewer funds. The
water mains will cost $108,000 and will be funded from water Bond
Funds. The water and sewer funds will be reimbursed by Tax
Increment Bonds.
The Chair asked when the project would be started and if
there was to be traffic disruption. Mr. Pudloski reported the
work would commence about April 15, with Emerson being closed for
approximately four weeks to construct a connecting chamber at
Emerson and Maple.
Mr. Pudloski responded to an question by Alderwoman Warshaw
of how the Downtown II sower design is going to increase the cost
of utilities. He explained the original estimate did not assume
detention of storm water and that large diameter pipes would be
put under the service drives to detain roof drain and run off
water before it enterAd the combined sewer at a controlled
release rate.
Lonq-Range Sewer plan
Mr. Pudloski discussed the program as outlined in the
project budget memo. He noted that $200,000 was budgeted
according to the plan approved last year. The $170,000 budgeted
last fiscal year was not expended and could be reprogrammed if we
approach the estimated expenditure of $268,000 for this fiscal
year.
Mr. Pudloski discussed the projects reported on the fact
sheet including TV contracts 1, 2, and 3. He explained the need
for a tunnel inspection consultant to ascertain the condition of
the large diameter sewers. These sewers are the main trunk lines
and because they are the largest size we can put in those streets
and are very expensive to replace, they will probably not be
replaced. The Chair asked what would happen if they were not in
good shape. Mr. Pudloski stated the consultants would recommend
how they can be repaired. We are now in the process of writing
requests for proposals.
Emerson Street sewer cleaning is necessary to get rid of
heavy sediments of up to 30" in the S foot diameter sewer so that
it can be inspected. Cleaning of these sewers, and in particular
the Emerson Street sewer, should have an immediate beneficial
effect.
The hiring of two temporary people, an Engineering Aide 11
and a Maintenance Worker II, are necessary for the physical
inspection and collection of data on the sewer system.
Engineering services expenditures listed are to get help front
consultants to do analysis.
We are investigating the purchase of a computer sewer
maintenance program to keep track of all the maintenance done on
J the sewers. we are now in the process of updating and doing a
physical inventory of all the sewers, cleaning, and TVing. We
want, and need, to put all that information in a computer program
format to start maintenance records so that every time we do
something on that sewer we can add that information and have a
good record of that sewer. The $20,O00 shown in the budget
includes the software and to load the data related to our system.
We are looking at several available and we will write request for
.proposals. we have also shorn atemporary Clerk II to enter the
information.
We have a proposed schedule for fact finding which we hope
to complete in a four year period. This is an ambitious program
but it should help the in-house prople to become very familiar
with the system.
Mr. Pudloski reported on the meeting he and Jim Tonkinson
had with the Metropolitan Sanitary District (MSG). He stated
that with their information we had begun to develop a design
philosophy. The philosophy is to use the capacity that the MSD
is providing rather than a 2-year, 5-year, or 10-year storm as
the limiting factor. Another point was that MSD has in essence
said they would allow larger outfalls into the channel for sewer
overflows greater than the capacity of the deep tunnel.
J Mr. Pudloski stated we had probably underestimated the
amount of analysis necessary to design the needed changes to the
sewer system and we would need to re-evaluate whether we should
buy a computer program or hire a consultant to help with the
analysis.
Mr. Pudloski suggested that staff prepare a one year status
report of the program for the Council. The Committee agreed and
directed staff to draft the report and forward it to the
Committee for review.
Chair adjourned the meeting at 6:55 P.M.
eAl
OCLI*ba�rd J Lii4fte 14 i
MINUTES OF FLOOD AND POLLUTION CONTROL COMMISSION
September 17, 1986
Members Present: Alderman Margaret Wold, Chairman
Alderman John Bleveans
Aldermen Roberta Warshaw
Dr. Jerry Handler
Members Absent: Alderman Beth Davis
Dr. Michael Goodkind
Ms. Sherry Bradford
Staff Present: Stephen T. Pudloski, Director of Public Works
Richard J. Figurelli, Supt. of Water & Sewers
James Tonkinson, City Engineer
David Stoneback, Asst. Supt./Operations-Water & Sewei
James Wolinski, Asst. Supt./Administration
Water & Sewers
The meeting was called to order by Chairman Wold at 8:03 P.M.
The minutes of November 13, 1985 and March 19, 1986 were approved
as submitted.
Downspout Disconnection Program
Mr. Wolinski reported that except for a few court cases pending
the program was completed. tie then summarized the program and
gave the following facts: 10,000 buildings came under the
ordinance of which 5,151 owners applied for a variance. These
variance applications involved about 26,044 downspouts of which
10,750 were granted. The total program looked at approximately
51,290 downspouts of which 40,385 are now disconnected. This is
79% disconnected and the remaining 21* receiving variances.
There were 13 tickets issued to appear in court for failure to
disconnect and 10 of these homeowners complied. The 3 that did
not comply also did not appear in court and judgments of $200
apiece were levied against the owners. We are currently working
with the Legal Department to resolve the problem and force
compliance. There were 12 tickets issued for concrete capping
violations, 10 of which have now met compliance and 2 have been
given extensions of time until October 10 by the court. We still
have 5 homes that have absentee owners who we have been unable to
contact as yet. The Legal Department is pursuing this matter.
Alderman Bleveans asked to have this information summarized and
sent to the Council. The Chair asked staff to prepare this memo
and also directed staff to invite the Review Board to the Council
meeting on the night that the memo is presented to thank them for
their work.
Mr. Wolinski also conveyed the feeling of the Review Board to
stay in existence for the full three-year term in the event any
new appeals are filed. The Commission agreed and extended their
appreciation to staff for their work on this project.
Sewer Construction - 1986
Mr. Tonkinson reported we had two contracts this year, the
Downtown II sewer in Maple Avenue and the resurfacing and
replacement of sewers in Maple (Foster to Noyes), Case Street,
Foster Street, Hull Terrace, and Lake Street. The sewer
replacements on both these contracts is completed and the
resurfacing is virtually completed with the exception of some
restoration work.
The Downtown II project costs amount to $636,897.32 with the
State refunding $403,453.18 from the Capital Do vvlopment Bond
Funds.
The Chair asked how the sewer repairs and replacements were
identified on the streets to be resurfaced. Mr. Tonkinson and
Mr. Pudloski explained the investigation procedure which included
TV'ing the sewer lines prior to resurfacing.
Alderman Hleveans asked how much more sewer work would be
required in Downtown II. Mr. Pudloski responded that the Maple
Street sewer from Emerson to Clark represented about 10% of the
work which will include storm water storage.
Long Range Sewer Plan
1. Status of Fact Finding Team.
Dav-e Stoneback handed out a fact sheet showing the progress
of the Storm Water Inundation Mitigation (SWIM) fact finding
team. They have completed their investigations in drainage
Basins B06, B02, B03, B03A, Bll, B12, and B13 and 95% of their
work in B07. The fact finding team has completed the
investigation of approximately 50% of the sewers. Basins BOB,
B082, and BO? are the basins left to be investigated and are
scheduled to be completed in 1988. In addition to this work, the
Engineering Department has investigated and recorded the
condition and function of drainage basin outfall structures in
all but three basins. Mr. Pudloski explained that essentially
the fact finding was a physical inventory of what is actually
there, to obtain accurate elevations of flow lines, manhole
inverts, and sewer sizes.
2. T.V. Inspection and Sewer Cleaning
Mr. Stoneback reported on TV Contract 1, 2, and 3, Emerson
Street sewer cleaning, and large diameter sewer inspection.
T.V. Contract No. 1 included light cleaning and TV inspection in
Basins BO1, B04, B04A, B05 and streets scheduled to be resurfaced
in 1986. National Power nodding Corporation completed the
contract which included 61,579 feet of sewer main at a total cost
of $34,302.80.
-2-
TV Contract No. 2 included light cleaning and TV inspection of
Basins B03, B03A, and B06. Wolf Equipment Corporation was
awarded the contract for the lump sum cost of $26,250.00. Wolf
began the inspection work for this project on May 7, 1986. As of
the contract completion date, June 30, 1986, Wolf had completed
only 25% of the 51,535 feet of sewer to ter inspected. During a
review of the inspection reports, for the work that Wolf had
completed, we found several inaccuracies that made the reports
useless to the City. Due to Wolf's poor performance his contract
was terminated.
The City is now taking action to enter into a contract with
National Power Rodding, the second low bidder for a lump sum cost
of $31,951.70, to undertake this contract.
TV Contract No. 3 included heavy cleaning and TV inspection in
Basins Bll, B12, and B13. The City Council approved the low bid
of $34,605.00 by National Power Rodding on June 9, 1986.
National Power Rodding has indicated that they will start the
inspection of the 57,675 feet of sewer in this project on
September 15, 1986. it is assumed that National Power Rodding
will complete this work prior to the November 30, 1986 completion
date.
The contract to clean the combined sewer in Emerson Street from
Orrington to Ashland was awarded to National Power Rodding
Corporation on April 14, 1986 for the cleaning of 3,938 feet of
72", 60" and 36" of combined sewer pipe in Emerson Street for the
lump sum cost of $50,000.00.
National Power Rodding began the sewer cleaning shortly after the
City obtained the required waste generator's permit in early
July. National Power Rodding had completed the cleaning of 327
feet of 36 inch combined sewer and approximately 870 feet of 60
inch sewer pipe when the brick manhole at the intersection of
Emerson Street and Asbury Avenue beqan to fall apart. At this
time the entire manhole structure has failed causing a void under
the concrete road surface. National Power Rodding has pulled off
the job site and has stated that they will not continue the
contract work until such time that Evanston has inspected the
remaining manholes and can assure them that the manholes are
structurly sound.
The City is currently obtaining repair cost estimates from five
construction companies to repair this damaged manhole.
Large Diameter Sewer Inspection
The four engineering firms which responded to our request for
proposal, to conduct a walk-through inspection of 11,550 feet of
54 inch and larger sewers, were interviewed. On July 17, 1986,
-3-
the City Council approved the proposal by Alvord, Burdick &
Howson to complete the inspections for the lump sum cost of
$39,000.00. This inspection work is tentatively scheduled to
begin by September 1, 1986.
Mr. Stoneback also reported that request for proposals were sent
to 12 firms for a Sewer Maintenance Management Program which is a
computer software program with associated hardware. This program
will provide an inventory of the sewer infrastructure and keep
records of all maintenance, inspections, and repairs of the sewer
system. It will also provide maintenance scheduling and be
utilized to formulate the long range sewer plan. Four firms
returned request for proposals which are now being looked at by
staff.
Mr. Stoneback handed out fact sheets showing expenditures to date
on all contracts.
Work Program - Year 2
Mr. Pudloski reported the work was progressing according to the
schedule provided. He explained the process of investigation
being pursued and the importance of completing the analysis of
the information before proceeding to establish a long range sewer
plan. The analysis will be slightly behind schedule, but the
fact finding will be completer] ahead of schpdulp. We have gotten
some proposals to help do the analysis and they arp more
expensive than we thought they would be. We are looking at
getting our own sewer analysis program to be coupled to the sewer
maintenance program to do our own analysis. We will then begin
looking at alternatives in the northwest side basins where the TV
inspections will be complete and where most of the unimproved
streets'are located. This will give us an opportunity to design
some detention into these streets.
We are going to propose expending $300,000 for the analysis, fact
finding and TV inspections next year. The original plan called
for spending $170,000 the first year and then $200,000 each
following year. We did not expend the $170,000, so we will
request the $300,000 which will put the planned expenditures back
on schedule. This money all comes out of the Northwest Water
Commission revenues which we expect to be two million dollars.
This will leave aproximately 1.4 million dollars for the sewer
program after operating expenses. We will use $300,000 for
analysis, which will leave approximately 1.1 million dollars to
do sewer construction. The sewer construction we will be doing
are the emergency repairs we find from the TV contracts, the work
we need to do under the streets we are resurfacing, and work we
need to do under streets we have programmed for special
assessments. We can expect approximately 1.4 million dollars
annually from Northwest Water Commission water sales now that
they are fully on line.
-4-
The Chair discussed the meeting schedule and the Commission
decided to continue the present practice of scheduling to meet on
the third Wednesday every other month, but would meet on an
as -needed basis with notification to the members,
Chairman Wold adjourned the meeting at 9:20 P.M.
Respectfully submitted,
Richard a. iqur lli