Loading...
HomeMy WebLinkAboutCCpacket20150831 SPECIAL CITY COUNCIL MEETING Monday, August 31, 2015 7:00 p.m. CITY OF EVANSTON, ILLINOIS Council Chambers Lorraine H. Morton Civic Center 2100 Ridge Avenue, Evanston, IL ORDER OF BUSINESS (I) Roll Call – Begin with Alderman Grover (II) Mayor Public Announcements (III) City Manager Public Announcements Recognition of Joseph McRae, Deputy City Manager and Director of Parks, Recreation and Community Services Streets Alive, Green Living Festival and Hispanic Heritage Month (IV) Communications: City Clerk (V) Public Comment Members of the public are welcome to speak at City Council meetings. As part of the Council agenda, a period for public comments shall be offered at the commencement of each regular Council meeting. Those wishing to speak should sign their name and the agenda item or non-agenda topic to be addressed on a designated participation sheet. If there are five or fewer speakers, fifteen minutes shall be provided for Public Comment. If there are more than five speakers, a period of forty-five minutes shall be provided for all comment, and no individual shall speak longer than three minutes. The Mayor will allocate time among the speakers to ensure that Public Comment does not exceed forty-five minutes. The business of the City Council shall commence forty-five minutes after the beginning of Public Comment. Aldermen do not respond during Public Comment. Public Comment is intended to foster dialogue in a respectful and civil manner. Public comments are requested to be made with these guidelines in mind. 1 of 83 City Council Agenda August 31, 2015 Page 2 of 4 (VI) Special Orders of Business (SP1) City Reorganization Update It is recommended that the City Council receive and file this report. For Action: Receive and File (SP2) FY 2016 Budget Update Staff recommends that City Council receive and file the FY2016 Budget update. For Action: Receive and File (SP3) FY2016 Budget Calendar Staff recommends that City Council approve the FY2016 budget preparation calendar. For Action (SP4) Approval of Funding in the FY2016 CIP for Two Studies of Evanston Parks and Recreation Facilities Staff recommends that City Council direct the City Manager to include $40,000 in the FY 2016 Capital Improvement Plan (CIP) for two studies: 1) a Park Report Card that will review park and recreation properties in Evanston (City, School Districts 65 and 202, Ridgeville Park District, Lighthouse Landing, and Metropolitan Water Reclamation District) and 2) a park and recreation financing report that will prioritize spending. For Action (SP5) Emerson/Ridge/Green Bay Project Update Staff will provide an update on the Emerson/Ridge/Green Bay Improvement Project. For Discussion (VII) Approval of Contract with Walsh Construction Company for Rehabilitation of Concrete in Water Plant Clearwells 1 and 2 (Bid 15-47) Staff recommends that City Council authorize the City Manager to execute a contract for the Rehabilitation of Concrete in Water Plant Clearwells 1 and 2 with Walsh Construction Company II, LLC (929 West Adams Street, Chicago, IL) in the amount of $302,874.10. Funding is provided by the Water Fund, Account 513.71.7330.65515. For Action 2 of 83 City Council Agenda August 31, 2015 Page 3 of 4 (VIII) Resolution 87-R-15, Authorizing the City of Evanston to Increase the FY2015 Budget for the Dempster/Dodge TIF Fund by $2,000,000 to a new total of $2,000,000 Staff recommends that City Council adopt Resolution 87-R-15 authorizing the City Manager to amend the FY2015 Budget for the Dempster/Dodge TIF Fund by $2,000,000 to a new total of $2,000,000. Per the agreement with Valli Produce, the City will be funding this incentive through future tax increment finance revenues. These revenues will be used to pay the debt service cost of a $2,000,00 debt issuance in the Dempster Dodge TIF fund. For Action (IX) Resolution 88-R-15, Authorizing the City of Evanston to Increase the FY2015 Budget for the Chicago/Main TIF Fund by $2,900,000 to a new total of $2,900,000 Staff recommends that City Council adopt Resolution 88-R-15 authorizing the City Manager to amend the FY2015 Budget for the Chicago/Main TIF Fund by $2,900,000 to a new total of $2,900,000. Per the agreement with Chicago & Main Funding Member, Inc., the City will be funding this incentive through future tax increment finance revenues. These revenues will be used to pay the debt service cost of a $2,900,000 debt issuance in the Chicago/Main TIF fund. For Action (X) Ordinance 111-O-15 Amending Section 9-2-3 (B) of the Evanston City Code to Increase Fire Department Ambulance Transport Fee Staff recommends that City Council adopt Ordinance 111-O-15 amending Section 9-2-3 of the Evanston City Code. The amendment will increase ambulance transport fees. For Introduction (XI) Ordinance 110-O-15 Amending Title 10, Schedule XVII of the Evanston City Code to Increase Parking Violation Penalties Staff recommends that City Council adopt Ordinance 110-O-15, amending Title 10, Schedule XVII, of the Evanston City Code, “Parking Violation Penalties”, Section 10-11-17. The amendment will increase the penalty for various parking fines. For Introduction (XII) Approval of Appointments -- For Appointment to: Commission on Aging Rick Gergerian Economic Development Committee Hecky Powell Plan Commission Patrick Brown For Action 3 of 83 City Council Agenda August 31, 2015 Page 4 of 4 (XIII) Call of the Wards (Aldermen shall be called upon by the Mayor to announce or provide information about any Ward or City matter which an Alderman desires to bring before the Council.) {Council Rule 2.1(10)} (XIV) Executive Session (XV) Adjournment MEETINGS SCHEDULED THROUGH SEPTEMBER 2015 Upcoming Aldermanic Committee Meetings Wed, Sept 2 6 pm Transportation/Parking Committee Wed, Sept 2 7:30 pm Economic Development Committee Tues, Sept 8 6 pm Human Services Committee Thurs, Sept 10 7 pm Joint CDBG and Mental Health Board Tues, Sept 15 6 pm A&PW, P&D, City Council meetings Wed, Sept 16 6:30 pm M/W/EBE Advisory Committee Wed, Sept 16 7 pm Northwestern University/City Committee Mon, Sept 21 7 pm City Council meeting Thurs, Sept 24 5:30 pm Emergency Telephone Board Thurs, Sept 24 7 pm Housing & Community Dev Act Committee Fri, Sept 25 7 am Housing & Homelessness Commission Mon, Sept 28 6 pm A&PW, P&D, City Council meetings Tues, Sept 29 7 pm Housing & Community Dev Act Committee Information is available about Evanston City Council meetings at: www.cityofevanston.org/citycouncil. Questions can be directed to the City Manager’s Office at 847-866-2936. The City is committed to ensuring accessibility for all citizens. If an accommodation is needed to participate in this meeting, please contact the City Manager’s Office 48 hours in advance so that arrangements can be made for the accommodation if possible. 4 of 83 To: Honorable Mayor and Members of the City Council From: Wally Bobkiewicz, City Manager Subject: City Reorganization Update Date: August 28, 2015 Recommended Action: It is recommended that the City Council receive and file this report. Background: On May 12, 2015, I announced an initiative to review several portions of City operations in light of pending budget issues with the State of Illinois. The text of my statement is Attachment 1. Since that time, the State has still not addressed its budget issues and has not adopted a FY 2016 budget that was required under law to be adopted by May 31. City staff has completed the review of City operations I requested and has made recommendations on the realignment of several City programs and services. I believe the restructuring that will be implemented addresses several areas where improvement was needed to better serve the residents of Evanston. These changes will in some cases save money, but mostly will allow the City to get more and better services with existing resources. The economic conditions impacting the City’s budget (apart from the potential impacts to Evanston from the State of Illinois’ budget) are very strong. I believe these changes will make the City of Evanston a stronger, more efficient organization in the future. The following is a summary of this work and the changes that will be made between now and December 31, 2015. Emergency Management and Public Safety Community Relations Police Chief Eddington, Fire Chief Klaiber and Parking and Revenue Manager Voss conducted a review of the City’s emergency management and public safety community relations. The have recommended a reorganization of the Fire Department’s management structure to create a Division Chief of Special Services/Emergency Operations. No additional staff will be required for the creation of this position. The position will provide a different approach to emergency management for the City, collaborating more regularly with City and regional partners. The details of this new For City Council meeting of August 31, 2015 SP1 City Reorganization Update For Action: Receive and File Memorandum 5 of 83 position are contained in Attachment 2 and will be addressed by Chiefs Eddington and Klaiber at the City Council meeting. The Police and Fire Departments also reviewed their community relations efforts. A summary of this review is included in Attachment 3. No significant changes are proposed for this area. Reorganization of Public Works and Utilities Departments Assistant City Manager Lyons was tasked with completing a review of the Public Works and Utilities Departments. He was assisted by Parking and Revenue Manager Voss and Sustainability Manager Hurley in these efforts. His analysis and recommendations to me are included in Attachment 4. Staff will now move forward to implement the creation of a Public Works Agency to be completed no later than December 31, 2015. Mr. Lyons will present these plans at the City Council meeting. Livable Communities Initiatives Community Development Director Muenzer and Sustainability Manager Hurley were tasked to review changes required for our livability initiatives. Their report is Attachment 5. I concur with their recommendations. The creation of a Mobility Services function in the Community Development Department will require moving some staffing from the Public Works Department which will be finalized in the next couple of months with the creation of the Public Works Agency. The recommended new Transportation Planner will be a broader position addressing mobility issues and will be a reorganized position from the existing Assistant to the City Manager/Intergovernmental Relations Coordinator position. Ylda Capriccioso has announced her resignation as of the end of October, 2015 to relocate out of the area. The City will begin recruitment for this new mobility position immediately so that the new position can be filled before Capriccioso’s departure. Human Services Director of Health and Human Services Thomas-Smith and Muenzer reviewed the current alignment of staffing between their departments to deliver Human Services and Housing services. They recommended no changes in their operations other than continued close working relations among staff, particularly with the staffing of the Housing and Community Development Act Committee and the Mental Health Board. One clerical position has already been transferred from Health and Human Services to Community Development this year to assist with this work. Directors Thomas-Smith and Muenzer will provide additional details at the City Council meeting. 6 of 83 Other Reorganization Issues Administrative Services Department: During the course of the last several months, it has become clear to me that the Administrative Services Department also requires some reorganization. The addition of Fleet Services from Public Works in May, the addition of Facilities Maintenance from Public Works with the creation of the Public Works Agency and the retirement of Fleet Services Manager Jesckhe requires us to examine the best way to manage these two functions. I have asked Parking and Revenue Manager Voss to serve as the Interim Fleet Manager in addition to returning to his Parking duties while we further examine options. Senior Management Analyst Alex Thorpe will continue to oversee the Revenue office as he has the last several months during this time. As the Administrative Services Department has grown, I believe it now makes sense to remove Finance operations from the department and have it stand alone as its own separate operation. I have asked Assistant City Manager Lyons when he completes his service as Acting Public Works Director to return to the City Manager’s Office and devote his attentions to overseeing Finance operations as well as take on other citywide responsibilities to assist me more on a day to day basis. The details of these changes will be worked out in the next 30-45 days. This will leave a vacancy in the position of Director of Administrative Services. I will begin an internal recruitment to fill this position on a permanent basis immediately. Deputy City Manager Storlie will continue to be the Acting Director until the position is filled. City Manager’s Office: With the departure of Capriccioso in October and the transition of Charliese Agnew from Community Engagement to Economic Development, the City Manager’s Office will also require some reorganization. Capriccioso’s position will transfer to Community Development and Agnew’s position will be reclassified as an entry level Assistant to the City Manager position. This position will remain vacant until later in the year. I have asked Community Engagement Manager Logan to review the current staffing in Community Engagement and recommend appropriate staffing adjustments. Economic Development Manager Leonard will return to her regular duties upon Lyons’ return to the City Manager’s Office. Conclusion The analysis of operations has been a significant effort. In May, I thought that additional consulting resources might be necessary to complete these efforts. However, staff said no; that the resources to do this work could be accomplished in house. I am proud of the work product completed by many of our team. I do want to provide special thanks to Assistant City Manager Lyons, Parking and Revenue Manager Voss and Sustainability Manager Hurley for their significant work on issues relating to the Public Works and Utilities Departments. The changes outlined here will make the City of Evanston a stronger, more effective organization for many years to come. 7 of 83 Attachments 1. May 12, 2015 memo “Planning for 2016” 2. August 28, 2015 memo “Emergency Management” 3. July 29, 2015 memo “Public Contact and Community Relations” 4. August 27, 2015 memo “Public Works/Utilities Department Reorganization Update” 5. August 3, 2015 memo “Livable Community Initiatives” 8 of 83 ATTACHMENT 1 From: Bobkiewicz, Wally Sent: Tuesday, May 12, 2015 9:48 AM To: All City Staff Subject: Planning for 2016 The City faces many challenges as we look toward planning for 2016. The State of Illinois remains in severe financial difficulty and it is hard to imagine any resolution to the State’s problems that will not also have negative impacts on the City’s finances. Last week’s decision by the Illinois Supreme Court finding State pension reform unconstitutional significantly adds to the State’s budget problems. In contrast, the City of Evanston is thriving with new private investments, and the larger community is once again turning its focus to addressing various community and neighborhood issues. Regrettably, however, it is hard to imagine any resolution to the State’s problems that will not also have negative impacts on the City’s finances. The City government has adjusted over the years to align itself with the pressing issues and priorities of the time. We have overhauled our customer service and community engagement efforts with the introduction of 311 and a dedicated Community Engagement Division; we have reorganized and reprioritized our Departments of Administrative Services, Health and Human Services, Parks Recreation and Community Services; and have focused our efforts on a healthy work environment. All of these changes were made to better fulfill the City Council’s goals and serve our community. The City of Evanston is once again at a juncture where realignment is necessary. The City needs to evaluate our preparedness for all emergencies and ensure that the Police and Fire Departments are aligned to address them. The City’s community standards, as reflected by the City Council’s goals and expectations, makes it plain that the City’s capital planning, infrastructure investments, facility and park maintenance and stewardship of natural resources requires realignment. The City has made great strides in making Evanston the most livable community, but the City government structure is not aligned to make the kind of forward progress that the community desires. Similarly, the City has worked diligently on Human Services issues since the dissolution of Evanston Township but structurally we are still not aligned to serve our residents as comprehensively as we can. Finally, there are several citywide projects that must receive the attention needed to complete or significantly advance in 2016 to meet community and City Council expectations. The staff of the City of Evanston has demonstrated many times in the past our ability to address challenges head on. The Evanston community expects the City to thrive despite challenges and in order to do so we must continue to be forward thinking and nimble in our approach to problems. 9 of 83 Given the uncertainty of the State’s plans for FY 2016 and beyond, I believe now is the time for staff to develop plans for the City of Evanston in 2016 to better serve our community. Today I am announcing the following changes to address these issues: Emergency Management and Public Safety Community Relations Review An area that has not received much attention in the past several years has been our planning and training for emergency responses. I am asking Police Chief Rich Eddington, Fire Chief Greg Klaiber along with Parking and Revenue Manager Rickey Voss to convene a working group to review our current staffing and planning in emergency management and report back recommendations on needed improvements. In addition, I am asking this same group to evaluate our community relations efforts in both the Police and Fire Departments and provide recommendations on needed improvements. Mr. Voss will temporarily leave his role in the Department of Administrative Services to support this and other planning efforts. Reorganization of Public Works and Utilities Departments I am asking Assistant City Manager/CFO Marty Lyons to temporarily leave his role as Director of Administrative Services and to work full time on an examination of the services provided by the Public Works and Utilities Departments. Both Public Works and Utilities are facing great challenges. How best to plan and execute critical infrastructure improvements? How best to serve client departments with the maintenance of program facilities? How best to leverage the important resource of the Evanston Water Plant as we look to expand water sales and conserve water simultaneously? How best to manage and collect consumed resources in an environmentally responsible way? How best to preserve and expand our urban forest? These departments will now report directly to Lyons and he will work closely with Directors Dave Stoneback and Suzette Robinson on both day to day operations and to examine how the services provided by both departments can better align with City goals and community standards. I believe this examination will result in the elimination of both departments and the creation of a new department or departments to better deliver these core services. I have asked Mr. Lyons to evaluate the value of bringing in outside experts if needed to best measure resources and efforts used in providing existing services. These evaluation efforts are primarily focused on to how best leverage the outstanding efforts of the men and women working every day in the field in these departments rather than identify alternative outsourced ways to provide these services. 10 of 83 As we move forward in this examination, I believe that the Fleet Services function no longer fits in the mission of these departments. Therefore, I am transferring the Fleet Services Division to the Department of Administrative Services. I have asked Sustainability Manager Catherine Hurley and Human Resources Manager Jennifer Lin to assist Lyons with his efforts in addition to their regular assignments. In addition, Mr. Voss will assist Lyons full time on this project. Mr. Lyons will relocate his offices to the Third Floor of the Civic Center. In this interim period, I have asked Deputy City Manager Erika Storlie to become Acting Director of Administrative Services and Economic Development Manager Johanna Nyden to serve as Acting Deputy City Manager to cover in Storlie’s absence. Senior Economic Development Coordinator Paul Zalmezak will serve as Acting Economic Development Manager in Nyden’s absence. In Mr. Voss’ absence, I have asked Senior Management Analyst Alex Thorpe to serve as Acting Revenue and Parking Manager. Livable Community Initiatives The City is taking great strides toward achieving our goal in making Evanston the most livable community. Sustainability Manager Catherine Hurley is leading the City’s efforts culminating in our Four Star Star Communities certification. Assistant Parks Recreation and Community Services Director Christina Ferraro is leading our great work on our Age Friendly Community initiative. Assistant to the City Manager Ylda Capriccioso brings new energy to our biking safety initiatives. However, additional efforts are also underway in Community Development, Utilities and Public Works. The City continues to face challenges managing the interrelationship between cars, trains, buses, bikes and pedestrians. I am asking Hurley and Director of Community Development Mark Muenzer to convene a working group to discuss options for 2016 to better address these issues. The City Council recently agreed to a new partnership with the Evanston Animal Shelter Association for operating the animal shelter. With the start of this new partnership June 1, 2015, the oversight of the animal shelter will transfer from the Police Department to the City Manager’s Office. Community Engagement Specialist Charliese Agnew will be coordinating this transition. Animal Control services will remain with the Police Department. I am also asking this Livable Communities working group to consider the best organizational home for the animal shelter moving forward. Human Services 11 of 83 Director of Health and Human Services Evonda Thomas-Smith led an extraordinary effort over the last two years integrating the functions of Evanston Township into the City and connecting all departments that provide human services support. I believe additional alignment is necessary to best deliver these services, especially the City’s work to provide affordable housing and shelter for the homeless. I am asking Thomas- Smith and Muenzer to convene a working group to offer recommendations for alignment changes in 2016. Focus on Major Projects There are four key projects that I believe must be either completed, fully planned or well underway in 2016 that will require the full attention of the City staff to move forward. This is necessary to implement the City Council’s priorities Robert Crown Center I asked Mr. Lyons to devote whatever time necessary to continue to move this project forward. The City Council is faced with additional planning decisions in the coming months and I am relying on Lyons to keep this project to the forefront of all concerned. Howard Street Theater Developing this theater proposal is the final public piece of the redevelopment of Howard Street between Chicago Avenue and Ridge Avenue. It is critical to bring additional private development to Howard Street that will occur once a project has been approved by the City Council and completed. I asked Ms. Nyden to bring this project with her from Economic Development to her role as Acting Deputy City Manager and continue to work diligently to make this project a reality. Harley Clarke Mansion With vacation this month of the building by the Evanston Arts Center and the report of the Harley Clarke Review Committee due on June 8, it is imperative that decision making on this property continue to move forward. Economic Development Specialist Cindy Plante and Director Muenzer have done a great job working with the committee and will continue to make this project a priority. Downtown Performing Arts Center The Mayor’s Downtown Performing Arts Center Committee has nearly completed its report. I anticipate that it will make its final report to the City Council on July 20, 2015. This project could be a transformative one for the future of our downtown and will require attention to move forward. Mr. Zalmezak and Cultural Arts Coordinator Jennifer Lasik will continue to provide focused attention on the project. 12 of 83 I am asking that all of the planning work described above be completed and reports submitted to me by Friday August 14, 2015. This work will assist in completing the proposed FY 2016 budget which will be submitted to the City Council for consideration in early October, 2015. All of the various temporary staffing assignments will be in place at least until August 31, 2015. The staff of the City of Evanston is a talented and resilient team. We have adjusted before to deliver the best quality of service to our community and I am confident that these efforts will continue that tradition. Thank you for all you do for the residents of Evanston. Please let me know if you have any questions. Wally Bobkiewicz City Manager City of Evanston 847-866-2936 13 of 83 To: Wally Bobkiewicz, City Manager From: Greg Klaiber, Fire Chief Richard Eddington, Chief of Police Rickey Voss, Revenue/Parking Manager Subject: Emergency Management Date: August 28, 2015 Your memorandum titled “Planning for 2016” directed Fire Chief Klaiber, Police Chief Eddington and Revenue/Parking Manager Voss to review the emergency management services of the City of Evanston. In complying we discovered numerous positive things, primary among them being the willingness of all city employees to step up and manage a crisis. Those employees’ competence in their individual areas of expertise is the bedrock upon which the resolution of any crisis will be based. However, our review also revealed several shortcomings. Thus, we propose that emergency management remain in the Fire Department under supervision of a Fire Command Officer and the Fire Chief. They will address the following issues: 1. Coordination of the Health, Fire and Police Departments, the PIO component of the City Manager’s Office, and the Northwestern University Police Department - In our opinion this area needs significant attention and coordination. Silos that have been erected around these individual functions are counterproductive to realistic emergency management. Regardless of the solution you select, we believe action steps must be taken to ensure the silos come down and consistent, long-term cooperation in crisis-management be established among the four functions, fire, health, police, and PIO. As a sub- note, issues regarding the Ebola virus in 2014 and early 2015 highlighted the need to ensure that the Health Department be a full partner in ongoing emergency-management issues. Current emergency management planning underutilizes the Northwestern University Police Department, which has a lieutenant assigned as its Emergency Manager. Chief Bruce Lewis has committed NUPD to full participation in the City of Evanston Emergency Management planning process. To insure cohesion, this working group will meet quarterly. Memorandum ATTACHMENT 2 14 of 83 2. Coordination with the Cook County Department of Homeland Security and Emergency Management – In that the City of Evanston is accredited by the Illinois Emergency Management Agency, it enjoys a semi-autonomous status unique among Cook County municipalities and can petition the State directly for a declaration of emergency and the financial reimbursement that goes along with mitigating the costs of the emergency. However, some additional responsibilities accompany semi-autonomous status, specifically biennial reports that submit the review of the emergency management plan for the City of Evanston and a requirement in that plan that periodic drills be undertaken to exercise the plan and assure that all assigned personnel understand their roles and responsibilities. In our collective opinion the changes we recommend will be helpful in addressing specific exercises that will be useful to the participants throughout the city. 3. Alignment with the Cook County Department of Homeland Security and Emergency Management – Members of the Fire and Police Departments have worked diligently to improve this relationship. We have availed ourselves of equipment and training provided by the Cook County Department of Homeland Security. However, our relationship could be greatly improved beyond that. In the committee’s collective judgment, the Cook County Department of Homeland Security and Emergency Management—a significant member of President Prekwinkle’s cabinet—will grow in authority and responsibility in the coming years. It would behoove us to align ourselves with it as closely as possible so as to avail ourselves of grant and training opportunities, as well as equipment. An example of the latter would be a mobile command post. As you are aware, for a host of reasons the police department no longer has a mobile command post. In an emergency, however, with just a phone call we would be able to obtain one from the Cook County Department of Emergency Management. Other equipment also is available. Additionally, with an enhanced relationship with the Department of Homeland Security, a member of their staff will respond to our emergency situation and advise us directly regarding resources available and the timeline for delivery of those resources. In our collective judgment, a significant emergency will overwhelm Evanston’s resources in relatively short order. We need to avail ourselves of this type of logistical support, both in equipment and personnel, in the event of an extended or wide-ranging emergency. 4. Proposed Solution – We propose the emergency management function remain in the Fire Department, but under supervision of a Fire Command Officer and the Fire Chief. We believe this new management team will re-energize Emergency Management in the City of Evanston, providing the opportunity for a fresh start and a refocusing of our collective efforts. As a second option we’ve discussed civilianization of this position, with the position reporting to the City Manager. There are pros and cons to both solutions. 15 of 83 The Fire Department’s command staff is accustomed to and adept at “pinch hitting” when the primary emergency manager is in training or on vacation. However, we propose that emergency management be added to the staff meetings so as to ensure all ranking members of the Fire Department are familiar with the current plan and procedures for emergency management in the City of Evanston. Obviously use of a command officer is a significant expense, whereas the civilian option would be less expensive, at least in the short-run. However, turnover in the position is a consideration for the long-haul. The issue we are trying to address in our preferred solution is a continuity of service that currently does not exist and, it is our collective concern, will not exist with the use of a civilian. The above constitutes the committee’s recommendations. Should you have any questions or concerns, please contact any committee member at your convenience. kmt 16 of 83 To: Wally Bobkiewicz, City Manager From: Richard Eddington, Chief of Police Subject: Public Contact and Community Relations Date: July 29, 2015 In your memo, Planning For 2016, you asked that the police department evaluate all its avenues, venues and opportunities for public contact. Following is a list of those activities. It is extensive. Engaging the public in a positive manner is a hallmark of the department. The task of engagement is not the province of a single unit or specific officers, but instead is undertaken by all echelons of the department. Consequently contacts are numerous— a testament to the department’s commitment to engaging the public positively for the betterment of the community and the improvement of police services. EPD has become proficient in both the “high tech” of social media and “high touch” of personal contact. EPD installed and inspected 346 car seats in 2014. This interaction is very important to new parents and reiterates our commitment to safety. EPD “touches” these families at a very special time for them which also fosters our commitment to traffic safety. As to “tech”, currently the police department has 1750 followers on Twitter and we have posted 1631 tweets. The police department’s Facebook page has 1520 “likes.” We use social media on a daily basis to effectively engage the community by posting the department’s daily bulletins, press releases and to advertise upcoming events. We often utilize social media to provide current information on in-progress incidents that involve vehicle accidents that may disrupt traffic flow. We have also provided real-time updates on incidents such as a shooting and the search for a bank robbery offender. Residents have used social media to reach out to the police department to provide suggestions on locations that require additional attention such as a stop sign that is often disregarded by motorists. Text-A-Tip has become part of our “tech” contact with the public. EPD responded to 188 Text-A-Tip messages in 2014. Memorandum ATTACHMENT 3 17 of 83 Visible and approachable presence in the community fosters “high touch” communication. EPD logged over 1,700 hours of foot patrol in the community. Additionally, EPD has incorporated the use of bicycles, ATVs, and T-3 personal electric vehicles as part of regular patrols. This allows for a more personal interaction with citizens while an officer is on patrol. In 2014 EPD committed to 408 hours of bicycle patrol, 96 hours of ATV patrol, and 72 hours of T-3 patrol. Following is a partial list of EPD’s public contacts: • Citizen Police Academy • Girl scout tours • Boy scout tours • Career Day panel at King Lab • Ward meetings • Security Surveys • Summer Youth Camps-counselor talks • YOU talks • Movies in the park • Food Truck Festival-Brummel Park • YEA Festival • Sidewalk Sales-Dempster Merchants • Prayer vigils • Black Lives Matter Rally at Curt’s Cafe • Food basket drive-Christmas • PST Unit bike rides • Bike registrations • Frequent visits to daycare centers • Read to kids at Washington School during Black History Month • Visit warming centers • Block parties • National Night Out • First Night • Presence Fair at St. Francis Hospital • Peace rallies • Stand Against Hate • Ethnic Festival at YMCA • Role plays for Leadership Evanston • Work with Hilda’s and Connections for the homeless • Evanston Bike the Ridge • MLK celebration at Fleetwood • City of Evanston youth basketball league/Fleetwood Community Center • Family Focus youth presentation (anti-bullying) • Town-Hall meeting at the Levy Center • ETHS track/field meet • ETHS Black Male summit 18 of 83 • EPD mentoring program • VFW Ladies Auxiliary Luncheon at Fleetwood • 5th Ward Prayer vigils: Springfield Baptist, First Church of God, First Seventh Day Adventist Church • NU Off Campus Life/ Community Counselors meetings (Dillo Day) • Summer Youth Counselor’s safety presentation (June 2015) • 7th Day Adventist Church Program (Q&A) • West End Area Block Club meetings • Gibbs-Morrison Ribbon Cutting • Mason Park Summer Drop Off Program • Bring Your Kids to Work Event • Law and Your Community Training • Legacy Conference • Levy Center Senior Spelling Bee • Dawes School Bike Safety Class • Hidden Park Neighbors Kids Talk • ESAP Coalition Event • Haitian Festival • Community Picnic • Bike to School Day – Washington School • Ridgeville Park District – Pizza in the Park • Numerous Block Parties • NOBLE – The Law & Your Community Training • Meet & Greet Citizens at the Farmer’s Market • Informal meetings with business owners and employees • Downtown and Lakefront area deployments • Participation in Block Parties • Coordinate and Participate in Special Olympics Events • Installation of Child Car Seats for Residents and Non-residents • Distribute Information on bike, pedestrian and rail safety Evanston Police Department’s public contact is extensive. However, continued refinement is our goal. EPD will continue to be attentive to feedback from the public during these contacts in order to foster our positive partnership with the Evanston community. 19 of 83 To: Wally Bobkiewicz, City Manager From: Martin Lyons, Asst. City Manager/Interim Public Works Director Subject: Public Works/Utilities Department Reorganization Update Date: August 27, 2015 On May 12, 2015 The City Manager informed all City staff of City-wide reorganization/assessment activities that needed to be accomplished in preparation for possible substantial revenue cuts from the State of Illinois.Per this communication the team shown below was instructed to review the current organization and operations of the Utilities and Public Works Departments. 1. Rickey Voss, Revenue and Parking Manager – Mr. Voss’s long service to the City in both a line capacity (police officer and Police Sargent) and as a current direct manager of AFSCME personnel, gives him a wide perspective and in comments back from staff, also made him approachable with specific issues. 2. Catherine Hurley, Sustainability Manager – Ms. Hurley’s education in engineering, as well as her leadership role in sustainability for the City of Evanston gives her the technical expertise to work with all engineering and technical staff on reviewing infrastructure, design and planning processes, and facilitating a discussion on how our current methods can be modified to achieve a sustainability goal. 3. Martin Lyons, Asst. City Manager/CFO – Mr. Lyons negotiated the last AFSCME contract, is familiar with Capital Improvements/Infrastructure planning process, and has knowledge of all city departmental operations as well as the operations of other public works/utilities operations while working for previous communities. This team implemented a grass roots review process that included the following components: 1. Meetings with the entire staff of both departments as a whole 2. Meetings with individual staff groups broken down by: a. Mid-level managers across multiple divisions b. Operating staff both by division/unit and across divisions and units. c. Individual meetings with directors, managers and staff. d. Not counting individual one on one meetings, more than 40 meetings occurred. 3. The above meetings were structured to provide both group and anonymous feedback from all staff. a. Staff was encouraged to provide feedback on the specific goal of the reorganization process in answer to the following question: “How would Memorandum ATTACHMENT 4 20 of 83 Page 2 of 4 you reorganize or restructure the two departments to provide better services/operate more efficiently?” b. At the initial round of meetings, staff was also encouraged to provide comments on specific issues impacting performance that did not pertain to structure or organizational issues (e.g. personnel, training, operational procedures). 4. Each meeting was structured to ask the same questions of all groups for each given stage of the process. As a result of the initial round of meetings the analytical team developed a list of operating, environmental, and capital related issues that were of concern to employees. This list is attached. The analysis team then engaged in another round of meetings with all staff to discuss these issues and to review sample organization charts. Once again, all staff were provided the opportunity to provide input either through direct discussion or through anonymous input (the use of 4”-6” note cards at each meeting). The sample organization charts were also distributed and were “marked up” by staff while at these meetings. Results/Recommendations: As noted in the following attachment, staff felt very strongly that changes needed to be made in several key areas: 1. Operations – Quicker filling of vacancies, improved competency in supervisory positions, more equipment/resources, and consistent commitment to tasks. 2. Personnel/Environment – Improve unhealthy work environment (personal interactions, not unsafe conditions), reduce micro management, improve management support, and standardize hiring processes and training. 3. Capital Planning – Better prioritization of the Capital Improvements Plan (CIP), setting realistic and sustainable expectations, and executing projects according to defined schedules. The analysis team strongly believes that reorganization, combined with a new renewed commitment from all personnel, working in new environments is critical to improving operations, environment and performance. The summary organization chart provided (page 4) recommends the return to a single Public Works Agency. This chart does not include all staff. The final placement of all staff will be accomplished over the next three months with the help of the new management structure and the operating staff of all divisions in the new agency. 21 of 83 Page 3 of 4 The proposed agency organizational plan provides a structure to facilitate the improvements discussed by all staff as noted above, and provides for: 1. Clear Leadership – The new Public Works Agency will have one director with four Bureau Chiefs responsible for operations. This structure allows: a. Agency Director to lead b. Bureau Chiefs to manage c. Supervisors and staff to execute 2. New Integration of Operations a. Bureau structure i. All Right of Way (streets, traffic, sewer, and water distribution) maintenance activities are together. ii. Environmental activities are consolidated in one bureau to continue the City’s goals for sustainable operations. iii. Water Plant activities are separated for the preparation of increased water sales. iv. Capital Planning includes all projects across all funds but will be managed by each area (Water and Sewer, Parks and Facilities, ROW, and Transportation). Substantial work still needs to be accomplished with this reorganization. Next steps need to further involve the management and staff of the new agency. These steps include: 1. Designation / Appointment of Bureau Chiefs - 9/28/15 2. Designation / Appointment of Agency Director – 10/16/15 3. Agency Director, Assistant City Manager & Bureau Chiefs to complete no later than 11/25: a. Structure of Bureaus b. Structure of Administration and Supervisory Personnel 4. Changes to the City Code regarding the new agency and the respective positions reflected in the Code. The analytical team and City staff in the Public Works and Utilities departments did an excellent job of sharing insights and suggestions on some very tough issues. Both departments expressed their concerns in a respectful manner and have the professionalism and ability to successfully implement these organizational changes to create a more efficient operation for the benefit of the community they serve. 22 of 83 Page 4 of 4 Attachments Attachment A -- 2nd Round Meeting Outline 23 of 83 Administrative Services MEETING OUTLINE 1.WHAT DO WE DO ABOUT: 1.OPERATIONS CONCERNS? 2.ENVIRONMENT CONCERNS? 3.INFRASTRUCTURE CAPITAL PROCESS? 2.REVIEW OF ORGANIZATION CHARTS 1.FIVE SAMPLES 2.COMMENTS 3.NEXT STEPS TO MAKE ANY OF THEM HAPPEN 1 ATTACHMENT A 24 of 83 Administrative Services REVIEW OF COMMENTS AND SUGGESTIONS 2 Operations 1)Vacancies 2)Competencies in Position – Reorganization put people beyond their competence 3)Consistent commitment to tasks / programs / work plan too many emergencies 4)Lack of equipment / resources 5)311 unintended consequences – the total picture 25 of 83 Administrative Services REVIEW OF COMMENTS AND SUGGESTIONS (CONT’D) 3 Personnel 1.Unhealthy work mean spirited 2.Micro Management 1.not just at top from CMO 2.Director & Supervisors 3.Lack of Management Support 4.Hiring Process 5.Training/Qualifications 26 of 83 Administrative Services REVIEW OF COMMENTS AND SUGGESTIONS (CONT’D) 4 Infrastructure/Capital 1.Execution of CIP once approved 2.Schedule of CIP/Can’t finish projects in same year 3.Project prioritization 1.Ability to get it all done 2.In house/versus outside 3.CIP Development 1.Technical 2.Political 4.Structure of Engineering 5.Sustainable Plan 1.Physical - can we execute and maintain? 2.Environmentally sustainable? 3.Financially Sustainable? 27 of 83 To: Wally Bobkiewicz, City Manager From: Mark Muenzer, Director of Community Development Catherine Hurley, Sustainability Manager Subject: Planning for 2016 – Livable Community Initiatives Date: August 3, 2015 Per your memo of May 12, 2015 a working group was created by Director Muenzer and Manager Hurley to review the City’s Livable Community Initiatives and how these efforts could be better coordinated and implemented in the future. Specific focus of the discussion was centered around how departments can better communicate and collaborate on the City’s Livable Community Initiatives and the mobility interrelationship between cars, trains, buses, bikes and pedestrians. The working group included the following staff from across six of the City’s departments: Damir Latinovic – Zoning and Planning Administrator Ylda Capriccioso – Assistant to the City Manager/Intergovernmental Affairs Christina Ferraro – Assistant Director, Parks, Rec. and Community Services Lara Biggs – Assistant Superintendent, Construction and Field Services Rickey Voss – Parking and Revenue Manager Rajeev Dahal – Senior Project Manager – Traffic Engineering and Right of Way The above staff met several times during June and July to discuss these topics and to provide recommendations on process and organizational structure changes that could be made to best address Evanston’s Livable Community Initiatives. A summary of the group’s recommendations are provided below. Process Changes The discussion around process changes focused on the need to regularly gather staff from across all departments to coordinate capital improvement projects and policy issues around Evanston’s Livable Community Issues. The group recommends the creation of a formal process and department stakeholder review group to ensure the review and incorporation of key staff feedback to support the City’s various Livable Community Initiatives. The group also discussed the opportunity to better engage Evanston’s boards/committees/commissions (BCCs) in our Livable Community Memorandum ATTACHMENT 5 28 of 83 Initiatives by providing updates on relevant projects/policies to BCCs who may not have direct review responsibilities on a topic but who could provide valuable input prior to the official review process. The intention would be to proactively update BCCs on Evanston’s Livable Community Initiatives and inform them of ways to provide feedback without delaying our regular project and policy approval process. Below is a summary of each recommendation. Recommendation 1: Create a formal internal process for coordination of Capital Improvement Projects and Policy/Program issues: • Process would be modeled off of format for DAPR for our own internal projects/programs/policies with regular scheduled meeting times (i.e. monthly and/or scheduled as needed) • Formal process for gathering and documenting feedback and responding that comments have been checked including creation of a staff comment form • Formal process would standardize how feedback is gathered and incorporated into projects: o Use standard checklist and forms to route around information and seek feedback i.e. Complete & Green Streets Checklist, Livability Checklist, etc o Incorporate considerations for non-code goals (Livability, Age Friendly, Stormwater etc) in evaluations • Formal process to include brainstorming session/input process for group to review and discuss City projects and policy discussions at a ‘big picture’ level (annual) • Checklist and scope or description of the project or program/policy would accompany internal communication documents and serve as a reminder of the agreed upon elements from the Livable Communities group. Recommendation 2: Create awareness and engagement for Evanston BCCs on the Livable Community Initiatives - Frequent updates on current projects and policies • Develop list of topics relevant to BCCs that staff should work to provide information to keep them informed and engaged • Create a process to share information updates, seek feedback (if appropriate) and document information gathered • Connect staff that support BCCs through this process to enhance communication and collaboration opportunities. For example, the recent Neighborhood Gardens and Urban Farms text amendment revised the zoning code and was required to go to the Plan Commission. Prior to submission to the Plan Commission, staff would have shared draft materials with relevant BCCs (i.e. Environment Board) and provided them an opportunity to provide input. This would be incorporated as part of the Staff review process. 29 of 83 Organizational Structure Changes The group discussed ideas for changes to Evanston’s organizational structure that would advance the Livable Community Initiatives. The primary discussion centered on the creation of a consolidated permit center within the Community Development Dept. to create a one-stop-shop for permits related to the City’s right of way and public spaces. While consultation will still be required from staff in their expert fields (i.e. forestry for trees, engineering for street openings), the creation of a centralized permit center would provide a better user experience and allow more efficiencies with the process of administering public and private property permits. On the specific topic of managing interactions between cyclists, pedestrians, vehicles and public transit, the group discussed the need for more planning around transportation issues within the community. The planning for Evanston’s mobility needs should include a consideration of land use, including the City’s right of way and physical assets such as parking infrastructure, which under this proposal would be under the purview of the Community Development Dept. Therefore the group recommends creating a mobility services focus within Community Development. The Mobility Services function would be integrated within the current Planning and Zoning Division. Recommendation 1: Create consolidated Permit Center within Community Development • Consolidate Right of Way permits and other permits currently being administered by various parts of Public Works o Move two Right of Way Permit Staff to Community Development’s Building and Inspection Services Division o Coordinate the acceptance and processing of other relevant permits:  Tree Permit, Block Party Permit, etc. • Update permit documents to better articulate permit process time and set expectations for levels of service • Coordinate eventual conversion to electronic plan review for both private and public property permits Recommendation 2: Create a Mobility Services Function within Community Development • Mobility services work team within Community Development’s Planning & Zoning Division (may be renamed to reflect new functions) o Traffic Engineering staff currently in Public Works (1 FTE) o Transportation Planner (1 FTE) o Bicycle Planning and Program coordination, including bike share program (Staffing TBD) o Parking Infrastructure Planning (Staffing TBD) 30 of 83 Evanston Animal Shelter The final topic of consideration for our working group was the permanent home for the oversight of the Evanston Animal Shelter. The working group discussed the options for where in the organization the Animal Shelter oversight could be located and came up with the following options: Health and Human Services; Parks, Recreation & Community Services; Police Department or the City Managers Office. After consulting with Community Engagement Specialist Charliese Agnew, who is coordinating this transition, the group recommends that the permanent home for the Animal Shelter oversight is located within Parks, Recreation & Community Services because the shelter is a community service. Thank you for the opportunity to convene this working group and provide input on process and organizational changes for the City of Evanston. Please feel free to contact us with any questions. 31 of 83 7For the City Council Meeting of September 20, 2010 2nd Quarter Financial Report For City Council meeting of August 31, 2015 Item SP2 2016 Budget For Action: Receive and Place on File To: Honorable Mayor and Members of the City Council From: Wally Bobkiewicz, City Manager Martin Lyons, Assistant City Manager/Chief Financial Officer Erika Storlie, Deputy City Manager Ashley King, Assistant Director of Administrative Services Alex Thorpe, Senior Management Analyst Subject: 2016 Budget Date: August 17, 2015 Recommended Action: Staff recommends that City Council receive and file the 2016 Budget update. Summary: During the July 7, 2015 meeting of the Rules Committee, City Council directed City Manager Bobkiewicz to present two budget scenarios—one with $500,000 in cuts and one with $1,500,000 in cuts. Staff would continue to wait on rulings from the State which would determine the severity of the impact to Evanston and would adjust the Proposed 2016 Budget accordingly. As of publication of this memorandum, the State continues to debate their 2015-2016 Budget without resolution. One of the items presented as a possibility from Illinois is a property tax freeze that would be effective in 2017 for Cook County communities. The latest addition to SB 318 would allow for property taxes to be increased for “public safety purposes”, meaning that levy increases related to police and fire pensions and operations would be eligible to be increased according to current tax cap regulations. As a result of this potential, the City is proposing a Public Safety Fund. This fund would capture all police and fire costs, including pensions. Essentially, it would be one location to see the various costs associated with public safety. All of the property tax levy would be used as revenue into this new fund. This would allow for more transparent reporting on the costs associated with providing public safety services as well as better tie the City’s tax levy to the public safety services. In 2016, Government Accounting Standards Board (GASB) Statement 67/68 will also require Police and Fire Pension costs to be listed with the relevant operating expenses. Memorandum 32 of 83 This bill has not been passed. Staff will wait for a final resolution before moving forward with the creation of the new fund. EXPENSES In looking to the 2016 General Fund Budget assuming no changes from the State of Illinois, staff has begun calculating the cost of contracted wage and benefit increases. Although they are continuing to refine their estimates, preliminary increases appear to be approximately $2.54M above 2015 costs with the IMRF early retirement incentive debt service at an additional $25,200. Assuming current staffing with no retirements and 100% occupancy, this salary amount is approximately 3.6% above 2015 budgeted amounts. REVENUES Various City revenues are trending upward and staff anticipates some of these trends to carry into 2016. FY2014 Adopted FY2014 Actuals FY 2015 Adopted 2015 YTD 2015 Year End Estimate FY2016 Proposed $ Diff from '15 Adopted 51525 - SALES TAX - BASIC 9,690,000 9,803,582 10,225,000 5,480,954 10,225,000 10,736,250 511,250 51530 - SALES TAX - HOME RULE 6,100,000 6,102,969 6,180,000 3,315,063 6,350,000 6,489,000 309,000 51595 - LIQUOR TAX 2,375,000 2,665,447 2,450,000 1,602,176 2,900,000 3,000,000 550,000 51625 - TELECOMMUNICATIONS TAX 3,150,000 2,473,450 3,150,000 1,464,375 2,100,000 2,000,000 (1,150,000) Grand Total 21,315,000$ 21,045,448$ 22,005,000$ 11,862,568$ 21,575,000$ 22,225,250$ 220,250$ Sales Tax Staff is anticipating an increase of just over $800,000 from 2015 amounts for Sales Tax (both basic and home rule). This will take into account the additional revenue from two new grocery stores and one new auto dealer (FIAT) as well as trending data. As can be seen from the chart above, 2015 amounts are anticipated to exceed 2015 budget at this point. Liquor Tax This budget number is being increased to $3,000,000 for 2016 due to the historic growth that Evanston has seen since 2001. End of year projections are $2,900,000 for 2015. With a full operating year of grocery stores, staff anticipates that the Liquor Tax will meet the increased 2016 budgeted amount. Grocery Stores The addition of two new grocery stores on the western and northern ends of Evanston present an exciting opportunity to capture new sales from customers located outside of Evanston. Valli Produce, opened in in July, at Evanston Plaza and offers a selection of international grocery goods. Valli is well-positioned to capture the residents of Evanston, Skokie, and Lincolnwood that are seeking specific international foods. Whole Foods Market on Green Bay Road, just south of the Evanston/Wilmette border, brings organic and sustainably focused foods, a grocery option not conveniently available in the communities immediately north of Evanston. Several factors are likely to influence in increase at sales at both stores: - 2 - 33 of 83 • Both stores are considered more specialized than grocery stores like Jewel-Osco or Dominick’s and can be expected to pull a larger market than those stores do or did. The total volume of customers is expected to be larger at each store than it had been when they were both Dominick’s. • Valli Produce and Whole Foods Market both have larger sales areas for liquor sales than the previous Dominick’s stores had. • Valli Produce has expanded its footprint and is a larger store overall. The table below illustrates the liquor sales based on store type. Store Size Low Range ($2.50/ square foot) High Range ($3.50/square foot) Dominick’s (2013 Revenue) Valli Produce 70,000 $175,000 $245,000 $97,000 Whole Foods Market 53,000 $132,500 $185,500 $156,500 Note: Estimated liquor sales are based on existing Evanston grocery stores. Telecommunications Tax This revenue source has seen a steady decline, both in Evanston and throughout the region, in the past decade. According to the Illinois Department of Revenue, of the 800 municipalities in Illinois with a telecommunications tax, revenue dropped by $40 Million from 2012 to 2014. Evanston is included in this decrease and needs to adjust expectations to the diminished revenue source. The 2016 baseline budget for this revenue is $1,150,000 less than 2015. Building Permits Building permit revenues have fluctuated drastically throughout the past few years, most notably to coincide with major building projects at Northwestern University. 2016 is anticipated to have a number of major projects, both private and related to the University. Conversations with developers on these projects have already begun. Community Development continues to discuss these projects with developers on a periodic basis. Staff is anticipating $7,500,000 in building permit revenue and will be recommending that a portion of this one-time increase be diverted to another fund. This will prevent the General Fund from relying on the total increase in case it is an outlier rather than an actual trend. The Insurance Fund or Solid Waste Fund would be logical repositories for the additional revenue due to their negative fund balances. Likewise, City Council could decide to funnel permit revenue to the Capital Fund and decrease the 2016 Bond issuance. - 3 - 34 of 83 At this point, it should also be noted that final actuarial numbers still have not been calculated for Police and Fire Pension Funds and staff expects that the City will have a minor increase in funding requirements due to continued low interest rates. In conclusion, barring any changes from the State of Illinois, preliminary looks at the General Fund and Enterprise funds show stability. Staff will continue to look at ways to decrease operating costs in order to increase funding for capital. - 4 - 35 of 83 To: Honorable Mayor and Members of the City Council From: Martin Lyons, Chief Financial Officer/Treasurer/Assistant City Manager Subject: FY2016 Budget Calendar Date: August 4, 2015 Recommendation: Staff recommends that City Council approve the FY2016 budget preparation calendar. Background: Although the City of Evanston continues to await decisions from the State of Illinois which could drastically affect the 2016 Budget planning process, staff needs to move forward with budget preparation. As such, please note that the attached calendar is subject to change. Attachment: FY2016 City Council Budget Calendar Memorandum For City Council meeting of August 31, 2015 Item SP3 FY2016 Budget Calendar For Action 36 of 83 DATE TIME ACTIVITY Monday, August 17, 2015 7PM*Mid-Year 2015 Budget Review Monday, August 31, 2015 7PM 2016 Budget Discussion Wednesday, September 23, 2015 7PM Citizen Budget Input Session Friday, October 9, 2015 5PM Proposed Budget to City Council Monday, October 19, 2105 7PM Budget Discussion Saturday, October 24, 2015 9AM - 1PM Special City Council meeting Public Hearing-- Truth in Taxation Public Hearing-- FY 2016 Budget Preliminary Tax Levy Estimate Monday, November 9, 2015 7PM*Budget Discussion Monday, November 16, 2015 7PM Budget Discussion (if needed) Monday, November 23, 2015 7PM*Budget & Tax Levy Adoption *meeting times are approximate City of Evanston City Council Budget Calendar Fiscal Year 2016 Rosh Hashanah is September 13th through 15th. Yom Kippur is September 22nd through 23rd. Columbus Day is October 12th. Thanksgiving is November 26th. 37 of 83 For City Council meeting of August 31, 2015 Item SP4 Business of the City by Motion: Funding for Parks and Recreation Studies For Action To: Honorable Mayor and Members of the City Council From: Wally Bobkiewicz, City Manager Johanna Leonard, Acting Deputy City Manager Bob Dorneker, Assistant Director, Parks and Recreation Subject: Inclusion of Funding in the FY2016 CIP for Two Studies of Evanston Parks and Recreation Facilities Date: August 31, 2015 Recommended Action: Staff recommends that City Council direct the City Manager to include $40,000 in the FY 2016 Capital Improvement Plan (CIP) for two studies: 1) a Park Report Card that will review park and recreation properties in Evanston (City, School Districts 65 and 202, Ridgeville Park District, Lighthouse Landing, and the Metropolitan Water Reclamation District) and 2) a parks and recreation financing report that will prioritize spending. Discussion: Park Report Cards are a popular tool for Parks and Recreation agencies to assess and measure the quality of park and recreation infrastructure and subsequently utilize the Report Card for discussion on the community’s parks and recreation needs and priorities. Several communities throughout the northeastern Illinois region have recently undertaken the development of these Report Cards; these communities have included Northbrook, Skokie, Naperville, Oak Park, Park Ridge and Wheeling. Wilmette will be conducting a survey in 2015 for their lakefront operations only. Attached to this memorandum is the 2014 Park Report Card for the Park District of Oak Park in Oak Park, IL. The 18 page document provides a summary of methodology and findings and grades for the Park District’s 80 acres of parkland in the following areas: paths and sidewalks, passive greenspace, bathrooms, playgrounds, sitting areas, drinking fountains, athletic spaces, and parking lots. City Council directed the staff to engage in long range planning for parks and open space in Evanston. The City Manager met with a sub-group of the Parks and Recreation Board that included Daniel Stein, President of the Parks and Recreation Board, and Amina DiMarco, member of the Parks and Recreation Board to discuss long range planning; the development of the potential Report Card is a result of these discussions with City Council and the Parks and Recreation Board. Contemplated for inclusion in Evanston’s Report Card, is all open space and park space located in Memorandum 38 of 83 Evanston that is the responsibility of the City, School Districts 65 and 202, Ridgeville Park District, Lighthouse Landing, or the Metropolitan Water Reclamation District. In total these properties amount to approximately 448.7 acres of open space and park space. In addition to the Report Card, staff recommends the inclusion of a parks and recreation financing report that will assist in prioritizing funding. The Report Card will provide a guide in prioritizing which areas of the Evanston parks have the greatest need for service and improvements. The financing report will support the planned allocation of financial resources to create a strategic plan for when work will be completed and what resources will be expended to improve the infrastructure. It will also help balance larger capital projects, with the routine maintenance, and other work undertaken each year to continue to make Evanston’s parks important destinations in the community. City staff has also discussed the proposed Report Card and financing report with members of the Parks and Recreation Board, who highly support the request for the two studies of Evanston’s open space and recreation facilities. Attachments: Park District of Oak Park’s 2014 Park Report Card 39 of 83 2014 park report card 218 Madison St Oak Park, IL 60302 (708) 725-2000 www.pdop.org 40 of 83 Project Manager Bobbi Nance, Park District of Oak Park Park Surveyors Bobbi Nance, Park District of Oak Park Daniel Grove, Lakota Group Acknowledgements Many thanks go to the non-profit organizaƟon, New Yorkers for Parks, including Lucy Robson, Research & Planning Analyst, for their assistance and advice in this process. Their New Yorkers for Parks Park Report Card Series was the original inspiraƟon for this project and it would not have goƩen off to such a great start without their help and willingness to share their own informaƟon and lessons learned. AddiƟonally, thanks to Daniel Grove, Associate Principal at the Lakota Group, for his willingness to help complete the first round of park assessments as part of the Park District of Oak Park’s comprehensive master planning process, as well as assist in refining the final evaluaƟon tool used to survey each park feature. 218 Madison St Oak Park, IL 60302 (708) 725-2000 www.pdop.org 41 of 83 Park District of Oak Park 2014 Park Report Card 3 why grade our parks? Although our programs and faciliƟes are highly valued and important parts of our service offerings, park lands will always be the most popular and most visible aƩributes to the Oak Park community. In the 2014 Oak Park Community Aƫtude & Interest Survey, 93.9% of respondents indicated that they or a member of their household had visited a park during the past year, which is much higher than the Illinois average of under 80%. This Park Report Card is an effort to objecƟvely and quanƟtaƟvely measure the quality of park infrastructure and maintenance in order to ensure the highest level of service possible for the residents of Oak Park. As with other Park District performance measurement iniƟaƟves, the Park Report Card allows the Park District of Oak Park to: • communicate prioriƟes internally among employees, as well as externally to the Board of Commissioners, ciƟzen commiƩees, and the public, • learn how the Park District’s present state compares to past performance and future goals, • measure the impact of park infrastructure investments and park maintenance efforts, • demonstrate progress towards meeƟng our mission, goals, and objecƟves, • provide direcƟon for allocaƟon of funds, staff, and other resources, and • offer transparence and accountability to the public. Using The InformaƟon in this Report The Park Report Card is intended to help the Park District of Oak Park advance its strategic iniƟaƟve, “Maintaining and Improving our Infrastructure.” The overall system grade is included as key metric in the Park District’s performance measurement program. AddiƟonally, the informaƟon contained in this report should help guide, along with other Park District plans and research and community feedback, the following: • Capital Improvement Plans, • Park Master Plans, and • Park maintenance standards and procedures 42 of 83 Park District of Oak Park 2014 Park Report Card 4 findings Overall Results Generally, Park District parks faired well, with the majority of parks (83%) receiving a raƟng of “Good” or higher and an overall system score of a “B” at 83 out of 100. Three parks received a score of “Fair.” Ridgeland Common RecreaƟon Complex received the highest score with a 92 and Stevenson Park received the lowest score with 71, a difference of 21 points. Appendix A lists the overall scores for each individual park. Geographical Analysis Geographically-speaking, the quality of the parks seems fairly distributed throughout the community. The NE, NW, and SE quadrants of Oak Park all contain one of the Top 5 Highest Rated parks and all four quadrants also contain at least one of the Top 5 Lowest Rated parks. In fact, the highest rated park (Ridgeland Common), is only blocks away from the lowest rated park (Stevenson Park). The southeast quadrant has the lowest ranking parks overall, but this Park Report Card does not reflect recent work completed with support from the Park District in upgrading the school fields at Longfellow and Irving Schools in that same quadrant. Appendix B displays park grades by locaƟon. Park Feature Analysis As the overall park scores would indicate, the majority of individual park features also scored well on average throughout the community. Five of the eight areas received a “B” (Good) raƟng. lowest score was Parking Lots, although this had a negligible impact on the overall score for the park system or any 11% 72% 17%0% Park Grade Distribution A (Excellent) B (Good) C (Fair) D (Poor) F (Failing) The majority of parks received a B (Good). Two parks received an A (Excellent) and 3 parks were given a C (Fair). No parks received a Poor or Failing score in 2014. Overall, most areas scored well, including Paths & Sidewalks and Passive Greenspaces, two areas important to Oak Park residents. Parking Lots received the lowest score, but had liƩle impact on the overall park scores. Instead, the Park District should focus on improving the Bathrooms & AthleƟcs Spaces scores to increase the overall system grade. 84 82 77 82 87 88 73 70 0 20 40 60 80 100 Paths & Sidewalks Passive Greenspaces Bathrooms Playgrounds Sitting Areas Drinking Fountains Athletic Spaces Parking Lots Park Feature Scores 43 of 83 Park District of Oak Park 2014 Park Report Card 5 findings individual park. Bathrooms, which received an overall grade of “C+,” suffered mainly from missing supplies and equipment and few unexplained locked and unsecured bathrooms. AthleƟc fields and courts scores were negaƟvely affected most by fencing and backstops as well as athleƟc surface issues. More informaƟon about how each Park Feature was rated is included later in this report. Issues Observed When issues were found at any park feature, the surveyor was asked to document the extent or impact of the problem. On average, minimal issues were found, including in the area of cleanliness and safety which received excellent scores. AddiƟonally, overall, park ameniƟes were generally found to be open and available to the public as scheduled. The most common issue found was with the park and athleƟc spaces fencing (including backstops). The only other noƟceable issue throughout the park system was related to landscaping. Conclusions Overall, the Park District and the residents of Oak Park should be proud of the progress made in its parks in recent years. The majority of parks were rated as “Good,” which demonstrated that while they are being used and experiencing some wear and tear, the capital improvements and park maintenance invested have resulted in an overall quality park system. The overall park system score was slightly lower than desired at 83 (the current target is 85). In order to improve this score, Park District staff should review the informaƟon in this report to make improvements to the infrastructure and maintenance of parks receiving a “C” as well as system-wide issues at AthleƟc Spaces and Bathrooms and with park fencing and landscaping. A more specific list of recommendaƟons based on park evaluaƟon results is included later in the report. It should be noted that maintaining all parks at the “A” level may require significant capital investments (those parks receiving the highest scores were generally those which have also were most recently renovated) and on-going maintenance to bring them up to and keep them at this level. In a community where 80 acres of parkland is expected to serve over 50,000 residents, this may not be pracƟcal. Very few issues were found with availability of ameniƟes or with cleanliness or safety issues. The most common issues observed were related to fencing and landscaping in parks. Observations Area Availability Area Equipment Missing Area Equipment Not Functioning Properly Area Infrastructure/Equipment Deterioration Area Seating Issues Area Fencing Issues Area Lighting Issues Area Landscaping Issues Area Surface Issues Area Cleanliness & Safety MINIMAL NOTICEABLE PREVALENT 44 of 83 Park District of Oak Park 2014 Park Report Card 6 Paths & sidewalks All walking and biking paths and sidewalks in and immediately around a park, as well as adjacent fencing, seating, lighting, and landscaping B Observations Area Availability Area Equipment Missing Area Equipment Not Functioning Properly Area Infrastructure/Equipment Deterioration Area Seating Issues Area Fencing Issues Area Lighting Issues Area Landscaping Issues Area Surface Issues Area Cleanliness & Safety N/A MINIMAL NOTICEABLE PREVALENT Paths Scores Andersen Park 81 AusƟn Gardens 86 Barrie Park 90 Carroll Park 87 Euclid Square 77 Field Park 81 Fox Park 99 Lindberg Park 79 Longfellow Park 71 Maple Park 94 Mills Park 92 Randolph Park 95 Rehm Park 80 Ridgeland Common 86 Scoville Park 81 Stevenson Park 66 Taylor Park 92 Wenonah Park N/A System Average 84 Overall, Park District paths and sidewalks received a score of “Good.” Structurally, the paths and sidewalks were generally in good shape, although in some parks, concrete steps and ramps were deterioraƟng. In most cases, an appropriate number of bike racks, benches, and trash receptacles were present. Few liƩer or safety issues were observed. The most common issues found were usually related to the ameniƟes adjacent to the paths or the landscaping. AddiƟonally, surface issues were observed, including sand, mud, and dirt that had migrated onto the paths, as well as frequent damage to the turf next to paths from winter snow removal. Some landscaping beds near walkways suffered from a lack of maintenance. (Stevenson Park) At many parks, the turf immediately next to the sidewalks was damaged from the winter snow removal process. (Longfellow Park) Overall, Park District walkways were in “Good” condiƟon. (AusƟn Gardens) 45 of 83 Park District of Oak Park 2014 Park Report Card 7 passive greenspace All passive green spaces in a park and accompanying fencing, seating, lighting, landscaping, and other equipment B- Observations Area Availability Area Equipment Missing Area Equipment Not Functioning Properly Area Infrastructure/Equipment Deterioration Area Seating Issues Area Fencing Issues Area Lighting Issues Area Landscaping Issues Area Surface Issues Area Cleanliness & Safety N/A MINIMAL NOTICEABLE PREVALENT Park Scores Andersen Park N/A AusƟn Gardens 84 Barrie Park N/A Carroll Park 81 Euclid Square N/A Field Park 84 Fox Park 71 Lindberg Park 84 Longfellow Park N/A Maple Park 85 Mills Park 84 Randolph Park 81 Rehm Park N/A Ridgeland Common N/A Scoville Park 74 Stevenson Park 75 Taylor Park 88 Wenonah Park 74 System Average 82 Overall, Park District passive green spaces received a score of “Good.” In most cases, an appropriate number of bike racks, benches, and trash receptacles were present and few issues with deterioraƟon with those items were found. Few liƩer or safety problems were observed. Green spaces in parks dedicated solely to passive acƟviƟes generally faired beƩer than smaller passive spaces in mulƟ-use parks adjacent to high-traffic area. The most common issues found in these parks included worn-out grass with bare spots and some weed issues, as well as landscaping issues caused by poor maintenance or the high volume of use. Turf oŌen suffered passive spaces near high- traffic areas, especially playgrounds. (Wenonah Park) Some empty tree pits and tree rings as well as and trees that need be removed were found in green spaces. (Lindberg Park) Overall, Park District green spaces were in “Good” condiƟon. (Maple Park) 46 of 83 Park District of Oak Park 2014 Park Report Card 8 bathrooms All public restrooms open to park visitors on a daily basis and accompanying equipment C+ Observations Area Availability Area Equipment Missing Area Equipment Not Functioning Properly Area Infrastructure/Equipment Deterioration Area Seating Issues Area Fencing Issues Area Lighting Issues Area Landscaping Issues Area Surface Issues Area Cleanliness & Safety N/A N/A N/A MINIMAL NOTICEABLE PREVALENT Park Scores Andersen Park 100 AusƟn Gardens N/A Barrie Park N/A Carroll Park N/A Euclid Square N/A Field Park 85 Fox Park 50 Lindberg Park 80 Longfellow Park 85 Maple Park 68 Mills Park N/A Randolph Park N/A Rehm Park N/A Ridgeland Common N/A Scoville Park 84 Stevenson Park N/A Taylor Park 72 Wenonah Park N/A System Average 77 Overall, Park District park bathrooms received a score of “Fair.” Structurally, most bathrooms were in good condiƟon, and were free of any cleanliness or safety problems. Bathrooms, which are opened and closed daily by Park District staff, were almost always open as expected, except for one instance of a locked bathroom at Fox Park and an unsecured bathroom at Field Park. At parks where the bathrooms were aƩached to community center, the bathrooms were in generally good condiƟon (having been most recently updated), but those at parks with stand-alone comfort staƟons are showing wear. The most common issues at the bathrooms were missing supplies and minor equipment. Except for a few excepƟons, restrooms were generally clean, but someƟmes missing supplies including soap dispensers and mirrors. (Maple Park) Some minor plumbing issues were found, including leaky sinks. (Scoville Park) Overall, Park District walkways were in “Fair” condiƟon. Generally, bathrooms aƩached to community centers were in beƩer condiƟon than stand-alone faciliƟes. (Andersen Park) 47 of 83 Park District of Oak Park 2014 Park Report Card 9 PLAYGROUNDS All playgrounds and splash pads in a park and accompanying fencing, seating, lighting, landscaping, and other play equipment b- Observations Area Availability Area Equipment Missing Area Equipment Not Functioning Properly Area Infrastructure/Equipment Deterioration Area Seating Issues Area Fencing Issues Area Lighting Issues Area Landscaping Issues Area Surface Issues Area Cleanliness & Safety MINIMAL NOTICEABLE PREVALENT Park Scores Andersen Park 90 AusƟn Gardens N/A Barrie Park 72 Carroll Park 79 Euclid Square 84 Field Park 88 Fox Park 83 Lindberg Park 82 Longfellow Park 81 Maple Park 70 Mills Park N/A Randolph Park 85 Rehm Park 85 Ridgeland Common N/A Scoville Park 99 Stevenson Park 66 Taylor Park 86 Wenonah Park 90 System Average 82 Overall, Park District playgrounds received a score of “Good.” Rarely was any playground equipment missing and in almost all cases, everything was funcƟoning properly. Most playgrounds are showing slight signs of deterioraƟon from use including chipped or peeling paint and some rust. Playground fencing mainly suffered from rust. Weeds were a common issue near many playgrounds as was surface issues, including low levels of sand and/or woodchip and frequent worn or bare spots in nearby turf. Playgrounds also experience the highest levels of liƩer of any area in the parks. The most noƟceable problem with the playgrounds included large amounts of sand from sand play areas that covered playground surfacing and clogged nearby drinking fountains. Sand caused many issues for playground cleanliness. (Barrie Park) AƩempts at landscaping near playgrounds was usually fuƟle. (Longfellow Park) Overall, Park District playgrounds were in “Good” condiƟon. (Andersen Park) 48 of 83 Park District of Oak Park 2014 Park Report Card 10 sitting areas All designated sitting areas in a park and accompanying fencing, seating, lighting, landscaping, and other equipment b+ Observations Area Availability Area Equipment Missing Area Equipment Not Functioning Properly Area Infrastructure/Equipment Deterioration Area Seating Issues Area Fencing Issues Area Lighting Issues Area Landscaping Issues Area Surface Issues Area Cleanliness & Safety N/A MINIMAL NOTICEABLE PREVALENT Park Scores Andersen Park 88 AusƟn Gardens N/A Barrie Park N/A Carroll Park N/A Euclid Square N/A Field Park 90 Fox Park 82 Lindberg Park N/A Longfellow Park N/A Maple Park N/A Mills Park N/A Randolph Park 94 Rehm Park N/A Ridgeland Common N/A Scoville Park N/A Stevenson Park N/A Taylor Park 81 Wenonah Park N/A System Average 87 Overall, Park District siƫng areas received a score of “Good.” No equipment was missing except for a trash receptacle at one site and all equipment was funcƟoning properly. Siƫng areas with shelters were in generally good condiƟon and the only equipment problems were the grills at the Taylor Park paƟo. Some minor deterioraƟon was found with some of the picnic tables, although it was more noƟceable at the Taylor Park paƟo. Issues with noƟceable weeds and bare spots lowered landscaping and surface scores. Cleanliness was affected slightly by heavier amounts of leaves and dirt and some minor liƩer issues. No safety issues were discovered. Most tables and benches were in good condiƟon with minor wear and tear. (Fox Park) Taylor Park’s paƟo scored the lowest of all of the seaƟng areas with cleanliness, landscaping, and equipment deterioraƟon issues. Overall, Park District siƫng areas were in “Good” condiƟon. (Taylor Park) 49 of 83 Park District of Oak Park 2014 Park Report Card 11 drinking fountains All individual drinking fountains in a park b+ Observations Area Availability Area Equipment Missing Area Equipment Not Functioning Properly Area Infrastructure/Equipment Deterioration Area Seating Issues Area Fencing Issues Area Lighting Issues Area Landscaping Issues Area Surface Issues Area Cleanliness & Safety N/A N/A N/A N/A MINIMAL NOTICEABLE PREVALENT Park Scores Andersen Park 83 AusƟn Gardens 100 Barrie Park 78 Carroll Park 88 Euclid Square 98 Field Park 95 Fox Park 80 Lindberg Park 95 Longfellow Park 82 Maple Park 92 Mills Park 83 Randolph Park 100 Rehm Park 86 Ridgeland Common 96 Scoville Park 92 Stevenson Park 78 Taylor Park 81 Wenonah Park 97 System Average 88 Overall, Park District drinking fountains were rated “Good” and received the highest area score in the park system. When issues were found, they were usually related to funcƟonality of the fountains, including leaks and water pressure either being too high or too low to use easily. Another frequent issue was clogged basins, oŌen by sand and other debris from nearby playgrounds. Drinking fountain pressure was either too high or too low in 18% of the fountains evaluated. Nearly every drinking fountain near a sand play area was clogged or dirty from the sand. (Barrie Park) Overall, Park District drinking fountains were in “Good” condiƟon. (Wehnonah Park) 50 of 83 Park District of Oak Park 2014 Park Report Card 12 ATHLETIC SPACES All athletic courts and fields in a park and accompanying fencing and backstops, player and spectator seating, lighting, and landscaping c Observations Area Availability Area Equipment Missing Area Equipment Not Functioning Properly Area Infrastructure/Equipment Deterioration Area Seating Issues Area Fencing Issues Area Lighting Issues Area Landscaping Issues Area Surface Issues Area Cleanliness & Safety MINIMAL NOTICEABLE PREVALENT Park Scores Andersen Park 81 AusƟn Gardens N/A Barrie Park 83 Carroll Park 74 Euclid Square 69 Field Park 75 Fox Park 69 Lindberg Park 56 Longfellow Park 69 Maple Park 78 Mills Park N/A Randolph Park N/A Rehm Park 68 Ridgeland Common 98 Scoville Park 98 Stevenson Park 70 Taylor Park 78 Wenonah Park N/A System Average 73 Overall, Park District athleƟc courts and fields received a score of “Fair.” Equipment, including nets, was rarely missing. Some funcƟonality issues discovered with court nets and poles, but otherwise most equipment operated as expected, although were oŌen showing signs of deterioraƟon. Adjacent landscaping usually contained weeds. The largest issues found were with fencing and surfaces. Fencing and backstops were oŌen in need of paint and fencing fabric was deformed, resulƟng in holes and gaps In several cases, gate latches were damaged or gates were hard to open and close. Due to either age or heavy use (or a combinaƟon of both), most athleƟc courts and fields had some type of surface defect— most commonly worn or bare spots in turf or cracks in court surfaces. Some ball diamond surfaces had ruts and a few contained more rocks than expected. Overall, Park District athleƟc spaces were in “Fair” condiƟon. (Carroll Park) Recently renovated arƟficial turf and other courts were the few spaces receiving high surface scores. (Ridgeland Common) Fencing and backstops were one of the lowest rated areas with athleƟc spaces. (Lindberg Park) 51 of 83 Park District of Oak Park 2014 Park Report Card 13 parking lots All designated parking lots in a park and accompanying equipment, fencing, lighting, and landscaping c- Observations Area Availability Area Equipment Missing Area Equipment Not Functioning Properly Area Infrastructure/Equipment Deterioration Area Seating Issues Area Fencing Issues Area Lighting Issues Area Landscaping Issues Area Surface Issues Area Cleanliness & Safety N/A N/A N/A N/A MINIMAL NOTICEABLE PREVALENT Park Scores Andersen Park N/A AusƟn Gardens N/A Barrie Park N/A Carroll Park N/A Euclid Square N/A Field Park N/A Fox Park N/A Lindberg Park N/A Longfellow Park N/A Maple Park N/A Mills Park N/A Randolph Park N/A Rehm Park 70 Ridgeland Common N/A Scoville Park N/A Stevenson Park N/A Taylor Park N/A Wenonah Park N/A System Average 70 Overall, Park District athleƟc courts and fields received a score of “Fair.” Although parking lots play a minor role in a visit to a park, for users they can be both the first and last impression a park receives. Rehm Park’s parking lot was the only one open at the Ɵme of the park inspecƟons. Issues with bumper stops, which included many missing and deterioraƟng bumpers, lowered overall parking lot scores, as did missing signs and issues with weeds and empty tree pits/tree rings. Some signage was missing, although the poles were sƟll in place. (Rehm Park) Bumpers were oŌen broken and were missing from many parking spots. (Rehm Park) Overall, Park District parking lots were in “Fair” condiƟon. (Rehm Park) 52 of 83 Park District of Oak Park 2014 Park Report Card 14 recommendations Based on the data collected, the following improvements will have the greatest impact on improving future park scores. Although it will not be possible or pracƟcal to incorporate all of these improvements immediately, they should be reviewed when seƫng maintenance standards and reviewing capital improvement plans. However, it’s important that any improvements chosen are incorporated with current maintenance and capital improvement efforts without eliminaƟng others, otherwise the Park District may see improved scores in one area while allowing a decline in another. • Address landscaping & weed issues. Frequent problems were observed in many parks with weeds, untrimmed bushes, and empty tree pits and tree rings, and empty plant beds. • Re-evaluate the locaƟon of plant beds and shrubs adjacent to high-traffic areas, especially playgrounds. Both the plants and turf were oŌen in poor condiƟon. • InvesƟgate ways to miƟgate the frequent damage done to turf alongside sidewalks during snow removal. Sidewalk edges were muddy, uneven, and unsightly in many areas and the destrucƟon of the turf oŌen led to weeds springing up in its place along main sidewalks and walkways. • The remaining asphalt walkways in the park system oŌen have cracks and uneven surfaces, which should be addressed in future capital improvements. • Much effort has been made to increase the quality of the turf at athleƟc fields. AddiƟonal aƩenƟon to the turf in passive areas will also help increase the scores, especially at heavily used locaƟons such as Scoville Park. • Complete an inventory of equipment in the bathrooms located in comfort staƟons to ensure that all locaƟons have a soap dispenser, paper towel dispenser/hand dryer, and mirror. • Monitor the water pressure in drinking fountains throughout the summer as part of regular park inspecƟons. • Increase efforts to miƟgate the impact of the sand play areas on the cleanliness of playgrounds and funcƟonality of nearby drinking fountains through more frequent clean-up of playground surfaces, public educaƟon, and/or re-evaluaƟng whether or not to include them in future master plans due to the conƟnued issues they caused. • Set park signage standards as to where park rules and where park hours will be minimally posted. Signage from park to park and even from area to area within a park varied dramaƟcally. • Paint, repair, and/or replace athleƟc fields and courts fencing and/or backstops at several locaƟons. The parks receiving the lowest scores in this area include Andersen Park, Euclid Square, Lindberg Park, Longfellow Park, and Stevenson Park. • Provide addiƟonal aƩenƟon to and/or prioriƟze improvements to the following areas: Rehm Park tennis courts, Longfellow Park tennis courts and baseball diamond, and Lindberg Park baseball diamonds. 53 of 83 Park District of Oak Park 2014 Park Report Card 15 METHODOLOGY Parks Included Park Report Card results include all Park District of Oak Park owned and leased park properƟes and features contained within them with the following excepƟons: 1) Park properƟes that have not been developed for public use, 2) Parks and/or features closed for capital improvements throughout the survey period, 3) FaciliƟes on a park site, except for public bathrooms available to park users, and 4) Unique or limited access park features, such as dog parks, Rehm trains, seasonal ice rinks, etc. Features Types Eight park feature types were chosen to represent features commonly found in Park District of Oak Park parks., including: 1) AthleƟc Fields & Courts 2) Playgrounds 3) Paths & Sidewalks 4) Passive Green Spaces 5) SeaƟng Areas 6) Bathrooms 7) Drinking Fountains 8) Parking Lots Survey Tool A custom survey tool was developed to rate each park feature in the following evaluaƟon areas: 1) Availability to Public 2) FuncƟonality & Maintenance 3) Surface Quality 4) Cleanliness & Safety The tool was developed for a tablet which allowed surveyors to collect and store the results and photos electronically and eliminated the need for paper compilaƟon. Data Collection Survey work for this report card took place between May 1 and July 20, 2014, Tuesday-Friday. In the field, surveyors completed an evaluaƟon for each feature contained within a given park (except as noted earlier in the criteria for “Parks Included”) whenever defined boundaries could be determined. For example, if a park had two water fountains, two feature evaluaƟons were completed. Likewise, a separate feature evaluaƟon was completed for each men’s and women’s bathrooms. However, some excepƟons included: 1) Generally, baseball diamonds were evaluated based only the infield, fencing, and bleachers as the ouƞield usually overlapped with a designated soccer field. 2) Groups of athleƟc courts, playgrounds or other features that shared fencing, benches, or other ameniƟes were evaluated together as one feature. Scoring Methods The evaluaƟon tool produces an overall score on a scale of 0 to 100 for each individual feature on each visit using relaƟve weights assigned for each evaluaƟon area. For example, a safety issue discovered would negaƟvely impact an individual park feature score more heavily than a minor maintenance issue, such as chipped paint. Individual features that were unavailable to the public without explanaƟon, i.e. a locked bathroom or athleƟc court or a water fountain that was not turned on, were automaƟcally given a “0” for that visit. All individual park feature scores for all visits throughout the surveying period are then averaged together with other park features of the same feature type to give a specific park an average feature type score. For example, if a park contains a baseball diamond, soccer field, and a tennis court, the scores for each of those individual athleƟc spaces are averaged together to create an overall park athleƟc spaces score. These overall feature type scores are then combined, using a second set of relaƟve weights, to give the overall park itself a score and final grade. Scores Grade CondiƟon 100-97 A+ Excellent 96-93 A Excellent 92-90 A- Excellent 89-87 B+ Good 86-83 B Good 82-80 B- Good 79-77 C+ Fair 76-73 C Fair 72-70 C- Fair 69-67 D+ Poor 66-63 D Poor 62-60 D- Poor 59 & below F Failing Scores are calculated to ensure that no individual feature area or park is penalized because it lacked any given feature. Both evaluaƟon area weights and park feature type weights were created based on feedback collected from a survey of community 54 of 83 Park District of Oak Park 2014 Park Report Card 16 METHODOLOGY members to determine what was most important to park user saƟsfacƟon. These weights ensure that the score is a true and accurate reflecƟon of how an Oak Park user would rate a park based on what is most important to them. These weights were verified through iniƟal tesƟng of the survey tool, where evaluators were asked to review a park and provide their own esƟmate of the leƩer grade based on findings prior to learning the score assigned to an area through the survey tool. 55 of 83 Park District of Oak Park 2014 Park Report Card 17 APPENDIX A Rank Park 1 Ridgeland Common 92 86 N/A N/A N/A N/A 96 98 N/A 2 Randolph Park 90 95 81 N/A 85 94 100 N/A N/A 3 AusƟn Gardens 88 86 84 N/A N/A N/A 100 N/A N/A 4 Andersen Park 87 81 N/A 100 90 88 83 81 N/A 4 Mills Park 87 92 84 N/A N/A N/A 83 N/A N/A 4 Scoville Park 87 81 74 84 99 N/A 92 98 N/A 7 Field Park 85 81 84 85 88 90 95 75 N/A 7 Wenonah Park 85 N/A 74 N/A 90 N/A 97 N/A N/A 9 Carroll Park 83 87 81 N/A 79 N/A 88 74 N/A 9 Taylor Park 83 92 88 72 86 81 81 78 N/A 11 Euclid Square 82 77 N/A N/A 84 N/A 98 69 N/A 12 Barrie Park 81 90 N/A N/A 72 N/A 78 83 N/A 12 Maple Park 81 94 85 68 70 N/A 92 78 N/A 14 Lindberg Park 80 79 84 80 82 N/A 95 56 N/A 14 Rehm Park 80 80 N/A N/A 85 N/A 86 68 70 16 Longfellow Park 78 71 N/A 85 81 N/A 82 69 N/A 17 Fox Park 77 99 71 50 83 82 80 69 N/A 18 Stevenson Park 71 66 75 N/A 66 N/A 78 70 N/A Average Score 83 84 82 77 82 87 88 73 70 Passive Greenspace Bathrooms Drinking Fountains Overall Score Paths & Sidewalks Playgrounds Sitting Areas Athletic Spaces Parking Lots AVERAGE park score B overall park scores 56 of 83 Park District of Oak Park 2014 Park Report Card 18 APPENDIX B Park Grades by location 11% 72% 17%0% Park Grade Distribution A (Excellent) B (Good) C (Fair) D (Poor) F (Failing) Parks 1. Ridgeland Common RecreaƟon Complex 2. Randolph Park 3. AusƟn Gardens 4. Andersen Park 5. Mills Park 6. Scoville Park 7. Field Park 8. Wenonah Park 9. Carroll Park 10. Taylor Park 11. Euclid Square 12. Barrie Park 13. Maple Park 14. Lindberg Park 15. Rehm Park 16. Longfellow Park 17. Fox Park 18. Stevenson Park 57 of 83 For City Council meeting of August 31, 2015 Item SP5 Emerson/Ridge/Green Bay Project Update For Discussion To: Honorable Mayor and Members of the City Council From: Martin Lyons, Chief Financial Officer/Treasurer/Assistant City Manager Dave Stoneback, Utilities Director Sat Nagar, P.E., City Engineer Subject: Emerson/Ridge/Green Bay Project Update Date: August 17, 2015 Recommended Action: Staff will provide an update on the Emerson/Ridge/Green Bay Improvement Project and Viaduct / Bridge Enhancements. Project mile stones including submission of plans to the Illinois Department of Transportation, project letting and construction schedule for 2016 along with key design issues, will be included in a presentation at the August 31, 2015 City Council meeting. Memorandum 58 of 83 For City Council meeting of August 31, 2015 Item VII Business of the City by Motion: Rehab of Concrete in Water Plant Clearwells For Action To: Honorable Mayor and Members of the City Council From: David Stoneback, Utilities Director Subject: Rehabilitation of Concrete in Water Plant Clearwells 1 and 2 (Bid No. 15-47) Date: August 24, 2015 Recommended Action: Staff recommends that City Council authorize the City Manager to execute a contract for the Rehabilitation of Concrete in Water Plant Clearwells 1 and 2 (Bid No. 15-47) with Walsh Construction Company II, LLC (929 West Adams Street, Chicago, IL) in the amount of $302,874.10. Funding Source: Funding will be from Water Fund, Account 513.71.7330.65515. Finished water storage improvements are budgeted at $2,000,000 for FY 2015. Of the initial budget for FY 2015, $1,271,781 remains for this and other projects. Background Information: The City of Evanston has eight clearwells located under the filters inside the water treatment plant which hold a total of 4.4 MG of finished water. The clearwells were constructed in phases, from 1914 to 1964. In 2010, CTL Group performed an inspection of the 1914 clearwells. That study determined that significant concrete repair work would be needed within the near future. These repairs have not yet been completed. The clearwells will need to be taken out of service to complete this work. In 2014, an inspection of the 1924 clearwells showed only minimal interior cracking. However, some larger cracks remain at the construction joints visible from inside the treatment plant corridors and pipe galleries. In 2014, CDM Smith completed a study indicating that the 1914 and 1924 clearwells should be repaired in 2015 so that the 1934 reservoir could be taken out of service and replaced beginning in 2016. The clearwells must be back in service prior to beginning work on the reservoir replacement. Memorandum 59 of 83 On April 13, 2015, City Council approved award of a contract to CDM Smith for engineering services to rehabilitate clearwells 1 and 2. Analysis: The bid for this project was advertised in the Chicago Tribune. Bids for the subject project were opened and publicly read on Tuesday, July 28, 2015. Four contractors submitted bids for this project. Contractor Information: Contractor Address Joseph J. Henderson & Son, Inc. 4288 Old Grand Avenue, Gurnee, IL Rausch Infrastructure LLC 8700 W. Bryn Mawr – Suite 830 N, Chicago, IL Spectrum Contracting Corporation 1411 W. Bernard Drive, Addison, IL Walsh Construction Company II, LLC 929 West Adams Street, Chicago, IL The submitted bids cannot be withdrawn or canceled for a period of sixty (60) calendar days following the bid opening, or until September 26, 2015. The bids were reviewed by Lara Biggs, Superintendent – Construction & Field Services. Attached is a bid summary showing the bids received. A detailed breakdown of bids is attached. Pricing Summary: Contractor Bid Price Walsh Construction $302,874.10 Joseph J. Henderson & Son, Inc. $452,000.00 Rausch Infrastructure LLC $484,540.00 Spectrum Contracting Corporation $667,950.00 The APW Committee held this item at the August 17, 2015 meeting and requested staff to review options for awarding this project. Staff will work with Walsh Construction to have them comply with the LEP requirements. If Walsh does not comply, the appropriate penalty will be imposed. The engineer’s estimate for this contract is $383,000. Available Funding: The FY 2015 budget includes $2,000,000 for finished water storage projects. This funding has been allocated as follows: 60 of 83 Description Funding Remaining Budget Original Budget $2,000,000 Engr Svcs for Clearwell Repair (awarded to CDM Smith on 4/13/15) $ 76,719 $1,923,281 Lincoln Street Resurfacing Project (Resolution 33-R-15, agreement with Northwestern University, approved on 3/23/15) $ 651,500 $1,271,781 Rehabilitation of Concrete in Clearwells 1 and 2 (under consideration) $ 302,874 $ 968,907 Staff has checked the references for Walsh and they are satisfactory. Walsh is requesting a waiver of the City’s M/W/EBE program goal, on the basis that they are self-performing all of the work. A memo reviewing their compliance is attached. Legislative History: On April 13, 2015, the City Council approved award of the engineering services for this project to CDM Smith. Attachments: Detailed Bid Tabulation M/W/EBE Compliance Review Memo 61 of 83 Rehabilitation of Concrete in Water Plant Clearwells 1 and 2(Bid No. 15-47)Bid TabulationItemDescriptionUnit Quant. Unit PriceExtended Price Unit PriceExtended Price Unit PriceExtended Price Unit PriceExtended Price1Lump Sum Price for Mobilization/ Demobilization/ Project Overhead and Administration / All Project Work not Included in Items 2 - 6EA 1 25,000.00$ 113,200.00$ 60,000.00$ 318,500.00$ 2 Polyurethane Crack Repair - WallsLinear Foot600 74.42$ 44,652.00$ 60.00$ 36,000.00$ 84.00$ 50,400.00$ 65.00$ 39,000.00$ 3Polyurethane Crack Repair - Underside of Top SlabLinear Foot2700 58.10$ 156,870.00$ 66.00$ 178,200.00$ 84.00$ 226,800.00$ 66.00$ 178,200.00$ 4 Epoxy Crack RepairLinear Foot10 68.26$ 682.60$ 60.00$ 600.00$ 84.00$ 840.00$ 250.00$ 2,500.00$ 5Top of Structural Slab Surface RepairsSquare Foot100 133.34$ 13,334.00$ 220.00$ 22,000.00$ 270.00$ 27,000.00$ 225.00$ 22,500.00$ 6Underside of Structural Slab Surface RepairsSquare Foot100 154.68$ 15,468.00$ 220.00$ 22,000.00$ 270.00$ 27,000.00$ 235.00$ 23,500.00$ 7Vertical Surface Structural Wall RepairsSquare Foot250 87.47$ 21,867.50$ 220.00$ 55,000.00$ 270.00$ 67,500.00$ 235.00$ 58,750.00$ 8Allowance Item No. 1 - Unforeseen Conditions25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ TOTAL302,874.10$ 452,000.00$ 484,540.00$ 667,950.00$ Walsh Construction JJ HendersonRauschSpectrum62 of 83 To: Martin Lyons, Assistant City Manager/CFO David Stoneback, Director of Utilities Lara Biggs, Superintendent – Construction & Field Services From: Tammi Turner, Purchasing Manager Subject: Rehabilitation of Concrete in Water Plant Clearwells 1 and 2 Bid 15-47 Date: August 31, 2015 The goal of the Minority, Women, and Evanston Business Enterprise Program (M/W/EBE) is to assist such businesses with opportunities to grow. In order to help ensure such growth, the City has established a 25% M/W/EBE subcontracting participation goal for general contractors. With regard to the Rehabilitation of Concrete in Water Plant Clearwells 1 and 2, Bid 15-47 in the base bid amount of $302,847.10, the primary contractor Walsh Construction has requested a waiver for the MWEBE participation goal. A MWEBE waiver is granted. CC: Erika Storlie, Deputy City Manager / Acting Director of Administrative Services Memorandum Bid 15-47, Rehabilitation of Concrete in Water Plant Clearwells 1 and 2, M/W/EBE Waiver Memo, 08.31.2015 63 of 83 For City Council meeting of August 31, 2015 Item VIII Resolution 87-R-15: Increase Funding for the Dempster/Dodge TIF Fund For Action To: Honorable Mayor and Members of the City Council From: Wally Bobkiewicz, City Manager Ashley King, Assistant Director of Administrative Services Johanna Leonard, Acting Deputy City Manager Subject: Resolution 87-R-15 “Authorizing the City of Evanston to Increase the FY2015 Budget for the Dempster/Dodge TIF Fund by $2,000,000 to a new total of $2,000,000 Date: August 21, 2015 Recommended Action: Staff recommends that City Council adopt Resolution 87-R-15 “Authorizing the City of Evanston City Manager to Amend the FY2015 Budget for the Dempster/Dodge TIF Fund by $2,000,000 to a New Total of $2,000,000.” Funding Source: Per the agreement with Valli Produce, the City will be funding this incentive through future tax increment finance revenues. These revenues will be used to pay the debt service cost of a $2,000,00 debt issuance in the Dempster Dodge TIF fund. Summary: The Dempster/Dodge Tax Increment Financing (TIF) District was established in 2012 to support the redevelopment of Evanston Plaza, the primary property located within this TIF district. The City entered into an agreement with the property owners to reinvest and rehabilitate the property in January 2015. The total cost of the City’s support for rehabilitation, which included the arrival of a new grocery store, Valli Produce, was $2,000,000. The redevelopment of Evanston Plaza into a modern shopping center with key anchors like a grocery store, will generate new property tax increment for the district that can be utilized to repay any debt issued. Attachments: Resolution 87-R-15 Map of Dempster/Dodge TIF Memorandum 64 of 83 8/31/2015 87-R-15 A RESOLUTION Authorizing the City of Evanston City Manager to Amend the Fiscal Year 2015 Budget for the Dempster/Dodge TIF Fund by $2,000,000, to a New Total of $2,000,000. WHEREAS, a total Dempster/Dodge TIF budget amendment for two million dollars ($2,000,000) is required due to rehabilitation costs associated with Evanston Plaza. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, COOK COUNTY, ILLINOIS: SECTION 1: That the foregoing recitals are hereby found as fact and made a part hereof. SECTION 2: That the Council authorize the Fiscal Year 2015 Dempster/Dodge TIF Fund budget be increased two million dollars ($2,000,000) to two million dollars ($2,000,000). SECTION 3: That approval of this resolution shall authorize the City Manager to expend and/or encumber up to two million dollars ($2,000,000) for Fiscal Year 2015 for Dempster/Dodge TIF Fund. SECTION 4: That this Resolution shall be in full force and effect from and after the date of its passage and approval in the manner provided by law. 65 of 83 87-R-15 ~2~ _______________________________ Elizabeth B. Tisdahl, Mayor Attest: _______________________________ Rodney Greene, City Clerk Adopted: __________________, 2015 66 of 83 2200 21131285 2017 1930 2004 2000 2015 1916 2001 1915 10221158 1164 10421114 11251824 12091223 1818181418131237 1938 1946 1954 1961 10281020 1/210321322 1018 1/21119182512151217 1225 1325 180818091125 1265 2022 2014 1920 1934 10231910 104419021033 1135 1133 1818120712191830 18091235 1275 2008 2000 1952 1966 1019 1/219511919 1326 10261020102410361122 1822 18201227 1323 18161255 1926 1960 19411916 10341046190619041320 1108 1112 1120 1116 1029 1121 1139 1131 1211182818261313 1321 181512261815 18092100 1942 1950 2001 1962 102119081160 1168 19001118 1021 1037 1039 1137 18221823182118191233 1317 1155 1225 2114 2020 1928 1944 1964 1917 104010381905 1908 11521901 10181318 110112131235 18291319 1327 180412052117 1233 1205 1245 2125 2101 2025 1922 1940 1956 1958 1968 10191021 1/2190010301027 1043 1127 18171315 18061811 1811DODGE AVEDEMPSTER ST GREENLEAF ST GREY AVECRAIN ST BROWN AVETIF District #7Dempster Dodge This map is provided "as is" without warranties of any kind.See www.cityofevanston.org/mapdisclaimers.html for more information.TIF7Letter.mxd - 3/27/2013 TIF District Building Tax Parcel Street Railroad 0 100 20050Feet67 of 83 For City Council meeting of August 31, 2015 Item IX Resolution 88-R-15: Increase Funding for the Chicago/Main TIF Fund For Action To: Honorable Mayor and Members of the City Council From: Wally Bobkiewicz, City Manager Ashley King, Assistant Director of Administrative Services Johanna Leonard, Acting Deputy City Manager Subject: Resolution 88-R-15 Authorizing the City of Evanston to Increase the FY2015 Budget for the Chicago/Main TIF Fund by $2,900,000 to a new total of $2,900,000 Date: August 21, 2015 Recommended Action: Staff recommends that City Council adopt Resolution 88-R-15 “Authorizing the City of Evanston City Manager to Increase the FY2015 Budget for the Chicago/Main TIF Fund by $2,900,000 to a New Total of $2,900,000.” Funding Source: Per the agreement with Chicago & Main Funding Member, Inc., the City will be funding this incentive through future tax increment finance revenues. These revenues will be used to pay the debt service cost of a $2,900,00 debt issuance in the Chicago/Main TIF fund. Summary: The Chicago/Main Tax Increment Financing (TIF) District was established in February 2014. The City entered into an agreement with Chicago & Main Funding Member, Inc., the developers of the vacant property at the southeast corner of Main Street and Chicago Avenue, in November 2014 to provide up to $2,900,000 in eligible tax increment financing (TIF) expenses for site development work associated with bringing office space to the mixed-use development. Since the Chicago/Main TIF district was only established in early 2014, the district has not had an opportunity to generate significant revenue through new property taxes. The redevelopment of the vacant property at the southeast corner of the intersection of Main Street and Chicago Avenue will generate significant new property tax increment for the district that can be utilized to repay any debt issued. Attachments: Resolution 88-R-15 Map of Chicago Main TIF Memorandum 68 of 83 8/31/2015 88-R-15 A RESOLUTION Authorizing the City of Evanston City Manager To Amend the Fiscal Year 2015 Budget for the Chicago/Main TIF Fund by $2,900,000, to a New Total of $2,900,000. WHEREAS, a total Chicago/Main TIF budget amendment for two million nine hundred thousand dollars ($2,900,000) is required due to site development of a mixed-use development within the Chicago Main TIF. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, COOK COUNTY, ILLINOIS: SECTION 1: That the foregoing recitals are hereby found as fact and made a part hereof. SECTION 2: That the Council authorize the Fiscal Year 2015 Chicago/Main TIF Fund budget be increased two million nine hundred thousand dollars ($2,900,000) to two million nine hundred thousand dollars ($2,900,000). SECTION 3: That approval of this resolution shall authorize the City Manager to expend and/or encumber up to two million nine hundred thousand dollars ($2,900,000) for Fiscal Year 2015 for Chicago/Main TIF Fund. SECTION 4: That this Resolution shall be in full force and effect from and after the date of its passage and approval in the manner provided by law. 69 of 83 88-R-15 ~2~ _______________________________ Elizabeth B. Tisdahl, Mayor Attest: _______________________________ Rodney Greene, City Clerk Adopted: __________________, 2015 70 of 83 RIDGE AVE MAIN ST CHICAGO AVESHERMAN AVEDEMPSTER ST GREENLEAF ST CUSTER AVEMAPLE AVELEE ST OAKTON ST MADISON ST SOUTH BLVD FOREST AVEELMWOOD AVECRAIN ST MONROE ST HINMAN AVEJUDSON AVEKEDZIE ST HAMILTON ST SHERIDAN RDREBA PL WASHINGTON ST KEENEY STRIDGE CTMICHIGAN AVEAUSTIN STBARTON AVESEWARD STOAK AVEBURNHAM PL CLEVELAND ST SHERMAN PLCALLAN AVECROFT LNOAK AVEHINMAN AVEHINMAN AVEAUSTIN ST MICHIGAN AVEELMWOOD AVELEE STFOREST AVEJUDSON AVESOUTH BLVD SEWARD ST TIF District #8Chicago Main This map is provided "as is" without warranties of any kind.See www.cityofevanston.org/mapdisclaimers.html for more information.TIF8Letter.mxd - 3/27/2013 TIF District Building Tax Parcel Street Railroad 0 200 400100Feet71 of 83 For City Council meeting of August 31, 2015 Item X Ordinance 111-O-15: Increasing Ambulance Transport Fees For Introduction To: Honorable Mayor and Members of the City Council From: Greg Klaiber, Fire Chief Subject: Ordinance 111-O-15 Amending Section 9-2-3 (B) of the Evanston City Code Date: August 5, 2015 Recommended Action: Staff recommends that City Council adopt Ordinance 111-O-15 amending Section 9-2-3 of the Evanston City Code. The amendment will increase ambulance transport fees. Summary: The previous amendment to the ordinance was effective December 31, 2009. Since that time our fee structure has fallen below the regional average rates. It has also been surpassed by the area’s Medicare allowable reimbursable rate. Currently, our fees are positioned below Medicare allowed amounts, which implies that we are not taking full advantage of reimbursement opportunities. The Medicare allowable reimbursable rate is a benchmark that most providers who accept Medicare payments do not want to fall below. The City of Evanston accepts Medicare reimbursements. The fee increases are delineated in the attached ordinance. Based on the recommended fee adjustments and the types of ambulance transport usage typically needed in Evanston, it is expected that an additional $200,000 annually in fees would be generated. Attachments : Ordinance 111-0-15 Memorandum 72 of 83 8/3/2015 111-O-15 AN ORDINANCE Amending Section 9-2-3 (B) of the Evanston City Code Increasing Fire Department Transport Fees BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, COOK COUNTY, ILLINOIS: SECTION 1: That Section 9-2-3(B) of the Evanston City Code, adopted 2012, as amended, be and hereby is further amended as follows: 9-2-3: FEES CHARGED; USE OF EQUIPMENT. (B) Both Nonresidents and Residents of the City of Evanston who have been provided emergency ambulance transport service by the City shall be required to pay a fee to the City, for each incident. All persons requiring transport to a hospital by the Evanston Fire Department (or its designees) and related services hereafter defined, shall be charged, per person, as follows: City Resident Non-City Resident BLS Transport $362.00 512362.00 $500.00 7500.00 ALS Transport $429.00 579429.00 $550.00 7550.00 ALS2 Transport $621.00 771621.00 $700.00 9700.00 Mileage $10.00 $10.00 Definitions: BLS Transport: Transportation that requires Basic Life Support Service. ALS Transport: Transportation that requires Advanced Life Support Service. ALS2 Transport: Transportation that requires more extensive/invasive Advanced Life Support Services. Mileage: Charge per mile of transport in ambulance. The City of Evanston shall also assess a Medicare allowable mileage fee of $7.00 per mile. Due to short transport driving distances for Evanston ambulance transport calls, it shall be assumed each transport incident at one mile for a fixed total fee of $7.00 per transport incident.The City of Evanston shall also assess a Medicare allowable mileage fee of $7.00 per mile. Due to short transport driving distances for Evanston ambulance 73 of 83 111-O-15 transport calls, it shall be assumed each transport incident at one mile for a total fixed fee of $7.00 per transport incident. SECTION 2: All ordinances or parts of ordinances in conflict herewith are hereby repealed. SECTION 3: If any provision of this ordinance or application thereof to any person or circumstance is held unconstitutional or otherwise invalid, such invalidity shall not affect other provisions or applications of this ordinance that can be given effect without the invalid application or provision, and each invalid provision or invalid application of this ordinance is severable. SECTION 4: This ordinance shall be in full force and effect from and after its passage, approval and publication in the manner provided by law. SECTION 5: The findings and recitals contained herein are declared to be prima facie evidence of the law of the City and shall be received in evidence as provided by the Illinois Compiled Statutes and the courts of the State of Illinois. Introduced:_________________, 2015 Adopted:___________________, 2015 Approved: __________________________, 2015 _______________________________ Elizabeth B. Tisdahl, Mayor Attest: _____________________________ Rodney Greene, City Clerk Approved as to form: _______________________________ W. Grant Farrar, Corporation Counsel ~2~ 74 of 83 For City Council Meeting of August 31, 2015 Item XI Ordinance 110-O-15: Amending Parking Violation Penalties For Introduction To: Honorable Mayor and Members of the City Council From: Martin Lyons, Assistant City Manager/CFO Rickey A. Voss, Parking/Revenue Manager Subject: Ordinance 110-O-15, Amending Title 10, Motor Vehicles and Traffic, Chapter 11, Traffic Schedules, Section 17, Schedule XVII: Parking Violation Penalties Date: August 28, 2015 Recommended Action: Staff recommends that the City Council adopt Ordinance 110-O-15, amending portions of City Code Section 10-11-17, Schedule XVII, Parking Violation Penalties regarding increasing the fines and late penalties for various parking violations. Staff recommends that the increase be effective on October 1, 2015. Funding Source: General Fund Revenue Account (100.19.1941.52505). Summary: Due to uncertainty with the State of Illinois’ budget, staff recommends the increase of parking violation fines and late penalties. The following are proposed: • Increase of fine of $5 for all parking violations throughout the City (i.e. parking without permit in certain City lots, parking on the side of the street scheduled for street cleaning, parking within 15 feet of a fire hydrant, etc.); • Increase of a fine from $10 to $25 for parking violations associated with expired parking meters (total increase of $15 per violation); • Increase of $5 of the penalty payment of the violation is not paid after the expiration of 10 days from the date of violation’s issue. There are no recommended fine or penalty increases for State Registration violation fines of twenty five ($25), and disabled violation fines of two hundred and fifty dollars ($250) and penalties of one hundred dollars ($100). These items are governed by the Memorandum 75 of 83 Illinois Complied Statutes (625ILCS5). The attached copy of Ordinance 110-O-15 provides a table which addresses the fine increases by violation. Attachments: Ordinance 110-O-15 2 76 of 83 8/5/2015 110-O-15 AN ORDINANCE Amending Title 10, Schedule XVII, of the Evanston City Code, “Parking Violation Penalties”, Section 10-11-17, Increasing the Penalty for Various Fines BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, COOK COUNTY, ILLINOIS: SECTION 1: That the Evanston City Code, 1979, as amended, be and hereby is further amended by amending Section 10-11-17 to read as follows: 10-11-17: SCHEDULE XVII; PARKING VIOLATION PENALTIES: The following penalties are hereby established as fines for violation of the parking provisions hereinafter enumerated: (A) Fine of ten twenty-five dollars ($10.00 25.00) plus fifteen twenty dollars ($15.00 20.00) additional penalty if paid after the expiration of twenty-one (21) ten (10) days from the date of issue. Schedule XVII (A): Parking Violation Penalties Expired parking meter 10-5-4(B) (B) Fine of twenty-five ($25.00) thirty ($30.00) plus twenty ($20.00) twenty-five dollars ($25.00) additional penalty if paid after the expiration of twenty-one (21) ten (10) days from the date of issue. 1. Parked without permit in certain city parking lots 10-4-16-1(B) Schedule XVII (B): Parking Violation Penalties Lot Location Lot 6 1433 Maple, 1454 Elmwood, and 1509 Elmwood (police and fire) Lot 30 1501 Elmwood in the "police vehicle only" area Lot 43(A) 2603 Sheridan Road in area designated "43A permit" Lot 44 555 Lincoln Street (water department) 77 of 83 110-O-15 ~2~ Lot 51 927 Noyes Street (Noyes art center) Lot 54 Poplar at Central Lot 56 2100 Ridge Avenue (civic center) Lot 58 Asbury Avenue and Leon Place (service center) 2. Parked near schools during school hours where posted 10-4-7 3. Parked in aisles in city parking lots 10-4-16-4 4. Parked in freight or passenger loading zone 10-4-14-3 5. Parked on private property without consent 10-4-6 6. Parked in area reserved for emergency vehicles 10-4-17 7. Parked on a bridge 10-4-1(A)7 8. Improper use of stops/stands by buses/cabs 10-4-14-5 9. Passenger vehicle parking only 10-4-5-2(A) 10. Commercial vehicle (25 feet or less) parked in residential area between 9:00 P.M. and 7:00 A.M. 10-4-5-3 11. Parked in bus stop or cabstand 10-4-14-6 12. Parked outside meter space lines 10-5-3(B) 13. Nonmotorized vehicle parked on street over 4 hours 10-4-3(C) (B.1) Fine of twenty-five dollars ($25.00). No current state registration(Ord. 21-0-02) 10-4-1(C) (C) Snow Route Parking Ban And Snow Emergency Penalties: Schedule XVII (C): Parking Violation Penalties 1. Snow Route Parking Ban: Vehicles illegally parked on a snow route, as designated in schedule VI, section 10-11-6 of this chapter and in subsection 10-4- 13(B) of this title during a snow route parking ban, shall pay a fine of fifty-five dollars ($55.00) sixty dollar ($60.00), plus an additional penalty of twenty dollars ($20.00) twenty-five dollar ($25.00) if paid after the expiration of twenty-one (21) ten (10) days from the date of issue. 78 of 83 110-O-15 ~3~ 2. Tow Away And Storage; Snow Route Parking Ban: Vehicles towed pursuant to subsection 10-4-13(E) of this title shall be subject to the fifty-five dollar ($55.00) sixty dollar ($60.00) fine plus an additional penalty of twenty dollars ($20.00) twenty-five dollars ($25.00) if paid after the expiration of ten (10) days from the date of issue pursuant to subsection (C)1 of this section and to the cost of towing and the daily storage fee, based on the current rate established in the city towing contract. 3. Snow Emergency; Vehicle Not Towed: Vehicles illegally parked, as defined in subsection 10-4-13(D) of this title, but not towed and relocated, during a snow emergency on all streets, other than those defined by ordinance to be a snow route, shall pay a fine of fifty-five dollars ($55.00) sixty dollars ($60.00), plus an additional penalty of thirty-five dollars ($35.00) forty dollars ($40.00) if paid after the expiration of twenty-one (21) ten (10) days from the date of issue. 4. Snow Emergency: Vehicles illegally parked as defined in subsection 10-4-13(D) or (E) of this title which are towed and relocated during a snow emergency on all streets other than those defined by ordinance to be a snow route shall pay a fine of one hundred fifty dollars ($150.00) one hundred-fifty five dollars ($155.00) plus an additional penalty of fifty dollars ($50.00) fifty-five dollars ($55.00) if paid after the expiration of twenty-one (21) ten (10) days from the date of issue. (D) Fine of thirty dollars ($30.00) thirty-five dollars ($35.00) plus twenty-five dollars ($25.00) thirty dollars ($30.00) additional penalty if paid after the expiration of twenty- one (21) ten (10) days from the date of issue. Schedule XVII (D): Parking Violation Penalties 1. Parked in violation of street cleaning regulations 10-4-12 2. Parked under fire escape 10-4-1(A)12 3. Parked left wheel to curb on two-way street or parked more than 12 inches from curb 10-4-8 4. Parked for selling merchandise from vehicle 10-4-3(B) 5. Parked within an intersection 10-4-1(A)3 6. Parked on or within a crosswalk 10-4-1(A)4 7. Parked within 20 feet of a crosswalk 10-4-1(B)3 8. Parked within 30 feet of traffic control device 10-4-1(B)4 9. Parked within 50 feet of railroad crossing 10-4-1(C)1 79 of 83 110-O-15 ~4~ 10. Parked within 20 feet of fire station driveway or within 75 feet of fire station entrance on opposite side of street 10-4-1(B)5 11. Leaving vehicle unattended with motor running 10-4-9 12. On a sidewalk in such a way as to obstruct any portion thereof 10-4-1(A)2 13. Parked on a parkway 10-4-1(A)11 14. Parked in violation of "passenger vehicle parking only" for vehicles longer than 25 feet 10-4-5-3 15. Nonmotorized vehicle parked between 9:00 P.M. and 6:00 A.M. (Ord. 6-0-02) 10-4-3(D) (E) Two hundred fifty dollars ($350.00), plus one hundred dollars ($100.00) additional penalty if paid after the expiration of twenty-one (21) ten (10) days from the date of issue: Schedule XVII (E): Parking Violation Penalties Parking in spaces reserved for the mobility limited pursuant to subsection 10-4-11(A) of this title. (F)Two hundred fifty dollars ($250.00), plus one hundred dollars ($100.00) additional penalty if paid after the expiration of twenty-one (21) ten (10) days from the date of issue: Schedule XVII (F): Parking Violation Penalties Parking in spaces reserved for the mobility limited pursuant to subsection 10-4-11(B) of this title. (G) Fine of fifty-five dollars ($55.00) sixty dollars ($60.00) plus twenty dollars ($20.00) twenty-five dollars ($25.00) additional penalty if paid after the expiration of twenty-one (21) ten (10) days from the date of issue. Schedule XVII (G): Parking Violation Penalties 1. Parking or operating a vehicle registered or required to be registered in the City without obtaining a valid Evanston vehicle license (the wheel tax sticker or "city sticker") 10-8-1 2. Parking or operating a vehicle registered or required to be registered in the City without displaying valid Evanston vehicle license (the wheel tax sticker or ("city sticker") 10-8-4 80 of 83 110-O-15 ~5~ H) Fine of fifty dollars ($50.00) fifty-five dollars ($55.00) plus fifty dollars ($50.00) fifty- five dollars ($55.00) additional penalty if paid after the expiration of twenty-one (21) ten (10) days from the date of issue. Schedule XVII (H): Parking Violation Penalties 1. Parked in alley 10-4-5-1 2. Obstructing traffic 10-4-2 3. Double parking 10-4-1(A)1 (I) Fine of fifty dollars ($50.00) sixty dollars ($60.00) plus fifty dollars ($50.00) fifty-five dollars ($55.00) additional penalty if paid after the expiration of twenty-one (21) ten (10) days from from the date of issue. Schedule XVII (I): Parking Violation Penalties 1. Parked within 15 feet of a fire hydrant 10-4-1(B)2 2. Parked in front of or within 8 feet of driveway (Posted) 10-4-1(B)1 3. Parked in or blocking an electric vehicle charging station 10-4-19 (J) Fine of forty-five dollars ($45.00) fifty dollars ($50.00) plus forty dollars ($40.00) forty-five dollars ($45.00) additional penalty if paid after the expiration of twenty-one (21) ten (10) days from the date of issue. Schedule XVII (J): Parking Violation Penalties 1. No parking permit in certain city lots 10-4-16-2(A) Lot Location Lot 1 South Boulevard and Hinman Avenue Lot 4 2101-2121 Central Street Lot 8 811 Main Street Lot 14 Lake Street and Sherman Avenue Lot 15 716 Main Street Lot 18 Clyde Avenue and Brummel Street Lot 20 1881 Oak Avenue 81 of 83 110-O-15 ~6~ Lot 21 1028-1030 Central Street, Chandler Center Lot 22 South Boulevard and Sheridan Road Lot 23 Dempster Street and Elmwood Avenue Lot 25 1614 Maple Avenue Lot 27 1619 Oak Avenue Lot 30 1501 Elmwood Avenue Lot 31 925 Sherman Avenue Lot 32 825 Hinman Avenue Lot 35 Main Street and Judson Avenue Lot 39 711-715 Hinman Avenue Lot 42 743 Hinman Avenue Lot 43 2603 Sheridan Road (garage area) Lot 45 833 Forest Avenue Lot 47 Lake Street and Maple Avenue Lot 48 1315 Emerson Street Lot 60 1232-34 Chicago Avenue Lot 64 Central Street at Ashland Avenue (K) Fine of thirty-five dollars ($35.00) forty dollars ($40.00) plus thirty dollars ($30.00) thirty-five dollars ($35.00) additional penalty if paid after the expiration of twenty-one (21) ten (10) days from the date of issue. Schedule XVII (K): Parking Violation Penalties 1. Parked in posted no parking zone 10-4-1(C)2 2. Parked longer than posted time limit 10-4-15-5 3. Parked longer than parking meter time limit 10-5-4(C) 4. No residential parking permit (including EVS district) 10-4-5-2(B) 82 of 83 110-O-15 ~7~ SECTION 2: All ordinances or parts of ordinances in conflict herewith are hereby repealed. SECTION 3: If any provision of this ordinance or application thereof to any person or circumstance is held unconstitutional or otherwise invalid, such invalidity shall not affect other provisions or applications of this ordinance that can be given effect without the invalid application or provision, and each invalid provision or invalid application of this ordinance is severable. SECTION 4: This ordinance shall be in full force and effect from and after its passage, approval and publication in the manner provided by law. SECTION 5: The findings and recitals contained herein are declared to be prima facie evidence of the law of the City and shall be received in evidence as provided by the Illinois Compiled Statutes and the courts of the State of Illinois. Introduced:_________________, 2015 Adopted:___________________, 2015 Approved: __________________________, 2015 _______________________________ Elizabeth B. Tisdahl, Mayor Attest: _______________________________ Rodney Greene, City Clerk Approved as to form: _______________________________ W. Grant Farrar, Corporation Counsel 83 of 83