HomeMy WebLinkAboutORDINANCES-1971-110-O-71L.
Form 2a BLl 500 11-56.
v
110M-0-71 - 4 3 7
AN ORDINANCE
FOR THE CONSTRUCTION OF A LOCAL IMPROVEMENT
41
known as
EVANST01.4 SPECIAL ASSESSMENT 11\10. 1322
E
BE IT ORDAINED BY THE CITY COUNCIL
OF THE CITY OF EVANSTON, ILLINOIS:
Section 1. That a local improvement shall be made within the City of Evanston, County of Cook and
State of Illinois, the nature, character, locality and description of which is as follows, to -wit:
That the public alley in the'.block bounded', on the north by
South Doulevardl, oil the south by Oak -'Con Street, on the east
by Ccallan ,avenue .and ors-- the yfest by Custer 1^:tienueg in the
'City of Evanston, County of Cook, State of .Illinois, be
improved by grading, constructing necessary storm sewer and
drainacae structure, and paving to a width of nineteen (19)
feet i�l th Portland Cement Concrete pavement eight (8) inches
thick.
Section 2. That the Recommendation of this Ordinance by the Board of Local Improvements of
the City of Evanston, Illinois, and the Estimate of the cost of said improvement made by the Engineer
of said Board, both hereto attached, be and the same are hereby approved and by reference thereto
made apart hereof; Eleven Thousand, Five Hundred Seventy -Nine Dollars
and 15/100 ll;579.15)o
.
Section 3. Tat said improvement shall be made and the cost thereof, including the sum of One
Thousand Fifty Dollars and no/100 ($1,050.00)----------- DWla&s,being tile
cost of making and collecting the Assessment and all other expenses as provided by law, shall be paid for
by Special assessment in accordance with an Act of the General Assembly of the State of Illinois, known
as thetb�,g Qs€l i"jigs, I gEs e e •X;3 � �t r�s 9,U and the mendments thereto;
2 r10 s f anacap, bu ; e� 1 e , e u ,r �, ?.9
Section 4. That the aggregate amount to be assessed and each individual assessment shall be divided
into ------ t_e.p_--- UQ)---------------- installments in the manner provided by law, and each of said installments
shall bear interest at the rate of ----- iX _.____ per centum (-------- per annum from the date of the first
voucher issued on account of work done upon said proposed improvement;
Section 5. That for the purpose of anticipating the collection of the installments of said assessment
levied against the real estate benefited thereby, bonds shall be issued payable out of said installments,
bearing in at the rate of ------------ 5.1%f________________________ per centum (------- �__%) per annum, payable annually
!� and signed on behalf of the City of Evanston, Illinois, by its 'Mayor and attested by its City Clerk and its
corporate seal affixed thereto; and each interest coupon attached to said bonds shall likewise be executed by
and shall bear the official or facsimile signature of the same officers who signed said bonds and who, if
facsimile signatures are used, do adopt by their execution of said bonds as and for their proper signatures
their respective facsimile signatures appearing on said coupons; and that said bonds shall be issued in ac-
cordance with and shall in all respects conform to the provisions of an. Act of the General Assembly of the
State of Illinois, known as the $ sti�e�l i sc.lti } MR dXAC�I' x }fit fl NI}a 'l t �t�:� ,.� �d� the
Amendments thereto; t' T1111-1 IS t:uanacapal Code, eilec. July , 0
Form 2b BLI 500 11-56
Section 6. That ....Richard A. Gatti President
-• .. ...... ...... ...... _..--....._.... - -- -- •. -- •. -- ---• .
of the Board of Local Improvements of the City of Evanston, Illinois, be and .... he is hereby directed to
file a Petition in the County Court of Cook County, Illinois, praying that steps may be taken to levy a
Special Assessment to pay the cost of said improvement in accordance with the provisions of this Ordinance
�) and in the manner prescribed by law;
Section 7. That all Ordinances or parts. of Ordinances conflicting with this Ordinance be and the
same are hereby repealed; and
Section 8. That this Ordinance shall be in force and effect from and after its passage and approval
according to law.
Adopted by the City Council of the City of Evanston, Illinois, on the 20th_day of -Dec-ember
A. D. 19-----71-----
Maurice F. Brown .
-------------------------------------------------
City .Clerk
Approved ---- IlaGemh._2Q_._------ -------- , .19._w__ -..
__fidg r---Vann-ema . --Jr-•-----------------------=----
Mayor
d
11
a
Form 3 BLI 500 11--58
RECOMMMENDATIOP: OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS.
The Board of Local Improvements of the City of Evanston, Illinois, herewith submits the draft of an
Ordinance for the making of a local improvement within the City of Evanston. County of Cook and State of
Illinois, the nature, character, locality and description of which is as follows, to -wit:
That, the public alley in the block bounded on the nortth by
South Boulevard, on the south by Oakton Street, on the east
by Callan Avenue and on the west by Custer Avenue, in the
City of Evanston, County of Cook., State of Illinois, be
improved by grading, constructing necessary storm sewer and
drainage structure, and paving to a width of nineteen (19)
feet with Portland Cement Concrete pavement eight (8) inches
thick,
and as part of said Ordinance and in conjunction therewith, said Board also herewith submits the Plans and
Specifications of and an Estimate of the cost of said improvement, including the cost of engineering services,
• as finally determined by said Board,- and said Board hereby recommends the passage of said Ordinance and
the making of the improvement, described therein.
Approved as to form:
James T. Murray
Attorney for the Board of Local Improvements
of the City of Evanston, Illinois.
Respectfully submitted,
BOARD OF LOCAL IMPROVEMENTS
of the City of Evanston, Illinois.
by
RJ chard A: tti, President
,,Jam 17. Ivio-ing- becre ary -
rr n HubeAV
_a clf—t-, W"
constltutfng a majority of the members of said
Board. ;
F` -
ALLEY PAVING SPECIFICATIONS
The improvement herein provided to be constructed shall be
constructed in accordance with the "Standard Specifications for
Road and Bridge Construction", prepared by the Department of Public
Works and Buildings of the State of Illinois and adopted by said
department, January 2, 1971, including the Supplemental Specifications
• thereto, together with the following Special Provisions. In case of
conflict between said specifications and these Special Provisions,
said Special Provisions shall take precedence and shall govern. Said
specifications are on file and may be inspected at the office of the
Public Works Group Manager, Municipal Building, Evanston, Illinois.
The following terms appearing in said specifications shall be
interpreted as follows:
"STATE" shall mean "CITY OF EVANSTON."
"DEPARTMENT OF PUBLIC WORKS AND BUILDINGS" shall mean
"PUBLIC WORKS GROUP" of the City of Evanston.
"ENGINEER" shall mean "CITY ENGINEER" of Evanston.
GENERAL:
The grade of the center line and outer edges of the pavement
at intermediate points shall be as indicated on attached plans.
The upper surface of the pavement herein provided to be con-
structed, when completed, shall conform to the arc of a circle
passing through the respective grade points at the center line
and at the outer edges of the pavement, and shall be true and
symmetrical.
• EY,AMINATION OF SITE OF WORK: The bidder shall, before sub-
mitting his bid, carefully examine the specifications and proposal.
He shall inspect in detail the site of the proposed work and familiar-
ize himself with all the local conditions affecting the contract and
the detailed requirements of construction. If his bid is accepted,
he will be responsible for all errors in his proposal resulting from
his failure or neglect to comply with these instructions.
PROPOSAL GUARANTY: Each proposal shall be accompanied by a
certified check on a responsible bank in the amount of ten percent (107.)
of the gross sum shown in the proposal, or as otherwise provided for
in Article 102.09 of the Standard Specifications. The certified checks
of the unsuccessful bidders shall be returned upon the award of contract.
The certified check of the successful bidder shall be retained only
until his bonds are approved and the contract signed.
- 1 -
10-71
WORKMEN'S COMPENSATION AND PUBLIC LIABILITY: The successful bid-
der at the time of execution of the contract shall furnish evidence of
an Illinois Workmen's Compensation Policy, and shall also be required
to carry full liability insurance protecting the City of Evanston
• against all claims for accidents to workmen, other persons or property.
PERFORMANCE BOND: Within ten days after receiving notice to the
award the successful bidder shall execute, in quadruplicate, a contract
with the City of Evanston for the complete performance of all work there-
in specified and shall furnish a surety bond satisfactory in form to the
Corporation Counsel, in the penal sum equal to one-third (1/3) of the
estimated aggregate amount of the contract. The condition of said bond
shall be that the bidder will faithfully keep and perform all the cove-
nants and agreements in the manner set forth in the contract. Said bond
shall be executed by the bidder as principal and by a reliable surety
company as surety. The surety company shall be duly authorized by law
to execute and deliver such bond in the State of Illinois and shall be
acceptable to the City of Evanston. Said bond shall remain in full force
and effect during the life of the contract and shall be held in the cus-
tody of the Public Works Director.
MAINTENANCE BOND: The Contractor will be required to furnish a
maintenance bond to the City of Evanston, in a sum equal to one-third
(1/3) of the contract price, guaranteeing improvement against all de-
fects arising from poor material or poor workmanship for a period of
two (2) years from the date of acceptance and completion thereof.
SPECIAL EXCAVATION: Prior to laying down the pavement thereon, the
alleys herein specified to be paved shall be cleaned in a thorough and
workmanlike manner of all debris and rubbish such as deteriorated pave-
ments, crossings, box drains, culverts, trees, stumps, etc. Excavation
• shall be done in accordance with the requirements of Section 205 of the
"Standard Specifications".
Such portions of the excavated material as shall be selected by the
Engineer shall be hauled by the Contractor, to, and dumped at, locations
within the City of Evanston to be designated by the Engineer.
PREPARATION OF SUBGRADE: The subgrade shall be constructed so as
to have as nearly as practicable, a uniform density throughout its en-
tire width,. Compression of the subgrade material shall be accomplished
by successive operations of a self-propelled tendem roller, weighing
not less than three (3) nor more than five (5) tons. Portions of the
subgrade inaccessible to the roller shall be wetted and tamped solidly
with a hand tamp weighing not less than fifty (50) pounds and not to
exceed one hundred (100) square inches in area. All soft, spongy or
yielding spots and all vegetable or other such objectionable materials
shall be entirely removed and the space refilled with sandy soil. Any
depressions that appear during the rolling shall be filled with sandy
soil and rolled until the Whole shall be uniformly compact and firm.
MM
Rolling shall continue until the subgrade is uniformly compacted,
brought to a true shape and to an elevation uniformly eight (8) inches
below the established grade and cross sectional contour of the top of
the pavement. Where the soil in the alley consists of sand or sandy
soil incapable of compaction by rolling or tamping, said compaction
shall be accomplished by thoroughly flooding the subgrade. After
• being prepared in the above manner the subgrade shall be so maintained
until the pavement has been placed thereon.
CF.ECKTNG AND ACCEPTANCE: Immediately before the pavement is laid,
the subgrade shall be. checked by means of an approved template, shaped
on the under side to conform to the lower surface of the finished pave-
ment, or by a method of testing approved by the Board of Local Improve-
ments. All high places shall be removed to true grade and any low places
filled with sandy soil and rolled or hand tamped until smooth and firm.,
The subgrade shall be checked and completed in accordance with these re-
quirements for a distance of not less than one hundred (100) feet in
advance of the pavement. If hauling over the subgrade after it has been
finished and checked as specified results in ruts or other such ob-
jectionable irregularities, the contractor shall reroll or hand tamp
the subgrade and place it in smooth and satisfactory condition before
the pavement is deposited upon it. If the condition of the subgrade is
such that it cannot be placed in satisfactory condition to receive the
pavement, paving shall be stopped by the Engineer unless the contractor
provides and hauls over suitable trackways or uses other means for the
protection and maintenance of the subgrade. The cost of subgrade pre-
paration and all excavation and replacement required by these specificat-
ions shall be included in the unit price bid for Special Excavation.
SEWER CONNECTIONS: All existing connections to the present sewer
shall be protected against damage during the construction of this pro-
posed improvement. Any connections damaged shall be repaired immediately
by the Contractor at his own expense.
TRENCH BACRFILL: This item shall consist of furnishing sand or
stone screenings from beyond the limits of this improvement, placing it
where directed by the Engineer and puddling same with water until settle-
ment is complete. It shall be used for backfilling trenches, between
new retaining walls and existing foundation walls, building foundations,
water main excavations and any other cavity which may occur in the area
of this improvement or where the inner edge of a trench is within two
feet of the edge of this improvement.
PORTLAND CEMENT: Portland cement used in Portland Cement Concrete
pavement, Portland Cement Concrete Base Course, Portland Cement Concrete
Curb, Portland Cement Concrete Sidewalk and Class "X" Concrete shall
comply with the requirements of Specifications for Air Entraining Cement
for Concrete Pavements, A.S.T.M. Designation: C 175, Type 1-A.
All portland cement used in this contract shall be included in the
contract unit price for the several payment items involved.
3 -
4-71
FORTLAND CEMENT CONCRETE PAVEMCNT; Portland Cement Concrete Pave-
ment shall be constructed in accordance with Section 408 of the
"Standard Specifications", except that the final finish shall be
obtained by the use of two (2) separate burlap drags, having a double
thickness, be at least four (4) feet wide and two (2) feet longer
than width of slab under construction. The burlap shall be attached
to a bridge riding on pavement forms and be kept saturated while in
.
use. It shall be laid on the pavement surface and dragged in the dir-
ection pavement is being laid, with approximately two (2) feet of width
in contact with the pavement surface. The burlap drag shall be kept
clean and free of hardened concrete.
The Engineer may require changes in belting, burlapping and equip-
ment to produce desired final surface texture.
Paymeni for PORTLAND CEMNT CONCRETE PAVEMENT shall be based on
pavement cross section with an eight (8) inch uniform thickness.
Contract unit price for PORTIAND CEMENT CONCRETE PAVEMENT shall in-
clude payment for all material, labor and equipment necessary for the
construction of this pavement.
LOTJGMUDINAL CENTER JOINTS: The concrete pavement shall be built
so as to have a longitudinal center joint. Said longitudinal joint
shall e,.tend along the center line of the pavement the entire length of
the improvement,. The joint shall be made by installing a specially
built metal strip which will separate the concrete. The said strip
shall be made of No. 18 gauge sheet steel seven and one-half (72)
inches in.width, and shall be delivered on the work in ten (10) foot
lengths. Said strip shall have a trapezoidal corrugation along the
center thereof, two and one-half (22) inches in vertical dimension and
one (1) inch in horizontal dimensiou. Adjoining strips shall butt
each other tightly and be securely fastened by means of metal clips.
Said strip shall extend vertically from the base of the concrete pave-
ment to one-half (2) inch below the top of the finished surface of the
• pavement and shall be held securely in vertical position to straight
alignment, by means of steel pins, left, in place, driven vertically'
through holes punched through said strip and not to exceed two end
one-half (22) feet centers. The pins used shall be three -eights (3/8)
inch in diameter and not less than fifteen (13) inches in length.
A template shall be used to install the strip vertically and for
straightening the alignment prior to the deposition of the concrete
and that the joints shall not be displaced during the finishing
operation.
Deformed steel tie bars one-half (Z) inch in diameter and two and
one-half (22) feet in length shall be placed through the longitudinal
joint in openings punched for that purpose, which openings shall be
along the center line of said strip so spaced _as not to exceed two and
one-half (22) feet centers. Each bar shall be held rigidly in hor-
izontal position during the placing of the concrete by the use of two
(2) metal bar chairs driven into the subgrade..
- 4 -
FurniGhing all material, labor and equipment for installing of
said loraitudinal joint and tie bars shall not be paid for directly,
but shall be considered incidental to the construction of the Portland
Cement Concrete Pavement.
TRA.NSVERSE,ERPANSION JOINTS: Transverse expansion joints shall be
placed throughout the entire improvement across the concrete pavement
• at right angles to the center thereof and at intervals of one hundred
(100) feet measured along said center line.. The expansion joints shall
be made by placing and leaving in place prior to laying the concrete
mixture for the pavement, a bituminous premoulded joint filler con-
forming to the requirements of Article 715.04 or 715.05 of the "Standard
Specifications." Said joint filler shall be three fourths (3/4) inch
in thickness and shall extend vertically from a point one (1) inch
below the top of the subgrade to a point one half (2) inch below the
finished grade of the pavement. The intervening space between the top
of said joint filler and the finished grade of the pavement shall be
filled with Asphalt P.A.Y.-3.
Load transfer across said expansion joints shall be accomplished
by installation of three -fourths (3/4) inch round smooth steel bars
eighteen (18) inches long at fifteen (15) inch centers through said
joint filler, or by other load transfer device approved by .the Engineer.
One end of each of said steel bars shall be furnished with a metal or
fibre cap to provide one (1) inch of expansion space. Said steel bars
shall be maintained rigidly in proper alignment by approved means.
All manhole frames and other fixed objects, with the exception of
frames otherwise mentioned in those specifications, shall be separated
from the concrete pavement by a joint filler of the same thickness and
character as hereinbefore specified for expansion joints, which joint
filler shall extend through the entire thickness of the pavement.
Said joint filler shall be placed in such a manner as to form a square
whose sides will be fifteen (15) inches from the upper outside edges
• of the frames.
Furnishing all labor, equipment, and materials for installation
of said expansion joints. Load transfer devices and reinforcing steel
shall not be paid for directly, but will be considered incidental to
the construction of the Portland Cement Concrete Pavement.
CONTRACTION JOINTS: Sawed contraction joints or other type of
contraction joints which may be approved by the Engineer, shall be
placed throughout the entire improvement across the concrete pavement
at right angles to the center thereof at intervals of twenty-five (25)
feet between expansion joints and in accordance with the detail shown
on plans.
Furnishing all labor, equipment, and materials for the installa-
tion of said contraction joints including dowel bar assembly shall not
be paid for directly, but will be considered incidental to the con-
struction of the Portland Cement Concrete Pavement.
- 5 -
IT
TX110 AND PTA&CING CONCRETE: Concrete shall be mixed and placed
in accordance ;with the requirements of Section 408 of the "Standard
Specifications", insofar as the same may apply. While being placed the
concrete shall be vigorously vibrated, by the use of a mechanical
vibrating device, and spaded to eliminate voids or honeycomb pockets.
• The concrete shall be especially well spaded and tamped against forms
and bulkheads. The concrete shall be struck off, so that the upper
surface shall conform to and be sufficiently higher than the contour.
herein specified for the upper surface of the finished pavement, to
give the specified thickness of pavement herein required. The strike
board shall be moved forward with a combined longitudinal and transverse
motion, and so manipulated as to tamp the concrete thoroughly. A
slight excess of material shall be kept in front of the cutting edge
at all times.. The entire area of the pavement shall be struck off and
tamped, so executed as to insure maximum compaction.
FINISHING CONCRETE: After the vibrating and the tamping has been
completed, the pavement shall be rubbed smooth of all ridges and de-
pressions and brought to a true and even surface by the use of wooden
floats.. A split float, shaped on the under side to conform to the
contour of the pavement, shall be used for finishing the concrete on
both sides of the longitudinal joints, hereinbefore specified. The
edges adjoining the transverse expansion joint and the form, shall be
tooled with an edging tool, having a radius of one -quarter (k) inch.
After the floating has been completed, the surface of the pavement
shall be tested with a notched straight edge, ten (10) feet in lengths.
This straight edge shall be placed over the transverse joints and be-
tween the same at frequent intervals, parallel to the center line of
the pavement and moved across from side to side. Any variation in
excess of one -eighth (1/8) inch above or below the general established
contour of the pavement shall be rubbed with a long handled float and
the irregularities corrected until the straight edge shall show a
• bearing for its entire length.
Workmen shall not walk on freshly laid concrete and no one shall
be allowed on the concrete after it has been worked into form and shape
until it has entirely hardened. The entire surfacing of the concrete
pavement shall be done from a bridge, not less than one (1) foot in
width which shall not come in contact with the concrete pavement at
any point. Two (2) of said bridges shall be provided for each concrete
mixing gang. Two bridges shall be maintained in constant readiness to
be immediately moved into position, to provide access for finishing,
tooling and edging joints, adjusting filler and refinishing damaged
portions of the finished surface.
PROTECTION AND CURING: Protection and curing shall comply with
the requirements of Section 408 of the "Standard Specifications".
- 6 -
STORM SEVERS
For the purposeof.csrrying off storm waters from the surface of
the pavement herein provided to be constructed, storm sewers of clay
sewer pipe or concrete sewer pipe shall be laid as hereinafter
specified.
• Said sewers shall be laid in open trenches, in the ground in such
manner. as to conform to the elevations, lines.aad.grade's hereinafter
specified in accordance with the requirements of Section 603 of the
"Standard Specifications," and shall be .designated as Stczm-Sewers,
Ty
ge 3•
The pipe used in the construction of said svers sh eall be of the
type known as "Bell and Spigot" having an internal diameter of 10"
inches. Where required for connections from catch basins or manhole
catch basins, 811. "Y" branch shall be furnished and -set in said sewer.
The material excavated shall be kept compactly along the sides of
the trenches and shall be backfilled as soon .as.practi.cable.in order to
occasion .the least possible inconvenience to the public in the use of
the street or alley as the case may be, but prior to said backfilling
and immediately after the.laying of the pipes, bank sand shall be .
carefully packed under, around and.over the pipes in such manner as
to compactly fill the trenches to a depth.of twelve (12) inches.above
the top -of the pipes. Where material excavated is not such as can be
readily compacted in said trenches, same shall be replaced with bank
sand, as directed by the Engineer.
The open and unconnected ends of said sewers shall each be securely
closed with a salt glazed, vitrified tile disc and sealed in the manner
specified for joints between pipes.
BASIS OF.PAYMIIIT: This Mork will be paid for at the contract unit
• price per lineal foot for Storm.Sewer, Type 3, of the diameters
specified, measured in place, which prices will be payment.in full
for all trench excavation, backfi.11ing with excavated material.or
bank sand, and for all labor, materials and equipment, including "Y"
branches, to complete the installation of the sewer, in place, in-
cluding connections to existing sewers.
4-71
. s
NAMOIL- CATCH BASINS
AND
CATCH BASINS.
Alley. Laving
• Catch basins shall be constructed of hard burned,,sewer brick or concrete
block. Said catch bas.ins.shall be cylindrical,in shape having an internal dia-
meter of forty-eight (48) inches at the bottom and upward to a point thirty (30)
inches below the top of masonry and .shall then be uniformly'drawn.in to twenty-
four (24) inches at the top of the. masonry, to .fit the iron cover hereinafter'
-specified to be furnished and set on -the walls of said catch.basins.
Said'catch basins shall have walls eight (8) inches thick, for brick,
and five (5) inches thick for concrete block. The brick'or block used in the
construction of said catch basins shall be laid in a mortar composed by volume
of one (1) part of Portland Cement and two. (2).parts of clean, sharp sand mixed
with sufficient clean water to give proper plasticity, The masonry joints
shall be neatly pointed and made secure against leakage. .,Said catch basins
shall rest on a.conerete bottom, six (6) inchesIn 'thickness; composed of
Class X Concrete conforming to the requirements of Section 52 of the "Standard
Specifications", or precast reinforced concrete slabs not less than twelve (12)
inches in width and four (4) inches in thickness. The said bottom shall be
circular in form and the diameter shall be such that the walls of the catch
basin shall rest entirely on the base. The elevation of the bottom shall be
determined by the Engineer.
Said catch basins shall be connected with the.sewer now existing, or
herein provided to be constructed, as the case•may be, in and along the center
line of said alley. Said catch basins shall be connected with the sewer afore-
said by means of clay or concrete sewer pipe, having an,internal diameter of
8 inches.
Said catch basin connection shall start in an 8" branch
• of the quality and laid in the manner required for storm sewers, .which "Y"
branch shall be set in said sewer at a point eight (8) feet in advance of the
vertical axis of the catch basin measured along and in the down stream direc-.
Lion of the sewers. The pipe shall be laid true to line and grade and the con-
nection shall enter the catch basin through the wall thereof at a point not less
than two (2) feet above the top of the bottom of said catch basin. The pipe
entering the catch.basins.through the wall thereof,. shall be a half -trap of
8" internal diameter. Cost of furnishing and installing said half -
trap shall be included in contract unit price for "Catch basins".
Method of laying pipe and backfilling same shall comply with requirements
for "Storm Sewers".
Said catch basins shall be equipped and fitted with a circular cast iron
frame provided with a tight fitting perforated lid. Said lid shall contain
forty (40) perforations of.substantially similarsize and shape and weigh one
hundred twenty (120) pounds. The total area of said perforations shall be
forty-three percent (430) of the total area of said lid. Said lid shall be
supported upon a circular flange or projection cast upon the inside of said
T" _ _T
•
Alley Paving
circular frame,.in such manner as to bring the upper surface of said lid, when
in place, to the same elevations as the top of the walls of said circular frame.
Said circular frame shall weigh two hundred seventy (270) pounds, be of. two .
piece construction, be fifteen (15) inches high and have an internal diameter
of twenty five (25) inches at the base and twenty three (23) inches at the top
thereof. The edges of the frame and lid, where .same adjoin each other when in
place, shall be machine 'turned in'such manner as.to leave said'edges smooth and.
be so shaped that said lid shall tightly fit into.said frame so as to permit no
play between them.
Said catch basin frame herein provided to be furnished and set, shall
rest on the walls of the catch basin and.shall be imbedded in a.mortar of the
quality herein required .for walls in said catch basin.
All cast iron used in making said cover shall be Gray Iron conforming
to the Specifications for Gray Iron Castings, A:S.T.M. Designation: A48.,
Class 20.
BASIS OF PAYMENT: This work will be.paid for at the contract unit price
for "Catch Basins" and for'" S inch Storm Sewers, Type-3" which
prices will be payment in full for all excavation, for backfilli.ng with ex-
Cavate.d material or with bank sand, and for all labor, equipment and material,
including cast iron frame and lid, to complete the installation of catch basins
andconnections to sewer.
8-70
r,.—..V
CAST M aC, ANh"* i.'Lf,) S
The Cast Iron Frames and Lids to be furnished with the catch basins or
tkanholes to be constructed under this contract shall be Gray Iron Castings cbn
forming to the Specifications for Gray Iron Castings, A.S.T.M. Designation:
A 48, Class 20, and shall conform to.the following requirements:
• TYPE-1 FRAME: For all paving surfaces, other than concrete, catch basins
or manholes shall be equipped and fitted with a circular.cast iron frame, here-
inafter referred to as a T_-/-pe-1 Frame, and a tight fitting open or closed lid.
Said circular frame shall weigh three hundred ninety (390) pounds, be of one
piece.construction, be nine (9) inches high and have an internal diameter of
twenty-four. (24) inches at the base and twenty-three (23) inches at the top
thereof. The edges of the frame and lid, where same adjoin each other when in
place, shall -.be machine turned in such manner as to leave said.edges.smooth and
be so shaped that said lid shall tightly fit into said frame so as to permit no.
play between them.
Said frame herein provided to be furnishedand set, shall rest on the .
walls of the catch basin.or manhole and shall be imbedded in a mortar.of the
quality herein required for walls in said catch basin or manhole.-
TYPE-5 FRAME: For concrete pavements, catch basins or manholes shall be
equipped with a circular cast iron frame, hereinafter referred to as a Type-5
Frame, and a tight fitting open or closed lid. Said circular frame shall weigh
two hundred seventy (270) pounds, be of two piece construction, be fifteen (15)
inches high and have an internal diameter of twenty-five (25) inches at the
base and twenty-three (23) inches at the top thereof. The edges of the frame
and lid, where same adjoin each other when in place, shall.be machine turned in
such manner as to leave said edges smooth and be so shaped that said lid shall
tightly fit into said frame so as to permit no play between them.
Said frame herein provided to be furnished and set, shall rest on the
walls of the catch basin or manhole and shall be imbedded in a mortar of the
• quality herein required for walls in said catch basin or manhole.
OPEN LID: The open lid shall contain forty (40) perforations.of sub-
stantially similar size and shape and weigh one hundred twenty (120) pounds.
The total area of said perforations shall be forty three per cent (43%) of the
total area of said lid.
CLOSED LID: The closed lid shall weigh one hundred fifty (150) pounds.
BASIS OF PAYMIMT: No payment will be made for this item where it is in-
cluded in the cost of the structure to which it pertains. Where this item is
not included in the cost of the structure, it will be paid for at the contract
unit price each for Cast Iron Frames with Open or Closed Lids. Cost of in-
stalling said frames and lids shall be included in price bid for adjustment or
reconstruction of catch basins, manholes or valve vaults upon which they are to
be placed.
8-70
i'_. _ 7
And that the estimate of the cost thereof, including labor,
materials and all other lawful expenses attending the proceedings for
making said improvement and the cost of making and collecting the assess-
ment therefor as provided by law, and as made by the Engineer of the Board,
amounting in the aggregate to $11,579.15.and itemized as follows:
• ESTIMATE OF ENGINEER OF_BOARA OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board.of Local Improvements of
the City of Evanston, heretofore adopted, providing that the public alley
in the block bounded on the north by'South Boulevard, on the south by
Oakton Street, on the east by Callan Avenue and on the west by Custer Avenue,
in the'City of Evanston, County of Cook, State of Illinois, be improved by
grading, constructing necessary storm sewer and drainage structure, and
paving to a width of nineteen (19) feet with Portland Cement Concrete pave-
ment eight (8) inches thick.
Said improvement to be constructed.in detail as specified_in
aforesaid Resolution.
I herewith submit an estimate of the cost of.such improvement as
described in said Resolution, including labor, materials and all other law-
ful expenses attending the proceedings for making said improvement and the
cost of making and collecting the assessment therefor as provided by law, viz:
ESTIMATE OF COST
227 cu. yds. of Special Excavation @$ 5.10 $ 1,157.70
781 sq. yds. of Portland Cement Concrete
Pavement, eight (8) inches
• thick, laid complete in place @$ 9.95 7,770.95
80 lin. ft. of Storm Sewers, Type-3,
10" diam. @$10.50 840.00
1 each Manhole -Catch Basin with
Type-5 Frame and Open Lid,
Complete in place @$435.00 435.00
11 sq. yds. Pavement Replacement, Entire @$ 18.00 198.00
15 sq. yds. Pavement Replacement, Surface @$ 8.50 127.50
Cost of Engineering Services. . . . . . . . 420.00
For Lawful Expenses, etc. . . . . . . . . . . . 630.00
TOTAL . . . . . . . . . . . . . . . . . . $ 11,579.15
Page 2 - Estimate of Cost continued:
RECAPITULATION
Total Cost of Construction. . . . . . .
Cost of Engineering Services. $ 420.00
For Lawful Expenses, etc. 630.00
TOTAL COST OF IMPROVEMENT. . . . .
$ 10,529.15
1,050.00
$ 11,579.15
I hereby certify that in my opinion the above estimate does not
exceed the probable cost of the above proposed improvement and the lawful
expenses attending the same..
Engineer o thetard )f Local Improvements.
of the Cry of Evanston
12-71
RESOLUTION, SPECIFI,CATIONS,.ESTIMATE AND.PLANS_
FOR A LOCAL IMPROVEMENT.
• RESOLVED, By the Board of Local. Improvements of the City of
Evanston, County of Cook, State of Illinois, that a local improve -
went, to be_paid for by special assessment in accordance with the
provisions of Division 2 of Article 9, of the Illinois Municipal Code
effective July 1, 1961 as amended., be and the same _is hereby originated
to be made within said City of Evanston, as_fol.lows:
That the roadway.of the public alley in the block bounded on
the north by South Boulevard, .on the south by Oakton Street, on the east.
by Callan Avenue and on the -west by Custer Avenue,.in the, City of Evanston,
County of Cook,. State of Illinois, be improved.by grading, constructing
necessary storm sewer and drainage structure, and paving to a'width of
nineteen (19) feet with Portland Cement Concrete pavement eight (8) inches
thick, in accordance with.attached.Specifications, Estimate and plans.
OVERSIZED
DOCUMENT
(PULLED FROM THIS LOCATION)