Loading...
HomeMy WebLinkAbout033-O-23 Granting a Special Use Permit for an Apartment Hotel located at 1555 Oak Avenue, in the R6 Residential District03/13/2023 04/14/2023 04/28/2023 05/12/2023 33-O-23 AN ORDINANCE Granting a Special Use Permit for an Apartment Hotel located at 1555 Oak Avenue, in the R6 Residential District WHEREAS, the City of Evanston is a home-rule municipality pursuant to Article VII of the Illinois Constitution of 1970; and WHEREAS, as a home rule unit of government, the City has the authority to adopt legislation and to promulgate rules and regulations that protect the public health, safety, and welfare of its residents; and WHEREAS, Article VII, Section 6(a) of the Illinois Constitution of 1970, states that the “powers and functions of home rule units shall be construed liberally,” was written “with the intention that home rule unit be given the broadest powers possible” (Scadron v. City of Des Plaines, 153 Ill.2d 164, 174-75 (1992)); and WHEREAS, it is a well-established proposition under all applicable case law that the power to regulate land use through zoning regulations is a legitimate means of promoting the public health, safety, and welfare; and, WHEREAS, Division 13 of the Illinois Municipal Code (65 ILCS 5/11-13-1, et seq.) grants each municipality the power to establish zoning regulations; and, WHEREAS, pursuant to its home rule authority and the Illinois Municipal Code, the City has adopted a set of zoning regulations, set forth in Title 6 of the Evanston City Code of 2012, as amended (“the Zoning Ordinance”); and ~1~ Page 1 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 33-O-23 ~2~   WHEREAS, Cameel Halim, property owner of the Museum Residences on Oak and/or the King Home, “the Applicant”, requests approval of a Special Use Permit for an Apartment Hotel in the R6 Residential District, located at the property commonly known as 1555 Oak Avenue, legally descripted and attached by reference herein as Exhibit A, and located in the R6 Residential District; and, WHEREAS, pursuant to Subsection 6-8-8-3, an Apartment Hotel is an allowed Special Use in the R6 Residential District; and WHEREAS, following due and proper publication of notice in Pioneer North, a suburban publication of the Evanston Review, not less than fifteen (15) nor more than thirty (30) days prior thereto, and following written notice to all property owners within 500 feet of the Subject Property, and following the placement of signs on the Subject Property not less than ten (10) days prior thereto, the Evanston Land Use Commission conducted a public hearing on January 11, 2023, in compliance with the provisions of the Illinois Open Meetings Act (5 ILCs 120/1 et seq.) on the application for a Special Use Permit for an apartment hotel, filed as zoning case no. 22ZMJV-0085; and WHEREAS, the Land Use Commission received extensive testimony, heard public comment, and made findings pursuant to Subsection 6-3-5-10, of the Zoning Ordinance, and by a vote of three (3) “yays” and two (2) “nays” with four (4) Commissioners absent, recommended City Council approval with conditions of the application for Special Use Permit for an apartment hotel with the below findings incorporated into the record: Page 2 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 33-O-23 ~3~   1. Is one of the listed special uses for the zoning district in which the property Lies: The Apartment Hotel definition is listed as an eligible special use in the R6 General Residential District so this standard is met. 2. Complies with the purposes and the policies of the Comprehensive General Plan and the Zoning Ordinance: The property has been vacant for a period of time and the adaptive reuse preserves the building meeting the standard. 3. Does not cause a negative cumulative effect in combination with existing special uses or as a category of land use: The proposed building reuse will bring downtown activity and so the standard is met. 4. Does not interfere with or diminish the value of the property in the Neighborhood: The property is now vacant property so the reuse will increase value and therefore the standard is met. 5. Is adequately served by public facilities and services: The building is near public transportation and is already served by public facilities, so the standard is met. 6. Does not cause undue traffic congestion: With the parking provided, the incremental traffic would not have a negative effect downtown and so the standard is met. 7. Preserves significant historical and architectural resources: The property preserves a mid-century non-historic building, and thus the standard is met. 8. Preserves significant natural and environmental resources: The lot has open space which is being preserved and so the standard is met. 9. Complies with all other applicable regulations: The applicant had proved to be familiar with Evanston regulations and so the standard is met. WHEREAS, on March 27, 2023, the Planning and Development (“P&D”) Committee of the City Council held a meeting, in compliance with the provision of the Open Meetings Act and the Zoning Ordinance, received input from the public, carefully considered the findings and recommendation for approval with conditions of the Land Use Commission, and tabled the request to a date certain on April 24, 2023; WHEREAS, on April 24, 2023, the Planning and Development (“P&D”) Committee of the City Council held a meeting, in compliance with the provision of the Open Meetings Act and the Zoning Ordinance, received input from the public, carefully considered the findings and recommendation for approval with conditions of the Land Use Commission, and tabled the request to a date certain on May 8, 2023; Page 3 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 33-O-23 ~4~   WHEREAS, on May 8, 2023, the P&D Committee of the City Council held a meeting, in compliance with the provision of the Open Meetings Act and the Zoning Ordinance, received input from the public, carefully considered the findings and recommendation for approval with conditions of the Land Use Commission as well as additional documentation provided by the Applicant, and additional conditions suggested by staff, and recommended approval thereof by the City Council; and WHEREAS, at its meetings on May 8, 2023 and May 22, 2023, held in compliance with the Open Meetings Act and the Zoning Ordinance, the City Council considered the recommendation of the P&D Committee, received additional public comment, made certain findings, and adopted said recommendation; and WHEREAS, it is well-settled law that the legislative judgment of the City Council must be considered presumptively valid (see Glenview State Bank v. Village of Deerfield, 213 Ill. App.3d 747) and is not subject to courtroom fact-finding (see National Paint & Coating Ass’n v. City of Chicago, 45 F.3d 1124). NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, COOK COUNTY, ILLINOIS, THAT: SECTION 1: The foregoing recitals are found as fact and incorporated herein by reference. SECTION 2: Pursuant to the terms and conditions of this ordinance, the City Council hereby grants the Special Use Permit, as applied for in zoning case no. 22ZMJV-0085, to allow the operation of one (1) Apartment Hotel. Page 4 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 33-O-23 ~5~   SECTION 3: Pursuant to Subsection 6-3-5-12 of the Zoning Ordinance, the City Council imposes the following conditions on the aforementioned zoning relief granted hereby, being a Special Use Permit for an Apartment Hotel as requested under zoning case no. 22ZMJV-0085, which may be amended by future ordinance(s), and violation of any of which shall constitute grounds for penalties or revocation of said Special Use Permit pursuant to Subsections 6-3-10-5 and 6-3-10-6 of the Zoning Ordinance: 1. The Applicant shall pave the unimproved parking lot in compliance with the City’s Stormwater Management Ordinance (Title 4, Chapter 20) within one year of approval of the Special Use Permit. This condition shall not apply if the Applicant submits a complete application within one year of approval of the Special Use Permit for an alternative use of the lots currently zoned D-4, fronting Maple Avenue, and completes the project. Should said application be denied by the City of Evanston, the original requirement will apply. 2. The Applicant shall substantially comply with the documents and testimony given by the Applicant on the Record. 3. The Applicant shall record the Special Use Permit with the Cook County Recorder of Deeds. 4. A Shared Housing License must be obtained pursuant to Evanston City Code 5-2-3 prior to occupancy. 5. The Applicant shall make all updates to the property required by the hotel flag’s Property Improvement Plan (PIP) dated March 22, 2023, and any amendments thereto, prior to occupancy. 6. The Applicant shall maintain a valid hotel flag or if there is no hotel flag affiliation, the Applicant shall contract with a third party management company, specializing in hotel management to operate the facility. 7. The Applicant shall comply with the hotel tax requirements pursuant to City Code 3-2-4. 8. The garden and patio area shall remain as open green space unless changes are proposed and approved in compliance with City Codes. 9. Exterior lighting and signage shall be in keeping with the residential character of the R-6 neighborhood and require a separate permit approval process. The Applicant shall have the right to apply for a variance to current lighting and signage requirements. 10. The Applicant agrees to consider installing rooftop solar photovoltaic. It is the Applicant’s sole discretion whether to make such installation based on the Applicant’s economic analysis. Page 5 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 33-O-23 ~6~   11. Applicant agrees to work collaboratively with the City’s Economic Development Division, the City’s Workforce Development Division, Evanston Township High School, and other local partners to identify, hire and train Evanston residents. It is within the Applicant’s sole discretion as to whom to hire. SECTION 4: When necessary to effectuate the terms, conditions, and purposes of this ordinance, “Applicant” shall be read as “Applicant’s tenants, agents, assignees, and successors in interest.” SECTION 5: This ordinance shall be in full force and effect from and after its passage, approval, and publication in the manner provided by law. SECTION 6: All ordinances or parts of ordinances in conflict herewith are hereby repealed. SECTION 7: If any provision of this ordinance or application thereof to any person or circumstance is ruled unconstitutional or otherwise invalid, such invalidity shall not affect other provisions or applications of this ordinance that can be given effect without the invalid application or provision, and each invalid provision or invalid application of this ordinance is severable. SECTION 8: The findings and recitals contained herein are declared to be prima facie evidence of the law of the City and shall be received in evidence as provided by the Illinois Compiled Statutes and the courts of the State of Illinois. Page 6 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 33-O-23 ~7~   Introduced: _________________, 2023 Adopted: ___________________, 2023 Approved: __________________________, 2023 _______________________________ Daniel Biss, Mayor Attest: _______________________________ Stephanie Mendoza, City Clerk Approved as to form: ______________________________ Nicholas E. Cummings, Corporation Counsel May 22 March 13 Page 7 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 May 24 33-O-23 ~8~   EXHIBIT A LEGAL DESCRIPTION PARCEL 1: LOTS 7, 8, AND 9 IN BLOCK 62 IN EVANSTON SUBDIVISION IN SECTION 18, TOWNSHIP 41 NORTH, RANGE 14 EAST OF THE THIRD PRINCIPAL MERIDIAN IN COOK COUNTY, ILLINOIS. PARCEL 2: ALL OF THE SUBDIVITED LOTS 1, 2 AND 5, TOGETHER WITH THE WEST 15 FEET OF SUBLOT 3 IN A.J. BROWN’S SUBDIVISION OF LOTS 10, 11, AND 12 IN BLOCK 62 IN VILLAGE (NOW CITY) OF EVANSTON IN SECTION 18, TOWNSHIP 41 NORTH, RANGE 14 EAST OF THE THIRD PRINCIPAL MERIDIAN. ACCORDING TO THE PLAT THEREOF RECORDED JUNE 18, 1885 AS DOCUMENT 633441 IN BOCK 20, PAGE 33. PARCEL 3: LOT 1 OF DIAMANTES’ CONSOLIDATION OF LOT 4 AND EAST 100 FEET OF LOT 3 IN A.J. BROWN’S SUBDIVIISON OF LOTS 10, 11, AND 12 IN BLOCK 62 IN VILLAGE (NOW CITY) OF EVANSTON, IN WEST ½ OF SOUTHWEST ¼ OF SECTION 18, TOWNSHIP 41 NORTH, RANGE 14 EAST OF THE PRICIPAL MERIDIAN, IN COOK COUNTY, ILLINOIS. PINS: 11-18-309-018-0000 11-18-309-019-0000 11-18-309-020-0000 11-18-309-024-0000 11-18-309-029-0000   Page 8 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 4/14/23, 9:14 AM CITY OF EVANSTON Mail - BCH1555, LLC - Application for Special Use for Apartment Hotel https://mail.google.com/mail/u/0/?ik=4762073d7a&view=pt&search=all&permthid=thread-f:1763009545898151411%7Cmsg-f:1763009545898151411… 1/5 Melissa Klotz <mklotz@cityofevanston.org> BCH1555, LLC - Application for Special Use for Apartment Hotel 1 message david@wrechicago.com <david@wrechicago.com> Wed, Apr 12, 2023 at 5:01 PM To: Melissa Klotz <mklotz@cityofevanston.org>, ewilliams@cityofevanston.org Cc: Cameel Halim <cmlabd@aol.com> Good Afternoon Melissa: Please find below our responses (in red) to the information request you sent last Thursday, March 30th: Additional Information Request 1. Statement from Wyndham confirming their intent to work with the applicant · Executed franchise contract would be ideal, but short of that an MOU/LOI or at least a written statement Please find attached the following documentation: i. EXHIBIT A – Email chain documenting the relationship with Wyndham. ii. EXHIBIT B – Wyndham’s Property Improvement Plan documenting requested changes to the facility. iii. EXHIBIT C – Wyndham’s rendering of changes necessary to the front façade of the building. iv. EXHIBIT D – Wyndham’s requested updates to the floorplans. 2. Statement from Wyndham regarding their experience managing an apartment hotel · List of locations - Wyndham is the world’s largest hotel chain by number of properties, thanks to its focus on more modestly-sized hotels. It has 26 Brands and over 9,000 properties across more than 80 countries globally, which makes Wyndham an internationally renowned hospitality company (see EXHIBIT E). · Mix of permanent vs. transient guests observed at facilities they manage – 100% transient. · Can they provide examples from their portfolio to substantiate this? – 100% transient – they do not have permanent [non-transient] guests. Page 9 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 4/14/23, 9:14 AM CITY OF EVANSTON Mail - BCH1555, LLC - Application for Special Use for Apartment Hotel https://mail.google.com/mail/u/0/?ik=4762073d7a&view=pt&search=all&permthid=thread-f:1763009545898151411%7Cmsg-f:1763009545898151411… 2/5 · Is there any plan to include the Wyndham Destinations timeshare model for the permanent guests? (Club Wyndham, Worldmark by Wyndham, Shell Vacations Club, and Margaritaville Vacation Club by Wyndham) – No, 100% transient. 3. Wyndham’s requirements: provide a summary of Wyndham’s licensing requirements. · What are Wyndham’s requirements if they are responsible for managing the facility vs. if the property owner is responsible for managing the facility – All Wyndham properties are self-managed by franchise owners. See EXHIBIT A, B, C & D to review Wyndham’s requirements. In addition, Wyndham will require a Certificate of Occupancy and Annual Trainings required and taught by the brand. These will be outlined in the Franchise Agreement (see EXHIBIT E). 4. Operations Summary - · Job titles and number of employees broken out by shift § General Manager - 1 §Front desk – 2 am, 2 pm, 1 overnight § Back office/accounting - 2 § Sales - 1 § Maintenance/Engineering/Housekeeping - 10 §F&B – 5, or 10 if the restaurant is opened to the public. § Security - 2 (see EXHIBIT E for above estimates) … total jobs created = 31. · Who is responsible for management of day to day operations? – The General Manager, overseen by CH Ventures staff will manage the day-to-day operations. However, Wyndham can and will provide support in various ways, above property level. They have a Regional Director of Operations that will provide support with Operational needs and suggestions. They also have a Quality Department that also monitors Quality to ensure Brand requirements are met. This is a general overview but the FDD will disclose a complete breakdown of services once completed (see EXHIBIT E). · How will they accomplish this? – Direct onsite management. · Who is responsible for cleaning facilities and what is the plan to manage it (for example, will you provide on-site cleaning staff, how many, etc.)– We will provide maintenance/housekeeping (see staffing question above). · Estimated number of units that will be for transient guests and permanent guests. – 100% transient. · Summary of booking process for a transient guest (does not have a lease and occupies an apartment, lodging room, or other living quarters on a daily or weekly basis) - who will manage this responsibility and how will it be tracked and records maintained and reported? – Wyndham will handle all reservations. On Average, 74% of reservations come through the Brand’s Central Reservations, the remaining 26% through other Online Travel agencies like Expedia and Travelocity. Wyndham Page 10 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 4/14/23, 9:14 AM CITY OF EVANSTON Mail - BCH1555, LLC - Application for Special Use for Apartment Hotel https://mail.google.com/mail/u/0/?ik=4762073d7a&view=pt&search=all&permthid=thread-f:1763009545898151411%7Cmsg-f:1763009545898151411… 3/5 negotiates on our behalf for associated fees. Wyndham does not have any requirements of lease agreements for stays over 30 days (see EXHIBIT E). Any stays over 30 days will need to pay at the same daily rates as our transient guests. · Summary of agreement/leasing process for a permanent guest (occupies or has the right to occupy a residential accommodation for a period of thirty (30) days or more) - who will manage this and how will it be tracked and records maintained and reported? Note, if five or more units are rented using a standard 12-month lease, the units are subject to the City’s Inclusionary Housing and Residential Landlord Tenant ordinances. – 100% transient. · Floor plans with dimensions and maximum occupants per unit. See EXHIBIT F. · Floor plans showing common space/amenities and what guests, whether transient or permanent, have access to those spaces. – See EXHIBIT G. These plans include a Salon\Barber Shop, Business Center, Sundries\Market, Meeting Room & Restaurant. · Who will manage the other amenity spaces within the facility (for example, the beauty shop), who is responsible for cleaning services and how frequently will they be serviced? All amenities will be self-managed onsite by the property staff as specified above in the job count response). A professional licensed operator has already been contracted for the salon to service both men & women. · Will the two restaurant spaces be used exclusively by guests of the apartment hotel and their guests, or will they be open to the public? If the latter, what parking will be provided/reserved for the restaurant use? – When we open, we will only include the first-floor restaurant which we hope the city will approve for being open to the public at large, but will make it available only to hotel guests if the city doesn’t allow us to proceed. This restaurant, if we get the city’s approval, will be expanded to include outdoor area seating in our garden. The grounds currently has plenty of parking to handle any guests of the restaurant. · How will you track occupancy (permanent vs. transient)? - Tracking of guests stays are all done through the property management system that we will receive as part of the Franchise (see EXHIBIT E). · Estimated occupancy rates (by month/season?) – Our research indicates that occupancy will vary between 60-100%, with an average occupancy closer to 70%. · Proposed rate schedule – This is market specific and Wyndham’s opening team will work with us to set the rates months before opening (see EXHIBIT E). These rates will change on a daily basis given current occupancy levels (as is done by all major hotels these days). 5. Traffic Impact: Guests vs. Permanent – We would note from Evanston Zoning Code requirements that if this property was zoned as an apartment building, we would need 40.65 parking spaces. If it continued as an assisted living facility (as it is currently zoned), it would require 26.1 parking spaces. As an apartment hotel, it needs 24.61 spaces. We see from this that the number of cars parking at the facility should be less than either of the other two uses. We have a huge parking lot that is also rented to both the YMCA and other local businesses, and believe that most travelers to the new apartment hotel would be arriving by Uber/Lyft. We conclude that the impact will be minimal on local traffic and of no influence on local parking. Page 11 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 4/14/23, 9:14 AM CITY OF EVANSTON Mail - BCH1555, LLC - Application for Special Use for Apartment Hotel https://mail.google.com/mail/u/0/?ik=4762073d7a&view=pt&search=all&permthid=thread-f:1763009545898151411%7Cmsg-f:1763009545898151411… 4/5 · How many guests will have their own cars? – Possibly around 25% Arrive via taxi/Uber Lyft? – 60-70% Arrive via public transit? – Very small, around 5%. · Timing of arrivals/departures? – Will assume typical averages, with a check-in time of between 2-4pm and a check-out time of between 10am-noon. ·Will van or shuttle services be provided, where will they stage for drop off/pick up? No van or shuttle service provided, but may reconsider in the future in order to take out-of-state guests to and from the hotel to the university campus. 6. Traffic Impact: Operations · How many/what type of delivery vehicles? – There is a large loading zone on the north side of the building that will be used primarily for food deliveries. However, the volume of deliveries may only be 1/3 of what was previously handled by the building in its previous designed function that required feeding 75 individuals each three meals a day as an assisted living facility. ·Timing of deliveries – Early morning through possibly 4pm. As a side note, we are currently preparing a slide show to present to the Planning & Development Committee to show all our proposals for the exterior of the property, the lobby, the guest rooms, the hallways and amenities – which we think will impress everyone and convince the committee of how good this project would be for the City of Evanston. If I can answer any other questions for you, please let me know. Regards, David Wolff Senior VP of Technology Operations & Special Project Development Wilmette Real Estate & Property Management E-mail: david@wrechicago.com Phone: 847-920-2078 This e-mail and its language, along with any attachments, are tools for negotiating purposes only and do not constitute a firm offer in entirety nor a firm offer as to any specific provision. Neither party is under any legal obligation to the other until the execution of the final lease/contract. Additionally, this e-mail, along with any attachments, are the confidential property of the sender, and are intended solely for the use of the individual or entity to whom this e-mail is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing or copying of this e-mail is strictly prohibited. Page 12 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 4/14/23, 9:14 AM CITY OF EVANSTON Mail - BCH1555, LLC - Application for Special Use for Apartment Hotel https://mail.google.com/mail/u/0/?ik=4762073d7a&view=pt&search=all&permthid=thread-f:1763009545898151411%7Cmsg-f:1763009545898151411… 5/5 7 attachments EXHIBIT A - FW_ Hawthorn_ Evanston, IL -- CONV PIP APPROVAL FROM BRAND.pdf 428K EXHIBIT B - OB-00065875_PIP Report_3-22-2023.pdf 59K EXHIBIT C - HTNConv_EvanstonIL-ExtMarkups-03.2023.pdf 5543K EXHIBIT D - HTNConv_EvanstonIL-PlanMarkups-03.2023.pdf 1373K EXHIBIT E - Wyndam's Email Confirming Replies.pdf 203K EXHIBIT F - 1555 Oak Ave B-6 Floors .pdf 1657K EXHIBIT G - Floorplan 1st floor.pdf 5136K Page 13 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 4/3/23, 3:48 PM FW: Hawthorn: Evanston, IL -- CONV PIP APPROVAL FROM BRAND https://mail.aol.com/webmail-std/en-us/PrintMessage 1/4 From:Leonard.Clifton@wyndham.com, To:cmlabd@aol.com, matt@wrechicago.com, Subject:FW: Hawthorn: Evanston, IL -- CONV PIP APPROVAL FROM BRAND Date:Fri, Mar 24, 2023 4:25 pm Attachments:OB-00065875_PIP Report_3-22-2023.pdf (59K), HTNConv_EvanstonIL-ExtMarkups-03.2023.pdf (5542K), HTNConv_EvanstonIL-PlanMarkups-03.2023.pdf (1373K), Guys, Please begin to review and lets discuss late next week… Enjoy the weekend. I need to get clarity on the exterior….. Thanks Lc Check out Links below to New Prototypes Americinn Hawthorn Suites LaQuinta Microtel Dual Brand Hawthorn / LaQuinta Leonard Clifton Director, Franchise Development Wyndham Hotels & Resorts, Inc. M (314) 303-6716 leonard.clifton@wyndham.com From: Pinto, Alice <Alice.Pinto@wyndham.com> Sent:Wednesday, March 22, 2023 5:10 PM To: Paliwal, Krishna <Krishna.Paliwal@wyndham.com> Cc:Kellam, David <david.kellam@wyndham.com>; Hare, Brian <brian.hare@wyndham.com>; Cli�on, Leonard <Leonard.Cli�on@wyndham.com> Subject:RE: Hawthorn: Evanston, IL -- CONV PIP APPROVAL FROM BRAND Importance: High Thanks Krishna. Leonard, you may use these documents as there are no further comments at this time from brand. Let me know if you need anything else at this time. thank you. Page 14 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 4/3/23, 3:48 PM FW: Hawthorn: Evanston, IL -- CONV PIP APPROVAL FROM BRAND https://mail.aol.com/webmail-std/en-us/PrintMessage 2/4 Alice Pinto Senior Manager, Architectural Design – Design & Construction Wyndham Hotels & Resorts, Inc. M (973) 987 - 2931 alice.pinto@wyndham.com From: Paliwal, Krishna <Krishna.Paliwal@wyndham.com> Sent: Wednesday, March 22, 2023 4:12 PM To: Pinto, Alice <Alice.Pinto@wyndham.com> Cc: Kellam, David <david.kellam@wyndham.com>; Hare, Brian <brian.hare@wyndham.com> Subject: RE: Hawthorn: Evanston, IL -- CONV PIP for Brand Review Approved “Count on Me” Krishna Paliwal President of La Quinta & Hawthorn Brands / Head of Architecture, Design & Construc�on Wyndham Hotels & Resorts, Inc. 22 Sylvan Way, Parsippany, NJ 07054 M (214) 733-3609 Krishna.paliwal@wyndham.com From: Pinto, Alice <Alice.Pinto@wyndham.com> Sent:Wednesday, March 22, 2023 4:09 PM To: Paliwal, Krishna <Krishna.Paliwal@wyndham.com> Cc:Kellam, David <david.kellam@wyndham.com>; Hare, Brian <brian.hare@wyndham.com> Subject: RE: Hawthorn: Evanston, IL -- CONV PIP for Brand Review Importance:High Krishna, I have completed the Conversion PIP for King Homes (closed former retirement home facility) Evanston, IL for Brand review. See attached for: PIP document Exterior markup PS Plan Markups Link to photos: Evanston, IL (King Homes) Page 15 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 4/3/23, 3:48 PM FW: Hawthorn: Evanston, IL -- CONV PIP APPROVAL FROM BRAND https://mail.aol.com/webmail-std/en-us/PrintMessage 3/4 Please note, there is an existing central system in the facility. Individual controls for the rooms are for the temperature for what is currently being output. There is no specific exhaust for the bathrooms. Let me know if this meets with brand approval or you have any questions or changes. thank you. Alice Pinto Senior Manager, Architectural Design – Design & Construction Wyndham Hotels & Resorts, Inc. M (973) 987 - 2931 alice.pinto@wyndham.com From: Paliwal, Krishna <Krishna.Paliwal@wyndham.com> Sent: Thursday, March 9, 2023 5:35 PM To: Pinto, Alice <Alice.Pinto@wyndham.com> Cc: Kellam, David <david.kellam@wyndham.com>; Hare, Brian <brian.hare@wyndham.com> Subject: RE: HTN: Evanston, IL -- PIP walkthrough of King Home on 3/7 Thanks Alice, I am not aware of it but please write a full PIP. I believe it could be a nice Hawthorn. “Count on Me” Krishna Paliwal President of La Quinta & Hawthorn Brands / Head of Architecture, Design & Construc�on Wyndham Hotels & Resorts, Inc. 22 Sylvan Way, Parsippany, NJ 07054 M (214) 733-3609 Krishna.paliwal@wyndham.com From:Pinto, Alice <Alice.Pinto@wyndham.com> Sent: Thursday, March 9, 2023 3:59 PM To:Paliwal, Krishna <Krishna.Paliwal@wyndham.com> Cc: Kellam, David <david.kellam@wyndham.com>; Hare, Brian <brian.hare@wyndham.com> Subject:HTN: Evanston, IL -- PIP walkthrough of King Home on 3/7 Hello Krishna I completed a walkthrough of this closed down former retirement home for a HTN PIP on 3/7. Page 16 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 4/3/23, 3:48 PM FW: Hawthorn: Evanston, IL -- CONV PIP APPROVAL FROM BRAND https://mail.aol.com/webmail-std/en-us/PrintMessage 4/4 Below are my observation/notes and click on link below to see the photos. The ownership group had mentioned about having drawings (existing and proposed) sent to us to review. Let me know your thoughts or anything to be aware of as I continue into writing the PIP. 75 rooms currently, a mix of all different 1-bedroom, studio suites, 1 and 2 bed ‘standard’ units (more rooms can be made from large gathering areas on upper floors.) 6 floors, 2 elevators First floor is all offices and public area incl. a large lounge and dining room, barber shop, full kitchen Floors 2-5 have been renovated (all real hardwood floors throughout rooms with new kitchens, appliances, new bathrooms with a shower stall, washer/dryer combo unit in bathroom, and all new furniture/furnishings but does not look commercial grade), 6th floor is untouched and plan to be made to like the other floors Basement is utility and BOH areas, and a large exercise room Stairwells look tight, owner’s team assured me it has been consulted that it is acceptable per code Link to photos below Evanston, IL (King Homes) thank you. Alice Pinto Senior Manager, Architectural Design – Design & Construction Wyndham Hotels & Resorts, Inc. 22 Sylvan Way Parsippany, NJ 07054 O (973) 753 - 6923 M (973) 987 - 2931 alice.pinto@wyndham.com This email message (including all attachments) is for the sole use of the intended recipient(s) and may contain confidential information. If you are not the intended recipient, please contact the sender by reply email and destroy all copies of the original message. Unless otherwise indicated in the body of this email, nothing in this communication is intended to operate as an electronic signature and this transmission cannot be used to form, document, or authenticate a contract. Wyndham Hotels and Resorts and/or its affiliates may monitor all incoming and outgoing email communications in the United States, including the content of emails and attachments, for security, legal compliance, training, quality assurance and other purposes. Page 17 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Brand: Hawthorn, Ref # :OPP00550884, Site #57909 1555 Oak Avenue, Evanston, IL, United States, 60201 Page 1 of 7 03/22/2023 02:02:15 PM Property Improvement Plan March 22, 2023 Hawthorn 1555 Oak Avenue, Evanston, IL, United States, 60201 Inspection Date : March 7, 2023 Items outlined below by Focus Area and Required Action Description. Y = Indicates Design Approval Required Category Items Required Action Description To Be Completed Prior to Opening Administrative Policies Property Improvement Plan (PIP) > Property Improvement Plan All work referenced in this PIP must be completed according to the franchise agreement. This includes, but is not limited to the facility complying with all local, state and federal laws and building codes, including The Americans with Disabilities Act and other codes applicable to the modification of buildings for persons whose disabilities are protected by law. All proposed architectural designs, product replacement or new finishes shall be submitted Wyndham Hotels and Resorts, Inc. Design and Construction Department for review and approval prior to installation in the field-no exceptions. (noted on items as "Design/Brand Approval Required.") All proposed substitutions to Wyndham specified materials or products shall be submitted to Wyndham Hotels and Resorts, Inc. Design and Construction Department for review and approval prior to installation/commencement of work in the field-no exceptions. Franchise owner is required to hire an architect to develop the drawings: plans and elevations. etc. based on this PIP, where required. Franchise owner is required to implement the brand prototype interior Haven design scheme (for guestrooms and guest corridors) with a complementary public space design, or a brand approved alternate custom interior design scheme prepared by a design professional. To implement the Hawthorn Haven interior scheme, hire a Wyndham approved FF and E procurement company to design and purchase all FF and E items. Any variances or deviations from items listed in the PIP must be approved in writing by an Architectural Design Manager AND Director of Franchise Operations (DFO). Any deviation from the PIP or Brand Standards will be subject to change at owner's expense and will not be considered a completed PIP item. Wyndham will work with the buyer to get the work completed based on the PIP/cost cap in the franchise agreement. Note that high impact guest items regardless of timeframe, for example mattresses, etc., may require attention sooner than later as this may affect guest satisfaction. Administrative Policies Uniforms Ensure all employees/staff members are clean and neat in appearance and wear proper brand uniforms and name tags during working hours and while customer facing. Administrative Policies Non Smoking Policy Adhere to non-smoking policy per Brand Standards Property must post the Smoking Policy at the front desk. Administrative Policies Ecolab dilution system and disinfectant products > Ecolab Provide an Ecolab Dilution Control System and Ecolab EPA-approved disinfectant products. Complete the Count on Us & Human Trafficking training. Administrative Policies HSIA Access (Bandwidth, Speed) > High Speed Internet Access Requirements Install new Wyndham WiFi system (or similar HSIA system) throughout hotel, provide download/upload minimum internet speeds per Brand standards. Contact Hotel Connectivity Solutions at hcs@wyndham.com Administrative Policies Line Item > Additional Line Item The property must be well-maintained and clean and neat in appearance. This requirement pertains to all areas of the property, including but not limited to: guestrooms, public areas, grounds, curb appeal, building, equipment, décor, furniture, fixtures and equipment, signs, linens and supplies. A general maintenance program must be in place of ensure that all facilities are functional having addressed all conditional deficiencies. Properties not meeting cleanliness standards may be required to complete housekeeping training. Food & Beverage Hours of Operation > Breakfast Availability Hawthorn Suites properties must adhere to the brand F & B concept. The concept includes complimentary continental hot breakfast and manager's afternoon social hour provided per Brand Standards. A restaurant, bar/lounge is optional. Contact a Wyndham approved supplier to assist with F & B requirements. Food & Beverage Counters/Cabinetry > Breakfast Area Fixtures and Finishes Create a new breakfast serving area by installing 20LF minimum millwork HPL cabinetry bases and natural stone countertop (quartz or similar). Install a coordinating decorative tile, decorative feature wall vinyl or similar upgraded wall treatment over all breakfast serving counters from top of backsplash to underside of ceiling above. Y Food & Beverage Furniture > Breakfast Area Fixtures and Finishes Provide new for all breakfast area FF&E, furniture (including dining table and chairs), decorative artwork, window treatments (white light filtering roller shades or alternatively, white sheers are acceptable) etc. with new coordinating to brand approved interior aesthetic. Ensure all finishes throughout (architectural, millwork wall casings and trim) in all F and B areas are in like-new condition, free of visible wear-scratches, scrapes, dings. etc. Repair or replace where cannot be repaired to a satisfactory condition. Y Page 18 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Brand: Hawthorn, Ref # :OPP00550884, Site #57909 1555 Oak Avenue, Evanston, IL, United States, 60201 Page 2 of 7 03/22/2023 02:02:15 PM Items outlined below by Focus Area and Required Action Description. Y = Indicates Design Approval Required Category Items Required Action Description To Be Completed Prior to Opening Food & Beverage Ceiling/Walls > Breakfast Availability Renovate the first floor dining room to create a breakfast serving and dining area per brand standards open to lobby (remove doors.) Implement a custom interior scheme cohesive to the Haven interior scheme for installation of all new finishes (new large format porcelain tile flooring (2ft. x 2ft. minimum) and inset carpet areas, remove handrail and install upgraded wall finishes, and remove sections of ACT and install smooth, painted drywall ceilings in select areas to feature.) Install a combination of recessed LED can light fixtures, linear cove lighting, decorative sconces and table lamps, etc. All decorative moldings may remain. Guestroom Robe Hook > Guest Bathroom Furnishings & Equipment Provide a two-pronged or double robe hook adjacent to shower/bathtub and towel bar (not located over toilet) in single coordinating finish and style consistent with plumbing fixtures/accessories finish in bathroom interior. (Chrome or nickel finish.)Y Guestroom Shower Rod > Guest Bathroom Furnishings & Equipment Provide a curved shower rod (where bathtubs occur) and 5-setting massage type shower head throughout (straight rod in ADA units.) Guestroom Sink/Vanity > Guest Bathroom Furnishings & Equipment Augment vanity with new natural stone countertop (quartz or similar) and backsplash. Ensure open shelf below for towel and hair dryer in a bag storage per brand approved interior scheme and coordinating to guestroom case goods package. Provide a modified style in ADA rooms for accessibility. Where possible, vanities to provide 4ft. L countertop surface for use due to extended stay guests. Y Guestroom Toilet > Guest Bathroom Furnishings & Equipment Ensure all toilets are in proper working order and in like-new condition free of visible wear or defects. Guestroom Terry > Guest Bath Terry Ensure a complete inventory of WynDry terry stock is provided including washcloths, bath mats and bath and hand towels per Brand Standards. Guestroom Hair Dryer > Guest Bath Amenities & Supplies Provide one (1) minimum two-speed hairdryer stored in either a generic black hairdryer bag, or a Wyndham Rewards logo'ed bag. Guestroom Presentation Tray > Guest Bath Amenities & Supplies Ensure bath amenities package is provided per Brand Standards including (optional) hand sanitizer. Guestroom Shower Curtain > Guest Bath Amenities & Supplies Where a shower curtain is used for bathtubs or ADA rooms, one (1) Hookless Wyndham Green® white Litchfield shower curtain with mesh window is required. Guestroom Mattress > Mattress Foundation Specifications Provide new bedsets throughout per Brand Standards. Provide specified platform bed base per brand specification. Guestroom Light Fixture > Guestroom Lighting Requirements Replace lighting/lamp package to be consistent with Haven interior scheme and per Brand Standards. Install coordinating wall sconce or pendant hung fixture over workspace/dining area per brand specifications. Install energy efficient LED lamps/bulbs for guest room lighting. Ceiling lighting at 3500K and decorative lamps, etc. at 2700K. All electrical wiring must be fully concealed within wall cavity construction, or obscured from view by case goods or similar condition. Surface mounted cord covers are discouraged. Y Guestroom Flooring > Guestroom Flooring/Carpeting Install a bound area rug under the bed and adjacent walking areas on all sides of bed per Haven interior scheme. Replace flooring transition strip/threshold at entry door where damaged or worn and ensure a coordinating transition is installed between any change in flooring finishes. Y Guestroom Closet Rod/Rack > Guestroom Furniture & Fixture Requirements Repair/Touch-up interior of enclosed closet and doors to match guestroom interior. Replace closet rod or shelving system where damaged. Ensure closet supplies are provided per brand standard requirements. Guestroom Cooktop/Stovetop Unit/Oven > Guestroom Furniture & Fixture Requirements All guestroom must have full kitchens to have the following elements (per a brand approved interior scheme) in a matching black or stainless steel finish: sink, chrome kitchen faucet, cooktop, appliances (full size refrigerator, dishwasher, and microwave), exhaust, cooking and dining supplies. Replace refrigerator with larger unit per brand standards. Remove cabinet about refrigerator if needed to accommodate new unit. Any other units to be reused must be in proper working order and like-new condition, and meeting brand standards. Y Guestroom Desk/Writing Surface > Guestroom Furniture & Fixture Requirements Replace workspace/dining area table per and chairs accommodating for minimum of 2 persons per Haven interior scheme. Area to have adjacent wall mounted outlet with USB charging ports per brand specification.Y Guestroom Dresser/Credenza/Media Cabinet > Guestroom Furniture & Fixture Requirements Replace case goods package in its entirety per Haven interior scheme. (headboard/nightstands, dresser/credenza, luggage bench, etc.)Y Guestroom Full Length Mirror > Guestroom Furniture & Fixture Requirements Provide full length wall mounted mirror coordinating to case goods package per Haven interior scheme.Y Guestroom Lounge Chairs > Guestroom Furniture & Fixture Requirements Provide new seating/sofa package per Haven interior scheme.Y Page 19 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Brand: Hawthorn, Ref # :OPP00550884, Site #57909 1555 Oak Avenue, Evanston, IL, United States, 60201 Page 3 of 7 03/22/2023 02:02:15 PM Items outlined below by Focus Area and Required Action Description. Y = Indicates Design Approval Required Category Items Required Action Description To Be Completed Prior to Opening Guestroom Telephone/Dialing Instructions > Guestroom Ops Supplies & Equipment Provide new telephone and telephone face plates per brand standards. Guestroom HVAC/PTAC/Odor/Temp > Interior HVAC/PTAC All guest rooms to be provided with heating, venting, and air conditioning to each room. Ensure all units are controlled via remote digital wall mounted thermostats per brand standards. No exposed electrical wiring to be visible. Guestroom Television > Guestroom Television Requirements Replace televisions to ensure Brand Standard requirements are satisfied. Minimum 43" flat panel, commercial grade, flat panel, Full HD 1080p, Pro: idiom, MPEG4. (Qty: 2 required at suites.) Guestroom Bathtub/Shower > Guest Bathroom Furnishings & Equipment Install glass door/enclosure at shower stalls. At ADA bathrooms, provide a new fold down seat or removable seat and ADA grab bars at accessible bathtubs per governing code/local authority.Y Guestroom Mirror > Guest Bathroom Furnishings & Equipment Remove vanity mirror and light and install new electric backlit mirrors throughout in all guest rooms per brand specification.Y Guestroom Linens > Guest Bed Linen Ensure a complete inventory of WynRest label linen is provided to include sheets, pillows, pillowcases, blankets, mattress pads. Replace decorative bed toppings with Brand approved bedding program coordinating to Haven interior scheme. Provide triple sheeting bed topping and including (1) decorative top sheet and (1) WynRest blanket or comforter. Guestroom Top of Bed > Decorative Bedding Provide decorative bed topping with brand approved bedding program coordinating to Haven interior scheme. Provide triple sheeting bed topping including (1) decorative top sheet and (1) WynRest blanket or comforter. Guestroom Outlets/Switches > Guestroom Lighting Requirements Replace (provide where missing) electrical wall mounted devices (outlets, switches, etc.) where damaged or worn. Cover plate shall be in coordinating white finish with component and uniform throughout. Guestroom Ceiling/Walls > Guestroom Walls/Ceiling Repair and re-paint walls and ceiling to like-new condition per Haven interior scheme. Guestroom Kitchen Cabinets, Sink, and Counters > Guestroom Furniture & Fixture Requirements Professionally refinish all existing kitchen cabinetry to like-new condition to typical Haven interior scheme painted grey finish. Replace cabinetry pulls with matte black. All new kitchens to be provided to be per Haven interior scheme design and specifications. Y Guestroom Window Treatments > Guestroom Furniture & Fixture Requirements Install new window treatments per Haven interior scheme. Ensure 1 layer of 100% blackout capability.Y Guestroom Ventilation > Guest Bathroom Lighting Ensure each bathroom is provided with a toilet exhaust system/exhaust fan and ensure system is operating at optimal efficiency and have exterior discharge. Guestroom Artwork > Guestroom Furniture & Fixture Requirements Provide artwork package per Haven interior scheme, including in bathroom.Y Guestroom Guestroom Collateral Provide all new guestroom supplies per Brand Standards. Guestroom Plumbing Fixtures > Guest Bathroom Furnishings & Equipment Replace all plumbing fixtures and controls with new per brand specification in matte black finish per typical. Guestroom Doors > Guestroom Doors Refurbish/Refinish all doors and frames throughout like-new condition, free of visible wear-scratches, scrapes, dings, etc. and to be uniform throughout. Prepare and re-paint metal door frames per a brand approved interior scheme. Install new vinyl floor thresholds. Install new hardware where damaged, missing, or not coordinating in finish. Doors are to be provided with a self-closing device, door stop, and one way viewer. All door hardware shall be in a uniform finish throughout. All hardware to be in a single coordinating finish-not brass. Hardware inside the guestrooms to be matte black throughout. Replace entrance door locks with electronic RFID type with BLE enabled technology to work with Wyndham's mobile platform Openkey. Work with one of the Wyndham approved door suppliers. Guestroom Window Locks > Guestroom Window Ensure windows are provided with locks or holds that limit opening for safety concerns. All windows to be refurbished to like-new condition. Replace any windows that are damaged or no longer weathertight. Guestroom Line Item > Additional Line Item Guestroom PIP items will refer to condition observed on floor 4, that showed some renovation already completed. Renovation of guestroom interior throughout on all floors must be brought to the level on floor 4 at minimum. Hotel Arrival and Exterior Exterior Signage > Exterior Signage Requirements Install approved exterior building signage (surface mounted internally illuminated reverse channel letters) per Brand graphic standard specifications. Contact a Wyndham approved exterior signage vendor and submit signage proposal to Wyndham signage manager for review and approval prior to ordering/installation. For exterior signage a fully executed prepaid contract with an approved sign vendor must be provided prior to commencement. Page 20 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Brand: Hawthorn, Ref # :OPP00550884, Site #57909 1555 Oak Avenue, Evanston, IL, United States, 60201 Page 4 of 7 03/22/2023 02:02:15 PM Items outlined below by Focus Area and Required Action Description. Y = Indicates Design Approval Required Category Items Required Action Description To Be Completed Prior to Opening Hotel Arrival and Exterior Dumpster Enclosure > Dumpster, Loading Dock and Service Area Ensure a dumpster enclosure is provided and bring to like-new condition. Ensure latching doors that are closed at all times. Hotel Arrival and Exterior Landscaping Ensure landscaping is continuously maintained throughout (site perimeter, landscape islands, building perimeter) by eliminating weeds and providing perennial and annual landscaping, and ground cover. All ground mounted and/or visible from public view mechanical units/equipment to be shielded with commercial grade fencing and/or landscaping. Hotel Arrival and Exterior Parking Lot and Driveway > Parking Area and Driveways Coordinate for guest parking accommodations 1 parking space: 1 guestroom minimum per brand requirement. Repair curbs where damaged. Hotel Arrival and Exterior Sidewalks/Walkways Pressure wash walkways throughout. Patch & repair any cracked or damaged areas. Hotel Arrival and Exterior Facade/Fascia/Storefront > Building Exterior Pressure-wash and clean all building exterior to remove dirt and debris to like-new condition. Paint EIFS/stucco, trims, gutters and downspouts per brand exterior colors. Install brand signature large format tile panels and brand red accent paint color at main entrance area. Pressure wash all exterior grilles to like-new condition. Replace where damaged. Submit exterior renovation proposal (drawings) to brand design for review/approval prior to commencement of work in the field. Y Hotel Arrival and Exterior Lighting > Exterior Lighting Exterior lighting shall be 4000K minimum. Light poles to be painted where paint condition is chipped, deteriorating or damaged for a consistent appearance. Walkway/Building light fixtures throughout shall be of uniform style and coordinating to exterior. Hotel Arrival and Exterior Porte Cochere/Canopy > Entrance Coverage/Porte Cochere Remove existing entrance canopy and install new 2 post canopy in brand exterior colors with linear LED lighting at underside at 4000K minimum. Submit exterior renovation proposal (drawings) to brand design for review/approval prior to commencement of work in the field. Pressure-wash paving at drive through area to like-new condition. Y Hotel Arrival and Exterior Windows Strip off existing paint (where occurs) and restore all hollow metal doors/frames to like-new condition free of scuffs, oxidation/rusting, and scratches. Paint (where applicable) existing hollow metal doors and frames coordinating to exterior. This applies to exterior doors where damaged or oxidation/wear is visible to like-new condition. Provide/Replace weather seals/stripping and door thresholds at all exterior entry doors where deteriorated or damaged. Replace windows where damaged and/or seals are broken (fogged appearance or dirt between window panes) and ensure all are weather tight. Hotel Facilities Ceiling/Walls > Interior Corridors Renovate corridors in their entirety per a brand approved interior scheme. Remove handrails, prepare and re-paint walls. Install new broadloom carpet and vinyl wall base. Replace ceiling tiles and paint ceiling grid throughout. Remove 2x2 parabolic drop in light fixtures and install new recessed LED can light or slim surface fixtures. Install modern wall sconces per brand specification. All lighting to be LED type at 3500K minimum. Y Hotel Facilities Elevator Ensure public elevator is in proper working order and per local authority. Install new large format floor tile, coordinating to lobby interior, refurbish laminate and solid surface wall panels, and retrofit lighting to LED.Y Hotel Facilities Ceiling/Walls > Fitness Center Design Renovate (or relocate and renovate) fitness room interior per brand approved interior scheme/aesthetic and per Brand Standards. Install new commercial grade wood look LVT with rubber backed gym flooring, minimum of 7mm thick. Remove wood wainscot and chair rail. Prepare and re-paint walls. Accent wall to be brand red color. Install one full wall of floor to ceiling wall mirror. Replace ceiling tiles and re-paint ceiling grid throughout. Replace light fixtures with new slim surface LED linear lights or recessed can light fixtures at 2700K minimum. Prepare and re-paint door and sidelight stiles/rails. Outfit with new RFID electronic lock for keycard access. Remove shutters and install light filtering roller shades at all windows. Replace all fitness equipment and supplies using an approved fitness vendor and per brand standards. Y Hotel Facilities Ice Machine > Ice Machine Requirements If provided, ensure dispenser type ice machines per brand standards are centrally located for access by guests on all floors. Hotel Facilities Sundry Shop Cabinets, Counters & Shelving > Retail/Sundry Shop/Mart Display and Design Construct a new ~100sf min. Sundry/Market adjacent to front desk check-in area per Brand Standards, in alignment to brand design for all finishes, FF and E, and accessories. Ensure visual connection and close physical proximity to front desk check-in area for convenient employee access. Install new professionally manufactured millwork shelving, cabinetry. Install full size un-branded refrigerator and full size freezer per brand specifications. Contact Wyndham F and B supplier for procurement and design. Submit proposal (drawings and specifications, etc.) to brand/design for review and approval prior to commencement of work in the field. Y Hotel Facilities Interior Signage Install new interior signage per brand graphic standards throughout. Contact a Wyndham approved interior signage vendor. Hotel Facilities Doors > Guest Laundry Design Construct a guest laundry facility per brand standards. Provide interior finishes (large format 2'x2' minimum hard surface floor tile and wall base, painted walls, and painted flat ceiling with LED recessed can light fixtures or slim surface linear lights.) Provide a rack for hanging clothes and a 4'L minimum solid surface fixed countertop for folding clothes. Install a commercial laundry washer and dryer. Y Page 21 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Brand: Hawthorn, Ref # :OPP00550884, Site #57909 1555 Oak Avenue, Evanston, IL, United States, 60201 Page 5 of 7 03/22/2023 02:02:15 PM Items outlined below by Focus Area and Required Action Description. Y = Indicates Design Approval Required Category Items Required Action Description To Be Completed Prior to Opening Hotel Facilities Line Item > Additional Line Item General public areas not to be re-used as-is must be re-purposed, such as barber shop and larger open meeting rooms, etc. Guest facing areas that are not per brand standards are not permitted remain. All rooms intended to remain for employee and staff function (such as offices) after all brand standards are met on property may remain, refurbish as needed to like-new condition. Submit architectural drawings to brand/design for review of all proposal for entire property to convert to hotel brand. Refer to plan markups provided for comments on layouts. Doors and hardware: Refurbish/Refinish all doors and frames throughout like-new condition, free of visible wear-scratches, scrapes, dings, etc. and to be uniform throughout. Prepare and re-paint metal door frames per a brand approved interior scheme. Install new vinyl floor thresholds. Install new hardware where damaged, missing, or not coordinating in finish. All hardware to be in a single coordinating finish-not brass. Install a new RFID electronic lock on all guest accessed public doors. Contact a Wyndham approved door supplier. Y Hotel Facilities Ceiling/Walls > Public Restroom Design and Requirements Renovate all public area restrooms to coordinate to new public area new interior and per brand standards and like-new condition. Prepare and re-paint or install wall vinyl on walls or a combination of both. Remove floor and wall tile and install new large format tile (2ft. x 2ft. minimum. Tile to be located behind plumbing fixtures at minimum.) Install new ceiling tiles and re-paint ceiling grid. Install new vanity or refurbish vanity with new natural stone (quartz) countertop, countertop/backsplash, augment mirror with a new frame and install vanity light. Install new sink and faucet/controls. Refurbish toilets in proper working order, toilet partitions, and all accessories and ensure supplies. Public restroom interior must be uniform in interior design/finishes and meet governing code for accessible design standards. Y Hotel Facilities Stairways/Railings > Stairwells Clean all stairwells. Ensure all finishes are in like-new condition and well lit for guest use. Ensure access is provided per governing code and authority. Lobby & Front Desk Floor Mat > Lobby Floor Mat Provide brand logo'ed floor mats at entrance and all secondary entry/exits. Lobby & Front Desk Furniture > Lobby Furniture Replace FF&E throughout (tables and chairs, seating, furnishings, decorative artwork, decorative lighting, window treatments, etc.) to a brand approved interior aesthetic to provide a consistent appearance. Select furnishing items can remain given they coordinate to new proposed custom public space interior. Y Lobby & Front Desk Line Item > Additional Line Item All rooms intended to remain for employee and staff function (such as offices) after all brand standards are met on property may remain, refurbish as needed to like-new condition.Y Lobby & Front Desk Front Desk Area > Front Desk Area Design (See plan markups sketch) Enlarge front desk area and renovate per brand aesthetic to Haven interior scheme. Extend partial height wall divider to underside of ceiling to create back wall drop for check-in area. Remove existing regisrtation desk in its entirety and replace with new open pod style with natural stone (quartz) countertop. Y Lobby & Front Desk Ceiling/Walls > Lobby Area Fixtures and Finishes (See plan markups sketch) Renovate the Entry Vestibule, Lobby Foyer, Lobby Seating Areas, Registration area, and Public Corridors throughout to implement Wyndham standards and Hawthorn design aesthetic. Utilize a brand approved interior scheme for installation of all new finishes (new large format porcelain tile flooring (2ft. x 2ft. minimum) and inset carpet areas, remove handrail and install upgraded wall finishes, and remove sections of ACT and install smooth, painted drywall ceilings in select areas to feature.) Install a combination of recessed LED can light fixtures, linear cove lighting, decorative sconces and tablelamps, etc. All decorative moldings may remain. Submit proposal (drawings, etc.) to brand/design for review and approval prior to commencement of work in the field. Y Meeting & Business Ceiling/Walls > Meeting Room & Board Room Design If meeting/banquet rooms will be provided, ensure these are renovated in their entirety to brand interior scheme/aesthetic and per brand standards. Install new carpet flooring and vinyl wall base throughout. Install new large, decorative pendant hung fixtures at lower dropped soffits to create visual interest. Ensure all lighting is LED type. Provide new FF and E and furniture and serving millwork base cabinetry and natural stone (quartz) counter. Provide light filtering roller shades at windows with one layer of blackout capability. Submit cohesive proposal to brand/design for review and approval prior to commencement of work in the field. Y Meeting & Business Availability > Business Center Equipment & Services Provide a new business center print station per brand aesthetic located in open lobby incorporating millwork base and new natural stone (quartz) countertop. Provide business center with a minimum of 2 computers and a shared printer and per brand standards.Y Page 22 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Brand: Hawthorn, Ref # :OPP00550884, Site #57909 1555 Oak Avenue, Evanston, IL, United States, 60201 Page 6 of 7 03/22/2023 02:02:15 PM Page 23 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Brand: Hawthorn, Ref # :OPP00550884, Site #57909 1555 Oak Avenue, Evanston, IL, United States, 60201 Page 7 of 7 03/22/2023 02:02:15 PM PLAN REQUIREMENTS & SUBMITTAL PROCESS Please submit all design plans and specifications to Wyndham Interior Design (interior.design@wyndham.com) for review and approval prior to purchasing or starting renovations. All renovations must meet Brand Standards, any items purchased or renovated without approval may need replacement if they do not meet brand design standards. OVERVIEW The PIP identifies specific items which we inspected at the Facility which were not in compliance with brand standards and need to be corrected. It is the responsibility of the Owner/Franchisee to review the Brand Standards Manual for a complete description of all standards and to maintain Brand Standards for any areas of the property that are not specifically covered in this PIP. In addition, you are responsible for ensuring that the Facility is constructed, improved, maintained and operated in compliance with all applicable federal, state and local laws, codes, ordinances and regulations, including but not limited to, the Americans with Disabilities Act and its Accessibility Guidelines. This PIP was based on a random sample inspection of the Facility on the date specified. You may need to take additional actions to meet brand standards or comply with law or, at our discretion, if the condition of the facility changes materially since the inspection date or if the brand standards change. All items in this PIP are required to be completed no later than the timeframes noted. Time extensions in no way imply a waiver. Failure to comply with specified deadlines for completing items may result in default under your license or franchise agreement and reservation service suspension. All items will continue to be evaluated on condition, appearance and adherence to brand standards through periodic quality assurance inspections. Any items on a future quality assurance inspection that do not meet brand standards will be required to be remedied. Failure to maintain acceptable levels of conditions and appearance and adherence to brand standards may be grounds for default under the Franchise or License Agreement. Prior to the commencement of all work you are required to ensure that you are complying with the most current standards. Please consult your Development Director or noted department with specific questions to comply with the requirements contained in the PIP. To obtain access to the Brand Standards please visit https://brandstandards.wyndham.com and/or contact your Wyndham representative to request temporary Brand Standard Portal access. Your request will be reviewed and processed in a timely manner. By signing this PIP, you acknowledge and agree that this PIP may be provided to Wyndham Hotels & Resort's approved vendors for the purpose of their offering products and services that are required to complete this PIP. You hereby grant permission for the entire PIP and/or any information necessary for the vendor to offer their products and services. The information provided includes but is not limited to contact information, property address, number of rooms, brand converting to, and a list of items related to necessary or required products and services. ONLY THE FRANCHISOR MAY REVISE THIS PIP. THE PIP IS VOID 180 DAYS AFTER THE INSPECTION DATE UNLESS THE FRANCHISE OR LICENSE AGREEMENT BECOMES EFFECTIVE. The Franchise Review Committee may in its discretion revise this PIP as a condition of approving your application. You should not consider this PIP to be final until we sign the License or Franchise Agreement. Signed: __________________________________________________________ Date: _____________ Print Name: _________________________________________________________ Revisions- All Previous Copies are Invalid Page 24 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 (shaded area) install new LQ large format tile panels as shown (work with a specified approved tile vendor) -trim back greenery/trees to allow for good visibility to area from street install new illuminated channel letter signage per HTN brand specifications, work with a Wyndham approved exterior signage vendor remove and install new 2-post entrance canopy per brand modern aesthetic and exterior colors patch and repair, pressure-wash all building surfaces (fascia, trims, grilles, etc.) to like-new condition Hawthorn Suites Evanston. IL 03/2023 FOR CONCEPTUAL USE ONLY. Property Owner is responsible for providing detailed drawings prepared by a professional for construction purposes and also submit to Wyndham Hotels & Resorts Dept. of Design and Construction for review in compliance to brand standards and in conjunction with the PIP document. Compliance to applicable local code regulations including accessibility standards have not been reviewed and are the sole responsibility of the architect of record.Page 30 of 57Page 25 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Page 26 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 King Homes Hawthorn conversion Evanston, IL 03/2023 FOR CONCEPTUAL USE ONLY. Property Owner is responsible for providing detailed drawings prepared by a professional for construction purposes and also submit to Wyndham Hotels & Resorts Dept. of Design and Construction for review in compliance to brand standards and in conjunction with the PIP document. Compliance to applicable local code regulations including accessibility standards have not been reviewed and are the sole responsibility of the architect of record. open up entrance into dining room/breakfast area from lobby breakfastserving areaextension of lobby/lounge seating area focal wall treatmentrepurpose rooms (if will be guest facing) Sundry / Market Front Desk Check-in Page 27 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 do not have common use toilets to the guest corridor side - re-purpose to ice machine area, on 2nd and 4th floors & laundry chute through all floors Page 28 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 create a guest laundry area on 3rd and 5h floors implement a laundry chute and housekeeping closet Page 29 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 do not have common use toilets to the guest corridor side - re-purpose to ice machine area, on 2nd and 4th floors & laundry chute through all floors Page 30 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 create a guest laundry area on 3rd and 5h floors implement a laundry chute and housekeeping closet Page 31 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 From:Clifton, Leonard To:david@wrechicago.com Cc:"Cameel Halim"; matt@wrechicago.com Subject:RE: Items Needed for Proposed Hawthorn: Evanston, IL Facility Date:Monday, April 3, 2023 12:06:17 PM See Responses Below… Please use as a guide From: david@wrechicago.com <david@wrechicago.com> Sent: Friday, March 31, 2023 6:15 PM To: Clifton, Leonard <Leonard.Clifton@wyndham.com> Cc: 'Cameel Halim' <cmlabd@aol.com>; matt@wrechicago.com Subject: Items Needed for Proposed Hawthorn: Evanston, IL Facility CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Evening Leonard, As part of the process to get our hotel property in Evanston, IL zoned to allow an “Apartment Hotel”, the Evanston City Council’s Planning & Development Committee has requested that we provide some specific information to them with regards to how we would operate this property. Would it be possible that you help us craft a proper reply by answering a few of the questions put to us by the city, that we might incorporate that information into our official response. 1. Statement from Wyndham regarding their experience with franchises: · Number of locations in each state and how many are extended stay vs hotels? Wyndham is the world’s largest hotel chain by number of properties, thanks to its focus on more modestly-sized hotels. It has 26 Brands and over 9,000 properties across more than 80 countries globally, which makes Wyndham an internationally renowned hospitality company. · How many of these franchises Wyndham manages and how many are self-managed? All Hotels are Self-Managed · What is the mix of permanent vs. transient guests observed at these facilities? 100% Transient 2. We have the physical requirements from Wyndham for the Property Improvement Plan, but need to know if there are any other licensing you require of us to obtain a franchise? Certificate of Occupancy and Annual Trainings required and taught Page 32 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 by the brand. These will be outlined in the Franchise Agreement. 3. Your thoughts on the following items: ·Can you help provide us with a best estimate of the number of employees, broken out by shift, needed to run the hotel? § General Manager - 1 § Front desk – 2 am, 2 pm, 1 Overnight §Back office - 2 § Sales - 1 § Housekeeping - 10 § Security - 2 · Can you help provide us an understanding of how the booking process works? On Average, 74% of Reservations come through the Brand’s Central Reservations, the remaining 26% through other Online Travel agencies like Expedia and Travelocity. Wyndham negotiates on your behalf for associated fees. What would Wyndham do and what would our responsibilities be if we self-manage the property. Wyndham can and will provide support in various ways, above property level. We have a Regional Director of Operations that will provide support with Operational needs and suggestions. We have a Quality Department that also monitors Quality to ensure Brand requirements are met. We have models for Revenue Management and Sales Support that are a paid service if you should choose. This is a general overview but the FDD discloses a complete breakdown of services. If a guest stays on long term (say, greater than 30 days), do you normally require them to sign some form of lease? How will both transient guests and long-term guests be tracked and recorded? Tracking of guests stays are all done through the property management system that you will receive as part of the Franchise. We do not have any requirements of lease agreements for stays over 30 days. ·Can you provide any thoughts on what an initial rate schedule might look like for daily, weekly & monthly customers? This is market specific and the opening team will work with you to set rate months before opening. Rate schedule will be established. If you can help us with answers to these questions, we can prepare our formal response for the scheduled April 24th hearing. Page 33 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Additionally, Mr. Halim would like to know the next time you are in Chicago so he can take you downtown to view his 311 unit / 16-story gold coast property at 1100 N. LaSalle, which he is now considering to also turn into a hotel. I will be in town the week of the 17th of April. I will confirm a date to meet as we get closer. Thanks Leonard Regards, David Wolff Senior VP of Technology Operations & Special Project Development Wilmette Real Estate & Property Management * E-mail: david@wrechicago.com ( Phone: 847-920-2078 This e-mail and its language, along with any attachments, are tools for negotiating purposes only and do not constitute a firm offer in entirety nor a firm offer as to any specific provision. Neither party is under any legal obligation to the other until the execution of the final lease/contract. Additionally, this e-mail, along with any attachments, are the confidential property of the sender, and are intended solely for the use of the individual or entity to whom this e-mail is addressed. If you are not one of the named recipient(s) or otherwise have reason to believe that you have received this message in error, please notify the sender and delete this message immediately from your computer. Any other use, retention, dissemination, forwarding, printing or copying of this e-mail is strictly prohibited. This email message (including all attachments) is for the sole use of the intended recipient(s) and may contain confidential information. If you are not the intended recipient, please contact the sender by reply email and destroy all copies of the original message. Unless otherwise indicated in the body of this email, nothing in this communication is intended to operate as an electronic signature and this transmission cannot be used to form, document, or authenticate a contract. Wyndham Hotels and Resorts and/or its affiliates may monitor all incoming and outgoing email communications in the United States, including the content of emails and attachments, for security, legal compliance, training, quality assurance and other purposes. Page 34 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Page 35 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Page 36 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Page 37 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Page 38 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Page 39 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Page 40 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 Page 41 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 SUNDRIES BUSINESS CENTER MEETING ROOM LOBBY BREAKFAST SERVING AREA BAR AREA (w/ wall of alcohol) HOST STATION Page 42 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 APPROVED MEETING MINUTES LAND USE COMMISSION Wednesday, January 11, 2023 7:00 PM Lorraine H. Morton Civic Center, 2100 Ridge Avenue, James C. Lytle City Council Chambers Members Present: Myrna Arevalo, George Halik, Jeanne Lindwall, Kristine Westerberg, and Matt Rodgers Members Absent: Brian Johnson, John Hewko, Kiril Mirintchev, and Max Puchtel Staff Present: Neighborhood and Land Use Planner, Meagan Jones, Assistant City Attorney, Alex Ruggie, Planning Manager Liz Williams, Zoning Administrator Melissa Klotz, Michael Griffith, Planner, and Sarah Flax, Interim Director of Community Development Presiding Member: Matt Rodgers _____________________________________________________________________ Call to Order Chair Rodgers opened the meeting at 7:02pm. A roll call was then done and a quorum was determined to be present. Commissioner Halik made a motion to move Agenda Items III, Election of Officers and IV, Approval of 2023 Meeting Schedule to after New Business and before Communications. Seconded by Commissioner Lindwall. A voice vote was taken, and the motion passed, 5-0. Approval of November 30, 2022 Meeting Minutes Commissioner Westerberg made a motion to approve the Land Use Commission meeting minutes from November 30, 2022, with the following amendments: 1. Page 8, third full paragraph, replace “increased” with “ceased”; and 2. Page 2, paragraph starting with Sue Loellbach, Connections Manager of Advocacy, should add that it was discussed that the Good Neighbor Agreement is not going to be done until after the permit was granted. Seconded by Commissioner Lindwall. A voice vote was taken, and the motion passed, 5-0. New Business A. Public Hearing: Special Use Permit | 1555 Oak Avenue | 22ZMJV-0085 Cameel Halim, property owner, requests a Special Use Permit for an Apartment Hotel at 1555 Oak Avenue, commonly known as the Museum Residences on Oak Page 1 of 10 January 11, 2023 Land Use Commission Meeting Page 43 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 APPROVED or the King Home, in the R6 General Residential District (Section 6-8-8-3). The Land Use Commission makes a recommendation to the City Council, the determining body for this case in accordance with Section 6-3-5-8 and Ordinance 92-O-21. Alan M. Didesch, General Counsel to BCH 1555 LLC, introduced William Ng of William NG Architects and presented an overview of the proposed Apartment Hotel and his interpretation of how it complies with City Standards for Approval. Commissioner Questions Commissioner Halik asked staff if there was a maximum number of transient units since there is a minimum of twenty-five percent. Ms. Klotz responded that the Zoning Code definition does not include a maximum. Commissioner Westerberg asked whether it would be a Hotel or an Apartment Hotel if there were 100% transient guests. Ms. Klotz noted that it could be either. Discussion ensued regarding the zoning ordinance definition and the primary use of the property. Commissioner Lindwall asked how the accessory property facilities (restaurant, barbershop, massage spa, etc.) would be used and who was going to operate them. Mr. Didesch responded that BCH 1555 LLC would hire for the positions and the implementation phasing has not yet been determined. Commissioner Westerberg asked whether they could use permeable pavers for the parking lot. Mr. Didesch responded that BCH 1555 LLC may consider it. Chair Rodgers called for public comment. There was none. The record was then closed. Deliberations Commissioner Lindwall remarked that transient hotel guests could provide additional city revenue that a permanent apartment building would not. Commissioner Halik said that he thinks the proposal meets the Zoning Code definition. Commissioner Westerberg noted that it may enhance and differentiate the Apartment Hotel Zoning Code definition by adding a maximum number of transient guests. Chair Rodgers stated that he also thinks it is a good project, but the Zoning Code definitions should be improved. The Chair reviewed the nine Standards for Special Use (Section 6-3-5-10). 1. Is one of the listed special uses for the zoning district in which the property lies: The Apartment Hotel definition is listed as an eligible special use in the R6 Page 2 of 10 January 11, 2023 Land Use Commission Meeting Page 44 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 APPROVED General Residential District and this project could also be interpreted as a Hotel implying that the Zoning Code Apartment Hotel definition should be clarified. 2. Complies with the purposes and the policies of the Comprehensive General Plan and the Zoning Ordinance: The property has been vacant for a period and the adaptive reuse preserves the building meeting the standard. 3. Does not cause a negative cumulative effect in combination with existing special uses or as a category of land use: The proposed building reuse will bring downtown activity and so the standard is met. 4. Does not interfere with or diminish the value of property in the neighborhood: The property is now vacant property so the reuse will increase value and therefore, the standard is met. 5. Is adequately served by public facilities and services: The building is near public transportation and is already served by public facilities, so the standard is met. 6. Does not cause undue traffic congestion: With parking provided, the incremental traffic would not have a negative effect downtown and so the standard is met. 7. Preserves significant historical and architectural resources: The property preserves a mid-century non-historic building, and thus the standard is met. 8. Preserves significant natural and environmental resources: The lot has open space which is being preserved and so the standard is met. 9. Complies with all other applicable regulations: The applicant had proved to be familiar with Evanston regulations and so the standard is met. Chair Rodgers asked for Commissioner comments on the standards. Commissioner Westerberg recommended adding a permeable paver condition. It was also clarified that there would be no percentage applied to the number of transient guests. Commissioner Lindwall made a motion to recommend approval to the City Council to approve the Special Use Permit on the property located at 1555 Oak Avenue, 22ZMJV-0085, with the following conditions: 1. The applicant paves the unimproved parking lot with permeable pavers within one year of approval of the Special Use Permit. 2. The Special Use Permit is in general compliance with the application and testimony provided. Second by Commissioner Halik. A voice vote was taken, and the motion carried, 3-2. B. Public Hearing: Appeal | 1733 Oakton Street | 22ZMJV-0088 Cheryl & Robert Muno, property owners of 1729 Oakton Street, appeal the Zoning Administrator’s decision to grant minor zoning relief (case number 22ZMNV-0074) to construct a second story addition with a proposed east interior side yard setback of 3.9’ and an existing first story of 3.9’ (Section 6-8-3-7) in the R2 Single Family Residential District. The appellant appeals the approval of the 3.9’ east interior side yard setback variation, and also appeals the overhang amount (eave; yard obstruction) approved without variation. The Land Use Commission is the determining body for this case in accordance with Section 6-3-8-8 of the Evanston Zoning Code and Ordinance 92-O-21. Page 3 of 10 January 11, 2023 Land Use Commission Meeting Page 45 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 APPROVED Robert Muno, 1729 Oakton Street, presented his opposition to the variances being requested at 1733 Oakton Street. The primary reasons for opposition include loss of light, increased noise, and the potential for stormwater runoff to negatively impact his property at 1729 Oakton Street. Commissioner Questions Commissioner Lindwall asked if the distance from the west side of the property to the house was about five feet. Mr. Muno stated that he did not know the exact distance. Ms. Klotz summarized that the variance was granted due to finding that it met the standards for a minor variation. Relocating the addition created construction issues and potential triggers for additional variance requests. The permitted bulk in the zoning district was not maximized and other houses on the block were at a similar height to the proposed addition. Commissioner Westerberg asked staff if an offset of the second story was considered, and Ms. Klotz replied that it was not. Ms. Klotz noted that a stormwater drainage plan will have to be approved prior to issuing the building permit. The record was then closed. Deliberations Commissioner Halik noted residents cannot own natural light or views and the setback was not an issue created by the homeowner. He also stated that the property owner has the right to build, and they were not proposing to maximize what they could have been allowed. Commissioner Westerberg noted that stormwater is a substantive issue and should be reviewed prior to permit issuance and Chair Rodgers concurred. The Commission then reviewed the Standards for a Minor Variation (Section 6-3-8-12-A). 1. The practical difficulty is not self-created: The legally nonconforming interior side yard setback is not self-created by the minor variation applicant and so the standard is met. 2. The requested variation will not have a substantial adverse impact on the use, enjoyment, or property values of adjoining properties: The second story height is not maximized thus not creating a substantial adverse impact and so the standard is met. 3. The requested variation is in keeping with the comprehensive general plan and the zoning ordinance: Adding on to existing house stock aligns with the plan meeting the standard. 4. The requested variation is consistent with the preservation policies set forth in the comprehensive general plan: The minor variation allows a second story addition rather than an increased building footprint which would have created a larger negative effect and so the standard is met. Page 4 of 10 January 11, 2023 Land Use Commission Meeting Page 46 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 APPROVED 5. The requested variation requires the least deviation from the applicable regulation among the feasible options identified before the Zoning Administrator issues his/her decision regarding said variation: Alternative locations were considered that did not take advantage of the existing structure and so the standard is met. Commissioner Lindwall made a motion to affirm the Zoning Administrator’s decision on the property located at 1733 Oakton Street, 22ZMJV-0088, with the instruction that as the project moves forward through the permitting process that staff pay particular attention to the stormwater management system. Second by Commissioner Halik. A voice vote was taken, and the motion carried, 5-0. Commissioner Halik made a motion to accept the Zoning Administrator’s interpretation on the property located at 1733 Oakton Street, 22ZMJV-0088, that the proposed 4” eave is compliant. Second by Commissioner Westerberg. A voice vote was taken, and the motion carried, 5-0. C. Public Hearing: Special Use & Major Variation | 1801-1805 Church Street and 1708-1710 Darrow Avenue | 22ZMJV-0089 Pastor Clifford Wilson, Mt. Pisgah Ministry, Inc., applicant, submits for a Special Use for a use (religious institution) in the oWE West Evanston Overlay District exceeding 10,000 square feet but less than 40,000 square feet (Sections 6-15-15-XVII-B.4 and 6-15-15-XVII-B.6), and submits for the following Major Variations from the Evanston Zoning Code: 1) Reduce required front yard build to zone from 5’-25’ to 0’ at upper floors (Section 6-15-15-XVII-A.2), 2) Reduce required west interior side yard setback from 5’ to 0’ (Section 6-15-15-XVII-A-6), 3) Increase impervious surface coverage from 60% + 20% semi-pervious surface material to 90.3% (Sections 6-15-15-XVII-A.8 and 6-15-15-XVII-A.9), 4) Increase building height from 2 stories or 30’ to 3 stories at 44.0’ to parapet (Section 6-15-15-XVII-B.1), 5) Eliminate the required building stoop base type and provide a storefront base type instead (Section 6-15-15-IV, Table IV.A, and 6-15-15-V-C.4), 6) Provide occupied space behind building parapet cap type where occupied space is not permitted (Section 6-15-15-IV, Table IV.A, and 6-15-15—VI-A.3), 7) Eliminate the required one short loading berth (Section 6-16-5, Table 16-E), 8) Increase yard obstruction from 10% to 40% into corner side setback for exterior building fins and vertical trellis (Section 6-4-1-9-B.1), 9) Eliminate the required 3’-4’ tall steel or PVC picket fence around the parking area (6-15-15-XVIII.B.5), in order to construct a 3-story building for a religious institution with both on-site and leased offsite parking in the B2 Business and oWE West Evanston Overlay Districts. The Land Use Commission makes a recommendation to the City Council, the determining body for this case in accordance with Zoning Code Section 6-3-5-9, and Ordinance 92-O-21. Senior Pastor Clifford Wilson, Mt. Pisgah Ministry, Inc., 1813 Church Street, stated their goal is to build a new non-denominational religious institution with a soup kitchen to help those in need. Mr. Richard Koenig, Executive Director of Koenig Housing Opportunity Page 5 of 10 January 11, 2023 Land Use Commission Meeting Page 47 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 APPROVED Development Corporation (“HODC”), a non-profit organization building affordable housing, provided an overview of the sites and the projects which revitalize the block with a new church, 44 new affordable residential apartments, and a retail space. Chair Rodgers asked staff to read Item IV. D. into the record due to the interrelationship of the projects. Ms. Ruggie confirmed that both projects will move together to the City Council for approval. Commissioner Questions Commissioner Halik inquired what the impact would be if the HODC project was reduced from five to four stories. Mr. Koenig replied that it would not be financially feasible. Commissioner Lindwall questioned the impact of eliminating the zero front yard setback and front loading for the buildings without a designated loading berth. Mr. Koenig responded that it would make the units smaller and challenge the number of parking spaces able to be built. Mr. Griffith added that Evanston Public Works indicated their approval of a shared on-street loading zone for the entire block. Mr. Koenig also mentioned that the church currently does not often use the loading space and does not expect a lot of HODC move-in and out traffic. Commissioner Lindwall asked about the planter locations and Mr. Koenig responded that they extend two feet from the east wall. Commissioner Lindwall asked why there is a separate location for the garbage chute and recyclables. Mr. Koenig replied that they have found this practice to promote less mixing of trash. Commissioner Halik said that the Special Overlay District triggers several variations and questioned staff about the future of overlay districts. Ms. Klotz answered that the Planning & Development Committee discussed the overlay district challenges due to the strict structure and age of the form-based Zoning Code with no further action. Commissioner Westerberg inquired about the stormwater and soil remediation plans. Mr. Griffith answered that the applicant is proposing a stormwater vault to hold and slowly release the water into the alley stormwater system and that any further soil remediation would be addressed during building permit review. Chair Rodgers called for public comment. Carlis Sutton, 1821 Darrow Avenue, commented that the overlay district is problematic and that the proposed design is not characteristic of the neighborhood. Tina Paden, 1122 Emerson Street, inquired about confirmation of the environmental cleanliness of the site. She asked about the value of the property that the church is being built on and future ownership of the two properties. She asked if HODC would be building the church and where was its parking. She asked what the public notice Page 6 of 10 January 11, 2023 Land Use Commission Meeting Page 48 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 APPROVED distance was for an overlay district. She asked if there would be a priority for minority hiring and how preference to Evanston residents could be managed. She questioned whether there was a lack of public meetings and if this use was the best for public property which should serve the greater community. Priscilla Giles, 1829 Ashland Avenue, objects to the size of the building as it relates to the neighborhood. Nambi Chambers, 1816 Darrow Avenue, expressed concern about traffic, parking and building height. Xiomara Chambers, 1816 Darrow Avenue, also expressed concern about parking especially during street and snow cleaning. She added that there tends to be standstill traffic in front of the storefronts. Katie Nawrocki, Crosby Theodore, LLC, 1817 Church Street, asked for a three-month continuance to discuss the documents and variations submitted by the applicant. Their concerns include stormwater, impact on a local landmark structure, the building's height and bulk, and that the least deviation standard was not provided. Erin Jackson, also 1817 Church Street, acknowledged that 1817 has stormwater issues and would like to understand how the proposed project would impact parking for her business. She also concurs with the spirit of providing affordable housing to individuals in the area. Vanessa Johnson McCoy, 1710 Central Street, noted that affordable housing is a need that she has seen in Evanston through her real estate experience and the church provides great service to the community. Sidney Reed, 1151 Ashland Avenue, expressed support of the affordable housing development and getting some of the property back in a taxable status. Keith Banks, 737 Reba Place Development Corporation, Suite B, spoke in support of the affordable housing development and the height of the building. Mr. Koenig summarized that the public meetings began in July 2019 with a community meeting regarding the site, followed by 5 th Ward meetings in October. The city issued a Request for Qualifications (RFQ) in January of 2020 and in June, the Economic Development Committee met to discuss the responses and voted to recommend the Mt. Pisgah Ministry and HODC partnership (“Partnership”) to the City Council in December. The City Council authorized negotiations with the Partnership in January 2021 and adopted an ordinance in February 2021 to negotiate a purchase and sale agreement with the Partnership. 5 th Ward project presentations were made in August and December of 2021. Flyers were distributed to neighborhood homes and businesses in September 2022 prior to another community meeting held later that month. Mr. Koenig confirmed that the city has property environmental clearance in the form of an Illinois Environmental Protection Agency (IEPA) No Further Remediation Required (NFR) Letter that was communicated by issuing it with the 2020 RFQ and including it with these public hearing packets. Pastor Wilson has testified regarding personally Page 7 of 10 January 11, 2023 Land Use Commission Meeting Page 49 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 APPROVED observing removal of the tanks. Any further clean-up objectives are local, based on land use and handled through the permitting process. Mr. Koenig responded that the donated portion of the property is appraised at approximately $1M and eligible for a state donation tax credit. The church will only own the east section of the property and HODC will own the west and pay property taxes. He further clarified that the five parcels will be combined and subdivided into two with two different parcel identification numbers (PINs). The two projects will be built independently. Pastor Wilson stated that they currently have 7 church parking spaces. Evanston Township High School has granted permission to let the church park on Sunday in the southeast parking lot if necessary (typically for weddings and funerals). He has reached out to adjacent churches for Saturdays or other days when they are not using spaces for additional parking if necessary. Mr. Koenig restated that Federal Fair Housing law does not allow a local waitlist. HODC has requested consideration to allow it but if it is not approved, they will comply with the law. He confirmed that they will comply with Evanston’s minority hiring program. Mr. Koenig summarized that there are 13 1-bedrooms, 20 2-bedrooms, and 11 3-bedrooms. The 1-bedrooms range from 640 to 670 square feet; the 2-bedrooms are 782 to 908 square feet, and the 3-bedrooms are 1,053 to 1,150 square feet. Mr. Griffith noted that public mail notice was sent within a radius of 500 feet, the requirement for variations. Commissioner Westerberg asked staff when plans were posted, and Mr. Griffith noted that the packet was posted the Friday prior to the Land Use Committee meeting and public mail notices were sent in mid-December. Mr. Koenig added that plans, elevations, and story boards have been part of earlier presentations over the last 18 months for both projects. Chair Rodgers asked for commissioners’ input on continuing the hearings and staff input on the Land Use Commission case schedule. Chair Rodgers set the expectation that the developer and church hold an additional community meeting to review the plans. He also noted that continuing to February 8, 2023, will not include another mailed public notice. Commissioner Lindwall suggested that stormwater drainage, lot coverage and alley function be discussed with the neighbors. Commissioner Lindwall made a motion to continue the hearing to the February 8, 2023 meeting on the property located at 1801-1805 Church Street and 1708-1710 Darrow Avenue, 22ZMJV-0089. Second by Commissioner Westerberg. A voice vote was taken, and the motion carried, 5-0. D. Public Hearing: Major Variation | 1811-1815 Church Street and 1708-1710 Page 8 of 10 January 11, 2023 Land Use Commission Meeting Page 50 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 APPROVED Darrow Avenue | 22ZMJV-0092 Richard Koening, Housing Opportunity Development Corporation, applicant, submits for the following Major Variations from the Evanston Zoning Code: 1) Reduce the required front yard build to zone from 5’-10’ to 0’ (Section 6-15-15-IX-A.3), 2) Reduce the required west and east interior side yard setbacks from 5’ to 0’ (Section 6-15-15-IX-A.5), 3) Reduce the required rear yard setback from 5’ to 0’ (Section 6-15-15-IX-A.6), 4) Increase the maximum permitted impervious surface coverage from 90% + 5% semi-pervious surface area to 99.7% of lot area (Sections 6-15-15-IX-A.7 and 6-15-15-IX-A.8), 5) Increase the maximum permitted building height from 3 stories and 47’ to 5 stories and 57.7’ (Section 6-15-15-IX-B.1), 6) Eliminate the required 8’ ziggurat setback at the 3rd story (Section 6-15-15-IX-B.1), 7) Eliminate the required one short loading berth (Section 6-16-5, Table 16-E), in order to construct a 5-story mixed-use building with ground floor retail, 44 dwellings, and on-site parking in the B2 Business and oWE West Evanston Overlay Districts. The Land Use Commission is the determining body for this case in accordance with Zoning Code Section 6-3-8-2, and Ordinance 92-O-21. Commissioner Lindwall made a motion to continue the hearing to the February 8, 2023 meeting on the property located at 1801-1805 Church Street and 1708-1710 Darrow Avenue, 22ZMJV-0089. Second by Commissioner Westerberg. A voice vote was taken, and the motion carried, 5-0. Election of Officers A. Election of Land Use Commission Chair and Vice-Chair Commissioner Halik made a motion to elect Commissioner Matt Rodgers Chair, seconded by Commissioner Lindwall, and Chair Rodgers accepted the nomination. The motion carried 5-0. Commissioner Rogers made a motion to elect Commissioner Max Puchtel Vice-Chair, seconded by Commissioner Lindwall. The motion carried 5-0. B. Election of Zoning Committee Members The Election was deferred until the next Commission meeting. C. Election of Comprehensive Plan Committee Members The Election was deferred until the next Commission meeting. D. Election of Comprehensive Plan Steering Committee Chair Commissioner Rogers made a motion to elect Commissioner Jeanne Lindwall as the Comprehensive Plan Steering Committee Chair, seconded by Commissioner Westerberg. The motion carried 5-0. Adoption of 2023 Meeting Schedule Commissioner Westerberg made a motion to adopt the 2023 calendar, seconded by Commissioner Lindwall. The motion carried 5-0. Communications Ms. Williams provided a Comprehensive Plan Update. Staff has identified key elements to bring before those committees that have purview over the plan and will schedule Page 9 of 10 January 11, 2023 Land Use Commission Meeting Page 51 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31 APPROVED these in the coming months prior to finalizing the RFP. Discussion ensued regarding communicating commission and staff recommendations to City Council. Chair Rodgers made a referral to staff to review the Zoning Code definition for an Apartment Hotel. Adjournment Commissioner Westerberg motioned to adjourn, Commissioner Lindwall seconded, and the motion carried, 5-0. Adjourned 10:03 pm. The next meeting of the Evanston Land Use Commission will be held on Wednesday, January 25, 2023, at 7:00 pm, in the James C. Lytle Council Chambers in the Lorraine H. Morton Civic Center. Respectfully submitted, Amy Ahner, AICP, Planning Consultant Reviewed by, Meagan Jones, Neighborhood and Land Use Planner Page 10 of 10 January 11, 2023 Land Use Commission Meeting Page 52 of 52 Doc ID: ca37a437e38f566005fb40813af03350f2b28f31