AN ORDINANCE
APPROVING SUPPLEMENTAL ASSESSMENT 1357S
FOR CITY OF EVANSTON LOCAL IMPROVEMENT KNOWN AS
SPECIAL ASSESSMENT NUMBER 1357
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
EVANSTON, ILLINOIS:
SECTION 1: That the local improvement known as Evanston
Special Assessment No. 1357 and described as
follows:
The public alley in the block bounded by Church
Street on the north, Davis Street on the south,
Fowler Avenue on the west and Pitner Avenue on the
east in the City of Evanston be improved by
excavating, constructing the necessary drainage
system, and paving with 8" Portland Cement concrete
Pavement to a width of fifteen feet (15'),
• has been completed and accepted by the Board of Local
Improvements.
SECTION 2: That the final costs and expenses
of said local improvement as determined by the
Board and its Engineer exceed the original special assessment
by Nine Thousand Three Hundred Eighty-six and 00/100 Dollars
($9,386.00) and require the levying of a supplemental
assessment.
SECTION 3: That the Recommendation of this
Ordinance for a supplemental assessment by the
Board of Local Improvements of the City of Evanston, Illinois,
and the statement of revised final project costs made by the
Engineer of said Board, both hereto attached, be and the same
are hereby approved and by reference thereto made a part
hereof.
SECTION 4: That the supplemental assessment,
as reflected in the revised final total
project cost of Seventy-seven Five Hundred Sixty-one and
14/100ths Dollars ($77,561.14) be approved, and that the Board
of Local Improvements be directed to file a petition for
supplemental assessment together with an amended special
assessment roll reflecting increased total assessments and
installment payments.
•
•
SECTION 5: That the Board of Local Improvements
be directed to comply with any and all
statutory procedures for the making, filing and levying of a
supplemental assessment.
SECTION 6: That all Ordinances or parts of
Ordinances conflicting with this Ordinance be
and the same are hereby repealed; and
SECTION 7: That this ordinance shall be in
full force and effect from and after its
passage and approval according to law.
Adopted by the City Council of the City of Evanston,
Illinois, on the Alf4 day of Ma-rc-1r , 1985.
City Clerk
Approved: 1985.
M o
• Approved as to form:
Attorney for the Board of Local
Improvements of the City of
Evanston, Illinois.
0 -2-
•
•
•
RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
SUPPLEMENTAL ASSESSMENT 1357S
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS:
The Board of Local Improvements of the City of Evanston,.
Illinois, herewith submits the draft of an Ordinance for the
approval of Supplemental Assessment 1357S to cure a deficiency
in Special Assessment 1357, a City of Evanston local
improvement described as follows:
The public alley in the block bounded by Church
Street on the north, Davis Street on the south,
Fowler Avenue on the west and Pitner Avenue on the
east in the City of Evanston be improved by
excavating, constructing the necessary drainage
system, and paving with 8" Portland Cement concrete
Pavement to a width of fifteen feet (151);
and as part of said Ordinance and in conjunction therewith,
said Board also herewith submits the statement of revised final
project costs of said improvement as finally determined by said
Board; and said Board hereby recommends the passage of said
Ordinance for Supplemental Assessment 1357S and the filing of
said Ordinance and the amended Special Assessment rolls
reflecting the costs of the supplemental assessment
incorporated therein.
Respectfully submitted,
BOARD OF LOCAL
of the City of
Approved as to form:
4- 4,4-x�
Attorney for the Board of Local
Improvements of the City of
Evanston, Illinois
IMPROVEMENTS
Evanston, Illinois
SPECIAL ASSESSMENT 1357
AND SUPPLEMENTAL SPECIAL ASSESSMENT 1,357s
Paving of alley bounded by Davis Street, Pitoer Avenue, Cbocob Street and
Fowler Avenue.
Contractor: Capitol Cement Company -
Award Amount: $68,709.00 �/�yOF[k4NS
Final Construction Coat; $71,932,00 /�y»oa�enw/"um
Change: $3,223.00
Job Awarded: September 6, 1984
Job Completed: November 19, I984
Final Inspection: December 14' 1984
I. Project Costs as Filed in Circuit Court:
rConstruction: $62,546.00
Engineering Costs: 2,814.57
Lawful Expenses: 2,814.57
Total Coot of
Improvement: $68,175.14
II. Final Project Costs to be Filed:
Construction: $71,932.00
Engineering and
Lawful Costs: 5,629.14
Total Cost of
Improvement: $77,561.14
�ocal Improvements