Loading...
HomeMy WebLinkAboutORDINANCES-1985-015-O-8515-0-85 AN ORDINANCE APPROVING SUPPLEMENTAL ASSESSMENT 1357S FOR CITY OF EVANSTON LOCAL IMPROVEMENT KNOWN AS SPECIAL ASSESSMENT NUMBER 1357 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS: SECTION 1: That the local improvement known as Evanston Special Assessment No. 1357 and described as follows: The public alley in the block bounded by Church Street on the north, Davis Street on the south, Fowler Avenue on the west and Pitner Avenue on the east in the City of Evanston be improved by excavating, constructing the necessary drainage system, and paving with 8" Portland Cement concrete Pavement to a width of fifteen feet (15'), • has been completed and accepted by the Board of Local Improvements. SECTION 2: That the final costs and expenses of said local improvement as determined by the Board and its Engineer exceed the original special assessment by Nine Thousand Three Hundred Eighty-six and 00/100 Dollars ($9,386.00) and require the levying of a supplemental assessment. SECTION 3: That the Recommendation of this Ordinance for a supplemental assessment by the Board of Local Improvements of the City of Evanston, Illinois, and the statement of revised final project costs made by the Engineer of said Board, both hereto attached, be and the same are hereby approved and by reference thereto made a part hereof. SECTION 4: That the supplemental assessment, as reflected in the revised final total project cost of Seventy-seven Five Hundred Sixty-one and 14/100ths Dollars ($77,561.14) be approved, and that the Board of Local Improvements be directed to file a petition for supplemental assessment together with an amended special assessment roll reflecting increased total assessments and installment payments. • • SECTION 5: That the Board of Local Improvements be directed to comply with any and all statutory procedures for the making, filing and levying of a supplemental assessment. SECTION 6: That all Ordinances or parts of Ordinances conflicting with this Ordinance be and the same are hereby repealed; and SECTION 7: That this ordinance shall be in full force and effect from and after its passage and approval according to law. Adopted by the City Council of the City of Evanston, Illinois, on the Alf4 day of Ma-rc-1r , 1985. City Clerk Approved: 1985. M o • Approved as to form: Attorney for the Board of Local Improvements of the City of Evanston, Illinois. 0 -2- • • • RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS SUPPLEMENTAL ASSESSMENT 1357S TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS: The Board of Local Improvements of the City of Evanston,. Illinois, herewith submits the draft of an Ordinance for the approval of Supplemental Assessment 1357S to cure a deficiency in Special Assessment 1357, a City of Evanston local improvement described as follows: The public alley in the block bounded by Church Street on the north, Davis Street on the south, Fowler Avenue on the west and Pitner Avenue on the east in the City of Evanston be improved by excavating, constructing the necessary drainage system, and paving with 8" Portland Cement concrete Pavement to a width of fifteen feet (151); and as part of said Ordinance and in conjunction therewith, said Board also herewith submits the statement of revised final project costs of said improvement as finally determined by said Board; and said Board hereby recommends the passage of said Ordinance for Supplemental Assessment 1357S and the filing of said Ordinance and the amended Special Assessment rolls reflecting the costs of the supplemental assessment incorporated therein. Respectfully submitted, BOARD OF LOCAL of the City of Approved as to form: 4- 4,4-x� Attorney for the Board of Local Improvements of the City of Evanston, Illinois IMPROVEMENTS Evanston, Illinois SPECIAL ASSESSMENT 1357 AND SUPPLEMENTAL SPECIAL ASSESSMENT 1,357s Paving of alley bounded by Davis Street, Pitoer Avenue, Cbocob Street and Fowler Avenue. Contractor: Capitol Cement Company - Award Amount: $68,709.00 �/�yOF[k4NS Final Construction Coat; $71,932,00 /�y»oa�enw/"um Change: $3,223.00 Job Awarded: September 6, 1984 Job Completed: November 19, I984 Final Inspection: December 14' 1984 I. Project Costs as Filed in Circuit Court: rConstruction: $62,546.00 Engineering Costs: 2,814.57 Lawful Expenses: 2,814.57 Total Coot of Improvement: $68,175.14 II. Final Project Costs to be Filed: Construction: $71,932.00 Engineering and Lawful Costs: 5,629.14 Total Cost of Improvement: $77,561.14 �ocal Improvements