AN ORDINANCE
FOR THE CONSTRUCTION OF A LOCAL IMPROVEMENT`
KNOWN AS
EVANSTON SPECIAL ASSESSMENT NO. 1379 +.
BE IT ORDAINED BY THE CITY COUNCIL
OF THE CITY OF EVANSTON, ILLINOIS:
Section I: That a local improvement shall be made within the City of
Evanston, County of Cook and State of Illinois, the nature, character,
locality and description of which is as follows, to -wit:
That Poplar Avenue, 843 feet south of south Line of Lincoln
Street to the south line of Lincoln Street in the City of
Evanston be improved by grading, constructing the necessary
drainage system with concrete curb and gutter and paving to a
width of twenty-four feet (24') with Bituminous Base Course seven
inches (7") thick and Bituminous Concrete Surface Course two
inches (2") thick.
Section 2: That the Recommendation of this Ordinance by the Board of
• Local Improvements of the City of Evanston, Illinois, and the Estimate of the
cost of said improvement made by'the Engineer of said Board, both hereto
attached, be and the same are hereby approved and by reference thereto made a
part hereof;
Section 3: That said improvement shall be made and the cost thereof,
including the sum of One Hundred Forty Four Thousand Six Hundred Sixty and
44/100ths Dollars ($144,660.44), being the cost of making and collecting the
Assessment and all other expenses as provided by law, shall be paid for by
Special Assessment in accordance with the Illinois Municipal Code, Chapter 24,
Section 9, Division 2, approved May 29, 1961 and all amendments thereto, and
Chapter 15, Title 7 of the City Code of the City of Evanston, 1979, as
amended.
Section 4: That One Hundred Nine Thousand Three Hundred Eighty and
46/100ths Dollars ($109,380.46) of the cost of said improvement shall be
allocated as public benefit, to be paid by the City, and the remainder of
Thirty Five Thousand Two Hundred Seventy Nine and 98/100ths Dollars
($35,279.98) as private benefit.
Section 5: That the aggregate amount to be assessed and each individual
assessment shall be divided into ten installments in the manner provided by
law, and each of said installments shall bear interest at the rate of seven
per centum. (70) per annum from sixty (60) days after the date of the first
voucher issued on account of work done upon said proposed improvement;
•
•
•
Section 6: That for the purpose of anticipating the collection of the
installments of said assessment levied against the real estate benefited
thereby, bonds shall be issued payable out of said installments, bearing
interest at the rate of seven per centum. (70) per annum, payable annually and
signed on behalf of the City of Evanston, Illinois, by its Mayor and attested
by its City Clerk and -its corporate seal affixed thereto; and each interest
coupon attached to said bonds shall likewise be executed by and shall bear the
official or facsimile signature of the same officers who signed said bonds and
who if facsimile signatures are used, do adopt by their execution of said
bonds as and for their proper signatures their respective facsimile signatures
appearing on said coupons; and that said bonds shall be issued in accordance
with and shall in all respects conform to the provisions of an Act of the
General Assembly of the State of Illinois, known as the "Illinois Municipal
Code," effective July 1, 1961 and the Amendments thereto;
Section 7: That David H. Barber, President of the Board of Local
Improvements of the City of Evanston, Illinois, be and he is hereby directed
to file a Petition in the County Court of Cook County, Illinois, praying that
steps may be taken to levy a Special Assessment to pay the cost of said
improvement in accordance with the provisions of this Ordinance and in the
manner prescribed by law;
Section 8: That all Ordinances or parts of Ordinances conflicting with
this Ordinance be and the same are hereby repealed; and
Section 9: That this Ordinance shall be in force and effect from and
after its passage and approval according to law.
Adopted by
day of -A,il,
the City Council of the City of Evanston, Illinois, on the
�Z, A , 19,p
Appr ed 19 G
Mayor
prqved as to form:
t Nv
ttorney for the jd of Luca
provements of the City of Evanston, Illinois.
CPA
City Clerk
• SPECIAL ASSESSMEW NO- 13 7 9 3
RECa4VEENDATION OF THE BOARD OF LOCAL IMPROVFMEWS
TO THE CITY COUNCIL OF TBE CITY OF EVANSTON, ILL=IS
T The Board of Local Improvements of the City of Evanston, Illinois, --
herewith submits the draft of an Ordinance for the making of a local
improvement within the City -of Evanston, County of Cook and State of Illinois,
the nature, character, locality and description of which is as follows,
to -wit:
Poplar Avenue, 843 feet south of south Line of Lincoln Street to the south
line of Lincoln Street in the City of Evanston be improved by grading,
constructing the necessary drainage system with concrete curb and gutter and
paving to a width of twenty-four feet (24') with Bituminous Base Course seven
inches (7) thick and Bituminous Concrete Surface Course two inches (2")
thick.
and as part of said Ordinance and in conjunction therewith, said Board also
• herewith submits the Plans and Specifications of and an Estimate of the cost
of said improvement, including the cost of engineering services, as finally
determined by said Board;.and said Board hereby recounLends the passage of said
Ordinance and the making of the improvement described therein.
Respectfully submitted,
BOARD OF LOCAL IMPROVEMEWS
T, OFFTHE City of Evanston, Ill nois
B /V
l
Approv as to fo
t Ai
Attorhey for the Bohrd` of
Local Improvements of the
City of Evanston, Illinois
HERBERT D. HILL 24497
ELLEN SZYMANSKI 54806
KATHLEEN BRENNIMAN 17030
CITY OF EVANSTON LAW DEPT.
2100 RIDGE
• EVANSTON, IL 60204
(312) 866-2937
•
•
Revised 6/5/89
ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston;
Pursuant to a Resolution of the Board of Local Improvements of the City of
Evanston, heretofore adopted that Poplar Avenue, 843 feet south of south line..,:,
of Lincoln Street to the;south line of Lincoln Street in the City of.Evanston
to be improved by grading, constructing the necessary drainage system with
concrete curb and gutter and paving to a width of twenty-four feet (241) with
Bituminous Base Course seven inches (71) thick and Bituminous Concrete Surface
Course two inches (2") thick.
Said improvement to be constructed in detail as specified in aforesaid
Resolution.
I herewith submit an estimate of cost of such improvement as described in said
Resolution, including labor, materials and all other lawful expenses attending
the proceedings for making said improvement and the cost of making and
collecting the assessment therefore as provided by law, viz:
ESTIMATE OF COST
QUANTITY
UNIT
ITEM
UNIT PRICE
COST
8
In.Dia.
Tree Removal
(6 to 15 In.Dia.)
15.00
120.00
2
Each
Relocate Existing
Lighting Unit
Complete
1500.00
3,000.00
84
Lin.Ft.
Thermoplastic Pave-
ment Marking Line-6"
0.75
63.00
. 17
Lin.Ft.
Thermoplastic Pave-
ment Marking line-24"
3.00
51.00
890
Cu.yd.
Special Excavation
18.00
16,020.00
170
Cu.Yd.
Trench Backfill
22.00
3,740.00
40
Ton
Granular Cradle
Material, CA-11
22.00
880.00
1655
Sq.Yd.
Top Soil Placement
3"
2.00
3,310.00
85
Sq.Yd.
Aggregate Base
Course, Type B - 6"
6.00
510.00
2573
Sq.Yd.
Bituminous Base
Course -7"
15.00
38,595.00
296
Ton
Bituminous Concrete
Surface Course, Mix-
ture D, Class I
45.00
13,320.00
10
Ton
Incidental Bituminous
Surfacing
60.00
600.00
171
Lin.Ft.
Storm Sewer, Type 2
10" (ESVCP)
35.00
5,985.00
11
Each
Catch Basin, Type A
4' Dia. Type 1 Frame
Open Lid
1500.00
16,500.00
6
Each
Manholes to be
Adjusted
200.00
1,200.00
Page -2- `
Estimate of Engineer of Board of Local Improvements - S.A. 1379 - Poplar Avenue
•
QUANTITY
UNIT ITEM
UNIT PRICE
COST
1
Each Valve Vaults to
be adjusted
200.00
200.00
3
Each Catch Basins to
be Removed
200.00
600.00
1160
Lin.Ft. Combination Con-
crete Curb and
Gutter, Type B6.12
11.00
12,760.00
106
Sq.yd. Driveway Pavement
Removal
7.00
742.00
70
Lin.Ft. Curb Removal
3.50
245.00
1010
Sq.Ft. Sidewalk Removal
1.00
1,010.00
42
Sq.Yd. Portland Cement Con-
crete Driveway Pave-
ment - 6"
45.00
1,890.00
1450
Sq.Ft. Portland Cement Con-
crete Sidewalk - 5"
2.50
3,625.00
260
Sq.Ft. Portland Cement Con-
crete Sidewalk - 6"
3.00
780.00
1655
Sq.Yd. Sodding
4.00
6,620.00
35
Lin.Ft. Fence Removal
10.00
350.00
Cost of Engineering Services .
5,972.22
•
For Lawful Expenses, etc. : : :
5,972.22
. . . . . . . . . . . . . . . . . . .
.. . . .
.�11,944.44
RECAPITULATION
Total Cost of Construction . . . . . . .
. . . . . .
. . .�132,716.00
Cost of Engineering Services . . . . . .
. . . . . .
. . . 5,972.22
For Lawful Expenses, etc . . . . . . . .
. . . . . .
. 5,972.22
Total Cost of Improvement . . . . . .
. . . . . .
. . .$144,660.44
I hereby certify that in my opinion the above estimate does not exceed the
probable cost of the above proposed improvement and the lawful expenses
attending the same.
gineer for the Board of Local
Improvements of the City of Evanston
0