HomeMy WebLinkAboutORDINANCES-1991-045-O-914-18-91
4-30-91
• 45-0-91
AN ORDINANCE
FOR THE CONSTRUCTION OF A LOCAL IMPROVEMENT
KNOWN AS
EVANSTON SPECIAL ASSESSMENT NO. 1394
BE IT ORDAINED BY THE CITY COUNCIL
OF THE CITY OF EVANSTON, ILLINOIS:
Section 1: That a local improvement shall be made within the City
of Evanston, County of Cook and State of Illinois, the nature, character,
locality and description of which is as follows, to -wit:
Bryant Avenue from the Chancellor Street to Isabella Street in the
City of Evanston be improved by grading, constructing the
necessary drainage system with concrete curb and gutter and paving
to a width of twenty-four feet (241) with Bituminous Concrete
Surface Course two inches (211) thick.
Section 2: That the Recommendation of this Ordinance by the Board
of Local Improvements of the City of Evanston, Illinois, and the Estimate of
the cost of said improvement made by the Engineer of said Board, both hereto
attached, be and the same are hereby approved and by reference thereto made
a part hereof;
Section 3: That said improvement shall be made and the cost
•
thereof, including the stun of One Hundred Fifty Eight Thousand Two Hundred
Twenty and 58/100ths Dollars ($158,220.58), being the cost of making and
collecting the Assessment and all other expenses as provided by law, shall
be paid for by Special Assessment in accordance with the Illinois Municipal
Code, Chapter 24, Section 9, Division 2, approved May 29, 1961 and all
amendments thereto, and Chapter 15, Title 7 of the City Code of the City of
Evanston, 1979, as amended.
Section 4: That Ninety Six Thousand Seven Hundred Twenty Eight
and 03/100ths Dollars ($96,728.03) of the cost of said improvement shall be
allocated as public benefit, to be paid by the City, and the remainder of
Sixty One Thousand Four Hundred Ninety Two and 55/100ths Dollars
($61,492.55) as private benefit.
Section 5: That the aggregate amount to be assessed and each
individual assessment shall be divided into ten installments in the manner
provided by law, and each of said installments shall bear interest at the
rate of seven per centum (7%) per annum from sixty (60) days after the date_
of the first voucher issued on account of work done upon said proposed
improvement;
Section 6: That for the purpose of anticipating the collection of
the installments of said assessment levied against the real estate benefited
thereby, bonds shall be issued payable out of said installments, bearing
1
•
45-0-91
• interest at the rate of seven per centum (70) per annum, payable annually
and signed on behalf of the City of Evanston, Illinois, by its Mayor and
attested by its City Clerk and its corporate seal affixed thereto; and each
interest coupon attached to said bonds shall likewise be executed by and
shall bear the official or facsimile signature of the same officers who
signed said bonds and who if facsimile signatures are used, do adopt by
their execution of said bonds as and for their r1Uj----L signatures their
respective facsimile signatures appearing on said coupons; and that said
bonds shall be issued in accordance with and shall in all respects conform
to the provisions of an Act of the General Assembly of the State of
Illinois, known as the "Illinois Municipal Code," effective July 1, 1961 and
the Amendments thereto;
n
�J
0
Section 7: That David H. Barber, President of the Board of Local
Improvements of the City of Evanston, Illinois, be and he is hereby directed
to file a Petition in the County Court of Cook County, Illinois, praying
that steps may be taken to levy a Special Assessment to pay the cost of said
improvement in accordance with the provisions of this Ordinance and in the
manner prescribed by law;
Section 8: That all ordinances or parts of Ordinances
conflicting with this ordinance be and the same are hereby repealed; and
Section 9: That this ordinance shall be in force and effect fran
and after its passage and approval according to law.
Adopted the City Council of the City of Evanston, Illinois, on the �O
day of , 1991.
i
Deput Jerk
1991.
Mayor
App ved as form:
I
Attorney for a Board of Local
Improvements of the City of Evanston, Illinois.
2
• SPECIAL ASSESSMENT N0. 1394
• a•• is � • r • i :• • - � • • i• -• a is
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board of Local Improvements of the City of Evanston, Illinois,
herewith submits the draft of an Ordinance for the making of a local
improvement within the City of Evanston, County of Cook and State of Illinois,
the nature, character, locality and description of which is as follows,
to -wit:
Bryant Avenue from the Chancellor Street to Isabella Street in the City
of Evanston be improved by grading, constructing the necessary drainage
system with concrete curb and gutter and paving to a width of twenty-four
feet (24') with Bituminous Concrete Surface Course two inches (2") thick.
and as part of said Ordinance and in conjunction therewith, said Board also
herewith submits the Plans and Specifications of and an Estimate of the cost
of said improvement, including the cost of engineering services, as finally
determined by said Board; and said Board hereby recommends the passage of said
Ordinance and the making of the improvement described therein.
AP
owed as form:
At ey for the Board of
Local Improvements of the
City of Evanston, Illinois
HERBERT D. HILL 24497
ELLEN SZYMANSKI 54806
KATHIEEN BRENNIMAN 17030
CITY OF EVANSTON LAW DEPT.
2100 RIDGE
EVANSTON, IL 60201
(70a) 866-2937
0
Respectf ul ly suhmitted,
BOARD OF LOCAL IMPROVEMENTS
oE,agArat Evans Il *no
EYA'r—'�'y 711"Pei
•
ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of
Evanston, heretofore adopted that Bryant Avenue from the Chancellor Street to
Isabella Street.in the City of Evanston be improved by grading, constructing
the necessary drainage system with concrete curb and gutter and paving to a
width of twenty-four feet (241) with Bituminous Base Course seven inches (70)
thick and Bituminous Concrete Surface Course two inches W) thick.
Said improvement to be constructed in detail as specified in aforesaid
Resolution.
I herewith submit an estimate of cost of such improvement as described in said
Resolution, including labor, materials and all other lawful expenses attending
the proceedings for making said improvement and the cost of making and
collecting the assessment therefore as provided by law, viz:
ESTIMATE OF COST
QUANTITY
UNIT
ITEM
UNIT PRICE
COST
14
In.Dia.
Tree Removal (6 to
15 Inch Diameter)
30.00
420.00
789
Cu.Yd.
Special Excavation
20.00
15,780.00
74
Cu.Yd.
Trench Backfill
22.00
1,628.00
10
Cu.Yd.
Sub -base Granular
Material, Type B
30.00
300.00
15
Ton
Granular Cradle
Material CA-11
22.00
330.00
2780
sa.Yd.
Top Soil Place-
ment - 3'
2.50
6,950.00
410
Sa.Yd.
Aggregate Base Course
Type B, 4•
4.00
1,640.00
385
Sy.Yd.
Aggregate Base Course
Type B, 6"
6.00
2,310.00
2045
Sa.Yd.
Bituminous Base
Course, 7•
16.00
32,720.00
205
Gal.
Bituminous Materials
(Prime Coat)
1.50
307.50
4
Ton
Aggregate (Prime
Coat)
20.00
80.00
235
Ton
Bituminous Concrete
Surface Course,
Mixture C, Class I
Type 3, 2•
45.00
10,575.00
45
Ton
Incidental Bituminous
Surfacing
70.00
3,150.00
Page -2-
Estimate of Engineer of Board of Local Improvements, S.A. 1394
Bryant Avenue
•
11
65
Lin.Ft.
Storm Sewers, Type
2, 10"
35.00
2,275.00
120
Lin.Ft.
Storm Sewer, Special
10" (DIP CL50)
60.00
7,200.00
5
Each
Catch Basin, Type A,
4' Dia., Type 1 Frame
Open Lid
1500.00
7,500.00
5
Each
Inlets, Type A, Type
1 Frame, Open Lid
(24" Depth)
700.00
3,500.00
1838
Lin.Ft.
Combination Concrete
Curb & Gutter, Type
B6.12
11.00
20,218.00
448
Sa.Yd.
Driveway Pavement
Removal
10.00
4,480.00
180
Lin.Ft.
Curb Removal
2.50
450.00
2550
Sc_r.Ft.
Sidewalk
Removal
1.50
3,825.00
63
Sa.Yd.
Portland Cement
Concrete Driveway
Pavement, 6"
28.00
1,764.00
1910
SQ_.Ft.
Portland Cement
Concrete Side-
walk - 5"
2.40
4,584.00
2780
Sc.Yd.
Sodding
4.00
11,120.00
25
Cu.Yd.
Top Soil
22.00
550.00
30
Each
Forsythia
50.00
1,500.00
• Cost of Engineering Services . . . . . . 6,532.04
For Lawful Expenses, etc. . . . . . . . 6,532.04
. . . . . . . . . . . . . . . . . . . . . . . . . . .$13, 064.08
RECAPITULATION
Total Cost of Construction . . . . . . . . . . . . . . . . $145,156.50
Cost of Engineering Services . . . . . . . . . . . . . . . 6,532.04
For Lawful Expenses, etc . . . . . . . . . . . . . . . . . 6,532.04
Total Cost of Improvement . . . . . . . . . . . . . . . . $158,220.58
I hereby certify that in my opinion the above estimate does not exceed the
probable cost of the above proposed improvement and the lawful expenses
attending the same. _
dames S. Tonkinson
Engineer for the Board of Local
Improvements of the City of Evanston