HomeMy WebLinkAboutORDINANCES-1993-028-O-93•
I
28-0-93
FOR THE CONSTRUCTION OF A LOCAL IMPROVEMENT
KNOWN AS
EVANSTON SPECIAL ASSESSMENT NO. 1397
BE IT ORDAINED BY THE CITY COUNCIL
OF THE CITY OF EVANSTON, ILLINOIS:
Section 1: That a local improvement shall be made within the City of
Evanston, County of Cook and State of Illinois, the nature, character, locality
and description of which is as follows, to -wit:
That Prospect Avenue from Simpson Street -to Grant Street in the City of
be improved by grading, constructing the necessary drainage system with
concrete curb and gutter and paving to a width of twenty-seven feet
(271) with Bituminous Base Course seven inches (711) thick and
Bituminous Concrete Surface Course two inches (211) thick or with
Portland Cement Concrete eight inches (811) thick.
Section 2: That the Recamnendation of this Ordinance by the Board of
Local Improvements of the City of Evanston, Illinois, and the Estimate of the
cost of said improvement made by the Engineer of said Board, both hereto
attached, be and the same are hereby approved and by reference thereto made a
part hereof;
Section 3: That said improvement shall be made and the cost thereof,
including the stun of Two Hundred Eighty Three Thousand Three Hundred Sixty and
49/100ths Dollars ($283,360.49), being the cost of making and collecting the
Assessment and all other expenses as provided by law, shall be paid for by
Special Assessment in accordance with the Illinois Municipal Code, Chapter 24,
Section 9, Division 2, approved May 29, 1961 and all amendments thereto, and
Chapter 15, Title 7 of the City Code of the City of Evanston, 1979, as amended.
Section 4: That One Hundred Ninety Seven Thousand Eight Hundred Four
and 15/100ths Dollars ($197,804.15) of the cost .of said improvement shall be
allocated as public benefit, to be paid by the City, and the remainder of Eighty
Five Thousand Five Hundred Fifty Six and 34/100ths Dollars ($85,556.34) as
private benefit.
Section 5: That the aggregate amount to be assessed and each
individual assessment shall be divided into ten installments in the manner
provided by law, and each of said installments shall bear interest at the rate of
seven per centum, (70) per annum from sixty (60) days after the date of the first
voucher issued on account of work done upon said proposed improvement;
Section 6: That for the purpose of anticipating the collection of the
installments of said assessment levied against the real estate benefited thereby,
bonds shall be issued payable out of said installments, bearing interest at the
rate of seven per centum (7%) per annum, payable annually and signed on behalf
28-0-93
-.8
of the City of Evanston, Illinois, by its Mayor and attested by its City Clerk
and its seal affixed thereto; and each interest coupon attached to said
bonds shall likewise be executed by and shall bear the official or facsimile
signature of the same officers who signed said bonds and who if facsimile
signatures are used, do adopt by their execution of said bonds as and for their
rlyyc, signatures their respective facsimile signatures appearing on said
coupons; and that said bonds shall be issued in accordance with and shall in all
respects conform to the provisions of an Act of the General Assembly of the State
of Illinois, known as the "Illinois Municipal Code," effective July 1, 1961 and
the Amendments thereto;
Section 7: That David H. Barber, President of the Board of Local
Improvements of the City of Evanston, Illinois, be and he is hereby directed to
file a Petition in the County Court of Cook County, Illinois, praying that steps
may be taken to levy a Special Assessment to pay the cost of said improvement in
accordance with the provisions of this Ordinance and in the manner prescribed by
law;
Section 8: That all ordinances or parts of ordinances conflicting with
this Ordinance be and the same are hereby repealed; and
Section 9: That this Ordinance shall be in force and effect from and
after its passage and approval according to law.
by �h
e City Council of the City of Evanston, Illinois, on the day of
Q� 1 , 1993.
City Clerk
Approved' l/ , 1993
Ma r }mob T�,vt
v /jastofo .,
rney for the Bcdrd of Local
Improvements of the City of Evanston, Illinois
Alternate #1
I' *
ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of
Evanston, heretofore adopted that Prospect Avenue from Simpson Street to Grant
Street in the City of Evanston be improved by grading, constructing the
necessary drainage system with concrete curb and gutter and paving to a width
of twenty-seven feet (27') with Bituminous Base Course seven inches (70) thick
and Bituminous Concrete Surface Course two inches (2') thick.-
Said improvement to be constructed in detail as specified in aforesaid
Resolution.
I herewith submit an estimate of cost of such improvement as described in said
Resolution, including labor, materials and all other lawful expenses attending
the proceedings for making said improvement and the cost of making and
collecting the assessment therefore as provided by law, viz:
ESTIMATE OF COST
QUANTITY
UNIT
ITEM
UNIT PRICE
COST
2
Each
Remove & Reset
Existing Street
Light
$1,500.00
$ 3,000.00
7
In.Dia.
Tree Removal (6 to
15 Inch Diameter)
30.00
210.00
58
In.Dia.
Tree Removal (over
15 inch Diameter)
40.00
2,320.00
1908
Cu.Yd.
Special Excavation
18.00
34,344.00
86
Cu.Yd.
Trench Backfill
22.00
1,892.00
10
Cu.Yd.
Sub -base Granular
Material, Type B
30.00
300.00
3840
Sq.Yd.
Top Soil
Placement -3'
2.00
7,680.00
625
Sq.Yd.
Aggregate Base
Course, Type B, 4'
4.00
2,500.00
215
Sq.Yd.
Aggregate Base
Course, Type B, 6'
6.00
1,290.00
4040
Sq.Yd.
Bituminous Base
Course, 7'
16.00
64,640.00
405
Gal.
Bituminous Materials
(Prime Coat)
2.00
810.00
8
Ton
Aggregate
(Prime Coat)
25.00
200.00
465
Ton
Bituminous Concrete
Surface Course, Mix-Cr
Class I, Type 3, 2'
42.00
19,530.00
Page -2-
Estimate of Engineer of Board of Local Improvements - S.A. 1397
Prospect Avenue, Asphalt Proposal
QUANTITY
UNIT
ITEM
UNIT PRICE
COST
30
Ton
Incidental Bitumi-
nous Surfacing
75.00
2,250.00
137
Lin.Ft.
Storm Sewer, Special
10' (DIP CL 50)
45.00
6,165.00
3
Each
Catch Basins, Type A
4' Dia., Type 1 Frame,
Open Lid
1,500.00
4,500.00
3
Each
Inlets, Type A, Type 1
Frame, Open Lid
1,200.00
3,600.00
7
Each
Catch Basins to be
Adjusted
200.00
1,400.00
1
Each
Catch Basins to be
Reconstructed
700.00
700.00
12
Each
Manholes to be
Adjusted
200.00
2,400.00
1
Each
Manholes to be
Reconstructed
700.00
700.00
6
Each
Valve Vaults to be
Adjusted
200.00
1,200.00
1
Each
Frames & Lids, Type
1, Closed Lid
200.00
200.00
2
Each
Filling Existing
-
Catch Basins
150.00
300.00
2810
Lin.Ft.
Combination Concrete
Curb & Gutter
Type B6.12
10.00
28,100.00
340
Sa.Yd.
Driveway Pavement
Removal
10.00
3,400.00
230
Lin.Ft.
Curb Removal
3.50
805.00
340
Lin.Ft.
Combination Curb &
Gutter Removal
3.50
1,190.00
630
Sq.Ft.
Sidewalk Removal
1.50
945.00
125
Sq.Yd.
Portland Cement
Concrete Driveway
Pavement - 6'
28.00
3,500.00
630
Sq.Ft.
Portland Cement
Concrete
Sidewalk - 5'
3.50
2,205.00
3840
Sq.Yd.
Sodding
5.00
19,200.00
80
Each
Concrete Bumper
Blocks Removal
5.00
400.00
70
Lin.Ft.
Remove and Reset
Split Rail Fence
15.00
1,050.00
•
Estimate of Engineer of Board of Local Improvements, S.A. 1397
Prospect Avenue, Asphalt Proposal
•
•
Cost of Engineering Services . . . . . . . �10,031.67
For Lawful Expenses, etc. �10,031.67
. . . . . . . . . . . . . . . . . . . . . . . . . . . �20, 063. 34
RECAPITULATION
Total Cost of Construction . . . . . . . . . . . . . . . . *222,926.00
Cost of Engineering Services . . . . . . . . . . . . . . . 10,031.67
For Lawful Expenses, etc . . . . . . . . . . . . . . . . . 10,031.67
Total Cost of Improvement . . . . . . . . . . . . . . . . *242,989.34
I hereby certify that in my opinion the above estimate does not exceed the
probable cost of the above proposed improvement and the lawful expenses
attending the same.
J es S. Tonkinson
tngineer for the Board of Local
Improvements of the City of Evanston
A16e°L11aL.e 4z
ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of
Evanston, heretofore adopted that Prospect Avenue from Simpson Street to Grant
Street in the City of Evanston be improved by grading, constructing the
necessary drainage system with concrete curb and gutter and paving to a width
of twenty-seven feet (271) with Portland Cement Concrete eight inches (80)
thick.
Said improvement to be constructed in detail as specified in aforesaid
Resolution.
I herewith submit an estimate of cost of such improvement as described in said
Resolution, including labor, materials and all other lawful expenses attending
the proceedings for making said improvement and the cost of making and
collecting the assessment therefore as provided by law, viz:
ESTIMATE OF COST
QUANTITY
UNIT
ITEM
UNIT PRICE
COST
2
Each
Remove & Reset
Existing Street
Light
$1,500,00
$ 3,000.00
7
In.Dia.
Tree Removal (6 to
15 Inch Diameter)
30.00
210.00
58
In.Dia.
Tree Removal (over
15 inch Diameter)
40.00
2,320.00
1791
Cu.Yd.
Special Excavation
18.00
32,238.00
86
Cu.Yd.
Trench Backfill
22.00
1,892.00
10
Cu.Yd.
Sub -base Granular
Material, Type B
30.00
300.00
3840
Sa.Yd.
Top Soil
Placement -3'
2.00
7,680.00
625
Sq.Yd.
Aggregate Base
Course, Type B, 4'
4.00
2,500.00
215
Sq.Yd.
Aggregate Base
Course, Type B, 6'
6.00
1,290.00
4040
Sq.Yd.
Portland Cement
Concrete Pavement,8'
30.00
121,200.00
f
l�
Page -2-
Estimate of Engineer of Board of Local Improvements - S.A. 1397
Prospect Avenue, Concrete Proposal
QUANTITY
UNIT
ITEM
UNIT PRICE
COST
30
Ton
Incidental Bitumi-
nous Surfacing
75.00
2,250.00
137
Lin.Ft.
Storm Sewer, Special
10' (DIP CL 50)
45.00
6,165.00
3
Each
Catch Basins, Type A
4' Dia., Type 1 Frame,
Open Lid
1,500.00
4,500.00
3
Each
Inlets, Type A, Type 1
Frame, Open Lid
1,200.00
3,600.00
7
Each
Catch Basins to be
Adjusted
200.00
1,400.00
1
Each
Catch Basins to be
Reconstructed
700.00
700.00
12
Each
Manholes to be
Adjusted
200.00
2,400.00
1
Each
Manholes to be
Reconstructed
700.00
700.00
6
Each
Valve Vaults to be
Adjusted
200.00
1,200.00
1
Each
Frames & Lids, Type
1, Closed Lid
200.00
200.00
2
Each
Filling Existing
Catch Basins
150.00
300.00
2810
Lin.Ft.
Combination Concrete
Curb & Gutter
Type B6.12
10.00
28,100.00
340
Sa.Yd.
Driveway Pavement
Removal
10.00
3,400.00
230
Lin.Ft.
Curb Removal
3.50
805.00
340
Lin.Ft.
Combination Curb &
Gutter Removal
3.50
1,190.00
630
Sa.Ft.
Sidewalk Removal
1.50
945.00
125
Sq.Yd.
Portland Cement
Concrete Driveway
Pavement - 6'
28.00
3,500.00
630
SC.Ft.
Portland Cement
Concrete
Sidewalk - 5'
3.50
2,205.00
3840
Sa.Yd.
Sodding
5.00
19,200.00
80
Each
Concrete Bumper
Blocks Removal
5.00
400.00
70
Lin.Ft.
Remove and Reset
Split Rail Fence
15.00
1,050.00
4165
Sa.Yd.
Protective Sealer
0.75
3,123.75
Estimate of Engineer of Board of Local Improvements, S.A. 1397
Prospect Avenue, Concrete Proposal
I
Cost of Engineering Services . . . . . . . $11,698.37
For Lawful Expenses, etc. . . . . . . . . �11,698.37
. . . . . . . . . . . . . . . . . . . . . . . . . .�23, 396. 74
RECAPITULATION
Total Cost of Construction . . . . . . . . . . . . . . . . $259,963.75
Cost of Engineering Services . . . . . . . . . . . . . . . 11,698.37
For Lawful Expenses, etc . . . . . . . . . . . . . . . . . 11,698.37
Total Cost of Improvement . . . . . . . . . . . . . . �283,360.49
I hereby certify that in my opinion the above estimate does not exceed the
probable cost of the above proposed improvement and the lawful expenses
attending the same.
Cngiias S. Tonkinson
neer for the Board of Local
Improvements of the City of Evansto
ll