HomeMy WebLinkAboutORDINANCES-1995-024-O-95•
24-0-95
AN ORDINANCE
FOR THE CONSTRUCTION OF A LOCAL IMPROVEMENT
KNOWN AS
EVANSTON SPECIAL ASSESSMENT NO. 1406
BE IT ORDAINED BY THE CITY COUNCIL
OF THE CITY OF EVANSTON, ILLINOIS:
Section 1: That a local improvement shall be made within the City of Evanston,
County of Cook and State of Illinois, the nature, character, locality and description of which
is as follows, to -wit:
That the public alley in the block bounded by Dempster Street on the north,
Crain Street on the south, McDaniel Avenue on the west and Fowler Avenue
on the east in the City of Evanston be improved by excavating, constructing the
necessary drainage system and paving with 8" Portland Cement Concrete
Pavement to a width of fifteen feet (15').
Section 2: That the Recommendation of this Ordinance by the Board of Local
is
Improvements of the City of Evanston, Illinois, and the Estimate of the cost of said
improvement made by the Engineer of said Board, both hereto attached, be and the same
are hereby approved and by reference thereto made a part hereof;
Section 3: That said improvement shall be made and the cost thereof, including
the sum of One Hundred Sixteen Thousand Five Hundred Fifty Three and 70/100ths Dollars
($116,553.70), being the cost of making and collecting the Assessment and all other
expenses as provided by law, shall be paid for by Special Assessment in accordance with
the Illinois Municipal Code, Chapter 24, Section 9, Division 2, approved May 29, 1961 and
all amendments thereto, and Chapter 15, Title 7 of the City Code of the City of Evanston,
1979, as amended.
Section 4: That Fifty Eight Thousand Two Hundred Seventy Six and 85/100ths
Dollars ($58,276.85) of the cost of said improvement shall be allocated as public benefit,
to be paid by the City, and the remainder of Fifty Eight Thousand Two Hundred Seventy Six
and 85/100ths Dollars ($58,276.85) as private benefit.
Section 5: That the aggregate amount to be assessed and each individual
assessment shall be divided into ten installments in the manner provided by law, and each
of said installments shall bear interest at the rate of seven per centum (7%) per annum from
• sixty (60) days after the date of the first voucher issued on account of work done upon said
proposed improvement;
Section 6: That for the purpose of anticipating the collection of the installments
of said assessment levied against the real estate benefited thereby, bonds shall be issued •
payable out of said installments, bearing interest at the rate of seven per centum (7%) per
annum, payable annually and signed on behalf of the City of Evanston, Illinois, by its Mayor
and attested by its City Clerk and its corporate seal affixed thereto; and each interest coupon
attached to said bonds shall likewise be executed by and shall bear the official or facsimile
signature of the same officers who signed said bonds and who if facsimile signatures are
used, do adopt by their execution of said bonds as and for their proper signatures their
respective facsimile signatures appearing on said coupons; and that said bonds shall be
issued in accordance with and shall in all respects conform to the provisions of an Act of
the General Assembly of the State of Illinois, known as the "Illinois Municipal Code,"
effective July 1, 1961 and the Amendments thereto;
Section 7: That David H. Barber, President of the Board of Local Improvements
of the City of Evanston, Illinois, be and he is hereby directed to file a Petition in the County
Court of Cook County, Illinois, praying that steps may be taken to levy a Special Assessment
to pay the cost of said improvement in accordance with the provisions of this Ordinance
and in the manner prescribed by law;
Section 8: That all Ordinances or parts of Ordinances conflicting with this
Ordinance be and the same are hereby repealed; and
Section 9: That this Ordinance shall be in force and effect from and after its
passage and approval according to law. •
i
Adopted by the City Council of the City of Evanston, Illinois, on the �;LG/day
of ��G2� , 1995.
City Clerk
z
oved 1995.
G
Mayor
Approved as to form:
tt�)rney for the Board ohocal
Improvements of the City of Evanston, Illinois
• SPECIAL ASSESSMENT NO. 1406
RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board- of, Local Improvements of the City of Evanston,
Illinois, herewith submits the draft of an Ordinance for the making
of a local improvement within the City of Evanston, County of Cook
and State of Illinois, the nature, character, locality and
description of which is as follows, to -wit:
The public alley in the block bounded by Dempster Street
on the north, Crain Street on the south, McDaniel Avenue
on the west and Fowler Avenue on the east in the City of
Evanston be improved by excavating, constructing the
necessary drainage system and paving with 8" Portland
Cement Concrete Pavement to a width of fifteen feet
(151).
and as part of said Ordinance and in conjunction therewith, said
Board also herewith submits the Plans and Specifications of an
Estimate of the cost of said improvement, including the cost of
engineering services, as finally determined by said Board; and said
Board hereby recommends the passage of said Ordinance and the
• making of the improvement described therein.
Respectfully submitted,
BOARD OF LOCAL IMPROVEME S
OF TH it of Evan on, llinois
By
Approved as to form:
ON 00,
Morney for the oard of z
Local Improvements of the,
City of Evanston, Illinois
HERBERT D. HILL 24497
ELLEN SZYMANSKI 54806
KATHLEEN BRENNIMAN 17030
CITY OF EVANSTON-LAW DEPT.
2100 RIDGE AVENUE
EVANSTON, IL 60201
(708) 866-2937
0
ADHERING RESOLUTION •
OF THE BOARD OF LOCAL IMPROVEMENTS
RECOMMENDING THE IMPROVING OF THE ALLEY
NORTH OF CRAIN STREET, EAST OF MCDANIEL AVENUE
SPECIAL ASSESSMENT NUMBER 1406
WHEREAS, on July 11, 1994, a Resolution was adopted by the Board of Local
Improvements of the City of Evanston, originating a local improvement in said City by
providing for the following:
The public alley in the block bounded by Dempster Street on the north, Crain
Street on the south, McDaniel Avenue on the west and Fowler Avenue on the
east in the City of Evanston be improved by excavating, constructing the
necessary drainage system and paving with 8" Portland Cement Concrete
Pavement to a width of fifteen feet (15').
WHEREAS, a public hearing was held by this Board on the 22nd day of March, 1995,
on the question of the necessity of the proposed improvement, and •
WHEREAS, all persons interested in said proposed improvement who desired to be
heard were heard, and no sufficient reason or objection was given or made to the proposed
improvement, and based on the proof submitted to this Board, this Board finds that good
and sufficient notices of said public hearing were given and mailed as required by law.
NOW, THEREFORE, BE IT AND IT IS HEREBY RESOLVED by the Board of Local
Improvements of the City of Evanston, Cook County, Illinois;
SECTION 1: That the aforesaid proposed local improvement described in the original
resolution adopted the 11th day of July, 1994, and as shown on the plans attached to the
original resolution and the estimate of the cost of said improvement, be adhered to.
SECTION 2: That the ordinance now before this Board of Local Improvements and
prepared at the request of the Board, be and the same is hereby approved and that each •
member of the Board of Local Improvements be requested to sign the Recommendation
•
•
attached to the said ordinance, recommending to the City Council of the City of Evanston
the passage of said ordinance.
SECTION 3: That the Secretary of the Board of Local Improvements be and he is
hereby requested to deliver to City Council of the City of Evanston the ordinance for the
said improvement, the estimate of the cost of said improvement as attached thereto together
with the recommendation of this Board of Local Improvements, and that copies of said
recommendation, estimate and ordinance be placed on file in the records of the Board of
Local Improvements.
SECTION 4: This resolution shall be in full force and effect from and after its passage
and approval.
�i
ADOPTED THIS 22 day of /a1�G�ii „ 1995.
BOARD OF LOCAL IMPR VEMENTS
OF City of Evan on, III ois
B
a
FILED IN MY OFFICE:
/'V ,.
This Z3 day of lvaa 4 1995
Secretary
Approved as to form:
4 orney for the Board of Loc provements
of t e City of Evanston, Illinois
ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of
Evanston, heretofore adopted, providing that the public alley in the block
bounded by Dempster Street on the north, Crain Street on the south, McDaniel
Avenue on the west and Fowler Avenue on the east in the City of Evanston be
improved by excavating, constructing the necessary drainage system and paving
with 8" Portland Cement Concrete Pavement at a width of fifteen feet (15').
Said improvement to be constructed in detail as specified in aforesaid
Resolution.
I herewith submit an estimate of cost of such improvement as described in said
Resolution, including labor, materials and all other lawful expenses attending
the proceedings for making said improvement and the cost of making and collecting
the assessment therefore as provided by law, viz:
QUANTITY
398
350
10
102
115
1110
20
230
233
11
UNIT
Cu.Yd.
Cu.Yd.
Cu.Yd.
Ton
Sq.Yd.
Sq.Yd.
Ton
Lin.Ft.
Lin.Ft.
Each
1 Each
85
Lin.Ft
220
Sq.Yd.
85
Lin.Ft
340
Sq.Ft.
ESTIMATE OF COST
ITEM
UNIT PRICE COST
Special Excavation $
Trench Backfill
Sub -base Granular
Material. Type B
Granular Cradle
Material, CA-11
Aggregate Base Course
Type B, 6"
Portland Cement Concrete
Pavement, 8"
Incidental Bituminous
Surfacing
Storm Sewer, Type 2
8" (ESVCP)
Storm Sewer, Type 2
10" (ESVCP)
Catch Basins, Type A.
4' Dia.. Type 5 Frame,
Open Lid
Manhole -Catch Basin
Type A. 4' Dia.,
Type 5 Frame, Open Lid
Concrete Curb. Type B
Driveway Pavement
Removal
Curb Removal
Sidewalk Removal
20.00
20.00
25.00
20.00
6.00
40.00
100.00
38.00
40.00
2,500.00
3,000.00
12.00
$ 7,960.00
7,000.00
250.00
2,040.00
690.00
44,400.00
2,000.00
8,740.00
9,320.00
10,000.00
3,000.00
1,020.00
10.00 2.200.00
4.00 340.00
1.00 340.00
•
0
• Page -2-
Estimate of Engineer of Board of Local Improvements - S.A. 1406
(Alley N/Crain Street, E/McDaniel Avenue)
OUANTITY
UNIT
ITEM UNIT PRICE
COST
10
Sq.Yd.
Pavement Removal & P.C.C.
Repl. Special-9" (HES)
60.00
600.00
110
Sq.Yd.
Portland Cement Concrete
Driveway Pavement, 6" $
35.00
$ 3,850.00
340
Sq.Ft.
Portland Cement Concrete
Sidewalk, 5"
4.00
1,360.00
1220
Sq.Yd.
Protective Sealer
1.00
1,220.00
30
Ton
Crushed Stone, CA-14
20.00
600.00
Cost of Engineering Services . . . . . . . . . . $4,811.85
For Lawful Expenses, etc . . . . . . . . . . . . .$4,811.85
. . . . . . . . . . . . . . . . . . . . . . . . . $9 , 623.70
RECAPITULATION
• Total Cost of Construction . . . . . . . . . .$106,930.00
Cost of Engineering Services . . . . . . . . .$ 4,811.85
For Lawful Expenses. etc. . . . . . . . . . . $ 4,811.85
Total Cost of Improvement . . . . . . . . . . $116,553.70
I hereby certify that in my opinion the above estimate does not exceed the
probable cost of the above proposed improvement and the lawful expenses attending
the same.
V
7���..
es S. Tonkinson
ineer for the Board of Local
Improvements of the City of Evanston
•
0
•
•