Loading...
HomeMy WebLinkAboutORDINANCES-1995-024-O-95• 24-0-95 AN ORDINANCE FOR THE CONSTRUCTION OF A LOCAL IMPROVEMENT KNOWN AS EVANSTON SPECIAL ASSESSMENT NO. 1406 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS: Section 1: That a local improvement shall be made within the City of Evanston, County of Cook and State of Illinois, the nature, character, locality and description of which is as follows, to -wit: That the public alley in the block bounded by Dempster Street on the north, Crain Street on the south, McDaniel Avenue on the west and Fowler Avenue on the east in the City of Evanston be improved by excavating, constructing the necessary drainage system and paving with 8" Portland Cement Concrete Pavement to a width of fifteen feet (15'). Section 2: That the Recommendation of this Ordinance by the Board of Local is Improvements of the City of Evanston, Illinois, and the Estimate of the cost of said improvement made by the Engineer of said Board, both hereto attached, be and the same are hereby approved and by reference thereto made a part hereof; Section 3: That said improvement shall be made and the cost thereof, including the sum of One Hundred Sixteen Thousand Five Hundred Fifty Three and 70/100ths Dollars ($116,553.70), being the cost of making and collecting the Assessment and all other expenses as provided by law, shall be paid for by Special Assessment in accordance with the Illinois Municipal Code, Chapter 24, Section 9, Division 2, approved May 29, 1961 and all amendments thereto, and Chapter 15, Title 7 of the City Code of the City of Evanston, 1979, as amended. Section 4: That Fifty Eight Thousand Two Hundred Seventy Six and 85/100ths Dollars ($58,276.85) of the cost of said improvement shall be allocated as public benefit, to be paid by the City, and the remainder of Fifty Eight Thousand Two Hundred Seventy Six and 85/100ths Dollars ($58,276.85) as private benefit. Section 5: That the aggregate amount to be assessed and each individual assessment shall be divided into ten installments in the manner provided by law, and each of said installments shall bear interest at the rate of seven per centum (7%) per annum from • sixty (60) days after the date of the first voucher issued on account of work done upon said proposed improvement; Section 6: That for the purpose of anticipating the collection of the installments of said assessment levied against the real estate benefited thereby, bonds shall be issued • payable out of said installments, bearing interest at the rate of seven per centum (7%) per annum, payable annually and signed on behalf of the City of Evanston, Illinois, by its Mayor and attested by its City Clerk and its corporate seal affixed thereto; and each interest coupon attached to said bonds shall likewise be executed by and shall bear the official or facsimile signature of the same officers who signed said bonds and who if facsimile signatures are used, do adopt by their execution of said bonds as and for their proper signatures their respective facsimile signatures appearing on said coupons; and that said bonds shall be issued in accordance with and shall in all respects conform to the provisions of an Act of the General Assembly of the State of Illinois, known as the "Illinois Municipal Code," effective July 1, 1961 and the Amendments thereto; Section 7: That David H. Barber, President of the Board of Local Improvements of the City of Evanston, Illinois, be and he is hereby directed to file a Petition in the County Court of Cook County, Illinois, praying that steps may be taken to levy a Special Assessment to pay the cost of said improvement in accordance with the provisions of this Ordinance and in the manner prescribed by law; Section 8: That all Ordinances or parts of Ordinances conflicting with this Ordinance be and the same are hereby repealed; and Section 9: That this Ordinance shall be in force and effect from and after its passage and approval according to law. • i Adopted by the City Council of the City of Evanston, Illinois, on the �;LG/day of ��G2� , 1995. City Clerk z oved 1995. G Mayor Approved as to form: tt�)rney for the Board ohocal Improvements of the City of Evanston, Illinois • SPECIAL ASSESSMENT NO. 1406 RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS The Board- of, Local Improvements of the City of Evanston, Illinois, herewith submits the draft of an Ordinance for the making of a local improvement within the City of Evanston, County of Cook and State of Illinois, the nature, character, locality and description of which is as follows, to -wit: The public alley in the block bounded by Dempster Street on the north, Crain Street on the south, McDaniel Avenue on the west and Fowler Avenue on the east in the City of Evanston be improved by excavating, constructing the necessary drainage system and paving with 8" Portland Cement Concrete Pavement to a width of fifteen feet (151). and as part of said Ordinance and in conjunction therewith, said Board also herewith submits the Plans and Specifications of an Estimate of the cost of said improvement, including the cost of engineering services, as finally determined by said Board; and said Board hereby recommends the passage of said Ordinance and the • making of the improvement described therein. Respectfully submitted, BOARD OF LOCAL IMPROVEME S OF TH it of Evan on, llinois By Approved as to form: ON 00, Morney for the oard of z Local Improvements of the, City of Evanston, Illinois HERBERT D. HILL 24497 ELLEN SZYMANSKI 54806 KATHLEEN BRENNIMAN 17030 CITY OF EVANSTON-LAW DEPT. 2100 RIDGE AVENUE EVANSTON, IL 60201 (708) 866-2937 0 ADHERING RESOLUTION • OF THE BOARD OF LOCAL IMPROVEMENTS RECOMMENDING THE IMPROVING OF THE ALLEY NORTH OF CRAIN STREET, EAST OF MCDANIEL AVENUE SPECIAL ASSESSMENT NUMBER 1406 WHEREAS, on July 11, 1994, a Resolution was adopted by the Board of Local Improvements of the City of Evanston, originating a local improvement in said City by providing for the following: The public alley in the block bounded by Dempster Street on the north, Crain Street on the south, McDaniel Avenue on the west and Fowler Avenue on the east in the City of Evanston be improved by excavating, constructing the necessary drainage system and paving with 8" Portland Cement Concrete Pavement to a width of fifteen feet (15'). WHEREAS, a public hearing was held by this Board on the 22nd day of March, 1995, on the question of the necessity of the proposed improvement, and • WHEREAS, all persons interested in said proposed improvement who desired to be heard were heard, and no sufficient reason or objection was given or made to the proposed improvement, and based on the proof submitted to this Board, this Board finds that good and sufficient notices of said public hearing were given and mailed as required by law. NOW, THEREFORE, BE IT AND IT IS HEREBY RESOLVED by the Board of Local Improvements of the City of Evanston, Cook County, Illinois; SECTION 1: That the aforesaid proposed local improvement described in the original resolution adopted the 11th day of July, 1994, and as shown on the plans attached to the original resolution and the estimate of the cost of said improvement, be adhered to. SECTION 2: That the ordinance now before this Board of Local Improvements and prepared at the request of the Board, be and the same is hereby approved and that each • member of the Board of Local Improvements be requested to sign the Recommendation • • attached to the said ordinance, recommending to the City Council of the City of Evanston the passage of said ordinance. SECTION 3: That the Secretary of the Board of Local Improvements be and he is hereby requested to deliver to City Council of the City of Evanston the ordinance for the said improvement, the estimate of the cost of said improvement as attached thereto together with the recommendation of this Board of Local Improvements, and that copies of said recommendation, estimate and ordinance be placed on file in the records of the Board of Local Improvements. SECTION 4: This resolution shall be in full force and effect from and after its passage and approval. �i ADOPTED THIS 22 day of /a1�G�ii „ 1995. BOARD OF LOCAL IMPR VEMENTS OF City of Evan on, III ois B a FILED IN MY OFFICE: /'V ,. This Z3 day of lvaa 4 1995 Secretary Approved as to form: 4 orney for the Board of Loc provements of t e City of Evanston, Illinois ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS To the Board of Local Improvements of the City of Evanston: Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore adopted, providing that the public alley in the block bounded by Dempster Street on the north, Crain Street on the south, McDaniel Avenue on the west and Fowler Avenue on the east in the City of Evanston be improved by excavating, constructing the necessary drainage system and paving with 8" Portland Cement Concrete Pavement at a width of fifteen feet (15'). Said improvement to be constructed in detail as specified in aforesaid Resolution. I herewith submit an estimate of cost of such improvement as described in said Resolution, including labor, materials and all other lawful expenses attending the proceedings for making said improvement and the cost of making and collecting the assessment therefore as provided by law, viz: QUANTITY 398 350 10 102 115 1110 20 230 233 11 UNIT Cu.Yd. Cu.Yd. Cu.Yd. Ton Sq.Yd. Sq.Yd. Ton Lin.Ft. Lin.Ft. Each 1 Each 85 Lin.Ft 220 Sq.Yd. 85 Lin.Ft 340 Sq.Ft. ESTIMATE OF COST ITEM UNIT PRICE COST Special Excavation $ Trench Backfill Sub -base Granular Material. Type B Granular Cradle Material, CA-11 Aggregate Base Course Type B, 6" Portland Cement Concrete Pavement, 8" Incidental Bituminous Surfacing Storm Sewer, Type 2 8" (ESVCP) Storm Sewer, Type 2 10" (ESVCP) Catch Basins, Type A. 4' Dia.. Type 5 Frame, Open Lid Manhole -Catch Basin Type A. 4' Dia., Type 5 Frame, Open Lid Concrete Curb. Type B Driveway Pavement Removal Curb Removal Sidewalk Removal 20.00 20.00 25.00 20.00 6.00 40.00 100.00 38.00 40.00 2,500.00 3,000.00 12.00 $ 7,960.00 7,000.00 250.00 2,040.00 690.00 44,400.00 2,000.00 8,740.00 9,320.00 10,000.00 3,000.00 1,020.00 10.00 2.200.00 4.00 340.00 1.00 340.00 • 0 • Page -2- Estimate of Engineer of Board of Local Improvements - S.A. 1406 (Alley N/Crain Street, E/McDaniel Avenue) OUANTITY UNIT ITEM UNIT PRICE COST 10 Sq.Yd. Pavement Removal & P.C.C. Repl. Special-9" (HES) 60.00 600.00 110 Sq.Yd. Portland Cement Concrete Driveway Pavement, 6" $ 35.00 $ 3,850.00 340 Sq.Ft. Portland Cement Concrete Sidewalk, 5" 4.00 1,360.00 1220 Sq.Yd. Protective Sealer 1.00 1,220.00 30 Ton Crushed Stone, CA-14 20.00 600.00 Cost of Engineering Services . . . . . . . . . . $4,811.85 For Lawful Expenses, etc . . . . . . . . . . . . .$4,811.85 . . . . . . . . . . . . . . . . . . . . . . . . . $9 , 623.70 RECAPITULATION • Total Cost of Construction . . . . . . . . . .$106,930.00 Cost of Engineering Services . . . . . . . . .$ 4,811.85 For Lawful Expenses. etc. . . . . . . . . . . $ 4,811.85 Total Cost of Improvement . . . . . . . . . . $116,553.70 I hereby certify that in my opinion the above estimate does not exceed the probable cost of the above proposed improvement and the lawful expenses attending the same. V 7���.. es S. Tonkinson ineer for the Board of Local Improvements of the City of Evanston • 0 • •