Loading...
HomeMy WebLinkAboutORDINANCES-1996-034-O-9634-0-96 • AN ORDINANCE FOR THE CONSTRUCTION OF A LOCAL IMPROVEMENT KNOWN AS EVANSTON SPECIAL ASSESSMENT NO. 1420 BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS: Section 1: That a local improvement shall be made within the City of Evanston, County of Cook and State of Illinois, the nature, character, locality and description of which is as follows, to -wit: The public alleys in the block bounded by South Boulevard on the north, Oakton Street on the south, Barton Avenue on the west and Ridge Avenue on the east in the City of Evanston, be improved by excavating, constructing the necessary drainage system and paving with 8" Portland Cement Concrete to a width of fifteen feet (15') on the east -west section of alley and nineteen feet (19') on the north -south section of alley. Section 2: That the Recommendation of this Ordinance by the Board of Local Improvements of the City of Evanston, Illinois, and the -Estimate of the cost of said • improvement made by the Engineer of said Board, both hereto attached, be and the same are hereby approved and by reference thereto made a part hereof. Section 3: That said improvement shall be made and the cost thereof, including the sum of One Hundred Eighty -Five Thousand Three Hundred Ten and 90/100ths Dollars ($185,310.90), being the cost of making and collecting the Assessment and all other expenses as provided by law, shall be paid for by Special Assessment in accordance with the Illinois Municipal Code, Chapter 65, Section 5/9-2-1 et seq., approved May 29, 1961 and all amendments thereto, and Chapter 15, Title 7 of the City Code of the City of Evanston, 1979, as amended. Section 4: That Ninety -Two Thousand Six Hundred Fifty -Five and 45/100ths Dollars ($92,655.45) of the cost of said improvement shall be allocated by the City, and the remainder of Ninety -Two Thousand Six Hundred Fifty -Five and 45/100ths Dollars ($92,655.45) as private benefit. Section 5: -That the aggregate amount to be assessed and each individual assessment shall be divided into ten installments in the manner provided by law, and each of said installments shall bear interest at the rate of seven per cent (7%) per annum from sixty (60) days after the date of the first voucher issued on account of work done upon said proposed improvement. • Section 6: That for the purpose of anticipating the collection of the installments of said assessment levied against the real estate benefited thereby, bonds shall be issued payable out of said installments, bearing interest at the rate of seven per cent (7%) per . annum, payable annually and signed on behalf of the City of Evanston, Illinois, by its Mayor and attested by its City Clerk and its corporate seal affixed thereto; and each interest coupon attached to said bonds shall likewise be executed by and shall bear the official or facsimile signature of the same officers who signed said bonds and who if facsimile signatures are used, do adopt by their execution of said bonds as and for their proper signatures their respective facsimile signatures appearing on said coupons; and that said bonds shall be issued in accordance with and shall in all respects conform to the provisions of an Act of the General Assembly of the State of Illinois, known as the "Illinois Municipal Code," effective July 1, 1961 and the Amendments thereto. Section 7: That David H. Barber, President of the Board of Local Improvements of the City of Evanston, Illinois, be and he is hereby directed to file a Petition in the County Court of Cook County, Illinois, praying that steps may be taken to levy a Special Assessment to pay the cost of said improvement in accordance with the provisions of this Ordinance and in the manner prescribed by law. Section 8: That all Ordinances or parts of Ordinances conflicting with this Ordinance be and the same are hereby repealed. Section 9: That this Ordinance shall be in force and effect from and after its passage, approval, and publication in the manner provided by law. Adopted by the City Council of the City of Evanston, Illinois, on thea,�,,—day • of , 1996. I r / City Clerk Appr ed , 1996 Mayor i prved as to form:torney for the Board# Local provements of the City of Evanston, Illinois 0 SPECIAL ASSESSMENT NO. 1420 RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS The Board of Local Improvements of the City of Evanston, Illinois, herewith submits the draft of an Ordinance for the making of a local improvement within the City of Evanston, County of Cook and State of Illinois, the nature, character, locality and description of which is as follows, to -wit: The public alleys in the block bounded by South Boulevard on the north, Oakton Street on the south, Barton Avenue on the west and Ridge Avenue on the east in the City of Evanston, be improved by excavating, constructing the necessary drainage system and paving with 8" Portland Cement Concrete to a width of fifteen feet (151) on the east -west section of alley and nineteen feet (191) on the north -south section of alley. and as part of said Ordinance and in conjunction therewith, said Board also herewith submits the Plans and Specifications of an Estimate of the cost of said improvement, including the cost of engineering services, as finally determined by said Board; and said M Board hereby recommends the passage of said Ordinance and the making of the improvement described therein. is Respectfully submitted, jopcLalImprovements d as to form: torney for the �oard of of the City of Evanston, Illinois HERBERT D. HILL 24497 ELLEN SZYMANSKI 54806 KATHLEEN BRENNIMAN 17030 CITY OF EVANSTON-LAW DEPT. 2100 RIDGE AVENUE EVANSTON, IL 60201 (847) 866-2937 0 BOARD .F . LOCAL IMPROVEMEikTS MIA10 � 1 AE ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS • The Board of Local Improvements of the City of Evanston: Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore adopted, providing that the public alleys in the block bounded by South Boulevard on the north, Oakton Street on the south, Barton Avenue on the west and Ridge Avenue on the east in the City of Evanston be improved by excavating, constructing the necessary drainage system and paving with 8" Portland Cement Concrete Pavement at a width of fifteen feet (15') on the east -west section of alley and nineteen feet (19') on the north -south section of alley. Said improvement to be constructed in detail as specified in aforementioned Resolution. I herewith submit an estimate of cost of such improvement as described in said Resolution, including labor, materials and all other lawful expenses attending the proceedings for making said improvement and the cost of making and collecting the assessment therefore as provided by law, viz: ESTIMATE OF COST ITEM Special Excavation Trench Backfill Sub -Base Granular Material, Type B Granular Cradle Material, CA - 11 Aggregate Base Course, Type B, 6" Incidental Bituminous Surfacing Portland Cement Concrete Pavement, 8" Storm Sewers, Special, 8" (DIP/CL 50) Storm Sewers, Special, 12" (DIP/CL 50) Storm Sewers, Type 2, 8" (ESVCP) Storm Sewers, Type 2, 10" (ESVCP) Catchbasins, Type A. 4" Diameter, Type 5 Frame, Open Lid Catchbasin, Type A, 4" Diameter, Type 5 Frame, Open Lid (Restrictor and Trap) Combination Concrete Curb and Gutter, Type B 6.12 Concrete Curb, Type B Combination Concrete Curb and Gutter Removal Curb Removal Driveway Pavement Removal Sidewalk Removal Portland Cement Concrete Driveway Pavement, 6" UNIT QUANTITY PRICE COST • CU.YD. 442 20.00 $8,840.0t, CU.YD. 486 20.00 $9,720.00 CU.YD. 10 25.00 $250.00 TON 115 20.00 $2,300.00 SQ.YD. 55 6.00 $330.00 TON 25 100.00 $2,500.00 SQ.YD. 1755 40.00 $70,200.00 LIN.FT. 43 60.00 $2,580.00 LIN.FT. 74 75.00 $5,550.00 LIN.FT. 176 35.00 $6,160.00 LIN.FT. 352 40.00 $14,080.00 EACH 6 2500.00 $15,000.00 EACH 2 2750.00 $5,500.00 LIN.FT. 25 15.00 $375.00 LIN.FT. 165 11.00 $1,815.00 LIN.FT. 25 4.00 $100.00 LIN.FT. 95 4.00 $380.00 SQ.YD. 410 10.00 $4,100.00 SQ.FT. 675 1.00 $675.00 SQ.YD. 315 35.00 $11,025.00 Page -2- Estimate of Engineer of Board of Local Improvement - S.A. 1420 Alley N/Oakton Street, E/Barton Avenue Portland Cement Concrete Sidewalk, 5" Protective Sealer Crushed Stone, CA - 14 Tree Removal (6 to 15 IN. Diameter) Pavement Removal & P.C.C. Replacement Special 9" (H.E.S.) SQ.FT. 675 4.00 $2,700.00 SQ.YD 2070 1.00 $2,070.00 TON 30 20.00 $600.00 IN.DIA. 76 35.00 $2,660.00 SQ.YD. 10 50.00 $500.00 Cost of Engineering Services ........ $ 7,650.45 For Lawful Expenses, etc. .......... 7,650.45 ....................................$15,300.90 RECAPITULATION Total Cost of Construction ......... $170,010.00 Cost of Engineering Services....... 7,650.45 For Lawful Expenses, etc. ......... 7,650.45 Total Cost of Improvement .......... $185,310.90 I hereby certify that in my opinion the above estimate does not exceed the probable • cost of the above proposed improvement and the lawful expenses attending the same. J es S. Tonkinson ngineer for the Board of Local Improvements of the City of Evanston is 4- • • .7