HomeMy WebLinkAboutORDINANCES-1999-025-O-9925-0-99
AN ORDINANCE
FOR THE CONSTRUCTION OF A LOCAL IMPROVEMENT
KNOWN AS
EVANSTON SPECIAL ASSESSMENT NO. 1433
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF EVANSTON,
ILLINOIS:
Section 1: That a local improvement shall be made within the City of
Evanston, County of Cook and State of Illinois, the nature, character, locality and
description of which is as follows, to -wit:
The public alley in the block bounded by Nathaniel Place on the
north, Lee Street on the south, Fowler Avenue on the west and
Pitner Avenue on the east, in the City of Evanston, be improved by
excavating, constructing the necessary drainage system and
paving with 8" Portland Cement Concrete Pavement to a width of
fifteen feet (15').
•Section 2: That the Recommendation of this Ordinance by the Board of Local
Improvements of the City of Evanston, Illinois, and the Estimate of the cost of said
improvement made by the Engineer of said Board, both hereto attached, be and the same
are hereby approved and by reference thereto made a part hereof.
Section 3: That said improvement shall be made and the cost thereof,
including the sum of One Hundred Two Thousand Six Hundred and 62/100ths Dollars
($102,600.62), being the cost of making and collecting the Assessment and all other
expenses as provided by law, shall be paid for by Special Assessment in accordance with
the Illinois Municipal Code, Chapter 65, Section 5/9-2-1 et seq., approved May 29, 1961
and all amendments thereto, and Chapter 15, Title 7 of the City Code of the City of
Evanston, 1979, as amended.
Section 4: That Fifty-one Thousand Three Hundred and 31/100ths Dollars
($51,300.31) of the cost of said improvement shall be allocated by the City, and the
remainder of Fifty-one Thousand Three Hundred and 31 /100ths Dollars ($51,300.31) as
private benefit.
Section 5: That the aggregate amount to be assessed and each individual
assessment shall be divided into ten installments in the manner provided by law, and each
•of said installments shall bear interest at the rate of seven per cent (7%) per annum from
sixty (60) days after the date of the first voucher issued on account of work done upon said
proposed improvement.
Section 6: That for the purpose of anticipating the collection of the installments •
of said assessment levied against the real estate benefited thereby, general obligation
bonds have been issued, fifty per cent (50%) of which are payable by the City and fifty per
cent (50%) of which are payable out of said installments, bearing interest at the rate of
seven per cent-(7%) per annum, payable annually and signed on behalf of the City of
Evanston, Illinois, by its Mayor and attested by its City Clerk and its corporate seal affixed
thereto; and each interest coupon attached to said bonds shall likewise be executed by
and shall bear the official or facsimile signature of the same officers who signed said bonds
and who if facsimile signatures are used, do adopt by their execution of said bonds as and
fortheir proper signatures their respective facsimile signatures appearing on said coupons;
and that said bonds shall be issued in accordance with and shall in all respects conform
to the provisions of an Act of the General Assembly of the State of Illinois, known as the
"Illinois Municipal Code," effective July 1, 1961 and the Amendments thereto.
Section 7: That Vanessa Burns, President of the Board of Local Improvements
of the City of Evanston, Illinois, be andShe is hereby directed to file a Petition in the County
Court of Cook County, Illinois, praying that steps may be taken to levy a Special
Assessment to pay the cost of said improvement in accordance with the provisions of this
Ordinance and in the manner prescribed by law.
Section 8: That all Ordinances or parts of Ordinances conflicting with this
Ordinance be and the same are hereby repealed. •
Section 9: That this Ordinance shall be in force and effect from and after its
passage, approval, and publication in the manner provided by law.
Adopted by the City Council of the City of Evanston, Illinois, on the -2f4Aday
` ri
of ufk , 1999.
�tt'.�,�-ter 1.'; �I�il,�,�►�
C�UClerk
ApproW t ' �3 , 1999
ayor pro tem
Appro ed as tctform:
A rney for the Board o cal Improve-
ments of the City of Evanston, Illinois
0
•
SPECIAL ASSESSMENT NO. 1433
RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board of Local Improvements of the City of Evanston, Illinois, herewith submits
the draft of an Ordinance for the making of a local improvement within the City of Evanston,
County of Cook and State of Illinois, the nature, character, locality and description of which
is as follows, to -wit: -
The public alley in the block bounded by Nathaniel Place on the north, Lee
Street on the south, Fowler Avenue on the west and Pitner Avenue on the
east, in the City of Evanston, be improved by excavating, constructing the
necessary drainage system and paving with 8" Portland Cement Concrete
Pavement to a width of fifteen feet (15').
and as part of said Ordinance and in conjunction therewith, said Board also herewith
submits the Plans and Specifications of an Estimate of the cost of said improvement,
including the cost of engineering services, as finally determined by said Board; and said
Board hereby recommends the passage of said Ordinance and the making of the
improvement described therein.
Approved as to form:
tpvemeros
orney fr the Board f Local Im-
of City of Evanston, Illinois
HERBERT D. HILL 24497
ELLEN SZYMANSKI 54806
KATHLEEN BRENNIMAN 17030
CITY OF EVANSTON-LAW DEPT.
2100 RIDGE AVENUE
EVANSTON, IL 60201
(847) 866-2937
Respectfully submitted,
BOARD OF LOCAL IMPROVEMENTS
OF THE City of Evanston, Illinois
ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston:
•
Pursuant to a Resolution of the Board of Local Improvements of the City
of Evanston, heretofore adopted,
providing that the public alley in the block bounded by Nathaniel Place on the north, Lee Street on the
south, Fowler Avenue on the west and Pitner Avenue on the east, in the City of Evanston, be improved by
excavating, constructing the necessary drainage system and paving with 8"
Portland Cement Concrete
Pavement to a width of fifteen feet (15').
Said improvement to be constructed in detail as specified in aforesaid Resolution.
I, herewith submit an estimate of cost of such improvement as described in
said Resolution,
including labor,
materials, and all other lawful expenses attending the proceedings for making said improvement
and the
cost of making and collecting the assessment therefore as provided by law, viz:
COST ESTIMATE
UNIT
ITEM UNIT OUANTITY
PRICE
TOTAL
Earth Excavation Cu.Yd. 200
$50.00
$10,000.00
Trench Backfill Cu.Yd. 146
$30.00
$4,380.00
Sub -Base Granular
Material, Type B Cu.Yd. 10
$40.00
$400.00
Granular Cradle
Material, CA -I I Ton 57
$20.00
$1,140.00
Aggregate Base Course,
•
Type B, 4" Sq.Yd. 10
$8.00
$80.00
Aggregate Base Course,
Type B, 6" Sq.Yd. 47
$10.00
$470.00
Incidental Bituminous
Surfacing Ton 16
$150.00
$2,400.00
Portland Cement Concrete
Pavement - 8" Sq.Yd. 910
$46.00
$41,860.00
Storm Sewers, 10", Type
1, (R.C.P./CLV) Lin. Ft. 249
$36.00
$8,964.00
Storm Sewers, Special, 8",
(D.I.P./CL50) Lin.Ft. 18
$45.00
$810.00
Storm Sewers, Special, 10",
(D.I.P./CL50) Lin.Ft. 30
$50.00
$1,500.00
Catch basins, Type A, 4' Diameter,
Type I Frame, Open Lid Each 2
$1,800.00
$3,600.00
Manhole, Type A, 4' Diameter,
Type I Frame, Open Lid Each 1
$1,800.00
$1,800.00
Inlet, Type A, Type 1 Frame,
Open Lid Each 1
$900.00
$900.00
Concrete Curb, Type B Ft. 125
$15.00
$1,875.00
Pavement Removal Sq. Yd. 70
$12.00
$840.00
Curb Removal Ft. 125
$4.00
$500.00
•
Driveway Pavement Removal Sq. Yd. 175
$8.00
$1,400.00
Sidewalk Removal Sq. Ft. 335
$1.00
$335.00
Page -2-
•Estimate of Engineer of BLI - S.A. 1433
(Alley N/Lee Street, E/Fowler Avenue)
ITEM
Portland Cement Concrete
Driveway Pavement, 6"
Portland Cement Concrete
Sidewalk, 5"
Protective Sealer
Crushed Stone, CA-14
Furnishing and Placing
Topsoil, 3"
Sodding, Salt Tolerant
Material Testing and
Inspection
UNIT
UNIT OUANTITY PRICE TOTAL
Sq.Yd.
130
$40.00
$5,200.00
Sq.Ft.
335
$5.00
$1,675.00
Sq.Yd.
1040
$1.00
$1,040.00
Ton
12
$25.00
$300.00
Sq. Yd.
60
$4.00
$240.00
Sq. Yd.
60
$7.00
$420.00
Lsum
1
$2,000.00
$2,000.00
Cost of Engineering Services ..................$4,235.81
For Lawful Expenses, etc . ....................... $4,235.81
.................................................................$8,471.62
RECAPITULATION
Total Cost of Construction ......................
$94,129.00
Cost of Engineering Services ...................$4,235.81
For Lawful Expenses, etc . ......................$4,235.81
Total Cost of Improvement......................$102,600.62
I hereby certify that in my opinion the above estimate does not exceed the probable cost of the above
proposed improvement and the lawful expenses attending the same.
,,_.,,,,James S. Tonkinson
Engineer for the Board of Local
Improvements of the City of Evanston
0 ntp 1433