HomeMy WebLinkAboutORDINANCES-2003-007-O-037-0-03
AN ORDINANCE
• FOR THE CONSTRUCTION OF A LOCAL IMPROVEMENT
KNOWN AS
EVANSTON SPECIAL ASSESSMENT NO. 1450
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF EVANSTON,
ILLINOIS:
Section 1: That a local improvement shall be made within the City of Evanston,
County of Cook and State of Illinois, the nature, character, locality and description of which
is as follows, to -wit:
That the unimproved public alley in the block bounded by Hull Terrace on the
north, Mulford Street on the south, Asbury Avenue on the west, and Barton
Avenue on the east, in the City of Evanston, be improved by excavating,
constructing the necessary drainage system and paving with 8" Portland
Cement Concrete pavement to a width of nineteen feet (19").
Section 2: That the Recommendation of this Ordinance by the Board of Local
Improvements of the City of Evanston, Illinois, and the Estimate of the cost of said
improvement made by the Engineer of said Board, both hereto attached, be and the same
•
are hereby approved and by reference thereto made a part hereof.
Section 3: That said improvement shall be made and the cost thereof,
including the sum of Ninety Thousand Six Hundred Fifty-nine and 66/100ths Dollars
($90,659.66), being the cost of making and collecting the Assessment and all other
expenses as provided by law, shall be paid for by Special Assessment in accordance with
the Illinois Municipal Code, Chapter 65, Section 5/9-2-1 et seq., approved May 29, 1961
and all amendments thereto, and Chapter 15, Title 7 of the City Code of the City of
Evanston, 1979, as amended.
Section 4: That Forty -Five Thousand Three Hundred Twenty-nine and
83/100ths Dollars ($45,329.83) of the cost of said improvement shall be allocated by the
City, and the remainder of Forty -Five Thousand Three Hundred Twenty-nine and 83/100ths
Dollars ($45,329.83) as private benefit.
Section 5: That the aggregate amount to be assessed and each individual
assessment shall be divided into ten installments in the manner provided by law, and each
of said installments shall bear interest at the rate of seven per cent (7%) per annum from
sixty (60) days after the date of the first voucher issued on account of work done upon said
• proposed improvement.
Section 6: That for the purpose of anticipating the collection of the
installments of said assessment levied against the real estate benefited thereby, general
obligation bonds have been issued, fifty per cent (50%) of which are payable by the City
and fifty per cent (50%) of which are payable out of said installments, bearing interest at
the rate of seven per cent (7%) per annum, payable annually and signed on behalf of the
City of Evanston, Illinois, by its Mayor and attested by its City Clerk and its corporate seal
affixed thereto; and each interest coupon attached to said bonds shall likewise be executed •
by and shall bear the official or facsimile signature of the same officers who signed said
bonds and who if facsimile signatures are used, do adopt by their execution of said bonds
as and for their proper signatures their respective facsimile signatures appearing on said
coupons; and that said bonds shall be issued in accordance with and shall in all respects
conform to the provisions of an Act of the General Assembly of the State of Illinois, known
as the "Illinois Municipal Code," effective July 1, 1961 and the Amendments thereto.
Section 7: That David Jennings, President of the Board of Local
Improvements of the City of Evanston, Illinois, be and he is hereby directed to file a Petition
in the County Court of Cook County, Illinois, praying that steps may be taken to levy a
Special Assessment to pay the cost of said improvement in accordance with the provisions
of this Ordinance and in the manner prescribed by law.
Section 8: That all Ordinances or parts of Ordinances conflicting with this
Ordinance be and the same are hereby repealed.
Section 9: That this Ordinance shall be in force and effect from and after its
passage, approval, and publication in the manner provided by law.
Introduced: F�)J4�ua,,LL2003
Adopted: v , 2003 •
i
Approved:
'2003
Mayor
ATTEST: J
C)Vraj
' Clerk
Appro ed s fora:
_j,
Corporation Counsel
•
r
Ll
ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore adopted,
providing that the unimproved public alley in the block bounded by Hull Terrace on the north, Mulford
Street on the south, Asbury Avenue on the west and Barton Avenue on the east, in the City of Evanston, be
improved by excavating, constructing the necessary drainage system and paving with 8" Portland Cement
Concrete Pavement to a width of nineteen feet (19').
Said improvement to be constructed in detail as specified in aforesaid Resolution.
I, herewith submit an estimate of cost of such improvement as described in said Resolution, including
labor, materials, and all other lawful expenses attending the proceedings for making said improvement and
the cost of making and collecting the assessment therefore as provided by law, viz:
ITEM UNIT
Earth Excavation
Cu.Yd.
Trench Backfill
Cu.Yd.
Sub -Base Granular
Material, Type B
Cu.Yd.
Granular Cradle
Material, CA-11
Ton
Aggregate Base Course,
Type B, 6"
Sq.Yd.
Incidental Bituminous
Surfacing
Ton
Portland Cement Concrete
Pavement - 8"
Sq.Yd.
Storm Sewers, Special, 10",
(D.I.P./ CL 50)
Lin.Ft.
Catch basins, Type A, 4' Diameter,
Type 1 Frame, Open Lid
Each
Inlet, Type A, Type 1 Frame,
Open Lid
Each
Manholes To Be Adjusted
Each
Concrete Curb, Type B
Ft.
Curb Removal
Ft.
Driveway Pavement
Removal
Sq.Yd.
COST ESTIMATE
QUANTITY
241
74
10
58
25
10
770
259
1
UNIT
PRICE
$45.00
$30.00
$30.00
$23.00
$8.00
$130.00
$42.00
$60.00
$2,500.00
TOTAL
$10,845.00
$2,220.00
$300.00
$1,334.00
$200.00
$1,300.00
$32,340.00
$15,540.00
$2,500.00
2 $1,000.00
$2,000.00
1 $300.00
$300.00
75 $12.00
$900.00
75 $4.00
$300.00
155 $12.00
$1,860.00
M
Page -2- •
Estimate of Engineer of BLI - S.A. 1450
(Alley N/Mulford Street, E/Asbury Avenue)
UNIT
ITEM
UNIT
OUANTITY
PRICE
TOTAL
Sidewalk Removal
Sq. Ft.
270
$1.00
$270.00
Portland Cement Concrete
Driveway Pavement, 6"
Sq.Yd.
135
$40.00
$5,400.00
Portland Cement Concrete
Sidewalk, 5"
Sq.Ft.
270
$5.00
$1,350.00
Protective Sealer
Sq.Yd.
905
$1.00
$905.00
Crushed Stone, CA-14
Ton
10
$25.00
$250.00
Bituminous Surface Removal
Sq.Yd.
55
$12.00
$660.00
Furnishing and Placing
Topsoil, 3"
Sq.Yd.
40
$3.00
$120.00
Sodding, Salt Tolerant
Sq.Yd.
40
$7.00
$280.00
Material Testing and
Inspection
Lsum
1
$2,000.00
$2,000.00
Cost of Engineering Services ..................$3,742.83
For Lawful Expenses, etc . ....................... $3,742.83 •
..................................................................$75485.66
RECAPITULATION
Total Cost of Construction ...................... $83,174.00
Cost of Engineering Services ...................$3,742.83
For Lawful Expenses, etc . ...................... $3,742.83
Total Cost of Improvement......................$90,659.66
I hereby certify that in my opinion the above estimate does not exceed the probable cost of the above
proposed improvement and the lawful expenses attending the same.
Keith Fujihara
Engineer for the Board of Local
Improvements.
Bli_ntp1450 0
SPECIAL ASSESSMENT NO. 1450
• RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board of Local Improvements of the City of Evanston, Illinois, herewith submits
the draft of an Ordinance for the making of a local improvement within the City of Evanston,
County of Cook and State of Illinois, the nature, character, locality and description of which
is as follows, to -wit:
That the unimproved public alley in the block bounded by Hull Terrace on the
north, Mulford Street on the south, Asbury Avenue on the west, and Barton
Avenue on the east, in the City of Evanston, be improved by excavating,
constructing the necessary drainage system and paving with 8" Portland
Cement Concrete pavement to a width of nineteen feet (19").
and as part of said Ordinance and in conjunction therewith, said Board also herewith
submits the Plans and Specifications of an Estimate of the cost of said improvement,
including the cost of engineering services, as finally determined by said Board; and said
Board hereby recommends the passage of said Ordinance and the making of the
improvement described therein.
• Respectfully submitted,
BOARD OF LOCAL IMPROVEMENTS
OF THE City of Evanston, Illinois
Byj�. QO
Approved as to form:
A>�forney for the Board �f Local Im-
provements of City of Evanston, Illinois
HERBERT D. HILL
24497
ELLEN SZYMANSKI
54806
KATHLEEN BRENNIMAN
17030
KAREN GILKESON
38364
CITY OF EVANSTON -- LAW
DEPT.
2100 RIDGE AVENUE
EVANSTON, IL 60201
• (847) 866-2937
r�
u
0
0