HomeMy WebLinkAboutORDINANCES-2004-019-O-0419-0-04
• AN ORDINANCE
FOR THE CONSTRUCTION OF A LOCAL IMPROVEMENT
KNOWN AS
EVANSTON SPECIAL ASSESSMENT NO. 1460
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF EVANSTON,
ILLINOIS:
SECTION 1: That a local improvement shall be made within the City of
Evanston, County of Cook and State of Illinois, the nature, character, locality and
description of which is as follows, to -wit:
That the unimproved public alley in the block bounded by Park Place on the
north, Hartzell Street on the south, Lincolnwood Drive on the west, and
Reese Avenue on the east, in the City of Evanston, be improved by
excavating, constructing the necessary drainage system and paving with
8" Portland Cement Concrete Pavement, North -South leg to a width of fifteen
feet (15') and East-West Leg to a width of nine feet (9').
• SECTION 2: That the Recommendation of this Ordinance by the Board of
Local Improvements of the City of Evanston, Illinois, and the Estimate of the cost of said
improvement made by the Engineer of said Board, both hereto �ttached, be and the same
are hereby approved and by reference thereto made a part hereof.
SECTION 3: That said improvement shall be made and the cost thereof,
including the sum of One Hundred Twenty -Four Thousand Seven Hundred Sixty-four and
12/100ths Dollars ($124,764.12), being the cost of making and collecting the Assessment
and all other expenses as provided by law, shall be paid for by Special Assessment in
accordance with the Illinois Municipal Code, Chapter 65, Section 5/9-2-1 et seq., approved
May 29, 1961 and all amendments thereto, and Chapter 15, Title 7 of the City Code of the
City of Evanston, 1979, as amended.
SECTION 4: That Sixty -Two Thousand Three Hundred Eighty-two and
06/100ths Dollars ($62,382.06) of the cost of said improvement shall be allocated by the
City, and the remainder of Sixty -Two Thousand Three Hundred Eighty-two and 06/100ths
Dollars ($62,382.06) as private benefit.
SECTION 5: That the aggregate amount to be assessed and each individual
assessment shall be divided into ten installments in the manner provided by law, and each
of said installments shall bear interest at the rate of seven per cent (7%) per annum from
• sixty (60) days after the date of the first voucher issued on account of work done upon said
proposed improvement.
SECTION 6: That for the purpose of anticipating the collection of the
installments of said assessment levied against the real estate benefited thereby, general
obligation bonds have been issued, fifty per cent (50%) of which are payable by the City
and fifty per cent (50%) of which are payable out of said installments, bearing interest at
the rate of seven per cent (7%) per annum, payable annually and signed on behalf of the
City of Evanston, Illinois, by its Mayor and attested by its City Clerk and its corporate seal
affixed thereto; and each interest coupon attached to said bonds shall likewise be executed
by and shall bear the official or facsimile signature of the same officers who signed said
bonds and who if facsimile signatures are used, do adopt by their execution of said bonds
as and for their proper signatures their respective facsimile signatures appearing on said
coupons; and that said bonds shall be issued in accordance with and shall in all respects
conform to the provisions of an Act of the General Assembly of the State of Illinois, known
as the "Illinois Municipal Code," effective July 1, 1961 and the Amendments thereto.
SECTION 7: That David Jennings, President of the Board of Local
Improvements of the City of Evanston, Illinois, be and he is hereby directed to file a Petition
in the County Court of Cook County, Illinois, praying that steps may be taken to levy a
Special Assessment to pay the cost of said improvement in accordance with the provisions
of this Ordinance and in the manner prescribed by law.
SECTION 8: That all Ordinances or parts of Ordinances conflicting with this
Ordinance be and the same are hereby repealed.
SECTION 9: That this Ordinance shall be in force and effect from and after
its passage, approval, and publication in the manner provided by law.
Adopted by the City Council of the City of Evanston, Illinois, on the Ct l day
of htCl, 2004.
C1 le
Ap roved t �' �� , 2004
Mayor
Approved as to form:
J
ttorney for the Boarc`of Local Improve-
ments of the City of Evanston, Illinois
•
•
SPECIAL ASSESSMENT NO. 1460
• RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board of Local Improvements of the City of Evanston, Illinois, herewith submits
the draft of an Ordinance for the making of a local improvement within the City of
Evanston, County of Cook and State of Illinois, the nature, character, locality and
description of which is as follows, to -wit:
That the unimproved public alley in the block bounded by Park Place on the
north, Hartzell Street on the south, Lincolnwood Drive on the west, and
Reese Avenue on the east, in the City of Evanston, be improved by
excavating, constructing the necessary drainage system and paving with
8" Portland Cement Concrete Pavement, North -South leg to a width of fifteen
feet (15') and East-West Leg to a width of nine feet (9').
and as part of said Ordinance and in conjunction therewith, said Board also herewith
submits the Plans and Specifications of an Estimate of the cost of said improvement,
including the cost of engineering services, as finally determined by said Board; and said
Board hereby recommends the passage of said Ordinance and the making of the
improvement described therein.
• Respectfully submitted,
BOARD OF LOCAL IMPROVEMENTS
OF THE City of Evanston, Illinois
By�,
Approved as to form: _
A orney for the Board o Local Im- _
provements of City of Evanston, Illinois
HERBERT D. HILL
24497t.�����
ELLEN SZYMANSKI
54806 /
KATHLEEN BRENNIMAN
17030
ELKE TOBER
40107
CITY OF EVANSTON -- LAW DEPT.
2100 RIDGE AVENUE
EVANSTON, IL 60201
• (847) 866-2937
ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore
adopted, providing that the unimproved public alley in the block bounded by Park Place on the north,
Hartzell Street on the south, Lincolnwood Drive on the west, and Reese Avenue on the east, in the City
of Evanston, be improved by excavating, constructing the necessary drainage system and paving with 8"
Portland Cement Concrete Pavement, North -South leg to a width of fifteen feet (15') and East-West leg
to a width of nine feet (9').
Said improvement to be constructed in detail as specified in aforesaid Resolution.
I, herewith submit an estimate of cost of such improvement as described in said Resolution, including
labor, materials, and all other lawful expenses attending the proceedings for making said improvement
and the cost of making and collecting the assessment therefore as provided by law, viz:
COST ESTIMATE
UNIT
ITEM
UNIT
OUANTITY
PRICE
TOTAL
Earth Excavation
Cu.Yd.
225
$50.00
$11,250.00
Trench Backfill
Cu.Yd.
258
$30.00
$7,740.00
Sub -Base Granular
Material, Type B
Cu.Yd.
10
$30.00
$300.00
Granular Cradle
Material, CA -I I
Ton
95
$27.00
$2,565.00
Aggregate Base Course,
Type B, 4"
Sq.Yd.
10
$6.00
$60.00
Incidental Bituminous
Surfacing
Ton
10
$140.00
$1,400.00
Portland Cement Concrete
Pavement- 8"
Sq.Yd.
780
$45.00
$35,100.00
Storm Sewers, 10", Type 1,
(R.C.P./ CL V)
Lin.Ft.
333
$45.00
$14,985.00
Storm Sewers, Special, 8",
(D.I.P./ CL 50)
Lin.Ft.
75
$65.00
$4,875.00
Storm Sewers, Special, 10",
(D.I.P./ CL 50)
Lin.Ft.
24
$75.00
$1,800.00
Catch basins, Type A, 4' Diameter,
Type I Frame, Open Lid
(with Restrictor)
Each
1
$4,000.00
$4,000.00
Catch basins, Type A, 4' Diameter,
Type 1 Frame, Open Lid
Each
1
$2,800.00
$2,800.00
Manholes, Type A, 4' Diameter,
Type 1 Frame, Open Lid
Each
1
$2,800.00
$2,800.00
Inlet, Type A, Type 1 Frame,
Open Lid
Each
5
$1,300.00
$6,500.00
Concrete Curb, Type B
Ft.
120
$15.00
$1,800.00
Curb Removal
Ft.
60
$5.00
$300.00
Pavement Removal
Sq.Yd.
30
$15.00
$450.00
is
Page -2-
Estimate of Engineer of BLI - S.A. 1460 •
(Alley N/Hartzell, E/Lincolnwood Drive)
•
ITEM UNIT
Driveway Pavement
Removal
Sq.Yd.
Sidewalk Removal
Sq. Ft.
Portland Cement Concrete
Driveway Pavement, 6"
Sq.Yd.
Portland Cement Concrete
Sidewalk, 5"
Sq. Ft.
Pavement Removal & PCC
Replacement, Special-9"(HES)
Sq.Yd.
Protective Sealer
Sq.Yd.
Crushed Stone, CA-14
Ton
Bituminous Surface Removal
Sq.Yd.
Furnishing and Placing
Topsoil, 3"
Sq.Yd.
Sodding, Salt Tolerant
Sq.Yd.
Material Testing and
Inspection
Lsum
UNIT
OUANTITY
PRICE
TOTAL
155
$13.00
$2,015.00
210
$1.00
$210.00
155
$42.00
$6,510.00
210
$5.00
$1,050.00
10
$90.00
$900.00
935
$1.50
$1,402.50
20
$30.00
$600.00
40
$10.00
$400.00
65
$3.00
$195.00
65
$7.00
$455.00
$2,000.00 $2,000.00
Cost of Engineering Services ..................$5,150.81
For Lawful Expenses, etc . ....................... $5,150.81
.................................................................$10,301.62
RECAPITULATION
Total Cost of Construction ...................... $114,462.50
Cost of Engineering Services ...................$5,150.81
For Lawful Expenses, etc . ......................$5,150.81
Total Cost of Improvement......................$124,764.12
I hereby certify that in my opinion the above estimate does not exceed the probable cost of the above
proposed improvement and the lawful expenses attending the same.
KeithYuj ihara
• Engineer for the Board of Local
Improvements
Bli_ntp 1460