HomeMy WebLinkAboutORDINANCES-2005-079-O-05•
6/14/2005
79-0-05
AN ORDINANCE
FOR THE CONSTRUCTION OF A LOCAL IMPROVEMENT
KNOWN AS EVANSTON SPECIAL ASSESSMENT NO. 1470
BE IT ORDAINED BY THE CITY COUNCIL, THE CITY OF
EVANSTON, ILLINOIS:
SECTION 1: That a local improvement shall be made within the
City of Evanston, County of Cook, and State of Illinois_ , the nature, character,
locality and description of which is as follows, to -wit:
That the unimproved public alley in the block bounded
by Emerson Street on the north, Lyons Street on the
south, Dodge Avenue on the west, and Darrow
Avenue on the east, in the City of Evanston, be
improved by excavating, constructing the necessary
• drainage system and paving with 8" Portland Cement
Concrete Pavement to a width of fifteen feet (15').
SECTION 2: That the Recommendation of this Ordinance by the
Board of Local Improvements of the City of Evanston, Illinois, and the Estimate of
the cost of said improvements made by the Engineer of said Board, both hereto
attached, be and the same are hereby approved and by reference thereto made
a part hereof.
SECTION 3: That said improvement shall be made and cost
thereof, including the sum of One Hundred Ninety -Nine Thousand Eight
Hundred Sixty and 76/100ths dollars ($199,860.76), being the cost of making
and collecting the Assessment and all other expenses as provided by law, shall
be paid for by Special Assessment in accordance with the Illinois Municipal
Code, Chapter 65, Section 5/9-2-1 et seq., approved May 29, 1961, and all
amendments thereto, and Chapter 15, Title 7 of the City Code of the City of
Evanston, 1979, as amended.
SECTION 4: That Ninety -Nine Thousand Nine Hundred Thirty and
38/100ths dollars ($99,930.38) of the cost of said improvement shall be allocated
by the City, and Ninety -Nine Thousand Nine Hundred Thirty and 38/100ths
• dollars ($99,930.38) of the cost of said improvement as private benefit.
79-0-05
SECTION 5: That the aggregate re ate amount to be assessed and each •
individual assessment shall be divided into ten installments in the manner
provided by law, and each of said installments shall bear interest at the rate of
seven percent (7%) per annum from sixty (60) days after the date of the first
voucher issued on account of work done upon said proposed improvement.
SECTION 6: That for the purpose of anticipating the collection of
the installments of said assessment levied against the real estate benefited
thereby, general obligation bonds have been issued, fifty percent (50%) of which
are payable out of said installments, bearing interest at the rate of seven percent
(7%) per annum, payable annually and signed on behalf of the City of Evanston,
Illinois, by its Mayor and attested by its City Clerk, and its corporate seal affixed
thereto; and each interest coupon attached to said bonds shall likewise be
executed by and shall bear the official facsimile signature of the same officers
who signed said bonds, and who if facsimile signatures are used, do adopt by
their execution of said bonds as and for their proper signatures their respective
facsimile signatures appearing on said coupons; and that said bonds shall be
issued in accordance with and shall in all respects conform to the provisions of
an Act of the General Assembly of the State of Illinois, known as the "Illinois
Municipal Code," effective July 1, 1961, and the amendments thereto.
SECTION 7: That David Jennings, President of the Board of Local •
Improvements of the City of Evanston, Illinois, be and he is hereby directed to file
a Petition in the County Court of Cook County, Illinois, praying that steps may be
taken to levy a Special Assessment to pay the cost of said improvement in
accordance with the provisions of this Ordinance and in the manner prescribed
by law.
SECTION 8: That all ordinances or parts of ordinances in conflict
herewith are hereby repealed.
SECTION 9: That this Ordinance shall be in full force and effect
from and after its passage, approval, and publication in the manner provided
by law.
Introduced: Itt v,IL , 2005
Adopted: 1 , 2005
•
—2—
79-0-05
r�
U
•
is
Approved:
12,
*Lraine . Morton, Mayor
Attest:
Mary F . M r "ity Clerk
Ap r ed as t for
Attbfney for the BoaFd of Local
Improvements of the City of Evanston, Illinois
2005
-3-
SPECIAL ASSESSMENT 1470
RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board of Local Improvements of the City of Evanston, Illinois,
herewith submits the draft of an Ordinance for the making of a local improvement within
the City of Evanston, County of Cook, and State of Illinois, the nature, character, locality
and description of which is as follows, to -wit:
That the unimproved public alley in the block bounded by
Emerson Street on the north, Lyons Street on the south,
Dodge Avenue on the west, and Darrow Avenue on the east,
in the City of Evanston, be improved by excavating,
constructing the necessary drainage system and paving with
8" Portland Cement Concrete Pavement to a width of
fifteen feet (15').
And as part of said Ordinance and in conjunction therewith, said Board also herewith
submits the plans and specifications of an estimate of the cost of said improvement,
including the cost of engineering services, as finally determined by said Board; and said
Board hereby recommends the passage of said Ordinance and the making of the
improvement described therein.
Respectfully submitted,
BOARD OF LOCAL IMPROVEMENTS
CITY W EVANSTON, ILLINOIS
By: kk&-zv
APPROVED AS TO FORM:
*Attmey for the Board of Local
Improvements of the City of Evanston, Illinois
HERBERT D. HILL
24497
ELLEN SZYMANSKI
54806
KATHLEEN F. BRENNIMAN
17030
ELKE PURZE
40107
CITY OF EVANSTON LAW DEPARTMENT
2100 RIDGE AVENUE
EVANSTON, ILLINOIS 60201
(847) 866-2937
.7
•
•
ESTIMATE OFENGINEER OFBOARD OFLOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore
adopted, providing that the unimproved public alley in the block bounded by Emerson Street on the north,
Lyons Street on the south, Dodge Avenue on the west, and Darrow Avenue on the east, in the City of
Evanston, be improved by excavating, constructing the necessary drainage system and paving with 8"
Portland Cement Concrete Pavement to a width of fifteen feet (15').
Said improvement to be constructed in detail as specified in aforesaid Resolution.
I, herewith submit an estimate of cost of such improvement as described in said Resolution, including labor,
materials, and all other lawful expenses attending the proceedings for making said improvement and the cost
of making and collecting the assessment therefore as provided by law, viz:
•
ITEM UNIT
Earth Excavation
Cu.Yd.
Trench Backfill
Cu.Yd.
Sub -Base Granular
Material, Type B
Cu.Yd.
Granular Cradle
Material, CA-11
Ton
Aggregate Base Course,
Type B, 6"
Sq.Yd.
Incidental Bituminous
Surfacing
Ton
Portland Cement Concrete
Pavement - 8"
Sq.Yd.
Storm Sewers, 10", Type 1,
(R.C.P./ CL V)
Lin.Ft.
Catch basins, Type A, 4' Diameter,
Type 1 Frame, Open Lid
(with restrictor)
Each
Manhole, Type A, 4' Diameter,
Type 1 Frame, Open and/or
Closed Lid
Each
Inlet, Type A, Type 1 Frame,
Open Lid
Each
Combination Concrete Curb and
Gutter, Type B6.12
Ft.
Pavement Removal
Sq.Yd.
Curb Removal
Ft.
Driveway Pavement
Removal
Sq.Yd.
COST ESTIMATE
UMT
OUAN777'YPRICE TOTAL
392
$43.00
$16,956.00
402
$30.00
$12,060.00
10
$30.00
$300.00
140
$27.00
$3,780.00
150
$6.00
$900.00
25
$140.00
$3,500.00
1475
$45.00
$66,375.00
626
$45.00
$28,170.00
2
$4,000.00
$8,000.00
2
$2,800.00
$5,600.00
4
$1,300.00
$5,200.00
250
$20.00
$5,000.00
120
$15.00
$1,800.00
250
$5.00
$1,250.00
395
$13.00
$5,135.00
Page -2-
Estimate of Engineer of BLI - S.A.1470
(Alley N/ Lyons Street, E/Dodge Avenue)
UNIT
ITEM UNIT OUANTITYPRICE TOTAL
Sidewalk Removal
Sq. Ft.
400
$1.00
$400.00
Portland Cement Concrete
Driveway Pavement, 6"
Sq.Yd.
280
$40.00
$11,200.00
Portland Cement Concrete
Sidewalk, 5"
Sq. Ft.
400
$5.00
$2,000.00
Protective Seater
Sq.Yd.
1755
$1.50
$2,632.50
Crushed Stone, CA-14
Ton
20
$30.00
$600.00
Pavement Removal & PCC
Replacement,
Special-9"(H.E.S.)
Sq.Yd.
20
$90.00
$1,800.00
Furnishing and Placing
Topsoil, 3"
Sq.Yd.
80
$3.00
$240.00
Sodding, Salt Tolerant
Sq.Yd.
80
$7.00
$560.00
Cost of Engineering Services .................. $ 8,251.13
For Lawful Expenses, etc . ....................... $8,251.13
.................................................................$16,502.26
RECAPITULATION
Total Cost of Construction ...................... $183,358.50
Cost of Engineering Services ................... $ 8,251.13
For Lawful Expenses, etc . ...................... $8,251.13
Total Cost of Improvement......................$199,860.76
I hereby certify that in my opinion the above estimate does not exceed the probable cost of the above
proposed improvement and the lawful expenses attending the same.
Sat Nagar, P.E.
Engineer
Board of Local Improvements