HomeMy WebLinkAboutORDINANCES-2008-015-O-08m
1 /16/2008
• 15-0-08
AN ORDINANCE
for the Construction of a Local Improvement known as
Evanston Special Assessment No. 1493
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
EVANSTON, ILLINOIS:
SECTION 1: That a local improvement shall be made within the City of
Evanston, County of Cook, and State of Illinois, the nature, character, locality and
description of which is as follows, to -wit.
That the unimproved public alley in the block bounded by
Grove Street on the north, Lake Street on the south, CTA
Railroad on the west, and Sherman Avenue on the east, in
the City of Evanston, be improved by excavating,
constructing the necessary drainage system, and paving
with 8" Portland Cement Concrete Pavement to widths of ten
feet (10') and nineteen feet (19').
SECTION 2: That the Recommendation of the Board of Local
Improvements (Exhibit A) of the City of Evanston, Illinois, of this Ordinance, and the
Estimate of the Cost (Exhibit B) of said improvement made by the Engineer of said
Board, both attached hereto, be and the same are hereby approved and by reference
thereto made a part hereof.
SECTION 3: That said improvement shall be made and the cost thereof,
including the sum of One Hundred Fifty -Nine Thousand, Six Hundred Fourteen and
16/100 Dollars ($159,614.16), being the cost of making and collecting the Assessment
and all other expenses as provided by law, shall be paid for by Special Assessment in
• accordance with the Illinois Municipal Code, Chapter 65, Section 5/9-2-1 et seq.
15-0-08
SECTION 4: That One Hundred Eleven Thousand, Nine Hundred Sixty -
One and 42/100 Dollars ($111,961.42) of the cost of said improvement shall be •
allocated by the City, and That Forty -Seven Thousand, Six Hundred Fifty -Two and
74/100 Dollars ($47,652.74) as private benefit.
SECTION 5: That the aggregate amount to be assessed and each
individual assessment shall be divided into ten (10) installments in the manner provided
by law, and each of said installment shall bear interest at the rate of seven percent (7%)
per annum from sixty (60) days after the date of the first voucher issued on account of
work done upon said proposed improvement.
SECTION 6: That, for the purpose of anticipating the collection of the
installments of said assessment levied against the real estate benefited thereby,
general obligation bonds have been issued, fifty percent (50%) of which are payable by
the City and fifty percent (50%) of which are payable out of said installments, bearing
interest at the rate of seven percent (7%) per annum, payable annually and signed on
behalf of the City of Evanston, Illinois, by its Mayor and attested by its City Clerk and its
corporate seal affixed thereto; and each interest coupon attached to said bonds shall
likewise be executed by and shall bear the official or facsimile signature of the same
officers who signed said bonds and who, if facsimile signatures are used, do adopt by
their execution of said bonds as and for their proper signatures their respective facsimile
signatures appearing on said coupons; and that said bonds shall be issued in
accordance with and shall be in all respects conform to the provisions of an Act of the
General Assembly of the State of Illinois, knows as the "Illinois Municipal Code,"
effective July 1, 1961, and the Amendments thereto. •
-2-
15-0-08
•
•
SECTION 7: That David Jennings, President of the Board of Local
Improvements of the City of Evanston, Illinois, be and he is hereby directed to file a
Petition in the County Court of Cook County, Illinois, praying that steps may be taken to
levy a Special Assessment to pay the cost of said improvement in accordance with the
provisions of this ordinance and in the manner prescribed by law.
SECTION 8: That all ordinances or parts of ordinances in conflict herewith
are hereby repealed.
SECTION 9: That this Ordinance shall be in full force and effect from and
after -its passage, approval, and publication in the manner provided by law.
Adopted by the City Council of the City of Evanston, Illinois on the 2 f day
ofN1,u , 2008.
Approved:
2008
J
Lorrai a H. Morton, Mayor
Approved as to form:
Elke B. Tober-
Attorney for the Board of Local
Improvements of the
City of Evanston, Illinois
-3-
15-0-08
Exhibit A
Recommendation of the Board of Local Improvements •
•
•
MC
3
SPECIAL ASSESSMENT NO. 1493
RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board of Local Improvements of the City of Evanston, Illinois,
herewith submits the draft of an Ordinance for the making of a local improvement within
the City of Evanston, County of Cook, and State of Illinois, the nature, character, locality
and description of which is as follows, to -wit.
That the unimproved public alley in the block bounded by
Grove Street on the north, Lake Street on the south, CTA
Railroad on the west, and Sherman Avenue on the east, in
the City of Evanston, be improved by excavating,
constructing the necessary drainage system, and paving
with 8" Portland Cement Concrete Pavement to widths of ten
feet (10') and nineteen feet (19').
And as part of said Ordinance and in conjunction therewith, said Board also herewith
submits the plans and specifications of an Estimate of the cost of said improvement,
including the cost of engineering services, as finally determined by said Board; and said
Board hereby recommends the passage of said Ordinance and the making of the
improvement described therein.
APPROVED AS TO FORM:
Attorney for the Board of Local
Improvements of the City of Evanston, Illinois
HERBERT D. HILL
24497
ELKE B. TOBER-PURZE
40107
KENNETH R. COX
45264
ELIZABETH HOWLETT
43981
LISA K. WOODS
43999
CITY of EVANSTON LAW DEPARTMENT
2100 RIDGE AVENUE
EVANSTON, ILLINOIS 60201
(847) 866-2937
Respectfully submitted,
BOARD OF LOCAL IMPROVEMENTS
CITY EVANSTON, ILLINOIS
By:
President
Date: 7 12008
>r
15-0-08
Exhibit B
Estimate of the Engineer of the Board of Local improvements •
C.
•
-5-
•
•
ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore
adopted, providing that the unimproved public alley in the block bounded by Grove Street on the north, Lake
Street on the south, CTA Railroad on the west, and Sherman Avenue on the east, in the City of Evanston, be
improved by excavating, constructing the necessary drainage system and paving with 8" Portland Cement
Concrete Pavement to widths of ten feet (10') to nineteen feet (191).
Said improvement to be constructed in detail as specified in aforesaid Resolution.
I, herewith submit an estimate of cost of such improvement as described in said Resolution, including
labor, materials, and all other lawful expenses attending the proceedings for making said improvement and the
cost of making and collecting the assessment therefore as provided by iaw, viz:
COST ESTIMATE
ITEM
EARTH EXCAVATION
TRENCH BACKFILL
SUBBASE GRANULAR MATERIAL, TYPE B
GRANULAR CRADLE MATERIAL, CA-11
AGGREGATE BASE COURSE, TYPE B, 6"
INCIDENTAL BITUMINOUS SURFACING
PORTLAND CEMENT CONCRETE PAVEMENT, 8"
STORM SEWERS, 10', TYPE 1, (R.C.P. / CLV )
STORM SEWERS, 8", SPECIAL (D.I.P., CL.50)
CATCHBASINS, TYPE A, 4' DIAMETER, TYPE 1 FRAME, OPEN LID,
WITH RESTRICTOR
MANHOLE, TYPE A, 4' DIAMETER, TYPE 1 FRAME, OPEN LID
INLET, TYPE A, TYPE 1 FRAME, OPEN LID
COMBINATION CONCRETE CURB AND GUTTER, TYPE B6.12
PAVEMENT REMOVAL
COMBINATION CURB AND GUTTER REMOVAL
DRIVEWAY PAVEMENT REMOVAL
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT - 8"
PROTECTIVE SEALER
CRUSHED STONE, CA-14
BITUMINOUS SURFACE REMOVAL
PAVEMENT REMOVAL A P.C.C. REPLACEMENT SPECIAL -
9" (H. E. S. )
BRICK PAVEMENT REMOVAL AND REPLACEMENT,
SPECIAL IN KIND
BLI_EST 1493
TOTAL ESTIMATED CONSTRUCTION COST
UNIT
QUANTIFY
UNIT PRICE
TOTAL
CU. YD.
170
$60.00
$10,200.00
CU. YD.
214
35.00
$7,490.00
CU. YD.
10
50.00
$500.00
TON
80
50.00
$4,000.00
SQ. YD.
125
10.00
$1,250.00
TON
15
175.00
$2,625.00
SO. YD.
540
75.00
$40,500.00
LIN. FT.
290
110.00
$31,900.00
LIN. FT.
72
120.00
$8,640.00
EACH
1
5,500.00
$5,500.00
EACH
1
4,000.00
$4,000.00
EACH
2
1,500.00
$3,000.00
FOOT
85
30.00
$2,550.00
80. YD.
30
25.00
$750.00
FT.
85
6.00
$510.00
SQ. YD.
140
22.00
$3,080.00
SO. YD.
140
70,00
$9,800.00
SO. YD.
680
3.00
$2,040.00
TON
20
40.00
$800.00
SQ. YD,
10
20.00
$200,00
SQ. YD.
40
125.00
$5,000.00
SQ. YD. 30 $70.00 $2,100.00
$146,435.00
Page -2-
Estimate of Engineer of BLI - S.A. 1493
(Alley, N/Lake St., E/CTA RailRoad)
Cost of Engineering Services ................. $ 6,589.58
For Lawful Expenses, etc ....................... $ 6,589.58
..... :.......................................................... $ 13,179.16
RECAPITULATION
Construction Cost ................... $ 146,435.00
Engineering ............................. $ 6,589.58
Legal ........................................ $ 6,589.58
Total Cost ................................. $ 159,614.16
I hereby certify that in my opinion the above estimate does not exceed the probable cost of the above
proposed improvement and the lawful expenses attending the same.
is
... ... ...... ,
i
Sa Nagar, P.E.
Senior Engineer
Board of Local Improvements
E
•
E
ESTIMATE OF ENGINEER OF BOARD OF LOCAL INIPROVENIENTS
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore
adopted, providing that the unimproved public alley in the block bounded by Church Street on the north,
Davis Street on the south, Judson Avenue on the west, and Forest Place (Sheridan Road) on the east, in the
City of Evanston, be improved by excavating, constricting the necessary drainage system and paving with 8"
Portland Cement Concrete Pavement to a width of sixteen feet (16').
Said improvement to be constructed in detail as specified in aforesaid Resolution.
I, herewith submit an estimate of cost of such improvement as described in said Resolution, including
labor, materials, and all other lawful expenses attending the proceedings for making said improvement and the
cost of making and collecting the assessment therefore as provided by law, viz:
COST ESTIMATE
ITEM
UNIT
QUANTITY
UNIT PRICE
TOTAL
EARTH EXCAVATION
CU. YD.
274
50.00
$13,700.00
TRENCH BACKFILL
CU. YD.
153
35.00
$5,355.00
SUB -BASE GRANULAR MATERIAL, TYPE B
CU. YD.
10
50.00
$500.00
GRANULAR CRADLE MATERIAL, CA-11
TON
100
50.00
$5,000.00
AGGREGATE BASE COURSE, TYPE B, 6"
SQ. YD.
90
10.00
$900.00
INCIDENTAL BITUMINOUS SURFACING
TON
15
175.00
$2,625.00
PORTLAND CEMENT CONCRETE PAVEMENT, 8"
SO. YD.
1010
70.00
$70,700.00
STORM:SEWERS,10", TYPE 1 ( R. C. P. / CL V)
LIN. FT.
424
110.00
$46,640.00
STORM SEWERS, 8% SPECIAL, (D. I. P. / CL 50)
LIN. FT.
14
110.00
$1,540.00
CATCHBASINS, TYPE A, 4' DIAMETER, TYPE 1 FRAME, OPEN LID,
EACH
1
5500.00
$5,500.00
WITH RESTRICTOR
INLET, TYPE A, TYPE 1 FRAME, OPEN LID
EACH
4
1500.00
$6,000.00
COMBINATION CONCRETE CURB & GUTTER, TYPE B 6.12
FOOT
215
30.00
$6,450.00
PAVEMENT REMOVAL
SQ. YD.
50
25.00
$1,250.00
COMBINATION CURB AND GUTTER REMOVAL
FOOT
215
6.00
$1,290.00
DRIVEWAY PAVEMENT REMOVAL
SQ. YD.
205
22.00
$4,510.00
SIDEWALK REMOVAL
SQ. FT.
880
2.00
$1,760.00
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT - 6"
SQ. YD.
175
60.00
$10,500.00
PORTLAND CEMENT CONCRETE SIDEWALK - 5"
SQ. FT.
830
8.00
$6,640.00
PROTECTIVE SEALER
SO. YD.
1185
3.00
$3,555.00
CRUSHED STONE, CA -14
TON
20
40.00
$800.00
BITUMINOUS SURFACE REMOVAL
SQ. YD.
45
20.00
$900.00
PAVEMENT REMOVAL & P.C.C. REPLACEMENT,SPECIAL-9"(H.E.S.)
SQ. YD.
15
125.00
$1,875.00
FURNISHING AND PLACING TOPSOIL, 3"
SQ. YD.
80
8.00
$640.00
PAGE TOTAL
$198,630.00
BLI_EST 1491
Page-2-
Estimate of Engineer of BLI - S.A. 1491
(Alley, N/Davis St., E/Judson Ave.)
CARRIED FORWARD $198,630.00
SODDING, SALT TOLERANT SQ. YD. 80 15.00 $1,200.00
DETECTABLE WARNINGS SQ. FT. 50 25.00 $1,250.00
BRICK PAVING - SAND SETTING BED SO. FT. 170 18.00 $3,060.00
TOTAL ESTIMATED CONSTRUCTION COST $204,140.00
Cost of Engineering Services ................. $ 9,186.30
For Lawful Expenses, etc ....................... $ 9,186.30
................................................................ $ 18,372.60
RECAPITULATION
Construction Cost ................... $ 204,140.00
Engineering ............................. $ 9,186.30
Legal ........................................ $ 9,186.30
Total Cost ................................. $ 222,512.60
I hereby certify that in my opinion the above estimate does not exceed the probable cost of the above
proposed improvement and the lawful expenses attending the same.
Sat Nagar, P.E.
Senior Engineer
Board of Local Improvements