HomeMy WebLinkAboutORDINANCES-2009-010-O-094/2/2009
10-0-09
AN ORDINANCE
for the Construction of a Local Improvement known as
Evanston Special Assessment No. 1499
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
EVANSTON, ILLINOIS:
SECTION 1: That a local improvement shall be made within the City of
Evanston, County of Cook, and State of Illinois, the nature, character, locality and
description of which is as follows, to -wit:
That the unimproved public alley in the block bounded by
Washington Street on the north, Madison Place on the
south, Pitner Avenue on the west, and Hartrey Avenue on
• the east, in the City of Evanston, be improved by excavating,
constructing the necessary drainage system and paving with
8" Portland Cement Concrete Pavement to a width of
fourteen feet (14),
SECTION 2: That the Recommendation (Exhibit A) of the Board of Local
Improvements of the City of Evanston, Illinois, of this Ordinance, and the Estimate of the
Cost (Exhibit B) of said improvement made by the Engineer of said Board, both
attached hereto, be and the same are hereby approved and by reference thereto made
a part hereof.
SECTION 3: That said improvement shall be made and the cost thereof,
including the sum of One Hundred Fifty -Seven Thousand, Three Hundred Thirty and
601100 Dollars ($157,330.60), being the cost of making and collecting the Assessment
• and all other expenses as provided by law, shall be paid for by Special Assessment in
accordance with the Illinois Municipal Code, Chapter 65, Section 5/9-2-1 et seq.
10-0-09 -
SECTION 4: That Seventy -Eight Thousand, Six Hundred Sixty -Nine and
30/100 Dollars ($78,665.30) of the cost of said improvement shall be allocated by the
City, Thirty -Nine Thousand, Three Hundred Thirty -One and 97/100 Dollars ($39,331.97)
as private benefit, and Thirty -Nine Thousand, Three Hundred Thirty -Three and 33/100
Dollars ($39,333.33) as funded by Home Depot.
SECTIONS: That the aggregate amount to be assessed and each
individual assessment shall be divided into ten (10) installments in the manner provided
by law, and each of said installment shall bear interest at the rate of seven percent (7%)
per annum from sixty (60) days after the date of the first voucher issued on account of
work done upon said proposed improvement.
SECTION 6: That, for the purpose of anticipating the collection of the
installments of said assessment levied against the real estate benefited thereby,
general obligation bonds have been issued, fifty • g g y percent (50%) of which are payable by
the City and twenty-five percent (25%) of which are payable out of said installments,
bearing interest at the rate of seven percent (7%) per annum, payable annually and
signed on behalf of the City of Evanston, Illinois, by its Mayor and attested by its City
Clerk and its corporate seal affixed thereto; and each interest coupon attached to said
bonds shall likewise be executed by and shall bear the official or facsimile signature of
the same officers who signed said bonds and who, if facsimile signatures are used, do
adopt by their execution of said bonds as and for their proper signatures their respective
facsimile signatures appearing on said coupons; and that said bonds shall be issued in
accordance with and shall be in all respects conform to the provisions of an Act of the
—2—
10-0-09
General Assembly of the State of Illinois, known as the "Illinois Municipal Code,"
• effective July 1, 1961, and the Amendments thereto.
SECTION 7: That David D. Stoneback, Interim President of the Board of
Local Improvements of the City of Evanston, Illinois, be and he is hereby directed to file
a Petition in the County Court of Cook County, Illinois, praying that steps may be taken
to levy a Special Assessment to pay the cost of said improvement in accordance with
the provisions of this ordinance and in the manner prescribed by law.
SECTION 8: That all ordinances or parts of ordinances in conflict herewith
are hereby repealed.
SECTION 9: That this Ordinance 10-0-09 shall be in full force and effect
from and after its passage, approval, and publication in the manner provided by law.
Adopted by the City Council of the City of Evanston, Illinois on they day
• of 6, 2009.
Approved:
1
-so , 2009
w
Lorrai a H. Morton, Mayor
Approved as to form:
Elke er- rz ey for the
. Board of Loc provements of the
City of Evanston, Illinois
ney Green , Ci y Clerk
-3-
10-0-09
Exhibit A
Recommendation
n
�J
•
-4-
• 3
SPECIAL ASSESSMENT NO. 1499
RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board of Local Improvements of the City of Evanston, Illinois, herewith submits the
draft of an Ordinance for the making of a local improvement within the City of Evanston,
County of Cook, and State of Illinois, the nature, character, locality and description of
which is as follows, to -wit.
That the unimproved public alley in the block bounded by Washington
Street on the north, Madison Place on the south, Pitner Avenue on the
west, and Hartrey Avenue on the east, in the City of Evanston, be
improved by excavating, constructing the necessary drainage system and
paving with- 8" Portland Cement Concrete Pavement to a width of
fourteen feet (14),
And, as part of said Ordinance, and in conjunction therewith, said Board also herewith
submits the plans and specifications of an estimate of the cost of said improvement,
including the cost of engineering services, as finally determined by said Board; and said
Board hereby recommends the passage of said Ordinance and the making of the
• improvement described therein.
Respectfully submitted,
APPROVED AS TO FORM:
Elke B.`To6er-P(tKze,--*'
Attorney for the Board of Local
Improvements of the City of Evanston, Illinois
ELKE B. TOBER-PURZE 40107
KENNETH R. COX 45264
ELIZABETH E. HOWLETT 43981
• LISA K. WOODS 43999
CITY of EVANSTON LAW DEPARTMENT
2100 RIDGE AVENUE
EVANSTON, ILLINOIS 60201
(847) 866-2937
BOARD OF LOCAL IMPROVEMENTS
CITY OF EVANSTON, ILLINOIS
By. . v,
John, Burke, Pres'dent
X1-,) 66'
le%r
Date: July 14, 2008
10-0-09
Exhibit B
Estimate
•
•
-5-
• ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore
adopted, providing that the unimproved public alley in the block bounded by Washington Street on the north,
Madison Place on the south, Pitney Avenue on the west, and Hartrey Avenue on the east, in the City of
Evanston, be improved by excavating, constructing the necessary drainage system and paving with 8" Portland
Cement Concrete Pavement to a width of fourteen feet (14').
Said improvement to be constructed in detail as specified in aforesaid Resolution.
I, herewith submit an estimate of cost of such improvement as described in said Resolution, including
labor, materials, and all other lawful expenses attending the proceedings for making said improvement and the
cost of making and collecting the assessment therefore as provided by law, viz:
COST ESTIMATE
ITEM
UNIT
NO.
ITEM
UNIT
QUANTITY
PRICE
1
EARTH EXCAVATION
CU. YD.
199
60.00
2
TRENCH BACKFILL
CU. YD.
144
20.00
3
SUB -BASE GRANULAR MATERIAL, TYPE B
CU. YD.
10
50.00
4
GRANULAR CRADLE MATERIAL, 'CA-11
TON
70
30.00
5
AGGREGATE BASE COURSE, TYPE B 4"
SQ. YD.
55
10.00
6
INCIDENTAL HOT -MIX ASPHALT SURFACING
TON
7
150.00
7
PORTLAND CEMENT CONCRETE PAVEMENT, 8"
SQ. YD.
660
70.00
8
STORM SEWERS, 10", TYPE 1 (R. C. P. / CL V)
FOOT
310
110.00
9
CATCH BASINS, TYPE A, 4' DIAMETER, TYPE 1 FRAME, OPEN LID
EACH
1
4800.00
10
INLET, TYPE A, TYPE 1 FRAME, OPEN LID
EACH
6
1500.00
11
COMBINATION CONCRETE CURB AND GUTTER, TYPE B6.12
FOOT
235
25.00
12
PAVEMENT REMOVAL
SQ. YD.
65
25.00
13
DRIVEWAY PAVEMENT REMOVAL
SQ. YD.
185
22.00
14
COMBINATION CONCRETE CURB AND GUTTER REMOVAL
FOOT
235
5.00
15
SIDEWALK REMOVAL
SQ. FT.
740
2.0.0
16
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT - 6"
SQ. YD.
160
50:00
17
PORTLAND CEMENT CONCRETE SIDEWALK - 5"
SQ. FT.
715
6.00
18
PROTECTIVE SEALER
'SQ. YD.
820
2.00
19
CRUSHED STONE, CA -14
TON
20
30.00
20
FURNISHING AND PLACING TOPSOIL, T
SQ. YD.
80
8.00
21
SODDING, SALT TOLERANT
SQ. YD.
80
15.00
22
DETECTABLE WARNINGS
SQ. FT.
25 .
25.00
•
ESTIMATED CONSTRUCTION COST
TOTAL
$11,940.00
$2, 880.00
$500.00
$2,100.00
. $550.00
$1,050.00
$46,200.00
$34,100.00
$4,800.00
$9,000.00
$5,875.00
$1,625.00
$4,070.00
$1,175.00
$1,480.00
$8,000.00
$4,200.00
$1,640.00
$600.00
$640.00
$1,200.00
$625.00
$144,340.00
BLI_EST 1499
Page -2-
Estimate of Engineer of BLI - S.A. 1499
(Alley, N/Madison Pl., E/Pitner Ave.)
Cost of Engineering Services ................. $6,495.30
For Lawful Expenses, etc ..................... $6,495.30
.................................................... $12,990.60
RECAPITULATION
Construction Cost ............................ $144,340.00
Engineering ................................... $6,495.30
Legal ........................................... $6,495.30
Total Cost ..................................... $157,330.60
I hereby certify that in my opinion the above estimate does not exceed the probable cost of the above
proposed improvement and the lawful expenses attending the same.
Sat Nagar, P.E.
Senior Engineer
Board of Local Improvements
•
0