9-0-09
AN ORDINANCE
for the Construction of a Local Improvement known as
Evanston Special Assessment No. 1497
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
EVANSTON, ILLINOIS:
SECTION 1: That a local improvement shall be made within the City of
Evanston, County of Cook, and State of Illinois, the nature, character, locality and
description of which is as follows, to -wit.
That the unimproved public alley in the block bounded by Noyes Street on
the north, Leonard Place on the south, Asbury Avenue on the west, and
Bryant Avenue on the east, in the City of Evanston, be improved by
excavating, constructing the necessary drainage system and paving with
• 8" Portland Cement Concrete Pavement to a width of fifteen feet (15'),
SECTION 2: That the Recommendation (Exhibit A) of the Board of Local
Improvements of the City of Evanston, Illinois, of this Ordinance, and the Estimate of the
Cost (Exhibit B) of said improvement made by the Engineer of said Board, both
attached hereto, be and the same are hereby approved and by reference thereto made
a part hereof.
SECTION 3: That said improvement shall be made and the cost thereof,
including the sum of One Hundred Thirty -Three Thousand, Twenty -Nine and 06/100
Dollars ($133,029.06), being the cost of making and collecting the Assessment and all
other expenses as provided by law, shall be paid for by Special Assessment in
0 accordance with the Illinois Municipal Code, Chapter 65, Section 5/9-2-1 et seq.
MrOMPOR
SECTION 4: That Sixty -Six Thousand, Five Hundred Fourteen and •
53/100 Dollars ($66,514.53) of the cost of said improvement shall be allocated by the
City, and Sixty -Six Thousand, Five Hundred Fourteen and 53/100 Dollars ($66,514.53)
as private benefit.
SECTION 5: That the aggregate amount to be assessed and each
individual assessment shall be divided into ten (10) installments in the manner provided
by law, and each of said installment shall bear interest at the rate of seven percent (7%)
per annum from sixty (60) days after the date of the first voucher issued on account of
work done upon said proposed improvement.
SECTION 6: That, for the purpose of anticipating the collection of the
installments of said assessment levied against the real estate benefited thereby,
general obligation bonds have been issued, fifty percent (50%) of which are payable by •
the City and fifty percent (50%) of which are payable out of said installments, bearing
interest at the rate of seven percent (7%) per annum, payable annually and signed on
behalf of the City of Evanston, Illinois, by its Mayor and attested by its City Clerk and its
corporate seal affixed thereto; and each interest coupon attached to said bonds shall
likewise be executed by and shall bear the official or facsimile signature of the same
officers who signed said bonds and who, if facsimile signatures are used, do adopt by
their execution of said bonds as and for their proper signatures their respective facsimile
signatures appearing on said coupons; and that said bonds shall be issued in
accordance with and shall be in all respects conform to the provisions of an Act of the
General Assembly of the State of Illinois, knows as the "Illinois Municipal Code,"
effective July 1, 1961, and the Amendments thereto. •
-2-
• SECTION 7: That David D. Stoneback, Interim President of the Board of
Local Improvements of the City of Evanston, Illinois, be and he is hereby directed to file
a Petition in the County Court of Cook County, Illinois, praying that steps may be taken
to levy a Special Assessment to pay the cost of said improvement in accordance with
the provisions of this ordinance and in the manner prescribed by law.
SECTION 8: That all ordinances or parts of ordinances in conflict herewith
are hereby repealed.
SECTION 9: That this Ordinance 9-0-09 shall be in full force and effect
from and after its passage, approval, and publication in the manner provided by law.
Adopted by the City Council of the City of Evanston, Illinois on the day
of , 2009.
Rodney Gr ne, City Clerk
Approved:
Zg , 2009
V
G�
Lo aine H. Morton, Mayor
Approved as to form:
Elke B. Tober-P �Aftorney he
Board of Local Improvements of the
City of Evanston, Illinois
•
—3—
Exhibit A •
Recommendation
n
LJ
•
�4�
n
LJ
•
•
3
SPECIAL ASSESSMENT NO. 1497
RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board of Local Improvements of the City of Evanston, Illinois, herewith submits the
draft of an Ordinance for the making of a local improvement within the City of Evanston,
County of Cook, and State of Illinois, the nature, character, locality and description of
which is as follows, to -wit.
That the unimproved public alley in the block bounded by Noyes Street on
the north, Leonard Place on the south, Asbury Avenue on the west, and
Bryant Avenue on the east, in the City of Evanston, be improved by
excavating, constructing the necessary drainage system and paving with
8" Portland Cement Concrete Pavement to a width of.fifteen feet (15'),
And, as part of said Ordinance, and in conjunction therewith, said Board also herewith
submits the plans and specifications of an estimate of the cost of said improvement,
including the cost of engineering services, as finally determined by said Board; and said
Board hereby recommends the passage of said Ordinance and the making of the
improvement described therein.
APPROVED A8 TO FORM:
Ike B. Tober- e,
Attorney for a Board of Local
Improvements of the City of Evanston, Illinois
ELKE B. TOBER-PURZE 40107
KENNETH R. COX 45264
ELIZABETH E. HOWLETT 43981
CITY of EVANSTON LAW DEPARTMENT
2100 RIDGE AVENUE
EVANSTON, ILLINOIS 60201
(847) 866-2937
Respectfully submitted,
BOARD OF LOCAL IMPROVEMENTS
CITY OF
EVANSTON, ILLINOIS
By:
John Burke, Presidenj
of)
Date: July 14, 2008
• 4
Exhibit B
Estimate
•
C:
•
-5-
•
ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore
adopted, providing that the unimproved public alley in the block bounded by Noyes Street on the north,
Leonard Place on the south, Asbury Avenue on the west, and Bryant Avenue on the east, in the City of
Evanston, be improved by excavating, constructing the necessary drainage system and paving with 8" Portland
Cement Concrete Pavement to a width of fifteen feet (15').
Said improvement to beconstructed in detail as specified in aforesaid Resolution.
I, herewith submit an estimate of cost of such improvement as described in said Resolution, including
labor, materials, and all other lawful expenses attending the proceedings for making said improvement and the
cost of making and collecting the assessment therefore as provided by law, viz:
COST ESTIMATE
ITEM
ITEM
UNIT
QUANTITY
=UNIT
TOTAL
NO.
PRICE
1
EARTH EXCAVATION
CU. YD.
187
55.00
$10,285.00
2
TRENCH BACKFILL
CU. YD.
121
20.00
$2,420.00
3
SUB -BASE GRANULAR MATERIAL, TYPE B
CU. YD.
10
30.00
$300.00
4
GRANULAR CRADLE MATERIAL, CA-11
TON
80
30.00
$2,400.00
5
INCIDENTAL HOT -MIX ASPHALT SURFACING
TON
5
150.00
$750.00
6
PORTLAND CEMENT CONCRETE PAVEMENT, 8"
SQ. YD.
710
70:00
$49,700.00
7
STORM SEWERS, 10", TYPE 1 (R. C. P. / CL V)
-FOOT
221
110.00
'$24,310.00
8
MANHOLE, TYPE A, 4' DIAMETER, TYPE 1 FRAME, OPEN LID
EACH
1
4000.00
$4,000.00
9
INLET, TYPE A, TYPE 1 FRAME, OPEN LID
EACH
3
15*00
$4,500.00
10
PAVEMENT REMOVAL
SQ. YD.
45
25.00
$1,125.00
11
DRIVEWAY PAVEMENT REMOVAL
SQ. YD.
190
22,00
$4,180.00
12
SIDEWALK REMOVAL_
SQ. FT.
350
2.00
$700.00
13
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT - 6"
SQ. YD.
190
50.00
$9,500.00
14
PORTLAND CEMENT CONCRETE SIDEWALK - 5"
SQ. FT.
325
,.6.00
$1,950.00
15
PROTECTIVE SEALER
SQ. YD.
900
-2.00
$1,800.00
16
CRUSHED STONE, CA -14
TON
20
30.00
$600.00
17
FURNISHING AND PLACING TOPSOIL, 3"
SQ. YD.
40
8.00
$320.00
18
SODDING, SALT TOLERANT
SQ. YD.
40
15,00
$600.00
19
DETECTABLE WARNINGS
SQ. FT.
25
25.00
$625.00
20
BRICK PAVING - SAND SETTING BED
SQ. FT.
110
18.00
$1,980.00
ESTIMATED CONSTRUCTION COST $122,045.00
BLI_EST 1497
Page -2- •
Estimate of Engineer of BLI - S.A. 1497
(Alley, N/Leonard Pl., E/Asbury Ave., WBryant Ave.)
Cost of Engineering Services ................. $5,492.03
For Lawful Expenses, etc ..................... $5,492.03
.................................................... $10,984.06
1_41*yl? j� Foci
Construction Cost .............................. $122,045.00
Engineering .................................... $5,492.03
Legal ............................................. $5,492.03
Total Cost ....................................... $133,029.06
I hereby certify that in my opinion the above estimate does not exceed the probable cost of the above
proposed improvement and the lawful expenses attending the same.
•
Sat agar, P.E.
Senior Engineer
Board of Local Improvements