HomeMy WebLinkAboutORDINANCES-2014-065-O-14•
7/17/2014
65-O-14
AN ORDINANCE
To Approve the Construction of a -Local Improvement Known as
Evanston Special Assessment No. 1512
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
EVANSTON, ILLINOIS:
SECTION 1: That a local improvement shall be made within the
City of Evanston, County of Cook, and State of Illinois, the nature, character,
locality and description of which is as follows, to -wit:
That the unimproved public alley in the block bounded by Isabella Street
on the north, Thayer Street on the south, Marcy Avenue on the west, and
Central Park Avenue on the east, in the City of Evanston, be improved by
• excavating, constructing the necessary drainage system and paving with
8" Portland Cement Concrete Pavement the East — West leg to a width of
sixteen feet (16) and North — South leg to a width of fifteen feet (15),
except alley abutting private property.
SECTION 2: That the Recommendation (Exhibit A) of the Board of
Local Improvements of the City of Evanston, Illinois, of this Ordinance, and the
Estimate of the Cost (Exhibit B) of said improvement made by the Engineer of
said Board, both attached hereto, be and the same are hereby approved and by
reference thereto made a part hereof.
SECTION 3: That said improvement shall be made subject to the
City's acceptance of a dedication of three separate small parcels of land located
at 2734 Central Park, 2738 Central Park, and 2746 Central Park, in the City of
Evanston, IL, partially falling within the area of the local improvement.
0
65-0-14
SECTION 4: That said improvement shall subsequently be made
and the cost thereof, including the sum of Two Hundred Ninety Thousand One
Hundred Forty -Four and 92/100 Dollars ($290,144.92), being the cost of making
and collecting the Assessment and all other expenses as provided by law, shall
be paid for by Special Assessment in accordance with the Illinois Municipal
Code, Chapter 65, Section 5/9-2-1, of seq.
SECTION 5: That One Hundred Forty -Five Thousand Seventy -
Two and 46/100 Dollars ($145,072.46) of the cost of said improvement shall be
allocated by the City; and the remainder of the cost, One Hundred Forty -Five
Thousand Seventy -Two and 46/100 Dollars ($145,072.46) will be allocated as
private benefit.
SECTION 6: That the aggregate amount to be assessed and each •
individual assessment shall be divided into ten (10) installments in the manner
provided by law, and each of said installment shall bear interest at the rate of
seven percent (7%) per annum from sixty (60) days after the date of the first
voucher issued on account of work done upon said proposed improvement.
SECTION 7: That, for the purpose of anticipating the collection of
the installments of said assessment levied against the real estate benefited
thereby, general obligation bonds have been issued, fifty percent (50%) of which
are payable by the City, homeowners pay -remaining fifty percent (50%) of which
are payable out of said installments, bearing interest at the rate of seven percent
(7%) per annum, payable annually and signed on behalf of the City of Evanston,
—2—
65-Q-14
Illinois, by its Mayor and attested by its City Clerk and its corporate seal affixed
thereto; and each interest coupon attached to said bonds shall likewise be
executed by and shall bear the official or facsimile signature of the same officers
who signed said bonds and who, if facsimile signatures are used, do adopt by
their execution of said bonds as and for their proper signatures their respective
facsimile signatures appearing on said coupons; and that said bonds shall be
issued in accordance with and shall be in all respects conform to -the provisions
of an Act of the General Assembly of the State of Illinois, knows as the "Illinois
Municipal Code," effective July 1, 1961, and the Amendments thereto.
SECTION 8: That Suzette Robinson, President of the Board of
Local Improvements of the City of Evanston, Illinois, be and she is hereby
• directed to file a Petition in the Circuit Court of Cook County, Illinois, praying that
steps may be taken to levy a Special Assessment to pay the cost of said
improvement in accordance with the provisions of this ordinance and in the
manner prescribed by law.
SECTION 9: All ordinances or parts of ordinances in conflict
herewith are hereby repealed.
SECTION 10: If any provision of this ordinance or application
thereof to any person or circumstance is held unconstitutional or otherwise
invalid, such invalidity shall not affect other provisions or applications of this
ordinance that can be given effect without the invalid application or provision, and
each invalid application of this ordinance is'severable.
—3—
65-0-14
SECTION 11: The findings and recitals contained herein are
declared to be prima facie evidence of the law of the City and shall be received in
evidence as provided by the Illinois Compiled Statutes and the courts of the State
of Illinois.
SECTION 12: This ordinance shall be in full force and effect from
and after its passage, approval, and publication in the manner provided by law.
Introduced: �u� 01i , 2014
Adopted: ---�\xv' �� , 2014
Attest:
�6-
dney Gr?e, City Clerk
Approved:
, 2014
Eliia th B. Tisdahl, Mayor
Approved as to form:
W. GraInt Far, ar, Corporation Counsel
0
•
0
•
Exhibit A
Recommendation
-5-
65-0-14
•
SPECIAL ASSESSMENT NO. 1512
RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board of Local Improvements of the City of Evanston, Illin-ois, herewith submits the
draft of Ordinance 65-0-14 for the making of a local improvement within the City of
Evanston, County of Cook, and State of Illinois, the nature, character, locality and
description of which is as follows, to -wit. -
That the unimproved public alley in the block bounded by Isabella Street on the
north, Thayer Street on the south, Marcy Avenue on the west, and Central Park
Avenue on the east, in the City of Evanston, be improved by excavating,
constructing the necessary drainage system and paving with 8" Portland Cement
Concrete Pavement the East — West leg to a width of sixteen feet (16) and North
— South leg to a width of fifteen feet (15), except alley abutting private property.
and, as part of said Ordinance, and in conjunction therewith, said Board also herewith
submits the plans and specifications of an estimate of the cost of said improvement,
including the cost of engineering services, as finally determined by said Board; and said
Board hereby recommends the passage of Ordinance 65-0-14 and the making of the •
improvement described therein.
APPROVED AS TO FORM:
Ma o Treto, Jr.
Attorney for the Board of Local
Improvements of the City of Evanston, Illinois
W. GRANT FARRAR
MARIO TRETO, JR.
CITY of EVANSTON LAW DEPARTMENT
2100 RIDGE AVENUE
EVANSTON, ILLINOIS 60201
(847) 866-2937
Attorney Code 46996
Respectfully submitted,
BOARD OF LOCAL IMPROVEMENTS
CITY OF EVANSTON, ILLINOIS
ByOzeLff9
�irjsQ Pr i enn t
Date: M A V - , 2014
•
Exhibit B
Estimate
•
•
65-0-14
ESTIMIATE OF ENGINEER OF BOARD OF L0CAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston: 0
Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore adopted, providing
that the unimproved public alley in the block bounded by Isabella Street on the north, Thayer Street on the south, Marcy
Avenue on the west, and Central Park Avenue on the east, in the City of Evanston, be improved by excavating, constructing
the necessary drainage system and paving with 8" Portland Cement Concrete Pavement the East - West leg to a width of
sixteen feet (16') and the North - South leg to a width of fifteen feet (I5'),except alley abutting private property.
Said improvement to be constructed in detail as specified in aforesaid Resolution.
I, herewith submit an estimate of cost of such improvement as described in said Resolution, including labor,
materials, and all other lawful expenses attending the proceedings for making said improvement and the cost of making and
collecting the assessment therefore as provided by law, viz:
COST ESTIMATE
ITEM
UNIT
ITEM
UNIT
QUANTITY
TOTAL
NO.
PRICE
1
EARTH EXCAVATION
CU. YD.
344
55.00
$18,920.00
2
TRENCH BACKFILL
CU. YD,
228
32,00
$7,296.00
3
SUB -BASE GRANULAR MATERIAL, TYPE 8
CU. YD.
20
30.00
$600.00
4
GRANULAR CRADLE MATERIAL, CA-11
TON
158
30.00
$4,740.00
5
AGGREGATE BASE COURSE, TYPE B, 6"
SQ. YD.
70
15,00
$1,050.00
6
INCIDENTAL HOT -MIX ASPHALT SURFACING
TON
30
170.00
$5,100.00 •
7
PORTLAND CEMENT CONCRETE PAVEMENT, 8"
SO. YD.
1150
65.00
$74,750.00
8
STORM SEWERS, SPECIAL, 8" (D. I. P. / CL 50)
FOOT
41
90.00
$3,690.00
9
STORM SEWERS, 10", TYPE 1 (R. C. P. I CL V)
FOOT
403
80.00
$32,240.00
10
STORM SEWERS, SPECIAL,10' (D. I. P. I CL 50)
FOOT
148
100.00
$14,800.00
11
STORM SEWERS, SPECIAL, 16- (D. 1. P. I CL 50)
FOOT
60
140.00
$8,400.00
12
CATCHBASINS, TYPE A,4' DIAMETER, TYPE 1 FRAME, OP LIDICL Lid
EACH
2
4200.00
$8,400.00
13
MANHOLE, TYPE A, 4' DIAMETER, TYPE 1 FRAME, OPEN LID
EACH
2
4000,00
$8,000.00
14
INLET, TYPE A, TYPE 1 FRAME, OPEN LID
EACH
6
1400.00
$8,400.00
15
MANHOLE TO BE ADJUSTED
EACH
1
500.00
$500.00
16
COMBINATION CONCRETE CURB & GUTTER, TYPE 8 6.12
FOOT
130
22.00
$2,860.00
17
PAVEMENT REMOVAL
SQ. YD.
35
22.00
$770.00
18
DRIVEWAY PAVEMENT REMOVAL
SQ. YD.
220
20.00
$4,400.00
19
COMBINATION CURB & GUTTER REMOVAL
FOOT
130
4.00
$520.00
20
SIDEWALK REMOVAL
SO. FT.
705
2.00
$1,410.00
21
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT - 6"
SO. YD.
165
48.00
$7,920.00
22
PORTLAND CEMENT CONCRETE SIDEWALK - 5"
SO. FT.
670
6.00
$4,020.00
23
PROTECTIVE SEALER
SQ, YD.
1315
1.80
$2,367.00
24
CRUSHED STONE, CA-14
TON
40
30.00
$1,200.00
25
FURNISHING AND PLACING TOPSOIL, 3"
SQ. YD.
100
8.00
$800.00
26
SODDING, SALT TOLERANT
SQ, YD.
100
15.00
$1,500.00
27
CLASS B PATCHES, 9" (HES)
SQ. YD.
115
90.00
$10,350.00
28
DETECTABLE WARNINGS
SQ. FT.
35
35.00
$1,225.00
BLI._EST1512
0
•
0
Page -2-
Estimate of Engineer of BLI- S.A. 1512
(Alley, N/Thayer St., ENarcy Ave.)
29 BRICK PAVING SAND SETTING BED
30 TREE REMOVAL (6 T015 INCH DIAMETER)
31 CONSTRUCTION LAYOUT AND STAKING
32 STREET SWEEPING
33 SOIL DISPOSAL ANALYSIS
34 NON SPECIAUSPECIAL WASTE DISPOSAL
35 CLOSED CIRCUIT TV INSPECTION
36 PRE -CONSTRUCTION SURFAC= VIDEO TAPING
SQ. FT.
115
18.00
$2,070.00
IN. DIA
12
50.00
$600.00
LUMP SUM
1
2,500.00
$2500.00
EACH
3
300:00
$900.00
LUMP SUM
1
2,500.00
$2,500.00
CU. YD,
570
27.00
$15,390,00
LUMP SUM
1
3,500.00
$3,500.00
LUMP SUM
1
2,500.00
$2,500.00
EST14ATED CONSTRUCTION COST $266,188.00
Cost of Engineering Services.... . ............ 111,978.46
For Lawful Expenses, etc ..................... $11,979.46
.................................................... $23,956.92
RECAPITULATION
Construction Cost .............................. $266,188.00
Engineering .................................... $11,978.46
Legal ............................................. $11,978.46
Total Cost ......... . ............ . ................ $290,144.92
I hereby certify that in my opinion the above estimate does not exceed the probable cost of the above proposed
improvement and the lawful expenses attending the same.
;
Sat Nagar, P.E.
Senior Engineer
Board of Local Improvements
•
�J