HomeMy WebLinkAbout081-O-21, Amending Title 4, Chapter 13 Floodplain Regulations7/6/21
81-0-21
AN ORDINANCE
Amending Title 4, Chapter 13 "Floodplain Regulations"
NOW BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
EVANSTON, COOK COUNTY, ILLINOIS, THAT:
SECTION 1: Title 4, Chapter 13 "Floodplain Regulations" of the
Evanston City Code of 2012, as amended, is hereby deleted in its entirety and further
amended to read as follows:
CHAPTER 13 — FLOODPLAIN REGULATIONS
4-13-1. — GENERAL PROVISIONS.
(A) Purpose. This Chapter is enacted pursuant to the police powers granted to the City of
Evanston by 65 ILCS 5/1-2-1, 5/11-12-12, 5/11-30-2, 5/11-30-8, and 5/11-31-2. The
purpose of this Chapter is to maintain the City of Evanston's eligibility in the National Flood
Insurance Program; to minimize potential losses due to periodic flooding including loss of
life, loss of property, health and safety hazards, disruption of commerce and governmental
services, extraordinary public expenditures for flood protection and relief, and impairment of
the tax base, all of which adversely affect the public health, safety and general welfare; and
to preserve and enhance the quality of surface waters, conserve economic and natural
values and provide for the wise utilization of water and related land resources. This Chapter
is adopted in order to accomplish the following specific purposes:
1. To meet the requirements of 615 ILCS 5/18(g) Rivers, Lakes and Streams Act;
2. To assure that new development does not increase the flood or drainage
hazards to others, or create unstable conditions susceptible to erosion;
3.To protect new buildings and major improvements to buildings from flood
damage;
4. To protect human life and health from the hazards of flooding;
81-0-21
5. To lessen the burden on the taxpayer for flood control projects, repairs to flood -
damaged public facilities and utilities, and flood rescue and relief operations;
6. To make federally subsidized Flood insurance available for property in the City of
Evanston by fulfilling the requirements of the National Flood Insurance Program;
7. To comply with the rules and regulations of the National Flood Insurance
Program codified as 44 CFR 59-79, as amended;
8. To protect, conserve, and promote the orderly development of land and water
resources; and
9. To preserve the natural characteristics and functions of watercourses and
Floodplains in order to moderate flood and stormwater impacts, improve water
quality, reduce soil erosion, protect aquatic and riparian habitat, provide
recreational opportunities, provide aesthetic benefits, and enhance community and
economic development.
(B) Scope. This Chapter is intended to supplement the City of Evanston zoning
ordinance, development ordinance, building Code and stormwater management
ordinance and further regulate and restrict the development, layout and improvement of
land, including drainage, underground utilities and service facilities; excavating, filling
and grading lots and other parcels and special flood hazard areas (SFHA), and storing
of certain materials thereon, stream and other floodwater runoff channels, and detention
ponds and basins; and the location, construction and elevation of buildings and other
structures and parts and appurtenances thereof, and the drainage of parking and other
paved lots and areas. In the event there is any conflict between the provisions of this
Chapter and any other City ordinance, the more restrictive provision or provisions shall
be applicable.
(C) Compliance With Other Applicable Regulations Required. Before starting any of the
works or uses regulated by this Chapter, an applicant shall comply with requirements
set forth in all other applicable ordinances and regulations with respect to submission
and approval of preliminary and final subdivision plats, improvement plans, building and
zoning permits, inspections, appeals and similar matters, along with those set forth in
this Chapter as required by federal and state statutes and regulations of any
departments of the state.
4-13-2. - DEFINITIONS.
For the purposes of this Chapter, the following definitions are adopted:
ACCESSORY STRUCTURE. A non -habitable Building, used only for
parking of vehicles or storage, that is on
the same parcel of property as the
principal Building and the use of which is
-2-
F-ITSM
AGRICULTURAL STRUCTURE.
APPLICANT.
APPROPRIATE USES.
ASCE.
BASE FLOOD.
BASE FLOOD ELEVATION (BFE)
BASEMENT.
BREAKAWAY WALL.
81-0-21
incidental to the use of the principal
Building.
An act in relation to the regulation of the
rivers, lakes, and streams of the State of
Illinois, 615 ILCS 5/5 et seq.
A walled and roofed structure used
exclusively for agricultural purposes or
uses in connection with the production,
harvesting, storage, raising, or drying of
agricultural commodities and livestock,
including aquatic organisms. Structures
that house tools or equipment used in
connection with these purposes or uses
are also considered to have agricultural
purposes or uses.
Any person, firm, corporation, or agency
that applies for a Floodplain Development
permit.
Only uses of the Designated Floodway
that are permissible and will be
considered for permit issuance. The only
uses that will be allowed are as specified
in Section 4-13-6(B).
American Society of Civil Engineers
The Flood having a one -percent chance
of being equaled or exceeded in any
given year. The Base Flood is often
referred to as the 100-year flood.
The height in relation to the North
American Vertical Datum (NAVD) of 1988
(or other datum, where specified) of the
crest of the Base Flood. Application of the
BFE at any location is as defined in
Section 4-13-4.
Any area of the building, including any
sunken room or sunken portion of a
room, having its floor below ground level
(subgrade) on all sides.
A wall that is not part of the structural
support of the building and is intended
through its design and construction to
collapse under specific lateral loading
forces, without causing damage to the
elevated portion of the building or
supporting foundation system.
-3-
81-0-21
BUILDING.
A walled and roofed Building, including
gas or liquid storage tank, that is
principally above ground, including
Manufactured Homes and prefabricated
buildings. The term also includes
Recreational Vehicles and travel trailers
installed on a site for more than 180
consecutive days.
CHANNEL.
Any river, stream, creek, brook, branch,
natural or artificial depression, ponded
area, flowage, slough, ditch, conduit,
culvert, gully, ravine, wash, or natural or
man-made drainageway, which has a
definite bed and banks or shoreline, in or
into which surface or groundwater flows,
either perennially or intermittently.
CHANNEL MODIFICATION.
Alteration of a Channel by changing the
physical dimensions or materials of its
bed or banks. Channel Modification
includes Damming, riprapping (or other
armoring), widening, deepening,
straightening, relocating, lining and
significant removal of native vegetation
from the bottom or banks. Channel
Modification does not include the clearing
of dead or dying vegetation, debris, or
trash from the Channel. Channelization
is a severe form of Channel Modification
involving a significant change in the
Channel cross-section and typically
involving relocation of the existing
Channel (e.g. straightening).
COASTAL HIGH HAZARD AREA.
An area of special flood hazard extending
from offshore to the inland limit of a
primary frontal dune along an open coast,
and any other area subject to high
velocity wave action from storms or
seismic sources. A coastal high hazard
area is identified on a community's FIRM
by the designation of zone VE.
COMPENSATORY STORAGE.
An artificially excavated, hydraulically
equivalent volume of storage within the
Floodplain used to balance the loss of
natural Flood storage capacity when
artificial fill or Structures are placed within
the Floodplain. The uncompensated loss
ME
81-0-21
of natural Floodplain storage can
increase off -site floodwater elevations
and flows.
CONDITIONAL APPROVAL OF A Preconstruction approval by IDNR/OWR
DESIGNATED FLOODWAY MAP and FEMA of a proposed change to the
CHANGE. Floodway map. This preconstruction
approval, pursuant to 17 III. Adm. Code
CONDITIONAL LETTER OF MAP
REVISION (CLOMR).
CRITICAL FACILITY.
DAM.
DESIGNATED FLOODWAY.
Part 3708, gives assurances to the
property owner that once an Appropriate
Use is constructed according to permitted
plans, the Floodway map can be
changed, as previously agreed, upon
review and acceptance of as -built plans.
A letter providing FEMA's comment on a
proposed project that would, upon
construction, affect the hydrologic or
hydraulic characteristics of a flooding
source and thus result in the modification
of the existing Designated Floodway, the
effective BFEs, or the Floodplain.
Any facility which is critical to the health
and welfare of the population and, if
flooded, would create an added
dimension to the disaster. Damage to
these Critical Facilities can impact the
delivery of vital services, can cause
greater damage to other sectors of the
community, or can put special
populations at risk.
All obstructions, wall embankments or
barriers, together with their abutments and
appurtenant works, if any, constructed for
the purpose of storing or diverting water or
creating a pool. Dams may also include
weirs, restrictive culverts, or impoundment
Structures. Underground water storage
tanks are not included.
The channel, including on -stream lakes,
and that portion of the Floodplain
adjacent to a stream or watercourse,
generally depicted on the FEMA FIRM
map, which is needed to store and
convey the existing Base Flood discharge
with no more than a 0.1 foot increase in
stage due to the loss of Flood
conveyance or storage, and no more
-5-
81-0-21
than a 10 percent increase in velocities.
(A) The Floodways are designated for on
the countywide FIRM of Cook County
prepared by FEMA and dated September
10, 2021. When two Floodway maps exist
for a waterway, the more recent effective
Floodway limit shall prevail.
(B) The Floodways for those parts of
unincorporated Cook County that are
within the extraterritorial jurisdiction, of the
City of Evanston that may be annexed into
the City of Evanston are designated on the
countywide FIRM of Cook County
prepared by FEMA and dated September
10, 2021.
(C) To locate the Designated Floodway
boundary on any site, the Designated
Floodway boundary should be scaled off
the FIRM map and located on a site plan,
using reference marks common to both
maps. Where interpretation is needed to
determine the exact location of the
Designated Floodway boundary,
IDNR/OWR should be contacted for the
interpretation.
DEVELOPMENT. Any man-made change to real estate,
including:
(A) Construction, reconstruction, repair, or
placement of a Building or any addition or
improvement to a Building.
(B) Substantial Improvement of an existing
Building.
(C) Installing a Manufactured Home on a
site, preparing a site for a Manufactured
Home, or installing a travel trailer or
Recreational Vehicle on a site for more
than 180 consecutive days.
(D) Installing utilities, construction of roads,
bridges, or similar projects.
81-0-21
(E) Demolition of a Building, re-
development of a site, clearing of land as
an adjunct of construction.
(F) Construction or erection of levees,
walls, fences, Dams, culverts, or Channel
Modification.
(G) Filling, dredging, grading, excavating,
paving, drilling, mining, or other non-
agricultural alterations of the ground
surface.
(H) Storage of materials including the
placement of gas and liquid storage
tanks, and any other activity that might
change the direction, height, or velocity
of Flood or surface waters.
(1) Any other activity of man that might
change the direction, height, or velocity of
Flood or surface water, including
extensive vegetation removal.
Development does not include such
activities as re -surfacing of pavement
when there is no increase in elevation, or
gardening, plowing, and similar agricultural
practices that do not involve filling, grading,
or construction of levees.
ELEVATION CERTIFICATES. A form published by FEMA that is used to
certify the elevation to which a Building has
been elevated.
FEMA Federal Emergency Management
Agency and its regulations at 44 CFR 59-
79, as amended.
FLOOD. A general and temporary condition of
partial or complete inundation of normally
dry land areas from overflow of inland or
tidal waters, or from the unusual and
rapid accumulation or runoff of surface
waters from any source. Flood also
includes the collapse or subsidence of
land along the shore of a lake or other
body of water as a result of erosion or
undermining caused by waves or
currents of water exceeding anticipated
cyclical levels or suddenly caused by an
unusually high water level in a natural
FLOOD FREQUENCY.
FLOOD FRINGE.
FLOOD INSURANCE RATE MAP
(FIRM).
FLOOD INSURANCE STUDY
FLOODPLAIN.
81-0-21
body of water, accompanied by a severe
storm, or by an unanticipated force of
nature, such as flash Flood or an
abnormal tidal surge, or by some similarly
unusual and unforeseeable event which
results in a general and temporary
condition of partial or complete inundation
of normally dry land areas from the
overflow of inland or tidal waters.
A period of years, based on a statistical
analysis, during which a Flood of a stated
magnitude may be expected to be
equaled or exceeded.
That portion of a Zone A or Zone AE
Floodplain that is outside of the
Floodway.
A map prepared by FEMA that depicts
the Floodplain or Special Flood Hazard
Area within a community. This map
includes insurance rate zones and
Floodplains and may or may not depict
Floodways and show BFE.
An examination, evaluation, and
determination of Flood hazards and if
appropriate, corresponding water surface
elevations.
The Floodplains are those lands within the
jurisdiction of the City of Evanston that are
subject to inundation by the Base Flood.
The Floodplains of the City of Evanston
are generally identified as such on panel
numbers 0253, 0254, 0258, 0265, 0266,
and 0268 of the countywide FIRM for Cook
County as prepared by the FEMA and
dated September 10, 2021.
(A) The Floodplains of those parts of
unincorporated Cook -County that are
within the extraterritorial jurisdiction of the
City of Evanston or that may be annexed
into the City of Evanston and that are
subject to inundation by the Base Flood.
The Floodplains are generally identified as
such on panel numbers 0253, 0254, 0258,
0265, 0266, and 0268 of the countywide
FIRM for Cook -County by the FEMA and
FLOODPLAIN ADMINISTRATOR
FLOODPROOFING.
FLOODPROOFING CERTIFICATE
FLOOD PROTECTION ELEVATION
(FPE).
FLOODWAY.
FREEBOARD.
HISTORIC STRUCTURE.
1.311M >K
dated September 10, 2021.
For the City of Evanston, the City Engineer
shall be responsible to fulfill the duties of
the Floodplain Administrator
Any combination of structural and non-
structural additions, changes or
adjustments to Buildings that reduce or
eliminate Flood damage to real estate or
improved real property, water and
sanitary facilities, Buildings, and their
contents.
A form published by FEMA that is used to
certify the elevation to which a Building
has been designed and constructed to be
structurally dry floodproofed.
The elevation of the Base Flood (or
depth) plus one foot of Freeboard at any
given location in the Floodplain.
See Designated Floodway.
An increment of elevation added to the
BFE to provide a factor of safety for
uncertainties in calculations, future
watershed Development, unknown
localized conditions, wave actions and
unpredictable . effects such as those
caused by ice or debris jams.
Any Building that is:
Listed individually in the National Register
of Historic Places or preliminarily
determined by the Secretary of the Interior
as meeting the requirements for individual
listing on the National Register.
Certified or preliminarily determined by the
Secretary of the Interior as contributing to
the historic district or a district preliminarily
determined by the Secretary of the Interior
to qualify as a registered historic district.
Individually listed on the State inventory of
historic places by the Illinois Historic
Preservation Agency.
Individually listed on a local inventory of
IDNR/OWR.
IDNR/OWR JURISDICTIONAL
STREAM.
LETTER OF MAP AMENDMENT
(LOMA):
LETTER OF MAP REVISION (LOMR)
LIMIT OF MODERATE WAVE ACTION
(LiMWA).
LOWEST FLOOR.
MANUFACTURED HOME.
81-0-21
historic places that has been certified by
the Illinois Historic Preservation Agency.
Illinois Department of Natural Resources,
Office of Water Resources.
IDNR/OWR has jurisdiction over any
stream serving a tributary area of 640
acres or more in an urban or urbanizing
area, or in the floodway of any stream
serving a tributary area of 6,400 acres or
more in a rural area. Construction on
these streams requires a permit from the
IDNR/OWR (17 III. Adm. Code Part 3700
or Part 3708). The IDNR/OWR may
grant approval for specific types of
activities by issuance of a statewide
permit or a regional permit.
Official determination by FEMA that a
specific Building, area of land or a parcel
of land, where there has not been any
alteration of the topography since the
date of the first NFIP map showing the
property within the Floodplain, was
inadvertently included within the
Floodplain and that the Building, area of
land or a parcel of land is removed from
the Floodplain.
Letter that revises BFEs, Floodplains or
Floodways as shown on an effective
FIRM.
A line shown on a FIRM to indicate the
inland limit of the 1.5-ft breaking wave
height during the base flood.
The lowest floor of the lowest enclosed
area (including Basement). An unfinished
or flood -resistant enclosure usable solely
for parking of vehicles, building access or
storage, in an area other than a
Basement area is not considered a
building's lowest floor; provided that such
enclosure is not built so as to render the
Building in violation of the applicable non -
elevation design requirements of this
Chapter.
A Building, transportable in one or more
sections, which is built on a permanent
chassis and is designated for use with or
_10-
MANUFACTURED HOME PARK OR
SUBDIVISION.
MODERATE WAVE ACTION AREA
(MoWA).
NEW CONSTRUCTION.
NEW MANUFACTURED HOME PARK
OR SUBDIVISION.
PUBLIC BODY OF WATER.
81-0-21
without a permanent foundation when
attached to the required utilities. The
term Manufactured Home does not
include a Recreational Vehicle.
A parcel (or contiguous parcels) of land
divided into two or more Manufactured
Home lots for rent or sale.
A special flood hazard area subject to the
potential for breaking wave heights of
greater than or equal to 1.5 feet, but less
than 3 feet, where the primary source of
flooding is astronomical tides, storm
surges, seiches, and/or tsunamis. A
MoWA is an area within zone AE on a
FIRM that is between the inland limit of
zone VE and a LiMWA, where identified.
(Also known as "Coastal A Zone")
New Construction means Buildings for
which the Start of Construction
commenced on or after the effective date
of a Floodplain management regulation
adopted by a community and includes any
subsequent improvements to such
Buildings.
Manufactured Home park or subdivision
for which the construction of facilities for
servicing the lots on which the
Manufactured Homes are to be affixed
(including at a minimum, the installation
of utilities, the construction of streets, and
either final site grading or the pouring of
concrete pads) is completed on or after
the effective date of the City of Evanston
initial Floodplain management
regulations.
North American Vertical Datum of 1988.
NAVD 88 supersedes the National
Geodetic Vertical Datum of 1929 (NGVD).
All open public streams and lakes capable
of being navigated by watercraft, in whole
or in part, for commercial uses and
purposes, and all lakes, rivers, and
streams which in their natural condition
were capable of being improved and made
-11-
PUBLIC FLOOD CONTROL PROJECT
RECREATIONAL VEHICLE
TRAVEL TRAILER.
REGIONAL PERMITS.
REGISTERED LAND SURVEYOR.
REGISTERED OR LICENSED
PROFESSIONAL ENGINEER (P.E.).
REPTITIVE LOSS.
81-0-21
navigable, or that are connected with or
discharge their waters into navigable lakes
or rivers within, or upon the borders of the
State of Illinois, together with all bayous,
sloughs, backwaters, and submerged
lands that are open to the main Channel or
body of water directly accessible thereto,
as identified in 17 III. Adm. Code Part
3704.
A flood control project which will be
operated and maintained by a public
agency to reduce flood damages to
existing buildings and structures,
includinga hydrologic and hydraulic study
of the existing and proposed conditions of
the watershed. Nothing in this definition
shall preclude the design, engineering,
construction, or financing, in whole or in
part, of a flood control project by persons
or parties who are not public agencies.
A vehicle which is: Built on a single
chassis; 400 square feet or less when
measured at the largest horizontal
projection; designed to be self-propelled or
permanently towable by a light duty truck;
and designed primarily not for use as a
permanent dwelling but as temporary living
quarters for recreational, camping, travel,
or seasonal use.
Regional Permits are offered for pre -
approved projects which are considered
minor projects that are permissible per III.
Adm. Code Part 3708 rules for
Northeastern Illinois Designated
Floodways. A complete listing of the terms
and conditions for specific project types
can be obtained from the IDNR/OWR
website.
A land surveyor registered in the State of
Illinois, under The Illinois Land Surveyors
Act. (225 ILCS 330/1, et seq.)
An engineer registered in the State of
Illinois, under The Illinois Professional
Engineering Practice Act. (225 ILCS
325/1 et seq.)
Flood -related damages sustained by a
-12-
RETENTION/DETENTION FACILITY
RIVERINE FLOODPLAIN.
START OF CONSTRUCTION
STATEWIDE PERMITS.
81-0-21
Building on two separate occasions
during a 10-year period for which the cost
of repairs at the time of each such Flood
event, on the average, equals or exceeds
25 percent of the market value of the
Building before the damaged occurred.
A retention facility stores stormwater
runoff without a gravity release. A
detention facility provides for storage of
stormwater runoff and controlled release
of this runoff during and after a Flood or
storm.
Any Floodplain subject to flooding from a
river, creek, intermittent stream, ditch, on -
stream lake system or any other identified
Channel. This term does not iinclude
areas subject to flooding from lakes,
ponding areas, areas of sheet flow, or
other areas not subject to overbank
flooding.
Includes Substantial Improvement and
means the date the Building permit was
issued, provided the actual Start of
Construction, repair, reconstruction,
rehabilitation, addition placement or other
improvement, was within 180 days of the
permit date. The actual start means the
first placement of permanent construction
of a Building on a site, such as the
pouring of slab or footings, the installation
of piles, the construction of columns or
any work beyond the stage of excavation,
including the placement of a
Manufactured Home on a foundation.
For a Substantial Improvement, actual
Start of Construction means the first
alteration of any wall, ceiling, floor, or
other structural part of a Building whether
or not that alteration affects the external
dimensions of the Building.
Statewide permits are offered for pre -
approved projects that are considered
minor projects which are permissible per
the IDNR/OWR Part 3700 rules. A
complete listing of the statewide permits
and permit requirements can be obtained
-13-
STRUCTURE.
SUBSTANTIAL DAMAGE.
SUBSTANTIAL IMPROVEMENT
from the IDNR/OWR website.
The results of a man-made change to the
land constructed on or below the ground,
including a Building any addition to a
Building; installing utilities, construction of
roads or similar projects; construction or
erection of levees, walls, fences, bridges
or culverts; drilling, mining, filling,
dredging, grading, excavating; and the
storage of materials.
Damage of any origin sustained by a
Building whereby cost to repair the
building to its before damaged condition
equals or exceeds 50 percent of the
market value of the Building before the
damage occurred, regardless of actual
repair work performed. The term
includes flood related damages
sustained by a Building on two separate
occasions in a 10-year period, in which
the cost of the repairs, on average,
equals or exceeds 25 percent of the
market value of the Building at the time
of each such flood event.
Any reconstruction, rehabilitation,
addition, or improvement of a Building
taking place during a 10-year period in
which the percentage of improvements,
figured cumulatively by dividing the cost
of each improvement by the market value
of the Building prior to the start of
construction of each improvement,
equals or exceeds 50 percent.
(A) Substantial Improvement is considered
to occur when the first alteration of any
wall, ceiling, floor, or other structural part of
the Building commences, whether or not
that alteration affects the external
dimensions of the Building. This term
includes Buildings which have incurred
Repetitive Loss or Substantial Damage,
regardless of the actual work done.
(B) The term does not, however, include
either:
-14-
81-0-21
1. Any project for improvement of a
Building to correct existing violations of
state or local health, sanitary, or safety
code specifications which have been
identified by the local code enforcement
official and which are solely necessary to
assure safe living conditions, or
2. Any alteration of a Historic Structure
listed on the National Register of Historic
Places or the Illinois Register of Historic
Places, provided that the alteration will not
preclude the Building's continued
designation as a Historic Structure.
TRANSITION SECTION. Reaches of the stream or Floodway
where water flows from a narrow cross-
section to a . wide cross-section or vice
VIOLATION.
4-13-3. - ADMINISTRATION.
versa.
The failure of a structure or other
development to be fully compliant with
this Chapter.
4-13-3-1. - FLOODPLAIN DEVELOPMENT PERMIT.
(A) No person, firm, corporation, or governmental body shall commence any
Development activities, including New Construction, Substantial Improvements, and
alterations of a watercourse wholly within, partially within or in contact with the
Floodplains until a floodplain development permit is obtained from the Floodplain
Administrator. No permit shall be issued by the Floodplain Administrator until the
requirements of this Chapter have been met.
(B) No person, firm, corporation, or governmental body shall commence any
development of a critical facility on land below the 0.2% annual chance flood elevation
without first obtaining a development permit from the Floodplain Administrator.
(C) A local floodplain development permit shall not be issued by the Floodplain
Administer for Development in a Floodway without the applicant first obtaining a state
floodway permit from IDNR/OWR, except as noted in Section 4-13-6.
-15-
81-0-21
(D) The Floodplain Administrator shall review all proposed Development by comparing
field surveyed topography of the site to the FIRM and shall make interpretations, where
needed, as to the location of the floodplain boundaries, floodway boundaries, and BFE.
1. Any Development that is located on land below the BFE, located in the
mapped Floodway, or associated with a Zone AO or VE is subject to the
requirements of this Chapter. A LOMA-Floodway (LOMR-FW) shall be required
before issuing a floodplain development permit for land higher than the BFE if
located within a mapped floodway.
2. Any Development located on land below the BFE that was filled after the date
of the site's first Floodplain designation on a flood map is subject to the
requirements of this Chapter.
3. Any Development located on land below the BFE that is that is hydraulically
connected to the Floodplain, but not shown on the current FIRM, is subject to the
provisions of this Chapter.
4. The Floodplain Administrator shall maintain documentation of the pre-existing
ground elevation at the site and, if applicable, certification that this ground elevation
existed prior to the date of the site's first FIRM identification in the Floodplain.
(E) If the Development site is within a Floodway or in a Floodplain for which a detailed
study has not been conducted, the floodplain development permit shall be referred to a
P.E. under the employ or contract of the City of Evanston for review to ensure that the
Development meets the requirements of this Chapter.
(F) A floodplain development permit or approval shall become invalid unless the actual
Start of Construction, for work authorized by such permit, is commenced within 180
days after its issuance, or if the work authorized is suspended or abandoned for a
period of 180 days after the work commences.
The Floodplain Administrator shall ensure that all Development activities happen in a
timely manner. All permitted work shall be completed within eighteen months after the
date of issuance of the permit or the permit shall expire. Time extensions, of not more
than 180 days each, may be granted, in writing, by the Floodplain Administrator. Time
extensions shall be granted only if the original permit is compliant with this Chapter and
the FIRM and FIS in effect at the time the extension is granted.
(G) Letters of Map Revision. The Floodplain Administrator shall require a CLOMR prior
to issuance of a development permit for proposed floodway encroachments that will
cause an increase in the BFE; and proposed development which will increase the BFE
by more than 0.1 feet in riverine area where FEMA has provided a BFE but no
floodway.
-16-
81-0-21
Once a CLOMR has been issued, the development permit may be issued for site
grading and structures necessary in the area of the map change to achieve the final
LOMR. Upon completion, the applicant shall submit as -built certifications, as required
by FEMA, to achieve a final LOMR prior to the release of final development permits.
Review Section 4-13-8(C)(11) for the construction of buildings in any floodplain issued a
LOMR Based on Fill.
(H) Application. An application for a floodplain development permit shall be made on a
form provided by the Floodplain Administrator.
1. The application shall be accompanied by drawings of the site, drawn to scale,
showing property line dimensions and legal description for the property and
sealed by a Registered P.E, licensed architect or Registered Land Surveyor;
existing grade elevations, using the NAVD.88, and all proposed changes in
grade resulting from excavation or filling; the location and dimensions of all
existing and proposed Buildings, additions to Buildings, sewage disposal and
water supply facilities; Floodplain limits based on elevation or depth, as
applicable; Floodway limits, as applicable; location and dimensions of all
structures, including but not limited to fences, culverts, decks, gazebos,
agricultural structures, and Accessory Structures.
2. For all proposed Buildings, the elevation of the Lowest Floor (including
Basement) and lowest adjacent grade shall be shown on the submitted plans
and the Development will be subject to the requirements of Section 4-13-8 of
this Chapter.
4-13-3-2 - DUTIES OF THE FLOODPLAIN ADMINISTRATOR.
(A) Check all new Development sites to determine whether they are in a Floodplain using
criteria listed in Section 4-134 of this Chapter or for Critical Facilities, using the 0.2%
annual chance flood elevation, if defined.
(B) If the site is in a Floodplain, determine whether the site in a Coastal High Hazard Area,
Moderate Wave Action Area, Floodway, Flood Fringe or in a Floodplain for which a
detailed study has not been conducted.
(C) If the site within a Flood Fringe, require that the minimum requirements of Sections 4-
13-5 and 4-13-8 be met.
(D) If the site within a Floodway, require that the minimum requirements of Sections 4-13-
6 and 4-13-8 be met.
(E) If the site is located within a Floodplain for which no detailed study has been
completed and approved, require that the minimum requirements of Sections 4-13-7 and
4-13-8 be met.
-17-
81-0-21
(F) If the site is within a Coastal High Hazard Area or Moderate Wave Action Area, require
that the minimum requirements of Section 4-13-8 be met.
(G) Inspect all projects before, during and after construction to assure proper elevation of
the Building and to ensure compliance with the provisions of this Chapter.
(H) Schedule, on an annual basis, an inspection of the Floodplain and document the
results of the inspection.
(1) Review Elevation Certificates and Floodproofing Certificates for accuracy and require
incomplete or deficient certificates be corrected and maintained in permit files including:
1. Elevation Certificate certifying the elevation of the Lowest Floor (including
Basement) of a residential or non-residential Building subject to Section 4-13-8 of
this Chapter, or an Elevation Certificate certifying the elevation of the lowest
horizontal structural member of the Lowest Floor, where required by Section 4-13-
8(C)(10) and/or;
2. Floodproofing Certificate certifying the elevation to which a non-residential
Building has been dry floodproofed, using a Floodproofing Certificate, for all
Buildings required to be dry floodproofed pursuant to Section 4-13-8 of this
Chapter.
3. Certification of structural design and methods of construction for VE zone
construction as required by Section 4-13-8(C)(10).
4. Certification of breakaway wall design, when applicable, as provided in Section
4-13-8(C)(10).
J. Maintain for public inspection and furnish upon request all permit records, including but
not limited to Base Flood data, Floodplain and Designated Floodway maps, copies of
federal or state permit documents, variance documentation, soil compaction records,
Conditional Letter of Map Revision, Letter of Map Revision, Letter of Map Amendment, as -
built elevation, Floodproofing Certificates and Elevation Certificates for all Buildings
constructed subject to this Chapter.
K. Floodway Permits. For all Development projects in a Floodway, ensure that
construction authorization has been granted by IDNR/OWR or a Delegated Community, or
written documentation is provided stating that a permit is not required from IDNR/OWR,
issued pursuant to 615 ILCS 5/5 et seq. Floodway permit requirements are specified in
Sections 4-13-6 and 4-13-7 of this Chapter.
L. Permits for Dams may be required from IDNR/OWR. The Floodplain Administrator
shall contact IDNR/OWR to determine if a permit is required and for application details.
Any work involving the construction, modification, or removal of a Dam, per 17 III. Adm.
INd M.
E311MiVAIII
Code Part 3702 (Rules for Construction of Dams), shall obtain an IDNR/OWR permit prior
to the issuing a local permit.
M. Ensure any and all required federal, state, and local permits are received prior to the
issuance of a Floodplain Development permit, including, but not limited to, permits
pertaining.to the Clean Water Act, Public Water Supply, Endangered Species Act, and
Illinois Endangered Species Protection Act.
N. Establish procedures for administering and documenting determinations, as outlined
below, of Substantial Improvement and Substantial Damage made pursuant to Section 4-
1 M.
1.Determine the market value or require the Applicant to obtain an appraisal of the
market value prepared by a qualified independent appraiser, of the Building before
the Start of Construction of the proposed work. In the case of repair, the market
value of the Building shall be the market value before the damage occurred and
before any repairs are made.
2. Compare the cost to perform the improvement, the cost to repair a damaged
Building to its pre -damaged condition, or the combined costs of improvements and
repairs, if applicaUe, to the market value of the Building, including the cost of
volunteer labor and donated materials must be included.
3. Determine and document whether the proposed work constitutes Substantial
Improvement or Substantial Damage.
4. Notify the Applicant if it is determined that the work constitutes Substantial
Improvement or repair of Substantial Damage and that compliance with the Flood
resistant construction requirements of the City of Evanston and this Chapter is
required.
O. Cooperation with Other Agencies.
1. Cooperate with state and federal Floodplain management agencies to improve
Base Flood and Floodway data and to improve the administration of this Chapter;
2. Submit data to IDNR/OWR and FEMA for proposed revisions of a regulatory
map within 6 months whenever a modification of the Floodplain may change the
BFE or result in a change to the Floodplain map;
3. Submit reports as required for the NFIP; and
4. Notify FEMA of any proposed amendments to this Chapter.
_19-
81-0-21
P. Promulgate rules and regulations as necessary to administer and enforce the
provisions of this Chapter, subject however to the review and approval of IDNR/OWR and
FEMA for any Chapter changes.
Q. Notify IDNR/OWR and adjacent communities in writing 30 days prior to the issuance of
a permit for the alteration or relocation of a watercourse.
R. If a variance is to be granted, the Floodplain Administrator shall review the
requirements of Section 4-13-10 to make sure they are met. In addition, the Floodplain
Administrator shall complete all notifications requirements, prepare a staff report and
recommendations.
S. Enforce the provisions of this Chapter, investigate violations, issue notices of violation
or stop work orders, and require corrective action, as outlined in Section 4-13-12.
4-13-4. - BASE FLOOD ELEVATION.
This Chapter's protection standard is based on the FIS for Cook County.
If a BFE is not available for a particular site, then the protection standard shall be according
to the best existing data available from federal, state, or other sources.
When a party disagrees with the best available data, they shall submit a detailed
engineering study needed to replace existing data with better data and submit it to
IDNR/OWR and FEMA for review and consideration prior to any Development of the site.
A. The BFE for the Floodplains of Evanston shall be as delineated on the Base Flood
profiles in the FIS of Cook County prepared by FEMA dated September 10, 2021 and
such amendments or revisions to such study and maps as may be prepared from time to
time.
B. The BFE for the Floodplains of those parts of unincorporated Cook County that are
within the extraterritorial jurisdiction of the City of Evanston or that may be annexed into
the City of Evanston shall be as delineated on the Base Flood profiles in the FIS of Cook
County prepared by FEMA and dated September 10, 2021, and such amendments or
revisions to such study and maps as may be prepared from time to time.
C. The BFE for each Floodplain delineated as an AH Zone or AO Zone shall be that
elevation (or depth) indicated on the countywide FIRM of Cook County and dated
September 10, 2021, and such amendments or revisions to such study and maps as may
be prepared from time to time. For any AH zone with an elevation specified in a table of
still water elevations in the FIS, the BFE shall be the elevation specified in the table of still
water elevations.
D. The BFE for each of the remaining Floodplains delineated as an A Zone on the
countywide FIRM of Cook County shall be according to the best existing data available
-20-
81-0-21
from federal, state, or other sources. Should no other data exist, an engineering study
must be financed by the Applicant to determine BFEs.
1. When no BFE exists, the BFE for a riverine Floodplain shall be determined from
an accepted hydraulic model, based on current industry standards.
2. The Flood flows used in the hydraulic models shall be obtained from an
accepted hydrologic model, based on current industry standards, or by techniques
presented in various publications prepared by the United States Geological Survey
for estimating peak Flood discharges.
E. The BFE for any zone VE floodplain, and for a zone AE floodplain in an area subject to
flooding effects from Lake Michigan, shall be the highest elevation specified on the FIRM
among all flood zones affecting the proposed development. Where development is
proposed to encroach upon a riverine Zone AE which is subject to flooding effects from
Lake Michigan, the requirements of Section 4-13-7 shall apply to the entire floodplain.
4-13-5. - OCCUPATION AND USE OF FLOOD FRINGE AREAS.
Development in and/or filling of the Flood Fringe will be permitted if protection is provided
against the Base Flood by proper elevation, compliance with Compensatory Storage
requirements, and other applicable provisions of this Chapter. No use will be permitted that
adversely affects the capacity of drainage facilities or systems. Developments located
within the Flood Fringe shall meet the requirements of this Section, along with the
requirements of Section 4-13-8.
A. Preventing Increased Damages
1. No Development in the Flood Fringe shall create a threat to public health and
safety.
2. If fill is being used to elevate the site above the BFE, the Applicant shall submit
sufficient data and obtain a LOMR from FEMA for the purpose of removing the site
from the Floodplain. See Section 4-13-8(C)(11) for additional requirements.
3. Compensatory Storage.
Whenever any portion of a Floodplain is authorized for use, the volume of space
which will be occupied by the authorized fill or Structure below the BFE shall be
compensated for and balanced by a hydraulically equivalent volume of excavation
taken from below the BFE.
a. The excavation volume shall be at least equal to 1.5 times the volume of
storage lost due to the fill or Structure
b. In the case of streams and watercourses, such excavation shall be made
opposite or adjacent to the areas so filled or occupied.
-21-
81-0-21
c. All Floodplain storage lost below the existing 10-percent annual chance
Flood elevation shall be replaced below the proposed 10-percent annual
chance Flood elevation. All Floodplain storage lost above the existing 10-
percent annual chance Flood elevation shall be replaced above the
proposed 10-percent annual chance Flood elevation.
d. All such excavations shall be constructed to drain freely and openly to the
watercourse.
4-13-6. - OCCUPATION AND USE OF DESIGNATED FLOODWAYS
This section applies to proposed Development, redevelopment, site modification or Building
modification within a Designated Floodway. The Designated Floodway shall be as
delineated on the countywide FIRM of Cook County, Floodplain development permits may
only be issued for works that meets 17 III. Adm. Code Part 3708, which restricts
development to Appropriate Uses of the Designated Floodway of which periodic inundation
will not pose a danger to the general health and welfare of the user, or require the
expenditure of public funds, or the provisions of public resources or disaster relief services,
or result in increased Flood stages due to the singular or cumulative loss of regulatory
Floodway storage or regulatory Designated Floodway conveyance, or increase in Flood
velocities. All Floodway modifications shall be the minimum necessary to accomplish the
purpose of the project. The Development shall also meet the requirements of Section 4-13-
8. No application is required for an individual permit from IDNR/OWR if the project meets
Regional Permit No. 3.
A. Floodway Permit
1. In addition to a floodplain development permit, work in the Designated Floodway
of an IDNR/OWR Jurisdictional Stream shall require either a floodway permit from
IDNR/OWR, documentation that the projects meets Regional Permit No. 3, or a
letter from IDNR/OWR stating no permit is required. An application for work in a
Floodway shall be made by submitting a completed application on the form
furnished by IDNR/OWR. The application for work in a Floodway, shall as a
minimum meet all the requirements in 17 III. Adm. Code Part 3708.
a. Engineering calculations and supporting data shall be submitted showing
that the proposed work will meet the permit criteria of Section 4-13-6(B).
b. If the Designated Floodway delineation or BFE will change due to the
proposed project, the application will not be considered complete until
IDNR/OWR has indicated conditional approval of the Designated Floodway
map change.
2. A Licensed P.E., under the employ or contract of the City of Evanston shall
review and approve applications reviewed under this Section.
-22-
81-0-21
B. Preventing Increased Damages and a List of Appropriate Uses
1. The only Development in a Floodway allowed are Appropriate Uses that will not
cause a rise in the BFE and will not create a damaging or potentially damaging
increase in Flood heights or velocity, be a threat to public health and safety and
welfare, impair the natural hydrologic and hydraulic functions of the Floodway or
Channel, or permanently impair existing water quality or aquatic habitat.
Construction impacts shall be minimized by appropriate mitigation methods as
called for in this Chapter. Only those Appropriate Uses listed in 17 III. Adm. Code
Part 3708 will be allowed. The approved Appropriate Uses are as follows:
a. Flood Control Structures, dikes, Dams and other public works or private
improvements relating to the control of drainage, Flooding, erosion, or water
quality or habitat for fish and wildlife.
b. Structures or facilities relating to the use of, or requiring access to, the
water or shoreline, such as pumping and treatment facilities, and facilities
and improvements related to recreational boating, commercial shipping and
other functionally water dependent uses;
c. Storm and sanitary sewer relief outfalls;
d. Underground and overhead utilities;
e. Recreational facilities such as playing fields and trail systems, including
any related fencing (at least 50 percent open when viewed from any one
direction) built parallel to the direction of Flood flows, and including open air
pavilions and toilet facilities (4 stall maximum) that will not block Flood flows
nor reduce Floodway storage.
f. Detached garages, storage sheds, or other non -habitable Accessory
Structures that will not block Flood flows nor reduce Floodway storage;
g. Bridges, culverts, roadways, sidewalks, railways, runways and taxiways
and any modification thereto;
h. Parking lots built at or below existing grade where either:
i. The depth of flooding during the Base Flood will not exceed 1.0
foot: or
ii. The Applicant of a short-term recreational use facility parking lot
formally agrees to restrict access during overbank flooding events
and accepts liability for all damage caused by vehicular access during
all overbank flooding events.
-23-
81-0-21
i. Aircraft parking aprons built at or below ground elevation where the
depth of flooding during the Base Flood will not exceed 1.0 foot;
j. Designated Floodway regrading, without fill, to create a positive non -
erosive slope toward a watercourse.
k. Floodproofing activities to protect previously existing lawful Buildings
including the construction of water tight window wells, elevating Buildings, or
construction of floodwalls around residential, commercial or industrial
principal Buildings where the outside toe of the floodwall shall be no more
than ten (10) feet away from the exterior wall of the existing Building, and,
which are not considered Substantial Improvements to the Building.
I. The replacement, reconstruction, or repair of a damaged Building,
provided that the outside dimensions are not increased, and if the Building
was damaged to fifty (50%) percent or more of the market value before the
damage occurred, the Building will be protected from flooding to the FPE.
m. Modifications to an existing Building that would not increase the enclosed
floor area of the Building below the BFE, and which will not block Flood flows
including but not limited to, fireplaces, bay windows, decks, patios, and
second story additions. If the Building is improved to fifty (50%) percent or
more of the market value before the modification occurred (i.e., a Substantial
Improvement), the Building will be protected from flooding to the FPE.
2. Appropriate Uses do not include the construction or placement of any new
Buildings, fill, Building additions, Buildings on stilts, excavation or Channel
Modifications done to accommodate otherwise non -Appropriate Uses in the
Floodway, fencing (including landscaping or planting designed to act as a fence)
and storage of materials except as specifically defined above as an Appropriate
Use.
3. Within the Designated Floodway, the construction of an Appropriate Use, will be
considered permissible provided that the proposed project meets the criteria
established in 17 III. Adm. Code Part 3708 and is so stated in writing with
supporting plans, calculations, and data by a Registered P.E. and provided that any
Building meets the protection requirements of this Chapter.
a. Preservation of Floodway Storage so as Not to Increase Downstream
Flooding.
i. Compensatory Storage shall be provided for any Designated
Floodway storage lost due to the proposed work from the volume of
fill or Structures placed and the impact of any related Flood control
projects.
-24-
81-0-21
ii. Compensatory Storage for fill or Structures shall be equal to 1.5
times the volume of Designated Floodway storage lost.
iii. Artificially created storage lost due to a reduction in head loss
behind a bridge shall not be required to be replaced.
iv. The compensatory Designated Floodway storage shall be placed
between the proposed normal water elevation and the proposed BFE.
All Designated Floodway storage lost below the existing 10-percent
annual chance Flood elevation shall be replaced below the proposed
10-percent annual chance Flood elevation. All Designated Floodway
storage lost above the existing 10-percent annual chance Flood
elevation shall be replaced above the proposed 10-percent annual
chance Flood elevation. All such excavations shall be constructed to
drain freely and openly to the watercourse.
v. If the Compensatory Storage will not be placed at the location of
the proposed construction, the Applicant's engineer shall
demonstrate through a determination of Flood discharges and water
surface elevations that the Compensatory Storage is hydraulically
equivalent.
vi. There shall be no reduction in Floodway surface area, as a result
of a Floodway modification, unless such modification is necessary to
reduce flooding at an existing Structure.
b. Preservation of Floodway Velocities so as Not to Increase Stream
Erosion or Flood Heights.
i. For all Appropriate Uses, except bridges or culverts or on -stream
Structures, the proposed work will not result in an increase in the
average Channel or Designated Floodway velocities or stage for all
Flood events up to and including the Base Flood event.
ii. In the case of bridges or culverts or on -stream Structures built for
the purpose of backing up water in the stream during normal or Flood
flows, velocities may be increased at the Structure site if scour,
erosion and sedimentation will be avoided by the use of rip -rap or
other design measures.
c. Construction of new bridges or culvert crossings and roadway
approaches shall meet 17 III. Adm. Code Part 3708.
i. The proposed Structure shall not result in an increase of
upstream Flood stages greater than 0.1 foot when compared to
the existing conditions for all Flood events up to and including the
-25-
81-0-21
Base Flood event; or the upstream Flood stage increases will be
contained within the Channel banks (or within existing vertical
extensions of the Channel banks) such as within the design
protection grade of existing levees or floodwalls or within recorded
Flood easements.
i. If the proposed construction will increase upstream Flood
stages greater than 0.1 feet, the developer must contact
IDNR/OWR to obtain a permit for a Dam or waiver.
The engineering analysis of upstream Flood stages must be
calculated using the Flood study flows, and corresponding
Flood elevations for tailwater conditions for the Flood study
specified in Section 4-13-4 of this Chapter. Bridges and
Culverts must be analyzed using any commonly accepted
FEMA approved hydraulic models.
Lost Floodway storage must be compensated for per Section
4-13-7(13)(3)(b).
Velocity increases must be mitigated per Section 4-113-
7(13)(3)(c).
If the crossing is proposed over a Public Body of Water that is
used for recreational or commercial navigation, an IDNR/OWR
permit must be received.
The hydraulic analysis for the backwater caused by the
bridge showing the existing condition and proposed regulatory
profile must be submitted to IDNR/OWR for concurrence that a
CLOMR is not required by Section 4-13-6(B).
All excavations for the construction of the crossing shall be
designed per Section 4-13-6(13)(3)(h).
d. Reconstruction or Modification of Existing Bridges, Culverts, and
Approach Roads shall meet 17 III. Adm. Code Part 3708.
i. The bridge or culvert and roadway approach reconstruction or
modification shall be constructed with no more than 0.1-foot
increase in backwater over the existing Flood profile for all Flood
frequencies up to and including the Base Flood event, if the
existing Structure is not a source of Flood damage.
-26-
81-0-21
ii. If the existing bridge or culvert and roadway approach is a
source of Flood damage to Structures in the upstream Floodplain,
the Applicant's engineer shall evaluate the feasibility of
redesigning the existing bridge or culvert and roadway approach
to reduce the existing backwater,'taking into consideration the
effects on Flood stages on upstream and downstream properties.
iii. The determination as to whether or not the existing crossing is
a source of Flood damage and should be redesigned must be
prepared in accordance with 17 III. Adm. Code Part 3708
(Floodway Construction in Northeastern Illinois) and submitted to
IDNR/OWR for review and concurrence before a permit is issued.
e. On -Stream Structures Built for the Purpose of Backing Up Water shall
meet 17 III. Adm. Code Part 3708.
i. Any increase in upstream Flood stages greater than 0.0 foot when
compared to the existing conditions, for all Flood events up to and
including the Base Flood event shall be contained within the Channel
banks (or within existing vertical extensions of the Channel banks)
such as within the design protection grade of existing levees or
Floodwalls or within recorded Flood easements.
ii. A permit or letter indicating a permit is not required must be
obtained from IDNR/OWR for any Structure built for the purpose of
backing up water in the stream during normal or Flood flow.
iii. All Dams and impoundment Structures, shall meet the permitting
requirements of 17 III. Adm. Code Part 3702 (Construction and
Maintenance of Dams). If the proposed activity involves a
modification of the Channel or Floodway to accommodate an
impoundment, it shall be demonstrated that:
The impoundment is determined to be in the public interest by
providing Flood control, public recreation, or regional
stormwater detention;
The impoundment will not prevent the migration of indigenous
fish species, which require access to upstream areas as part
of their life cycle, such as for spawning;
The impoundment will not cause or contribute to degraded
water quality or habitat conditions. Impoundment design
should include gradual bank slopes, appropriate bank
stabilization measures and a pre -sedimentation basin.
-27-
81-0-21
A non -point source control plan has been implemented in the
upstream watershed to control the effects of sediment runoff
as well as minimize the input of nutrients, oil and grease,
metals, and other pollutants. If there is more than one
municipality in the upstream watershed, the municipality in
which the impoundment is constructed should coordinate with
upstream municipalities to ensure comprehensive watershed
control;
The project otherwise complies with the requirements of
Section 4-13-6.
f. Excavation in the Floodway shall meet 17 III. Adm. Code Part 3708.
g. General Criteria for Analysis of Flood Elevations.
i. The Flood profiles, flows and Floodway data in the Designated
Floodway study, referenced in Section 4-13-5, must be used for
analysis of the base conditions. If the study data appears to be in
error or conditions have changed, IDNR/OWR shall be contacted for
approval and concurrence on the appropriate base conditions data to
use.
ii. If the Floodway elevation at the site of the proposed construction is
affected by backwater from a downstream receiving stream with a
larger drainage area, the proposed construction shall be shown to
meet:
The requirements of this section for the BFEs of the
Designated Floodway conditions; and
Conditions with the receiving stream at normal water
elevations.
iii. If the Applicant learns from IDNR/OWR, local governments, or a
private owner that a downstream restrictive bridge or culvert is
scheduled to be removed, reconstructed, modified, or a Public Flood
Control Project is scheduled to be built, removed, constructed or
modified within the next five years, the proposed construction shall be
analyzed and shown to meet the requirements of this section for both
the existing conditions and the expected Flood profile conditions
when the bridge, culvert or Flood control project is built.
h. Conditional Letter tof Map Revision.
lam
81-0-21
i. If the Appropriate Use would result in a change in the Designated
Floodway location or the BFE, the Applicant shall submit to
IDNR/OWR and FEMA all information, calculations and documents
necessary to be issued a conditional Designated Floodway map
revision and receive from IDNR/OWR a conditional concurrence of
the Designated Floodway change before a permit is issued.
ii. The final Designated Floodway map will not be changed by FEMA
until as -built plans or record drawings of initial filling, grading,
dredging, or excavating activities are submitted and accepted by
FEMA and IDNR/OWR. All field surveys shall be conducted under the
supervision of a Registered P.E. or Registered Land Surveyor and
shall be sealed. All required engineering analyses shall be conducted
under the supervision of a Registered P. E., or in the case of a
federal project, by the federal agency and shall be so sealed or
stated.
iii. In the case of non -government projects, the municipality in
incorporated areas and the county in unincorporated areas shall
concur with the proposed conditional Designated Floodway map
revision before IDNR/OWR approval can be given.
iv. No filling, grading, dredging, or excavating shall take place until a
conditional approval is issued.
v. After receipt of conditional approval of the Designated Floodway
change and issuance of a permit and a Conditional Letter of Map
Revision, construction as necessary to change the Floodway
designation may proceed including filling, grading, dredging, and
excavating. No additional Development activities, including the
construction of Buildings, shall take place in the Floodplain or
Designated Floodway until a final LOMR is issued by FEMA with
concurrence from IDNR/OWR.
i. Public Flood Control Projects. For Public Flood Control Projects, the
permitting requirements of this section will be considered met if the applicant
can demonstrate to IDNR/OWR through hydraulic and hydrologic
calculations that the proposed project will not singularly or cumulatively
result in increased flood heights outside the project right-of-way or
easements for all flood events up to and including the 100-year frequency
event.
j. Professional Engineer's Supervision.
All engineering analyses shall be performed by or under the supervision of a
Registered P.E.
-29-
81-0-21
4. Permits for Dams
a. Any work involving the construction, modification, or removal of a Dam
per 17 III. Adm. Code Part 3702 (Rules for Construction of Dams) shall
obtain an IDNR/OWR permit prior to the start of Dam construction,
b. If the Floodplain Administrator finds a Dam that does not have an
IDNR/OWR permit, the Floodplain Administrator shall immediately notify the
IDNR/OWR Bartlett office.
c. If the Floodplain Administrator finds a Dam which is believed to be in
unsafe condition, the Floodplain Administrator shall immediately notify the
owner of the Dam, the IDNR/OWR Bartlett office, and the Illinois Emergency
Management Agency.
5. Activities that do not Require a Registered Professional Engineer's Review
Regional Permit No. 3, which authorizes, for example, underground and overhead
utilities, storm and sanitary sewer outfalls, sidewalks, patios, athletic fields,
playground equipment and streambank protection activities; may be permitted
without a Registered P.E.'s review. Such activities shall still meet the other
requirements of this Chapter, including the mitigation requirements.
4-13-7. - OCCUPATION AND USE OF FLOODPLAIN AREAS WHERE FLOODWAYS
ARE NOT IDENTIFIED.
In riverine Floodplains, where no Floodways have been identified, no Development shall
be permitted unless the cumulative effect of the proposals, when combined with all other
existing and anticipated uses and Structures, shall not significantly impede or increase the
flow and passage of the floodwaters nor significantly increase flood heights. The
Development must meet all applicable requirements of this Ordinance and 17 III. Adm.
Code Part 3700.
A. Floodway Permit
1. In addition to a floodplain development permit, work within an IDNR/OWR
Jurisdictional Stream shall require either a floodway permit from IDNR/OWR,
documentation that the projects meets the conditions of a Statewide Permit listed in
Section 4-13-7(B)(3), or a letter from IDNR/OWR stating no permit is required. In
addition to the requirements of Section 4-13-3, the application for a floodplain
development permit shall also include the following information:
a. A detailed description of the proposed activity, its purpose, and intended
use;
-30-
81-0-21
b. Site location (including legal description) of the property, drawn to scale,
on the FIRM, indicating whether it is proposed to be in an incorporated or
unincorporated area;
c. Anticipated dates of initiation and completion of activity;
d. Plans of the proposed activity shall be provided which include as a
minimum:
i. A vicinity map showing the site of the activity, name of the
waterway, boundary lines, names of roads in the vicinity of the site,
graphic or numerical scale, and north arrow;
ii. A plan view of the project and engineering study reach showing
existing and proposed conditions including principal dimensions of
the Structure or work, elevations, using the NAVD 88, adjacent
property lines and ownership, drainage and Flood control easements,
distance between proposed activity and navigation Channel (when
the proposed construction is in or near a commercially navigable
body of water), Floodplain limit, location and orientation of cross -
sections, north arrow, and a graphical or numerical scale;
iii. Cross-section views of the project perpendicular to the flow of
floodwater and engineering study reach showing existing and
proposed conditions including principal dimensions of the work as
shown in plan view, existing and proposed elevations, normal water
elevation, 10-percent annual chance Flood elevation, BFE, and
graphical or numerical scales (horizontal and vertical); and
iv. A seeding or stabilization plan for the disturbed areas.
e. Engineering calculations and supporting data shall be submitted showing
that the proposed work will meet the criteria of Section 4-13-7(B).
f. Any and all other federal, state, and local permits or approvals that may
be required for this type of Development.
2. Based on the best available existing data according to federal, state, or other
sources, the Floodplain Administrator shall compare the elevation of the site to the
BFE.
a. Should no BFE information exist for the site, the developer's engineer
shall calculate the BFE according to Section 4-13-4(D).
b. The_Floodplain Administrator shall maintain documentation of the existing
ground elevation at the Development site and certification that this ground
-31—
81-0-21
elevation existed prior to the date of the site's current FIRM's Floodplain
identification
B. Preventing Increased Damages
1. No Development in the Floodplain, where a Floodway has not been determined,
shall create a damaging or potentially damaging increase in Flood heights or
velocity or threat to public health, safety and welfare or impair the natural hydrologic
and hydraulic functions of the Floodway or Channel or impair existing water quality
or aquatic habitat. Construction impacts shall be minimized by appropriate
mitigation methods as called for in this Chapter.,
2. Within all riverine Floodplains where the Floodway has not been determined, the
following standards shall apply:
a. The developer shall have a Licensed P.E. state in writing and show
through supporting plans, calculations, and data that the project meets the
engineering requirements of Section 4-13-6 for the entire Floodplain.
b. As an alternative, the developer should have an engineering study
performed to determine a Floodway and submit that engineering study to
IDNR/OWR and FEMA for acceptance as a Designated Floodway.
c. Upon acceptance of the Floodway by IDNR/OWR and FEMA, the
developer shall then demonstrate that the project meets the requirements of
Section 4-13-6 for the Designated Floodway. The Floodway shall be defined
according to the definition in Section 4-13-2 of this Chapter
d. A Development permit shall not be issued unless the Applicant first
obtains an IDNR/OWR permit or a determination has been made that an
IDNR/OWR permit is not required.
e. Permits for Dams.
i. Any work involving the construction, modification, or removal of a
Dam per 17 III. Adm. Code Part 3702 (Rules for Construction of
Dams) shall obtain an IDNR/OWR permit prior to the start of dam
construction.
ii. If the Floodplain Administrator finds a Dam that does not have an
IDNR/OWR permit, the Floodplain Administrator shall immediately
notify the IDNR/OWR Bartlett office.
iii. If the Floodplain Administrator finds a Dam which is believed to be
in unsafe condition, the_Floodplain Administrator shall immediately
-32-
F-3990.E
notify the owner of the Dam, the IDNR/OWR Bartlett office, and the
Illinois Emergency Management Agency.
3. The following activities may be permitted without a Licensed P.E.'s review or
calculation of BFE and Designated Floodway. Such activities shall still meet the
other requirements of this Chapter.
a. Bridge and culvert crossings of streams in rural areas meeting conditions
of IDNR/OWR Statewide Permit No. 2;
b. Barge fleeting facilities meeting conditions of IDNR/OWR Statewide
Permit No. 3;
c. Aerial utility crossings meeting conditions of IDNR/OWR Statewide Permit
No. 4
d. Minor boat docks meeting conditions of IDNR/OWR Statewide Permit No.
5;
e. Minor, non -obstructive activities meeting conditions of IDNR/OWR
Statewide Permit No. 6; activities (not involving fill or positive change in
grade) are covered by this permit;
f. Outfall Structures and drainage ditch outlets meeting conditions of
IDNR/OWR Statewide Permit No. 7;
g. Underground pipeline and utility crossings meeting the conditions of
IDNR/OWR Statewide Permit No. 8;
h. Bank stabilization projects meeting the conditions of IDNR/OWR
Statewide Permit No. 9;
i. Accessory Structures and additions to existing residential Buildings
meeting the conditions of IDNR/OWR Statewide Permit No. 10;
j. Minor maintenance dredging activities meeting conditions of DNiR/OWR
Statewide Permit No. 11;
k. Bridge and culvert replacement Structures and bridge widenings meeting
conditions of IDNR/OWR Statewide Permit No. 12;
I. Temporary construction activities meeting conditions of IDNR/OWR
Statewide Permit No. 13;
m. Special Uses of Public Waters meeting conditions of IDNR/OWR
Statewide Permit No. 14; and
-33-
81-0-21
n. Any Development determined by IDNR/OWR to be located entirely within
a Flood Fringe area shall be exempt from State Floodway permit
requirements.
4. The Flood carrying capacity of any altered or relocated watercourse shall be
maintained.
5. Compensatory Storage.
a. Whenever any portion of a Floodplain is authorized for use, the volume of
space which will be occupied by the authorized fill or Structure below the BFE
shall be compensated for and balanced by a hydraulically equivalent volume
of excavation taken from below the BFE.
b. The excavation volume shall be at least equal to 1.5 times the volume of
storage lost due to the fill or Structure.
c. In the case of streams and watercourses, such excavation shall be made
opposite or adjacent to the areas so filled or occupied.
d. All Floodplain storage lost below the existing 10-percent annual chance
Flood elevation shall be replaced below the proposed 10-percent annual
chance Flood elevation. All Floodplain storage lost above the existing 110-
percent annual chance Flood elevation shall be replaced above the
proposed 10-percent annual chance Flood elevation. All such excavations
shall be constructed to drain freely and openly to the watercourse.
4-13-8. - PERMITTING REQUIREMENTS APPLICABLE TO ALL FLOODPLAIN
AREAS.
In addition to the requirements found in Sections 4-13-5, 4-13-6 and 4-13-7 for
Development in Flood Fringes, Designated Floodways, and Floodplains where no
Floodways have been identified, the following requirements shall be met. Where an
existing or proposed Building or other Development is affected by multiple flood zones, by
multiple BFEs, or both, the Development activity must comply with the provisions of the
Chapter applicable to the most restrictive flood zone and the highest base flood elevation
affecting any part of the existing or proposed Building, or for other developments, affecting
any part of the Development area.
A. Public Health and Other Standards
1. No Developments in the Floodplain shall include locating or storing chemicals,
explosives, buoyant materials, animal wastes, fertilizers, flammable liquids,
pollutants, or other hazardous or toxic materials below the FPE unless such
materials are stored in a floodproofed and anchored storage tank and certified by a
-34-
81-0-21
P.E. or floodproofed Building constructed according to the requirements of this
Chapter.
2. Public utilities and facilities such as sewer, gas and electric shall be located.and
constructed to minimize or eliminate Flood damage.
3. Public sanitary sewer systems and water supply systems shall be located and
constructed to minimize or eliminate infiltration of floodwaters into the systems and
discharges from the systems into floodwaters.
4. New and replacement water supply systems, wells, sanitary sewer lines and on -
site waste disposal systems may be permitted providing all manholes or other above
ground openings located below the FPE are watertight. New and replacement on -
site sanitary sewer lines or waste disposal systems shall be located and constructed
to avoid impairment to them or contamination from them during flooding.
5. All other activities, defined as Development, such as pools, fences, filling, paving,
etc., shall be designed so as not to alter Flood flows or increase potential Flood
damages. Non-structural fill within a Coastal high hazard area (zone V, V1-30, or
VE) or within a Moderate Wave Action Area shall be permitted only if an engineering
report demonstrates that the fill will not cause wave runup, ramping, or deflection of
floodwaters that cause damage to buildings.
6. The use of fill for structural support of buildings within a Coastal high hazard
area (zone V, V1-30, or VE) or within a Moderate Wave Action Area is prohibited.
7. Man-made alterations of sand dunes within a Coastal high hazard area (zone V,
V1-30, or VE) or within a Moderate Wave Action Area are prohibited unless an
engineering report documents that the alterations will not increase potential flood
damage by reducing the wave and flow dissipation characteristics of the sand
dunes.
8. Within a Coastal high hazard area or within a Moderate Wave Action Area,
bulkheads, seawalls, revetments, and other erosion control structures shall not be
connected to the foundation or superstructure of a Building, and shall be designed
and constructed so as not to direct floodwaters or increase flood forces or erosion
impacts on the foundation or superstructure of any Building.
B. Carrying Capacity and Notification of Adjacent Communities
1. For all projects involving Channel Modification, fill, or stream maintenance
(including levees), the Flood carrying capacity of the watercourse shall be
maintained.
2. In addition, the City of Evanston shall notify adjacent communities in writing 30
days prior to the issuance of a permit for the alteration or relocation of the
watercourse.
-35-
81-0-21
C. Protecting Buildings
1. In addition to the damage prevention requirements in Sections 4-13-5 and 4-13-6
of this Chapter, all Buildings located within a Floodplain, shall be protected from
Flood damage below the FPE. This Building protection criteria applies to the
following situations:
a. New Construction or placement of a new Building or alteration or addition
to an existing Building.
b. Substantial Improvements, made to any existing Building. If substantially
improved, both the existing Building and any addition must meet the Flood
protection standards of this section.
c. A Substantially Damaged Building under repair. Substantial Damage shall
be figured cumulatively during a 10-year period by comparing the cost to
repair the building to its pre -damage condition with the market value of the
building immediately prior to the damage, for each event in which the building
sustains damage, and adding the percentages of damage for each event. If
Substantially Damaged, the entire Building must meet the Flood Protection
standards of this section.
d. Installing a Manufactured Home on a new site or a Manufactured Home
on an existing site.
e. Installing a travel trailer or Recreational Vehicle on a site for more than
180 consecutive days; and
f. Repetitive Loss to an existing Building.
2. Residential Buildings: In zones A, AO, AH, and AE, the lowest floor, including
Basement, of New Construction of residential Buildings, and Substantially
Improved residential Buildings, must be elevated to the FPE, and are subject to
the more specific additional requirements below.
a. If fill, including grading to redistribute onsite material to alter existing
topography, is used as a means of elevation:
i. The fill shall be placed in layers no greater than six inches before
compaction and must extend at least twenty (20) feet beyond the
foundation before sloping below the FPE in lieu of a geotechnical
report.
ii. The fill shall be protected against erosion and scour during
flooding by vegetative cover, riprap, or other structural measure.
-36-
81-0-21
iii. The fill shall be composed of clean rock or soil and not include
debris or refuse material.
iv. The fill shall not adversely affect the flow of surface drainage
from or onto neighboring properties.
b. If the Building's lowest floor is elevated above ground level with an
enclosed or unenclosed area below the lowest floor:
i. The Building shall be elevated on piles, walls, columns, or other
foundation that is permanently open to floodwaters.
ii. All enclosed areas below the FPE shall provide for equalization
of hydrostatic pressures by allowing the automatic entry and exit of
floodwaters. A minimum of two (2) permanent openings shall be
provided on at least two walls located below the BFE and no more
than one (1) foot above finished grade. The openings shall provide
a total net area of not less than one (1) square inch for every one
(1) square foot of enclosed area subject to flooding, or the design
must be certified by a Registered P.E, as providing the equivalent
performance in accordance with accepted standards of practice.
Refer to FEMA TB1, Openings in Foundation Walls and Walls of
Enclosures, for additional guidance.
iii. All electrical lines, switches, receptacles, and fixtures must be
located above the FPE except to the minimum extent required by
applicable building or life -safety codes. Any switches, receptacles,
and/or fixtures required by applicable building or life -safety codes to
extend below the FPE shall be rated, or located in enclosures
rated, for prolonged submersion.
iv. The Building, foundation, and supporting members shall be
adequately anchored to prevent flotation, collapse, or lateral
movement of the Building resulting from hydrodynamic and
hydrostatic loads, including the effects of buoyancy, and be
designed so as to minimize exposure to current, waves, ice, and
floating debris.
v. All Building components below the FPE shall be constructed of
materials resistant to Flood damage.
vi. Water and sewer pipes, electrical and telephone lines,
submersible pumps, and other service facilities may be located
below the FPE provided they are waterproofed.
-37-
81-0-21
vii. The area below the FPE shall be used solely for parking,
storage, or building access and not later modified or occupied as
habitable space.
3. Nonresidential Buildings: In zones A, AO, AH, and AE, the lowest floor
(including basement) of New Construction of nonresidential buildings, and
Substantial Improvement of nonresidential Buildings, must.either (1) be elevated
to or above the FPE, subject to the more specific additional requirements of
Sections 4-13-8(C)(2)(a) through 4-13-8(C)(2)(b) above; or (2) be structurally dry=
floodproofed, provided a Registered P.E. or architect has developed and/or
reviewed the structural design, specifications, and plans for construction, and the
Registered P.E. or architect submits a FEMA Floodproofing Certificate, certifying
that the design and methods of construction are in accordance with accepted
standards of practice for meeting the requirements of ASCE 24-14, and the
following conditions:
a. Below the FPE, the Building and attendant utility and sanitary facilities
shall be watertight with walls substantially impermeable to the passage of
water and structural components capable of resisting hydrostatic and
hydraulic loads and the effects of buoyancy.
b. The Building design accounts for Flood velocities, duration, rate of rise,
hydrostatic and hydrodynamic forces, the effects of buoyancy, and impact
from debris and ice.
c. Floodproofing measures will be incorporated into the Building design
and operable without human intervention and without an outside source of
electricity.
d. The Building, utility, and sanitary facilities' design and construction will
prevent the effect of sewer backup into the building.
e. Levees, berms, floodwalls, and similar works are not considered
Floodproofing for the purpose of this Chapter.
4. In zones A, AO, AH, and AE, all placement or substantial improvement of
Manufactured Homes and permanent installation of travel trailers on site for more
than 180 consecutive days, shall be:
a. Elevated with the Lowest Floor at or above the FPE using a support
and anchoring system, designed by a P.E. pursuant to 77 III. Adm. Code §
870.110.
b. Anchored to resist flotation, collapse, or lateral movement by being tied
down in accordance with the rules and regulations for the Illinois Mobile
Home Tie -Down Act issued pursuant to 77 III. Adm. Code § 870.220
-38-
81-0-21
5. In zones A, AO, AH, and AE, travel trailers and Recreational Vehicles, on site
for more than 180 consecutive days, shall meet the elevation requirement and
anchoring requirements of Section 4-13-8(C)(4) unless the following conditions
are met:
a. The vehicle must be either self-propelled or towable by a light duty
truck.
b. The vehicle must not be attached to any permanent additions or
external Structures, such as decks and porches.
c. The vehicle must be designed solely for recreation, camping, travel, or
seasonal use rather than as a permanent dwelling.
d. The vehicles having a total area not exceeding four hundred (400)
square feet when measured at the largest horizontal projection.
e. The vehicle's wheels must remain on axles and have inflated tires.
f. Any air conditioning units must be attached to the frame so as to be
safe for movement out of the Floodplain.
g. The vehicle must be attached to a site only by quick disconnect type
utilities and security devices. Utility connections include, but are not limited
to, propane tanks, electrical and sewage.
h. The vehicle must be licensed and titled as a Recreational Vehicle or
park model, be entirely supported by jacks, or have a hitch jack
permanently mounted, have the tires touching the ground and be
supported by block in a manner that will allow the block to be easily
removed by use of the jacks/hitch jack.
6. In zones A, AO, AH, and AE, detached Accessory Structures may be
constructed with the Lowest Floor below the FPE provided the following
conditions are met:
a. The Building must be non -habitable, must not include areas intended
or used for cooking, and must not include bathrooms, toilet rooms, or
shower rooms.
b. All areas below the BFE shall be constructed with Flood -resistant
materials.
c. The Building must be used only for the storage and parking and cannot
be modified later into another use.
-39-
Q91M
d. The Building shall be located outside of the Designated Floodway
unless the Building can be constructed and placed on a Building site so as
not to block Flood flows nor reduce Floodway storage (Section 4-13-
6(13)(1)(f), can also meet the Appropriate Use criteria of Section 4-13-6,
and all other applicable requirements of this Chapter
e. All electrical lines, switches, receptacles, and fixtures must be located
above the FPE except to the minimum extent required by applicable
building or life -safety codes. Any switches, receptacles, and/or fixtures
required by applicable building or life -safety codes to extend below the
FPE shall be rated, or located in enclosures rated, for prolonged
submersion.
f. No plumbing, heating, or air conditioning shall be permitted in
Accessory Structures allowed under this subsection to be wet
floodproofed in lieu of elevation.
g. The structure must have at least two (2) permanent openings on at
least two walls not more than one (1) foot above grade and below the
BFE, with one (1) square inch of opening for every one (1) square foot of
floor area.
h. The structure must be no more than one story in height and no more
than six hundred (600) square feet in size.
i. The Building shall be anchored to resist floatation and overturning.
j. All flammable or toxic materials (gasoline, paint, insecticides, fertilizers,
etc.) shall be stored above the FPE.
k. The Lowest Floor elevation should be documented, and the owner
advised of the Flood insurance implications of building with the Lowest
Floor below the BFE.
7. In Floodplain zones AO and AH, drainage paths shall be provided to guide water
around and away from the Buildings.
8. The repair, remodeling, or maintenance of existing Buildings located within a
Designated Floodway, built before November 18, 1987, are exempt from 17 III. Adm
Code Part 3708, including the more restrictive Appropriate Use standards. Such
Buildings are not exempt from Section 4-13-8(A), including Substantial Damage and
Substantial Improvement requirements, and if enlarged, replaced, or structurally
altered must meet the requirements of 17 III. Adm. Code Part 3708.
81-0-21
9. New Construction or Substantial Improvement of Critical Facilities within the
floodplain or the 0.2 percent annual chance flood elevation when defined, shall have
the lowest floor (including basement) elevated or structurally dry floodproofed to the
0.2 percent annual chance flood elevation or three feet above the BFE, whichever is
greater. Adequate parking shall be provided for staffing of the critical facilities at or
above the BFE or 0.2 percent chance flood, when defined. Access routes to all
critical facilities should be reviewed and considered when permitting. Access routes
should be elevated to or above the level of the BFE.
Floodproofing and sealing measures may also be used to provide protection, as
described in Section 7, and must be taken to ensure that toxic substances will not be
displaced by or released into floodwaters.
Critical Facilities include emergency services facilities (such as fire and police
stations), schools, hospitals, retirement homes, senior care facilities, water treatment
plants, and arterial roads and associated bridges.
10. In a Coastal high hazard area (zone VE) and in any area of zone AE designated
as a Moderate Wave Action Area, the building protection requirements of this
Section 4-13-8(C) must be met according to the following criteria:
a. All New Construction and Substantial Improvements shall be elevated on
pilings or columns so that the bottom of the lowest horizonal structural
member of the Lowest Floor (excluding the pilings or columns) is elevated to
or above the FPE, and the pile or column foundation and structure attached
thereto is anchored to resist flotation, collapse, and lateral movement due to
the effects of wind and water loads acting simultaneously on all building
components.
i. Water loading values used shall be those associated with the Base
Flood.
ii. Wind loading values shall be those defined according to American
Society of Civil Engineers 7-16 Minimum design loads and associated
criteria for buildings and other structures, or other equivalent standard.
b. A registered professional engineer or architect shall develop or review the
structural design, specifications and plans for the construction, and shall
certify that the design and methods of construction to be used are in
accordance with accepted standards of practice for meeting the provisions of
Section 4-13-8(C)(10)(a).
c. All New Construction and Substantial Improvements shall have the space
below the Lowest Floor either free of obstruction or constructed with non -
supporting Breakaway Walls, open wood lattice -work, or insect screening
intended to collapse without causing collapse, displacement, or other
-41
Doc ID: 3cb8b991625aa8ad19d9d5dfbc728d2481e5e05c
81-0-21
structural damage to the elevated portion of the building or supporting
foundation system.
i. For the purpose of Section 4-13-8(C)(10)(c), a Breakaway Wall
shall have a design safe loading resistance of not less than 10 and no
more than 20 pounds per square foot.
ii. Use of Breakaway Walls which exceed a design safe loading
resistance of 20 pounds per square foot (either by design or where so
required by local or state codes) may be permitted only if a registered
professional engineer or architect certifies that the designs proposed
meet all of the following conditions:
Breakaway Wall collapse shall result from a water load less
than that which would occur during the base flood; and
The elevated portion of the Building and supporting foundation
system shall not be subject to collapse, displacement, or other
structural damage due to the effects of wind and water loads
acting simultaneously on all building components (structural
and non-structural). Water loading values shall be those
associated with the base flood. Wind loading values shall be
those defined according to American Society of Civil Engineers
7-16 Minimum design loads and associated criteria for
buildings and other structures, or equivalent standard.
iii. All space enclosed by Breakaway Walls, open wood lattice -work,
or insect screening below the lowest floor shall be used solely.for
parking of vehicles, building access, or storage.
d. Placement or Substantial Improvement of Manufactured Homes must
comply with Section 4-13-8(C)(10)(a) through Section 4-13-8(C)(10)(c).
e. Recreational Vehicles, including park models, must either be on site for
fewer than 180 consecutive days; or be fully licensed and ready for highway
use; or comply with Section 4-13-8(C)(10)(a) through Section 4-13-
8(C)(10)(c).
11. When construction of a building following a LOMR Based on Fill is
requested, the condition where a site in the floodplain is removed due to the use
of fill to elevate the site above the BFE, the applicant may not apply for a permit
from the City of Evanston to construct the lowest floor of a building below the
BFE in the floodplain.
D. Compensatory Storage.
-42-
81-0-21
1. Whenever any portion of a riverine Floodplain is authorized for use, the volume of
space which will be occupied by the authorized fill or Structure below the BFE shall
be compensated for and balanced by a hydraulically equivalent volume of
excavation taken from below the BFE.
2. The excavation volume shall be at least equal to 1.5 times the volume of storage
lost due to the fill or Structure.
3. In the case of streams and watercourses, such excavation shall be made
opposite or adjacent to the areas so filled or occupied.
4. All Floodplain storage lost below the existing 10-percent annual chance Flood
elevation shall be replaced below the proposed 10-percent annual chance Flood
elevation. All Floodplain storage lost above the existing 110-percent annual chance
Flood elevation shall be replaced above the proposed 10-percent annual chance
Flood elevation. All such excavations shall be constructed to drain freely and openly
to the watercourse.
4-13-9. - SUBDIVISION REQUIREMENTS.
The Evanston City Council shall consider Flood hazards, to the extent that they are known
in all official actions related to land management, use and Development.
A. New subdivisions, Manufactured Home parks, annexation agreements, and Planned
Unit Developments within the Floodplain shall be reviewed to assure that the proposed
Developments are consistent with Sections 4-13-5, 4-13-6, 4-13-7 and 4-13-8 of this
Chapter and the need to minimize Flood damage. Plats or plans for new subdivisions,
Manufactured Home parks and Planned Unit Developments shall include a signed
statement by a Registered P.E. that the plat or plans account for changes in the drainage of
surface waters in accordance with the Plat Act (765 ILCS 205/2).
B. Proposals for new subdivisions, Manufactured Home parks, travel trailer parks, Planned
Unit Developments and additions to Manufactured Home parks and additions to
subdivisions shall include BFE data and Floodway delineations. Where this information is
not available from an existing adopted study, the Applicant's engineer shall be responsible
for calculating the BFE per Section 4-13-4(D). and the Floodway delineation.
C. Streets, blocks, lots, parks, and other public grounds shall be located and laid out in
such a manner as to preserve and utilize natural streams and Channels. Wherever
possible, the Floodplains shall be included within parks or other public grounds.
D. The Evanston City Council shall not approve any Planned Unit Development or plat of
subdivision located outside the corporate limits unless such agreement or plat is in
accordance with the provisions of this Chapter.
-43-
81-0-21
E. All public utilities and facilities, such as sewer, gas, electrical and water systems, must
be located and constructed to minimize or eliminate Flood damage.
4-13-10. —VARIANCES.
A. No variances shall be granted within a Designated Floodway if any increase in Flood
levels would result.
B. Whenever the standards of this Chapter place undue hardship on a specific
Development proposal, the Applicant may apply for a variance. Upon proper application
and after fifteen (15) days' notice of public hearing, the Community Development Director
and City Engineer shall review the applicant's request for a variance and shall submit the
staff recommendation to the City Council. The City Council may attach such conditions to
granting of a variance, as it deems necessary to further the intent of this chapter.
C. No variance shall be granted unless the Applicant demonstrates, and the Evanston City
Council finds, that all of the following conditions are met:
1. The Development activity cannot be located outside the Floodplain.
2. An exceptional hardship would result if the variance were not granted.
3. The variance granted is the minimum necessary, considering the Flood hazard,
to afford relief.
4. There will be no additional threat to public health or safety, destruction of
beneficial stream uses and functions including, aquatic habitat, creation of a
nuisance, causation of fraud on or victimization of the public, or conflict with existing
local laws or ordinances.
5. There will be no additional public expense for Flood protection, lost
environmental stream uses and functions, rescue or relief operations, policing, or
repairs to streambeds and banks, roads, utilities, or other public facilities; and
6. The provisions of Sections 4-13-5(B) and 4-13-7(B) of this Chapter shall still be
met; and
7. The circumstances of the property are unique and do not establish a pattern
inconsistent with the intent of the NFIP; and
8. All other required state and federal permits or waivers have been obtained.
D. The City Engineer shall notify an Applicant in writing that a variance from the
requirements of Section 4-13-8 that would lessen the degree of protection to a Building will:
81-0-21
1. Result in increased premium rates for Flood insurance up to amounts as high as
$25 per $100 of insurance coverage; and
2. Increase the risks to life and property; and
3. Require that the Applicant proceed with knowledge of these risks and that the
Applicant will acknowledge in writing the assumption of the risk and liability.
E. The findings of fact and conclusions of law made by the Evanston City Council
according to Section 4-13-10(C) the notifications required by Section 4-13-10(D), and a
record of hearings and evidence considered as justification for the issuance of all variances
from this Chapter shall be maintained by the City_in perpetuity.
F. Variances requested in connection with restoration of a historic site or Historic Structure,
may be granted to allow repair or rehabilitation of Historic Structures using criteria more
permissive than the requirements of Sections 4-13-10(C) and 4-13-10(D), subject to the
conditions that:
1. The variance is the minimum necessary to preserve the historic character and
design of the Building; and
2. The repair or rehabilitation will not preclude the Building's continued designation
as a Historic Structure.
4-13-11. - DISCLAIMER OF LIABILITY.
The degree of Flood Protection required by this Chapter is considered reasonable for
regulatory purposes and is based on available information derived from engineering and
scientific methods of study. Larger Floods may occur, or Flood heights may be increased
by man-made or natural causes. This Chapter does not imply that Development, either
inside or outside of the Floodplain, will be free from flooding or damage. This Chapter does
not create liability on the part of the City or any officer or employee thereof for any Flood
damage that results from reliance on this Chapter or any administrative decision made
lawfully thereunder.
4-13-12. - PENALTY.
A. Failure to obtain a floodplain development permit for Development in the Floodplain or
failure to comply with the conditions of a floodplain development permit or a variance shall
be deemed to be a violation of this Chapter. Upon due investigation, whenever the
Community Development Director in consultation with the Corporation Counsel and City
Engineer determines that a Violation of the minimum standards of this Chapter exists, the
Community Development Director shall issue a Notice of Violation. The Notice of Violation
constitutes a suspension of the permit.
-45-
81-0-21
The Notice of Violation shall contain the address or parcel identification number of the
property, a brief description of the Violation; section of the Chapter violated; the
requirement to stop all work in Violation of this Chapter; a statement informing the violator
that they may contest the notice in writing within ten days, correct the violation in ten days,
or apply for a permit; a warning that if the violator fails to comply the community shall
institute appropriate legal proceedings; and a statement that the Chapter authorizes fines of
not less than fifty dollars ($50.00) or more than one thousand dollars ($1,000) for each day
during or on which a Violation occurs or continues.
Notification to the owner shall be in any of the following manners:
1. By personally delivering to the owner of the property involved, or to the owner's
agent, or to the person doing the work.
2. By posting a copy of the stop work order on the subject property in a
conspicuous place, or
3. By personally delivering or mailing a copy of the notice of violation to any
adult who resides at, occupies, uses, leases, manages, or maintains the property
on which the Violation is located,
4. By personally delivering or mailing a copy of the notice of violation to any
owner in title to the property on which the Violation is located.
B. If such owner fails, after ten days from the date the written notice is issued, to correct
the violation, apply for a permit, or contest the notice in writing, the City may make
application to the Circuit Court for an injunction requiring conformance with this Chapter or
make such other order as the Court deems necessary to secure compliance with the
Chapter.
C. Any person who violates this Chapter shall, upon conviction thereof, be fined not less
than fifty dollars ($50.00) or more than one thousand dollars ($1,000) for each offense. A
separate offense shall be deemed committed upon each day during or on which a violation
occurs or continues.
D. The City shall record a notice of violation on the title to the property.
E. The Community Development Director shall inform the owner that any such violation is
considered a willful act to increase Flood damages and, therefore may cause coverage by
a Standard Flood Insurance Policy to be suspended.
F. No floodplain development permit shall be permanently suspended or revoked until a
hearing is held by the Evanston City Council. Written notice of such hearing shall be served
on the permittee and shall state: (1) the grounds for complaint or reasons for suspension or
revocation; and (2) the time and place of the hearing. At such hearing, the permittee shall
be given an opportunity to present evidence on his/her behalf. At the conclusion of the
MO
81-0-21
hearing, the Evanston City Council shall determine whether the permit shall be suspended
or revoked.
G. Nothing herein shall prevent the City from taking such other lawful action to prevent or
remedy any violations. All costs connected therewith shall accrue to the person or persons
responsible.
SECTION 2: All ordinances or parts of ordinances in conflict herewith are
hereby repealed.
SECTION 3: If any provision of this ordinance or application thereof to
any person or circumstance is held unconstitutional or otherwise invalid, such invalidity
shall not affect other provisions or applications of this ordinance that can be given
effect without the invalid application or provision, and each invalid provision or invalid
application of this ordinance is severable.
SECTION 4: This Ordinance repeals and replaces other Ordinances adopted
by the City to fulfill the requirements of the NFIP including: Evanston 2008 Floodplain
Ordinance.
However, this Ordinance does not repeal the original resolution or Ordinance
adopted to achieve eligibility in the program. Nor does this Chapter repeal, abrogate, or
impair any existing annexation agreements, easements, covenants, or deed restrictions.
Where this Ordinance and other Ordinance easements, covenants or deed restrictions
conflict or overlap, whichever imposes the more stringent restrictions shall prevail.
-47-
Introduced: Julv 06. , 2021 Approved:
Adopted: August 09 2021
Auaust10 2021
Daniel Biss, Mayor
Attest: Approved as to form:
XJb��.aru� ��,�,� /1�cclrola.r �'. Guux.rtciiq..s
Stephanie Mendoza, City Clerk Nicholas E. Cummings, Corporation
Counsel