HomeMy WebLinkAboutORDINANCES-2015-061-O-15•
4/28/2015
61-0-15
AN ORDINANCE
To Approve the Construction of a Local Improvement Known as
Evanston Special Assessment No. 1513
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
EVANSTON, ILLINOIS:
SECTION 1: That a local improvement shall be made within the
City of Evanston, County of Cook, and State of Illinois, the nature, character,
locality and description of which is as follows, to -wit:
That the unimproved public alley in the block bounded by Harrison Street
on the north, Colfax Street on the south, Central Park Avenue on the
• west, and Lincolnwood Drive on the east, in the City of Evanston, be
improved by excavating, constructing the necessary drainage system and
paving with 8" Portland Cement Concrete Pavement to a width of fifteen
feet (15).
SECTION 2: That the Recommendation (Exhibit A) of the Board of
Local Improvements of the City of Evanston, Illinois, of this Ordinance, and the
Estimate of the Cost (Exhibit B) of said improvement made by the Engineer of
said Board, both attached hereto, be and the same are hereby approved and by
reference thereto made a part hereof.
SECTION 3: That said improvement shall be made and the cost
thereof, including the sum of Two Hundred Fifty -Two Thousand Six Hundred
Twenty -Four and 94/100 Dollars ($252,624.94), being the cost of making and
collecting the Assessment and all other expenses as provided by law, shall be
C.
•
61-0-15
paid for by Special Assessment in accordance with the Illinois Municipal Code,
Chapter 65, Section 5/9-2-1, et seq.
SECTION 4: That One Hundred Twenty -Six Thousand Three
Hundred Twelve and 47/100 Dollars ($126,312.47) of the cost of said
improvement shall be allocated by the City; and the remainder of the cost, One
Hundred Twenty -Six Thousand Three Hundred Twelve and 47/100 Dollars
($126,312.47) will be allocated as private benefit.
SECTION 5: That the aggregate amount to be assessed and each
individual assessment shall be divided into ten (10) installments in the manner
provided by law, and each of said installment shall bear interest at the rate of
seven percent (7%) per annum from sixty (60) days after the date of the first
• voucher issued on account of work done upon said proposed improvement.
•
SECTION 6: That, for the purpose of anticipating the collection of
the installments of said assessment levied against the real estate benefited
thereby, general obligation bonds have been issued, fifty percent (50%) of which
are payable by the City, homeowners pay remaining fifty percent (50%) of which
are payable out of said installments, bearing interest at the rate of seven percent
(7%) per annum, payable annually and signed on behalf of the City of Evanston,
Illinois, by its Mayor and attested by its City Clerk and its corporate seal affixed
thereto; and each interest coupon attached to said bonds shall likewise be
executed by and shall bear the official or facsimile signature of the same officers
who signed said bonds and who, if facsimile signatures are used, do adopt by
—2—
•
61-0-15
their execution of said bonds as and for their proper signatures their respective
facsimile signatures appearing on said coupons; and that said bonds shall be
issued in accordance with and shall be in all respects conform to the provisions
of an Act of the General Assembly of the State of Illinois, knows as the "Illinois
Municipal Code," effective July 1, 1961, and the Amendments thereto.
SECTION 7: That Suzette Robinson, President of the Board of
Local Improvements of the City of Evanston, Illinois, be and she is hereby
directed to file a Petition in the Circuit Court of Cook County, Illinois, praying that
steps may be taken to levy a Special Assessment to pay the cost of said
improvement in accordance with the provisions of this ordinance and in the
manner prescribed by law.
• SECTION 8: All ordinances or parts of ordinances in conflict
herewith are hereby repealed.
SECTION 9: If any provision of this ordinance or application
thereof to any person or circumstance is held unconstitutional or otherwise
invalid, such invalidity shall not affect other provisions or applications of this
ordinance that can be given effect without the invalid application or provision, and
each invalid application of this ordinance is severable.
SECTION 10: The findings and recitals contained herein are
declared to be prima facie evidence of the law of the City and shall be received in
evidence as provided by the Illinois Compiled Statutes and the courts of the State
of Illinois.
L�
—3—
•
•
•
61-0-15
SECTION 11: This ordinance shall be in full force and effect from
and after its passage, approval, and publication in the manner provided by law.
Introduced:Qy i 2015
M V
Adopted: 1 1�,r r'�(�, 2015
Approved:
—V2015
' 2
Eliz th B. Tisdahl, Mayor
Attest: Approved as to form:
RoAey Greery�, City Clerk W. Gra t Farrar, rporation Counsel
—4
n
LJ
•
Exhibit A
Recommendation
-5-
61-0-15
L_J
SPECIAL ASSESSMENT NO. 1513
RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board of Local Improvements of the City of Evanston, Illinois, herewith submits the
draft of Ordinance 61-0-15 for the making of a local improvement within the City of
Evanston, County of Cook, and State of Illinois, the nature, character, locality and
description of which is as follows, to -wit. -
That the unimproved public alley in the block bounded by Harrison Street on the
north, Colfax Street on the south, Central Park Avenue on the west, and
Lincolnwood Drive on the east, in the City of Evanston, be improved by
excavating, constructing the necessary drainage system and paving with 8"
Portland Cement Concrete Pavement to a width of fifteen feet (15').
and, as part of said Ordinance, and in conjunction therewith, said Board also herewith
submits the plans and specifications of an estimate of the cost of said improvement,
including the cost of engineering services, as finally detemnined by said Board; and said
• Board hereby recommends the passage of Ordinance 61-0-15 and the making of the
improvement described therein.
APPROVED AS TO FORM:
Maho Treto, Jr.
Attorney for the Board of Local
Improvements of the City of Evanston, Illinois
Respectfully submitted,
BOARD OF LOCAL IMPROVEMENTS
CITY OF EVANSTON, ILLINO
B
uzett inson, P sident
W. GRANT FARRAR
MARIO TRETO, JR. a
CITY of EVANSTON LAW DEPARTMENT Date: 4nl l
41-
2100 RIDGE AVENUE
EVANSTON, ILLINOIS 60201
• (847) 866-2937
Attorney Code 46996
, 2015
r1
U
Exhibit B
Estimate
C]
61-0-15
ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS
• To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore
adopted, providing that the unimproved public alley in the block _bounded by Harrison Street on the north,
Colfax Street on the south, Central Park Avenue on the west, and Lincolnwood Drive on the east, in the
City of Evanston, be improved by excavating, constructing the necessary drainage system and paving with
8" Portland Cement Concrete Favement to a width of fifteen feet (15').
Said improvement to be constructed in detail as specified in aforesaid Resolution.
I, herewith submit an estimate of cost of such improvement as described in said Resolution,
including labor, materials, and all other lawful expenses attending the proceedings for making said
improvement and the cost of making and collecting the assessment therefore as provided by law,
COST ESTIMATE
ITEOM
UNIT
N.PRICE
ITEM
UNIT
QUANTITY
TOTAL
1
EARTH EXCAVATION
CU. YD.
311
$50.00
$
15,550.00
2
TRENCH BACKFILL
CU. YD.
278
32.00
$
8,896.00
3
SUB -BASE GRANULAR MATERIAL, TYPE B
CU. YD.
10
30.00
$
300.00
4
GRANULAR CRADLE MATERIAL, CA-11
TON
143
30.00
$
4,290.00
5
AGGREGATE BASE COURSE, TYPE B, 6'
SO. YD.
75
10.00
$
750,00
6
INCIDENTAL HOT -MIX ASPHALT SURFACING
TON
12
180.00
$
2,160.00
7
PORTLAND CEMENT CONCRETE PAVEMENT, 8'
SQ. YD.
1,075
67.00
$
72,025,00
• 8
STORM SEWERS, SPECIAL, IT (D. I. P. / CL 50)
FOOT
244
90.00
$
21,960.00
9
STORM SEWERS, 10% TYPE 1 ( R. C. P. / CL V)
FOOT
95
80.00
$
7,600.00
10
STORM SEWERS, 12', TYPE 2 (R. C. P. / CL IV)
FOOT
267
100.00
$
26,700.00
11
CATCH BASINS, TYPE A, 4' DIAMETER, TYPE 1 FRAME, OPEN LID
EACH
1
4,500.00
$
4,500.00
12
INLET, TYPE A, TYPE 1 FRAME, OPEN LID
EACH
6
1,400.00
$
8,400.00
13
COMBINATION CONCRETE CURB AND GUTTER, TYPE B 6.12
FOOT
110
25.00
$
2,750.00
14
DRIVEWAY PAVEMENT REMOVAL
SQ. YD.
45
18.00
$
810.00
15
COMBINATION CONCRETE CURB AND GUTTER REMOVAL
FOOT
110
5.00
$
550.00
16
SIDEWALK REMOVAL
SQ, FT.
245
2.00
$
490.00
17
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT - 6'
SQ. YD,
45
60.00
$
2,700.00
18
PORTLAND CEMENT CONCRETE SIDEWALK - 5'
SO. FT.
245
6.00
$
1,470.00
19
PROTECTIVE SEALER
SQ. YD,
1,120
2.00
$
2,240.00
20
CRUSHED STONE, CA -14
TON
35
30.00
$
1,050.00
21
FURNISHING AND PLACING TOPSOIL, 3'
SQ. YD.
80
8.00
$
640.00
22
SODDING, SALT TOLERANT
SQ. YD.
80
20.00
$
1,600.00
23
CLASS B PATCHES, SPECIAL 9' ( HES)
SQ. YD.
20
90.00
$
1,800.00
24
DETECTABLE WARNINGS
SQ. FT.
22
40.00
$
880.00
25
PAVERS REMOVAL AND REPLACEMENT
SO. FT.
155
18.00
$
2,790.00
26
TREE REMOVAL ( 6 TO 15 INCH DIAMETER)
IN. DIA.
26
50.00
$
1,300.00
27
TREE REMOVAL ( OVER 15 INCH DIAMETER)
IN. DIA.
80
75.00
$
6,000.00
28
HOT - MIX ASPHALT SURFACE REMOVAL
SQ. YD.
45
10.00
$
450.00
29
CONSTRUCTION LAYOUT AND STAKING
LUMP SUM
1
2,500.00
$
2,500.00
• 30
STREET SWEEPING
EACH
3
300.00
$
900.00
BLI_EST_1513
• Page -2-
Estimate of Engineer of BLI - S.A. 1513
(Alley, N/Colfax St., E/Central Park Ave.)
ITEM ITEM
N0,
31 SOIL DISPOSAL ANALYSIS
32 NON SPECIAUSPECIAL WASTE DISPOSAL
33 CLOSED CIRCUIT TV INSPECTION
34 PRE -CONSTRUCTION SURFACE VIDEO TAPING
•
•
UNIT
UNIT
QUANTITY
TOTAL
PRICE
LUMP SUM
1 2,800.00
$
2,800.00
CU. YD,
589 35.00
$
20,615.00
LUMP SUM
1 3,500.00
$
3,500.00
LUMP SUM
1 800.00
$
800.00
ESTIMATED CONSTRUCTION COST
$
231,766.00
Cost of Engineering Services, ........................ $ 10,429.47
For Lawful Expenses, etc ............................. $ 10429.47
Sub -Total ......... . ......... . ................... $ 20,858.94
RECAPITULATION
Construction Cost.. .......................... $ 231,766.00
Engineering ................................... $ 10,429.47
Legal ........................................... $ 10,429.47
Total Cost ..................................... $ 252,624,94
I hereby certify that in my opinion the above estimate does not exceed the probable cost of
the above proposed improvement and the lawful expenses attending the same.
Sat Nagar, P. .
City Engineer
Board of Local Improvements