HomeMy WebLinkAboutORDINANCES-2016-073-O-166/2/2016
73-0-16
AN ORDINANCE
To Approve the Construction of a Local Improvement Known as
Evanston Special Assessment No. 1519
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
EVANSTON, ILLINOIS:
SECTION 1: That a local improvement shall be made within the
City of Evanston, County of Cook, and State of Illinois, the nature, character,
locality and description of which is as follows, to -wit:
That the unimproved public alley in the block bounded by Lake
Street on the north, Greenwood Street on the south, Darrow Avenue on the west,
and Dewey Avenue on the east, in the City of Evanston, be improved by
excavating, constructing the necessary drainage system and paving with 8"
Portland Cement Concrete Pavement, the East-West leg to width of nine feet (9')
and North -South leg to a width of thirteen feet (13').
SECTION 2: That the Recommendation (Exhibit A) of the Board of
Local Improvements of the City of Evanston, Illinois, of this Ordinance, and the
Estimate of the Cost (Exhibit B) of said improvement made by the Engineer of
said Board, both attached hereto, be and the same are hereby approved and, by
reference thereto made a part hereof.
SECTION 3: That said improvement shall be made and the cost
thereof, including the sum of Two Hundred Eighty Five Thousand Thirty Five and
00/100 Dollars ($285,035.00), being the cost of making and collecting the
Assessment and all other expenses as provided by law, shall be paid for by
73-0-16
Special Assessment in accordance with the Illinois Municipal Code, Chapter 65,
Section 5/9-2-1, et seq.
SECTION 4: That Two Hundred Twenty Seven Thousand Sixty
One and 67/100 Dollars ($227,061.67) of the cost of said improvement shall be
allocated by the City; and the remainder of the cost, Fifty Seven Thousand Nine
Hundred Seventy Three and 33/100 Dollars ($57,973.33) will be allocated as
private benefit.
SECTION 5: That the aggregate amount to be assessed and each
individual assessment shall be divided into ten (10) installments in the manner
provided by law, and each of said installment shall bear interest at the rate of
seven percent (7%) per annum from sixty (60) days after the date of the first
voucher issued on account of work done upon said proposed improvement.
SECTION 6: That, for the purpose of anticipating the collection of
the installments of said assessment levied against the real estate benefited
thereby, general obligation bonds have been issued, up to Two Hundred Twenty
Seven Thousand Sixty One and 67/100 Dollars ($227,061.67) of which is
payable by the City, homeowners pay up to Fifty Seven Thousand Nine Hundred
Seventy Three and 33/100 Dollars ($57,973.33) of which is payable out of said
installments, bearing interest at the rate of seven percent (7%) per annum,
payable annually and signed on behalf of the City of Evanston, Illinois, by its
Mayor and attested by its City Clerk and its corporate seal affixed thereto; and
each interest coupon attached to said bonds shall likewise be executed by and
-2-
73-0-16
shall bear the official or facsimile signature of the same officers who signed said
bonds and who, if facsimile signatures are used, do adopt by their execution of
said bonds as and for their proper signatures their respective facsimile signatures
appearing on said coupons; and that said bonds shall be issued in accordance
with and shall be in all respects conform to the provisions of an Act of the
General Assembly of the State of Illinois, knows as the "Illinois Municipal Code,"
effective July 1, 1961, and the Amendments thereto.
SECTION 7: That David Stoneback, President of the Board of
Local Improvements of the City of Evanston, Illinois, be and he is hereby directed
to file a Petition in the Circuit Court of Cook County, Illinois, praying that steps
may be taken to levy a Special Assessment to pay the cost of said improvement
in accordance with the provisions of this ordinance and in the manner prescribed
by law.
SECTION 8: All ordinances or parts of ordinances in conflict
herewith are hereby repealed.
SECTION 9: If any provision of this ordinance or application
thereof to any person or circumstance is held unconstitutional or otherwise
invalid, such invalidity shall not affect other provisions or applications of this
ordinance that can be given effect without the invalid application or provision, and
each invalid application of this ordinance is severable.
SECTION 10: The findings and recitals contained herein are
declared to be prima facie evidence of the law of the City and shall be received in
—3—
73-0-16
evidence as provided by the Illinois Compiled Statutes and the courts of the State
of Illinois.
SECTION 11: This ordinance shall be in full force and effect from
and after its passage, approval, and publication in the manner provided by law.
Introduced: �� 1 , 2016 Approved:
Adopted: ���� , 2016 �jv i—`{ 1 5 12016
Attest:
CQ.Q1ttt., nj"d
In e,owc t Koney Greene, City Clerk
Eliz th B. Tisdahl, Mayor
Approved as to form:
4
W. Grant Farrar, oation Counsel
—4—
73-0-16
Exhibit A
Recommendation
-5-
SPECIAL ASSESSMENT NO. 1519
RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board of Local Improvements of the City of Evanston, Illinois, herewith submits the
draft of Ordinance 73-0-16 for the making of a local improvement within the City of
Evanston, County of Cook, and State of Illinois, the nature, character, locality and
description of which is as follows, to -wit. -
That the unimproved public alley In the block bounded by Lake Street on the north, Greenwood
Street on the south, Darrow Avenue on the west, and Dewey Avenue on the east, in the City of
Evanston, be improved by excavating, constructing the necessary drainage system and paving
with 8" Portland Cement Concrete Pavement, the East-West leg to width of nine feet (9 J and
North -South leg to a width of thirteen feet (13').
and, as part of said Ordinance, and in conjunction therewith, said Board also herewith
submits the plans and specifications of an estimate of the cost of said improvement,
including the cost of engineering services, as finally determined by said Board; and said
Board hereby recommends the passage of Ordinance 73-0-16 and the making of the
improvement described therein.
APPROVED AS TO FORM:
*Mar4Tre,r. '
Attorney for the Board of Local
Improvements of the City of Evanston, Illinois
W. GRANT FARRAR
MARIO TRETO, JR.
CITY of EVANSTON LAW DEPARTMENT
2100 RIDGE AVENUE
EVANSTON, ILLINOIS 60201
(847) 866-2937
Attorney Code 46996
Respectfully submitted,
BOARD OF LOCAL IMPROVEMENTS
CITY OF EVANST N, ILLINOIS
By: " Z), J, IV-)--
David Stoneback, President
Date: YYt AY ?e , 2016
73-0-16
Exhibit B
Estimate
Mc
ESTIMATE OF ENGINEER OF HOARD OF LOCAL IMPROVEMENTS
To the Board of Local Improvements of the City of Evanston.
Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore
adopted, providing that the unimproved public alley in the block bounded by Lake Street on the north,
Greenwood Street on the south, Darrow Avenue on the west, and Dewey Avenue on the east, in the City
of Evanston, be improved by excavating, constructing the necessary drairiage system and paving with 8"
Portland Cement Concrete Pavement, the East-West legs to width of nine feet (9) and North -South leg to
a width of thirteen feet (13').
Said improvement to be constructed in detail as specified in aforesaid Resolution.
I, herewith submit an estimate of cost of such improvement as described in said Resolution,
including labor, materials, and all other lawful expenses attending the proceedings for making said
improvement and the cost of making and collecting the assessment therefore as provided by law,
COST ESTIMATE
M
UNIT
T
ITEM
UNIT
QUANTITY
PRCE
TOTAL
1
EARTH EXCAVATION
CU. YD,
260
50.00
$
13,00000
2
TRENCH BACKFILL
CU YO,
335
25.00
S
8,37500
3
SUB -BASE GRANULAR MATERIAL, TYPE 6
CU YD
20
40.00
$
80000
4
GRANULAR CRADLE MATERIAL, CA-11
TON
180
30.00
S
5,40000
5
AGGREGATE BASE COURSE, TYPE B, 6'
SO. YD,
75
15.00
$
1,12500
6
INCIDENTAL HOT -MIX ASPHALT SURFACING
TON
10
250,OD
$
2,50000
7
PORTLAND CEMENT CONCRETE PAVEMENT, 8'
So YD
885
70,00
$
61,950 00
8
STORM SEWERS, SPECIAL,10' (D. I, P. / CL 50)
FOOT
407
9000
S
36,63000
9
STORM SEWERS,12'. TYPE 2 (R_ C. P. I CL 111)
FOOT
346
8000
S
27,680 00
10
STORM SEWERS, SPECIAL 16', (0.1, P. I CL 50)
FOOT
0
120,00
S
-
11
CATCH BASIN, TYPE A, 4' DIAMETER, TYPE 1 FRAME, CLOSED LID
EACH
0
4,500.00
$
12
MANHOLE, TYPE A, 4' DIAMETER, TYPE 1 FRAME, OPEN LID
EACH
3
5,500.00
$
16,500.00
13
INLET, TYPE A, TYPE 1 FRAME, OPEN LID
EACH
5
1500.DO
S
7,5N.00
14
COMBINATION CONCRETE CURB AND GUTTER, TYPE 8 6.12
FOOT
225
25.00
$
5.62500
15
PAVEMENT REMOVAL
So. YD.
40
2500
S
1,00000
is
DRIVEWAY PAVEMENT REMOVAL
so. YD.
350
2000
$
7,000.00
17
COMBINATION CURB AND GLITTER REMOVAL
FOOT
225
i0.00
S
2,250,00
18
SIDEWALK REMOVAL
SO. FT_
520
2M
S
1,300.OD
19
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT - 6'
So. YO.
350
65,00
$
22,750.00
20
PORTLAND CEMENT CONCRETE SIDEWALK -5'
So. FT,
520
6.00
$
3,120.00
21
PROTECTIVE SEALER
So. YD,
1235
2.00
S
2,470.00
22
CRUSHED STONE, CA -14
TON
30
30.00
$
900.00
23
FURNISHING AND PLACING TOPSOIL, 3'
So. YD.
80
8.00
S
640.00
24
SODDING, SALT TOLERANT
So. YD.
80
17.00
5
1,360.00
25
CLASS B PATCHES, SPECIALS' (HES)
SO. YD.
0
90.00
5
-
26
DETECTABLE WARNINGS
So, FT.
85
45,00
S
3,825.00
27
HOT -MIX ASPHALT SURFACE REMOVAL
So. YD.
30
15.00
S
450.00
28
TREE REMOVAL (OVER t5 INCH DIAMETER)
IN. DIA,
72
75.00
5
5,400.OD
BLI_EST_1519
Page -2-
Estimate of Engineer of BLI - S.A. 1519
(Alley N/Greenwood St., Eldarrow Ave.)
M
ITEC
UNIT
ITEM
UNIT
QUANTITY
TOTAL
29
CONSTRUCTION LAYOUT AND STAKING
LUM. SUM
1
2,500.00
S
2500.00
30
STREET SWEEPING
EACH
5
400.00
S
2000.00
31
SO4L DISPOSAL ANALYSIS
LUM, SUM.
1
2,500.00
$
2.500.00
32
NON SPECIAUSPECIAL WASTE DISPOSAL
CU YD
275
30.00
$
8,250b0
33
CLOSED CIRCUIT TV INSPECTION
LUM SUM,
1
3.500.00
$
3,500.00
34
PRE -CONSTRUCTION SURFACE VIDEO TAPING
LUM SUM
1
1.500.00
S
1,500.D0
35
EPDXY PAVEMENT MARKING UNEA'
FOOT.
170
10.00
$
1,700.00
TOTAL
$
2611,500.00
Cost of Engineering Services ......................... $ 11,767.50
For Lawful Expenses, etc ............................. $ 11,767.50
Sub -Total ....................................... $ 23,535,00
RECAPITULATION
Construction Cost ............................ $ 261,500.00
Engineering .................................. $ 11,767.50
Legal ........................................... $ 11,767.50
Total Cost ..................................... $ 285,035.00
hereby certify that in my opinion the above estimate does not exceed the probable cost of
the above proposed improvement and the lawful expenses attending a same.
Lara . Biggs, P.E.
City ngineer
Board of Local Improvements