HomeMy WebLinkAboutORDINANCES-2017-027-O-173/29/2017
27-0-17
AN ORDINANCE
To Approve the Construction of a Local Improvement Known as
Evanston Special Assessment No. 1521
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
EVANSTON, ILLINOIS:
SECTION 1: That a local improvement shall be made within the
City of Evanston, County of Cook, and State of Illinois, the nature, character,
locality and description of which is as follows, to -wit:
That the unimproved public alley in the block bounded by CTA Rail
Road on the north, Brummel Street on the south, Grey Avenue on the west, and
Brown Avenue on the east, in the City of Evanston, be improved by excavating,
constructing the necessary drainage system and paving with 8" Portland Cement
Concrete Pavement, to a width of fourteen and a half feet (14.5').
SECTION 2: That the Recommendation (Exhibit A) of the Board of
Local Improvements of the City of Evanston, Illinois, of this Ordinance, and the
Estimate of the Cost (Exhibit B) of said improvement made by the Engineer of
said Board, both attached hereto, be and the same are hereby approved and by
reference thereto made a part hereof.
SECTION 3: That said improvement shall be made and the cost
thereof, including the sum of Two Hundred Fifty Two Thousand Seven Hundred
Thirty Two and 85/100 Dollars ($252,732.85), being the cost of making and
collecting the Assessment and all other expenses as provided by law, shall be
27-0-17
paid for by Special Assessment in accordance with the Illinois Municipal Code,
Chapter 65, Section 5/9-2-1, et seq.
SECTION 4: That One Hundred Twenty Six Thousand Three
Hundred Sixty Six and 43/100 Dollars ($126,366.43) of the cost of said
improvement shall be allocated by the City; and the remainder of the cost, One
Hundred Twenty Six Thousand Three Hundred Sixty Six and 43/100 Dollars
($126,366.43) will be allocated as private benefit.
SECTION 5: That the aggregate amount to be assessed and each
individual assessment shall be divided into ten (10) installments in the manner
provided by law, and each of said installment shall bear interest at the rate of
three percent (3%) per annum from sixty (60) days after the date of the first
voucher issued on account of work done upon said proposed improvement.
SECTION 6: That, for the purpose of anticipating the collection of
the installments of said assessment levied against the real estate benefited
thereby, general obligation bonds have been issued, up to One Hundred Twenty
Six Thousand Three Hundred Sixty Six and 43/100 Dollars ($126,366.43)of
which are payable by the City, homeowners pay up to One Hundred Twenty Six
Thousand Three Hundred Sixty Six and 43/100 Dollars ($126,366.43) of which
are payable out of said installments, bearing interest at the rate of three percent
(3%) per annum, payable annually and signed on behalf of the City of Evanston,
Illinois, by its Mayor and attested by its City Clerk and its corporate seal affixed
thereto; and each interest coupon attached to said bonds shall likewise be
—2—
27-0-17
executed by and shall bear the official or facsimile signature of the same officers
who signed said bonds and who, if facsimile signatures are used, do adopt by
their execution of said bonds as and for their proper signatures their respective
facsimile signatures appearing on said coupons; and that said bonds shall be
issued in accordance with and shall be in all respects conform to the provisions
of an Act of the General Assembly of the State of Illinois, knows as the `Illinois
Municipal Code," effective July 1, 1961, and the Amendments thereto.
SECTION 7: That David Stoneback, President of the Board of
Local Improvements of the City of Evanston, Illinois, be and he is hereby directed
to file a Petition in the Circuit Court of Cook County, Illinois, praying that steps
may be taken to levy a Special Assessment to pay the cost of said improvement
in accordance with the provisions of this ordinance and in the manner prescribed
by law.
SECTION 8: All ordinances or parts of ordinances in conflict
herewith are hereby repealed.
SECTION 9: If any provision of this ordinance or application
thereof to any person or circumstance is held unconstitutional or otherwise
invalid, such invalidity shall not affect other provisions or applications of this
ordinance that can be given effect without the invalid application or provision, and
each invalid application of this ordinance is severable.
SECTION 10: The findings and recitals contained herein are
declared to be prima facie evidence of the law of the City and shall be received in
—3—
27-0-17
evidence as provided by the Illinois Compiled Statutes and the courts of the State
of Illinois.
SECTION 11: This ordinance shall be in full force and effect from
and after its passage, approval, and publication in the manner provided by law.
Introduced: Nrk\ 1 , 2017 Approved:
1 �
Adopted: 1 \ �� , 2017 '�� 12017
Attest:
Rodney Gr ne, City Clerk
ElizAlieth B. Tisdahl, Mayor
Approved as to form:
W. Grant Farrar, Corporation Counsel
—4—
27-0-17
Exhibit A
Recommendation
-5-
SPECIAL ASSESSMENT NO. 1521
RECOMMENDATION OF THE BOARD OF LOCAL IMPROVEMENTS
TO THE CITY COUNCIL OF THE CITY OF EVANSTON, ILLINOIS
The Board of Local Improvements of the City of Evanston, Illinois, herewith submits the
draft of Ordinance 27-0-17 for the making of a local improvement within the City of
Evanston, County of Cook, and State of Illinois, the nature, character, locality and
description of which is as follows, to -wit:
That the unimproved public alley in the block bounded by CTA Rail Road on the north, Brummel
Street on the south, Grey Avenue on the west, and Brown Avenue on the east, in the City of
Evanston, be improved by excavating, constructing the necessary drainage system and paving
with 8" Portland Cement Concrete Pavement, to a width of fourteen and a half feet (14.5 j.
and, as part of said Ordinance, and in conjunction therewith, said Board also herewith
submits the plans and specifications of an estimate of the cost of said improvement,
including the cost of engineering services, as finally determined by said Board; and said
Board hereby recommends the passage of Ordinance 27-0-17 and the making of the
improvement described therein.
APPROVED AS TO FORM:
Mario Treto,/Jr.
Attorney for the Board Local
Improvements of the City of Evanston, Illinois
W. GRANT FARRAR
MARIO TRETO, JR.
CITY of EVANSTON LAW DEPARTMENT
2100 RIDGE AVENUE
EVANSTON, ILLINOIS 60201
(847) 866-2937
Attorney Code 46996
Respectfully submitted,
BOARD OF LOCAL IMPROVEMENTS
CITY OF EVANSTON, ILLINOIS
By: " 46�14
d Stoneback, President
Date: F�,e �, , .t `"� , 2017
27-0-17
Exhibit B
Estimate
-6-
ESTIMATE OF ENGINEER OF BOARD OF LOCAL IMPROVEMENTS,
To the Board of Local Improvements of the City of Evanston:
Pursuant to a Resolution of the Board of Local Improvements of the City of Evanston, heretofore
adopted, providing that the unimproved public alley in the block bounded by CTA Rail Road on the north,
Brummel Street on the south, Grey Avenue on the west, and Brown Avenue on the east, in the City of
Evanston, be improved by excavating, constructing the necessary drainage system and paving with 8"
Portland Cement Concrete Pavement, to a width of fourteen and half feet (14.5').
Said improvement to be constructed in detail as specified in aforesaid Resolution.
I, herewith submit an estimate of cost of such improvement as described in said Resolution,
including labor, rrlaterials, and all other lawful expenses attending the proceedings for making said
improvement and the cost of making and collecting the assessment therefore as provided by law,
COST ESTIMATE
ITEM
ITEM
UNIT
QUANTITY
UNIT
TOTAL
NO.
PRICE
1
EARTH EXCAVATION
CU. YD.
254
65.00
$
16,510.00
2
TRENCH BACKFILL
CU. YD.
124
40.00
$
4,960.00
3
SUB -BASE GRANULAR MATERIAL, TYPE B
CU, YD.
20
45.00
$
900.00
4
GRANULAR CRADLE MATERIAL, CA-11
TON
88
30.00
$
2,640.00
5
AGGREGATE BASE COURSE, TYPE 8,4'
SO. YD,
20
15.00
$
300.00
6
INCIDENTAL HOT -MIX ASPHALT SURFACING
TON
5
225.00
$
1,125.00
7
PORTLAND CEMENT CONCRETE PAVEMENT, 8'
So. YD.
945
75.00
$
70,875.00
8
STORM SEWERS, SPECIAL,10- (D.1. P. I CL 50)
FOOT
260
125.00
$
32,500.00
9
STORM SEWERS,12', TYPE 2 (R. C. P. I CL 111)
FOOT
117
100.00
$
11,700.00
10
CATCH BASIN, TYPE A, 4' DIAMETER, TYPE 1 FRAME, OPEN LID
EACH
1
4,500.00
$
4,500.00
11
MANHOLE, TYPE A, 4' DIAMETER, TYPE 1 FRAME, OPEN LID
EACH
1
5,000.00
$
5,000.00
12
INLET, TYPE A, TYPE 1 FRAME, OPEN LID
EACH
5
1900.00
$
9,500.00
13
COMBINATION CONCRETE CURB AND GUTTER, TYPE B 6.12
FOOT
225
30.00
$
6,750.00
14
PAVEMENT REMOVAL
SO. YD.
45
25.00
$
1,125.00
15
DRIVEWAY PAVEMENT REMOVAL
$0. YD.
195
20.00
$
3,900.00
16
COMBINATION CURB AND GUTTER REMOVAL
FOOT
225
8.00
$
1,800.00
17
SIDEWALK REMOVAL
SQ. FT.
470
2.50
$
1,175.00
18
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT - 6'
so. YD.
195
65.00
$
12,675.00
19
PORTLAND CEMENT CONCRETE SIDEWALK - 5'
SO. FT.
470
8.00
$
3,760.00
20
PROTECTIVE SEALER
SO. YD.
1140
2.00
$
2,280.00
21
CRUSHED STONE, CA -14
TON
20
45.00
$
900.00
22
FURNISHING AND PLACING TOPSOIL, 3-
SO. YD.
170
8.00
$
1,360.00
23
SODDING, SALT TOLERANT
SQ. YD,
170
15.00
$
2,550.00
24
CLASS B PATCHES, SPECIAL 9- (HES)
SO. YD.
0
90.00
$
-
25
DETECTABLE WARNINGS
SO. FT,
20
45.00
$
900.00
26
HOT -MIX ASPHALT SURFACE REMOVAL
SQ. YD.
40
20.00
S
800.00
27
TEMPORARY FENCE
FOOT
120
3.00
S
360.00
BLI_EST 1521
Page -2-
Estimate of Engineer of BLI - S.A. 1521
(Alley N/Brummel St., E/Grey Ave.)
ITEM
TE
ITEM
UNIT
QUANTITY
UNIT
TOTAL
PRICE
28
CONSTRUCTION LAYOUT AND STAKING
LUM. SUM.
1
4,000.00
$
4,000.00
29
STREET SWEEPING
EACH
5
400.00
$
2000.00
30
SOIL DISPOSAL ANALYSES
LUM. SUM.
1
3,000.00
$
3,000.00
31
NON SPECIAUSPECIAL WASTE DISPOSAL
CU.YD
254
30.00
$
7,620.00
32
CLOSED CIRCUIT TV INSPECTION
LUM. SUM.
1
4,000.00
$
4,000.00
33
PRE -CONSTRUCTION SURFACE VIDEO TAPING
LUM. SUM.
1
3,000.00
$
3,000.00
34
TREE REMOVAL(6 TO 15 INCH DIAMETER)
IN.DIA..
22
50.00
:$
1,100.00
35
TREE REMOVAL(OVER 15 INCH DIAMETER)
IN.DIA,
30
90.00
$
2700.00
36
EPDXY PAVEMENT MARKING LINE-4' YELLOW
FOOT,
120
30.00
$
3,600.00
TOTAL
$
231,865.00
Cost of Engineering Services ......................... $ 10,433.93
For Lawful Expenses, etc ............................. $ 10,433.93
Sub -Total ....................................... $ 20,867.86
RECAPITULATION
Construction Cost ............................ $ 231,865.00
Engineering ................................... $ 10,433.93
Legal ........................................... $ 10,433.93
Total Cost ..................................... $ 252,732.86
I hereby certify that in my opinion the above estimate does not exceed the probable cost of
the above proposed improvement and the lawful expenses attending the same.
Lara N. Biggs, P.E.
City Engineer
Board of Local Improvements