Loading...
HomeMy WebLinkAboutRESOLUTIONS-2010-034-R-10• 34-R-1 D 5/12/2010 A RESOLUTION Authorizing the City Manager to Sign the IDOT Local Agency Agreement for Federal Participation for Phase 11 Design Engineering Services with Stanley Consultants Inc. to Modernize Traffic Signals along Sheridan Road from Chicago Avenue to Central Street WHEREAS, a goal of the Strategic Plan for the City of Evanston is to provide safe transportation infrastructure within City confines; and WHEREAS, in order to facilitate the free flow of traffic and insure safety to the motoring public, the City of Evanston and Stanley Consultants Inc. are desirous of entering into an IDOT Local Agency Agreement for Federal Participation for phase II design engineering services on Sheridan Road, a copy of which is attached hereto as Exhibit A 40 and incorporated herein by reference; and WHEREAS, said phase II design engineering services include modernize traffic signals and signal interconnect at the five Sheridan Road intersections of Chicago Avenue, Foster Street, Noyes Street, Lincoln Street, and Central Street within the City of Evanston; and WHEREAS, the City Council of the City of Evanston has determined that it is in the best interests of the City of Evanston to enter into said Agreement with IDOT and Stanley Consultants Inc. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EVANSTON, COOK COUNTY, ILLINOIS: • SECTION 1: That the City Manager is hereby authorized and directed to sign and the City Clerk authorized and directed to attest on behalf of the City the IDOT 34-R-10 Local Agency Agreement for Federal Participation with Stanley Consultants Inc., • attached hereto as Exhibit A. SECTION 2: That the City Manager is hereby authorized and directed to negotiate any additional conditions of the Agreement as may be determined to be in the best interests of the City. SECTION 3: That this Resolution 34-R-10 shall be in full force and effect from and after its passage and approval in the manner provided by law. Eliza th B. Tisdahl, Mayor Attest: nn Rodney Greene, City Clerk D" at, ,K Adopted: ! Y 1 a� , 2010 • 0 -2- 34-R-10 EXHIBIT A • 1D®T Local Agency Agreement for Federal Participation with Stanley Consultants Inc. • -3- Local Agency City of Evanston L Illinois Department 4 of Transpoirtaban County C Cook A Section L 10-00258-00-TI._ Project No. A Preliminary Engineering M 9003(5 9) G Services Agreement Job No. E For 91-410-10 Federal Participation Contact Name/Phone/E-mail Address N Sat Nagar, P.E. C (847) 866-2964 Y snaaar .citvofevanston.ora Consultant Stanley Consultants, Inc. C O Address N 8501 W Hiaains Rd, Suite 730 S City Chicaao State L T Zip Code A _Ws i1 N Contact Name/Phone/E-mail Address T Sagar Sonar - (773) 693-7690 sonarsaaar0stanlevor THIS AGREEMENT is made and entered into this May day of 24 , 2010 between the above Local Agency (LA) and Consultant (ENGINEER) and covers certain professional engineering services in connection with the PROJECT. Federal -aid funds allotted to the LA by the state of Illinois under the general supervision of the Illinois Department of Transportation (STATE) will be used entirely or in part to finance engineering services as described under AGREEMENT PROVISIONS. Project Description Name Sheridan Road Signal Interconnect Route SheridanRd Length 1.5 mile Structure No. NA Termini South Boulevard to Central Street Description The project involves installation of new traffic signals and signal interconnect at the nine Sheridan Road intersections of South Boulevard, Main Street, Burnham Place, Dempster Street, Chicago Ave, Foster St, Noyes St, Lincoln St and Central St. Agreement Provisions 1. THE ENGINEER AGREES, 1. To perform or be responsible for the performance, in accordance with STATE approved design standards and policies, of engineering services for the LA for the proposed improvement herein described. 2. To attend any and all meetings and visit the site of the proposed improvement at any reasonable time when requested by representatives of the LA or STATE. 3. To complete the services herein described within 270 calendar days from the date of the Notice to Proceed from the LA, excluding from consideration periods of delay caused by circumstances beyond the control of the ENGINEER. 4. The classifications of the employees used in the work should be consistent with the employee classifications and estimated man- hours shown in EXHIBIT A. If higher -salaried personnel of the firm, including the Principal Engineer, perform services that are indicated in Exhibit A to be performed by lesser -salaried personnel, the wage rate billed for such services shall be commensurate with the payroll rate for the work performed. 5. That the ENGINEER is qualified technically and is entirely conversant with the design standards and policies applicable for the PROJECT; and that the ENGINEER has sufficient property trained, organized and experienced personnel to perform the services enumerated herein. ;• 6. - That the ENGINEER shall be responsible for the accuracy of the work and shall promptly make necessary revisions or corrections resulting from the ENGINEER's errors, omissions or negligent acts without additional compensation. Acceptance of work by the STATE will not relieve the ENGINEER of the responsibility to make subsequent correction of any such errors or omissions or for clarification of any ambiguities. 7. That all plans and other documents furnished by the ENGINEER pursuant to this AGREEMENT will be endorsed by the ENGINEER and will affix the ENGINEER's professional seal when such seal is required bylaw. Plans for structures to be built as apart of the improvement will be prepared under the supervision of a registered structural engineer and will -affix structural engineer seal when such seal is required by law. It will be the ENGINEER's responsibility to affix the proper seal as required by the Bureau of Local • Roads and Streets manual published by the STATE. 8. That the ENGINEER wilt comply with applicable federal statutes, state of Illinois statutes, and local laws or ordinances of the LA. Page 1 of 7 BLR 05610 (Rev. 9/06) Printed on 5/14/2010 3:35:57 PM 9. The undersigned certifies neither the ENGINEER nor i have: a. employed or retained for commission, percentage, brokerage, contingent fee or other considerations, any firm or person (other than a bona fide employee working solely for me or the above ENGINEER) to solicit or secure this AGREEMENT, • b. agreed, as an express or implied condition for obtaining this AGREEMENT, to employ or retain the services of any firm or person in connection with carrying out the AGREEMENT or c. paid, or agreed to pay any firm, organization or person (other than a bona fide employee working solely for me or the above ENGINEER) any fee, contribution, donation or consideration of any kind for, or in connection with, procuring or carrying out the AGREEMENT. d. are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any Federal department or agency, e. have not within a three-year period preceding the AGREEMENT been convicted of or had a civil judgment rendered against them for commission of fraud or criminal offense in connection with obtaining, attempting to obtain or performing a public (Federal, State or local) transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements or receiving stolen property, f. are not presently indicted for or otherwise criminally or civilly charged by a government entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (e) and g. have not within a three-year period preceding this AGREEMENT had one or more public transactions (Federal, State or local) terminated for cause or default. 10. To pay its subconsultants for satisfactory performance no later than 30 days from receipt of each payment from the LA. 11. To submit all invoices to the LA within one year of the completion of the work called for in this AGREEMENT or any subsequent Amendment or Supplement. 12. To submit BLR 05613, Engineering Payment Report, to the STATE upon completion of the project (Exhibit B). 13. Scope of Services to be provided by the ENGINEER: ® Make such detailed surveys as are necessary for the planning and design of the PROJECT. ❑ Make stream and flood plain hydraulic surveys and gather both existing bridge upstream and downstream high water data and flood flow histories. ❑ Prepare applications for U.S. Army Corps of Engineers Permit, Illinois Department of Natural Resources Office of Water •Resources Permit and Illinois Environmental Protection Agency Section 404 Water Quality Certification. ❑ Design:and/or.approve.cofferdams and superstructure shop drawings. Prepare -Bridge -Condition ReporCand'Preliiniinary Bndgi Design and Hydraulic Report; (including economic analysis of bridge or culverttypes and high.watereffects on roadway overflows and -bridge approaches). ❑ Prepare the necessary environmental and planning documents including the Project Development Report,, Environmental Class of Action Determination or Environmental Assessment,. State Clearinghouse; Substate Clearinghouse and all necessary environmental -clearances. ❑. Make such soilsurveys or subsurface investigations including borings -and soil profiles as may be required to. famish sufficient data for.the design of the proposed: improvement. Such -investigations to be made in'accordance with, the current Standard Specifications for Road.and-Bridge Construction ;=Bureau ofLoeal Roads'and StreetsfAiiministrative;Policies; Federal -Aid Procedures for Local: Highway Improvements or any othe(applicable requirements of the'STATE. ❑ Analyze and evaluate the soil surveys and stricture borings to determine the roadway structural design and bridge foundation. ❑ Prepare preliminary roadway and drainage structure plans and meet with representatives of the LA and STATE at the site of the improvement for review of plans prior to the establishment of final vertical and horizontal alignment, location and size of drainage structures, and compliance with applicable design- requirements and policies. ❑ Make or cause to be made such traffic studies and counts and special intersection studies as may be requirec to'fumish sufficient data for the design of the proposed improvement. ® Complete the general and detailed plans, special provisions and estimate of cost Contract plans shall be prepared in accordance with the guidelines contained in the Bureau of Local Roads and Streets manual. The special provisions and detailed estimate of cost shall be furnished in quadruplicate. • ❑ Furnish the LA with survey and drafts in quadruplicate all necessary right-of-way dedications, construction easements and borrow pit and channel change agreements including prints of the corresponding plats and staking as required. Page 2 of 7 SLR 05610 (Rev. 9106) Printed on 5/14/2010 3:35:57 PM II. THE LA AGREES, 1. To furnish the ENGINEER all presently available survey data and information 2. To pay the ENGINEER as compensation for all services rendered in accordance with this AGREEMENT, on the basis of the following compensation formulas: • Cost Plus Fixed Fee ® CPFF = 14.5%[DL + R(DL) + OH(DL) + IHDC], or ❑ CPFF = 14.5%[DL + R(DL) + 1.4(DL) + IHDC], or ❑ CPFF = 14.5%[(2.3 + R)DL + IHDC] Where: DL = Direct Labor IHDC = In House Direct Costs OH = Consultant Firm's Actual Overhead Factor R = Complexity Factor Specific Rate (:1 (Pay per element) Lump Sum ❑ 3. To pay the ENGINEER using one of the following methods as required by 49 CFR part 26 and 605 ILCS 5/5-409: ❑ With Retainage a) For the first 50% of,completed work, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LA, monthly payments for the work performed shall be due and payable to the ENGINEER, such payments to be equal to 90% of the value of the partially completed work minus. all. previous partial payments made. to the ENGINEER. b) After 60% of the work is completed, and upon receipt of monthly invoices from the ENGINEER and the approval thereof by the LA, monthly payments covering work performed shall be due and payable to the ENGINEER, such payments to be equal to 95% of the value of the partially completed work minus all previous partial payments made to the ENGINEER. c) Final Payment — Upon approval of themork by the LA,but notlaterthan 60.days after the work.is completed and reports have been made and accepted by the LA and the STATE, a sum of money equal to the basic fee as determined in this AGREEMENT less the total of the amounts of partial payments previously paid to th&ENGINEER shall be due and payable to the ENGINEER. ® Without Retainage a) For progressive payments — Upon receipt of'monthly invoices from the ENGINEER and the approval thereof by the LA, monthly payments for the work performed shall be due, and payable to the. ENGINEER,.such payments to. be equal to�the value of the. partially completed work minus all previous partial payments made to`the ENGINEER. b) Final Payment- Upon -approval of -the work by;the.LA but notlaterthan 60.days;after,the;work is completed and -reports have been made arid'accepted by'the L,4 and STATE, -a sumo money,equat.to,the.basic fee as determined in this -AGREEMENT less the total of the. amounts of partial payments previously paid to the ENGINEER shall be due and payable to the ENGINEER. 4. The recipient shall not discriminate 66- the basii. of race, color,: national;origin or sex,in the. award and'perforrnance of any DOT - assisted contractor in'the administration ofitsDBE program or the requirements. of 49 CFR part 26. The recipient shall take all necessary and reasonable steps.under 49 CFR part 26 to ensure nondiscrimination in the award and administration of DOT -assisted contracts. The recipient's DBE program, as required.by, 49 CFR _part 26,and as.approved by:DOT, is incorporated.by reference in this agreement. Implementation of this program, s.a legal: obligation: and failure to cant' out its terms shall be'treated°as violation of this agreement. Upon notification to the recipient of.its failure to carry out its approvad program, .the Department may. impose sanctions as provided for under part 26 and 'inay; in appropriate cases;.refer the matter for enforcement under 18 U.S.C.-1001 and/or the Program Fraud Civil Remedies Act of 1986 (31 U.S.C. 3801 et seq.). Ill. IT IS MUTALLY AGREED, 1. That no work shall be commenced by the ' ENGINEER prior to issuance by the LA of a written Notice to Proceed. 2. That tracings, plans, specifications, estimates, maps and other documents.prepared by the, ENGINEER -in accordance with this AGREEMENT shall be delivered to and become the property of the LA and that basic survey notes; sketches, charts -and other data prepared .or obtained in accordance with this AGREEMENT shall be made available, upon request, to the LA or to the STATE, without restriction or.limitation as to their use. • Page 3 of 7 BLR 05610 (Rev. 9/06) Printed on 5/14/2010 3:35:57 PM 3. That all reports, plans, estimates and special provisions furnished by the ENGINEER shall be in accordance with the current Standard Specifications for Road and Bridge Construction, Bureau of Local Roads and Streets Administrative Policies, Federal -Aid Procedures for Local Highway Improvements or any other applicable requirements of the STATE, it being understood that all such furnished documents shall be approved by the LA and the STATE before final acceptance. During the performance of the engineering services herein provided for, the ENGINEER shall be responsible for any loss or damage to the documents herein •enumerated while they are in the ENGINEER's possession and any such loss or damage shall be restored at the ENGINEER's expense. 4. That none of the services to be furnished by the ENGINEER shall be sublet, assigned or transferred to any other party or parties without written consent of the LA. The consent to sublet, assign or otherwise transfer any portion of the services to be furnished by the ENGINEER shall not be construed to relieve the ENGINEER of any responsibility for the fulfillment of this agreement. 5. To maintain, for a minimum of 3 years after the completion of the contract, adequate books, records and supporting documents to verify the amounts, recipients and uses of all disbursements of funds passing in conjunction with the contract; the contract and all books, records and supporting documents related to the contract shall be available for review and audit by the Auditor General and the STATE; and to provide full access to all relevant materials. Failure to maintain- the books, records and supporting documents required by this section shall establish a presumption in favor of the STATE for the recovery of any funds paid by the STATE under the contract for which adequate books, records and supporting documentation are not available to support their purported disbursement. 6. The payment by the LA in accordance with numbered paragraph 3 of Section II will be considered payment in full for all services rendered in accordance with this AGREEMENT whether or not they be actually enumerated in this AGREEMENT. 7. That the ENGINEER shall be responsible for any and all damages to property or persons arising out of an error, omission and/or negligent act in the prosecution of the ENGINEER's work and shall indemnify and save harmless the LA, the STATE, and their officers, agents and employees from all suits, claims, actions or damages of any nature whatsoever resulting there from. These indemnities shall not be limited by the listing of any insurance policy. 8. This AGREEMENT may be terminated by the LA upon giving notice in writing to the ENGINEER at the ENGINEER's last known post office address. Upon such termination, the ENGINEER shall cause to be delivered to the LA all drawings, plats, surveys, reports, permits, agreements, soils and foundation analysis, provisions, specifications, partial and completed estimates and data, if any from soil survey and subsurface investigation with the understanding that all such material becomes the property of the LA. The LA will be responsible for reimbursement of all eligible expenses to date of the written notice of termination. 9. This certification is required by the Drug Free Workplace Act (301LCS 580). The Drug Free Workplace Act requires that no grantee or contractor shall receive a grant or be considered for the purpose of being awarded a contract for the procurement of any property •or service from the State unless that grantee or contractor will provide a drug free workplace. False certification or violation of the certification may result in sanctions including, but not limited to, suspension of contract or grant payments, termination of a contract or grant and debarment of the contracting or grant opportunities with the State for at least one (1)_ year but no more than five (5). years. For the purpose of this certification, "grantee' or "contractor" means a corporation, partnership or other entity with twenty-five (25) or more employees at the time of issuing the grant, or a rdepartment division or other unit thereof, directly responsible for the specific performance under a contract or grant of $5,000 or more from the State, as defined in the Act. The contractor/grantee certifies and agrees that it will provide a drug free workplace by: a. Publishing a statement: (1) Notifying employees that the unlawful manufacture, distribution, dispensing, possession or use of a controlled. substance, including cannabis,,is prohibited in the grantee's'or contractor's workplace. (2) Specifying the actions that will be taken against employees for violations of such prohibition. (3) Notifying the employee that, as a condition of employment on such contract or grant, the employee will: (a) abide by the terms of the statement; and (b) notify the employer of any criminal drug statute conviction for a violation occurring in the workplace no later than five, (5) days after such conviction. b. Establishing a drug free awareness program to inform employees about: (1) The dangers of drug abuse in the workplace; (2) The grantees or contractors policy of maintaining a drug free workplace; (3) Any available drug counseling, rehabilitation and employee assistance program; and (4) The penalties that -may be imposed upon an employee for drug violations. c. Providing a copy of the statement required by subparagraph (a) to each employee engaged in the performance of the contract or grant and to post the statement in a. prominent place in the workplace. d. Notifying the contracting or granting agency within ten (10) days after receiving notice under part (B) of paragraph (3) of subsection (a) above from an employee or otherwise receiving actual notice of such conviction. e. Imposing a sanction on, or requiring the satisfactory participation in a drug abuse assistance or rehabilitation program by, f. Assisting employees in selecting a course of action in the event drug counseling, treatment and rehabilitation is required and indicating that a trained referral team is in place. • g. Making a good faith effort to continue to maintain a drug free workplace through implementation of the Drug Free Workplace Act. Page 4 of 7 BLR 05610 (Rev. 9/06) Printed on 5/14/2010 3:35:57 PM 10. The ENGINEER or subconsultant shall not discriminate on the basis of race, color, national origin or sex in the performance of this AGREEMENT. The ENGINEER shall carry out applicable requirements of 49 CFR part 26 in the administration of DOT assisted contracts. Failure by the ENGINEER to carry out these requirement&is a material breach of this AGREEMENT, which may result in the termination of this AGREEMENT or such other remedy as the LA deems appropriate. Prime Consultant: Stanley Consultants, Inc { Sub -Consultants: Infrastructure Engineering, Inc. I Metro Transportation Group, Inc. j Brown Traffic Products, Inc. I Executed by the LA: ATTEST: By: Clerk (SEAL) Executed by the ENGINEER: ATTEST: By: Title: Vice President Page 5 of 7 Printed on 6/14/2010 3:35:57 PM • Aqreement Summary TIN Number Agreement Amount ' 42-1320758 $147,968.25 1 1TIN Number Acreement Amount 36-3527342 I $30,350.01 I 36-3075322 $23,425.00 36-2656899 $920.00 Sub -Consultant Total: 54;322.33 Prime Consultant Total: 147,968.25 { Total for all Work: 202,290.58 City of Evanston (Munidpality/rownshiNCounty) By: Title: Stanley Consultants, Inc. By: Title: Project Principal • BLR 05610 (Rev. 9106) DF-824-039 REV 12104 PAYROLL ESCALATION TABLE FIXED RAISES FIRM NAME Stanley Consultants, Inc. DATE 05114110 PRIMEISUPPLEMENT PTB NO. CONTRACT TERM 14 MONTHS OVERHEAD RATE 161.32% START DATE 7/1/2010 COMPLEXITY FACTOR RAISE DATE 41112011 % OF RAISE 3.001/6 ESCALATION PER YEAR 7/1/2010 - 4/1/2011� 4/2/2011 - 9/1/2011 I 9 5 14 14 64.29% 36.79% 1.0107 The total escalation for this project would be: 1.07% Bureau of Design and Environment Printed 5/14&:38 PM • — DF-824-039 REV 12104 PAYROLL RATES FIRM NAME Stanley Consultants, Inc. DATE 05114/10 PRIME/SUPPLEMENT PSB NO. ESCALATION FACTOR 1.07% CLASSIFICATION I NAME , CURRENT RATE CALCULATED RAT Project Principal Robert Lewis $58.40 $59.03 Senior Traffic Engineer Rob Koss $63.00 $63.68 Project Manager Sagar Sonar $46.85 $47.35 Traffic Engineer Brian Scifers $50.50 $51.04 Design Engineer Mark Ward $27.60 $27.90 CAD Tech Dwayne Jackson $27.60 $27.90 Resident Engineer Joseph Nunn $37.85 $38.26 Surveyor Steve Haller $30.15 $30.47 • • PREPARED EY THE AGREEMENTS UNITPrinted 5/14/2010 3:38 PM DBE DROP BOX FIRM PS13 PRIME/SUPPLEMENT ITEM Project Management and Coordination Data Collection Technology Review (Site Assessment / Identity Improvement: (Contract Documents I IPublic Meetings ISCAT I I I I I I I Subconsultant DL TOTALS 0 COST PLUS FIXED FEE COST ESTIMATE OF CONSULTANT SERVICES DF-824-039 REV 12/04 Stanley Consultants, Inc. DATE DATE 05/14/10 OVERHEAD RATE 1.51 COMPLEXITY FACTOR 0 OVERHEAD IN-HOUSE ( Outside SERVICES % OF' MANHOURS PAYROLL & DIRECT FIXED Direct BY DBE TOTAL GRAND FRINGE BENI COSTS FEE Costs OTHERS, TOTAL TOTAL IAI (a) (C 1.� . (4) !EI (Fl (G) IHl le-Gl 176 " 8,592.08 12,914-04 185.00 3,179.07 24,930.20 12.32% 38 1,1.76.77 ,: 1,776.93 " '60100 ' ; 435.41. 372.68 6,652.74 7,025.42 ,, 10,4y4,53 5.1;8% 50 2,404.49 3,630,18 889.66 6.924.93 3.42% 4 1"89:41 286:01 20,00 "_ ;. 70.08 920:00 1,485.49 0.73% 975 32,627.22 '49,267.10 2,834J2 12.072.07 151'824.59 15,824.59 112,625.71 55.68% 98 4,395.39 6,637:05 57&00 1;62630 13;233.74 6.54% 8 378.82 572.01 ; 140.16� 600.00 30.925.00 7,500.00 " ` 32'615.99 16.12% _ 1 I 1 •: I� J I I � I I. I ;I_ I• i I ... L. I I I 1 0.001 . .1 I 1 0.001 0.00% 13491 49.764.191 75.143.921 3.674,12110,412.161 V4-972 681 54.322.331 30,350.011 202,290.681 100.00% DBE 16.00% • Printed 5/14/2010 t. 'M i z/09 4 AVERAGE HOURLY PROJECT RATES FIRM Stanley Consultants, Inc. PSB DATE 0,5/14110 PRIME/SUPPLEMENT SHEET 1 OF 2 PAYROLL AVG TOTAL PROJECT RATES Project Management and "Data Collection... Techno ogy Review Site. Assessment / Identify HOURLY Hours % Wgtd ' Hours % Wgtd Hours % Wgtd "Hours % Wgtd -Hours % Wgtd` CLASSIFICATION RATES Part Avg Part. Avg Part. ,-Avg- Part. Avg _ Part. - Avg Project Principal 59.03 35 2.59% 1.53 12 6.82% 4.02. ` Senior Traffic Engine 63.68 24 1.78% 1.13 Project Manager 47.35 371 27.50%, 13.02 132 75.00% 35:51 6 15.79% !"7.48"' ' "40 `80.00% 37.88 4 700.00"% 47.35 Traffic Engineer 51.04 121 8.97% 4.58 32 18.18% 9.28 ^' "' "' "" " 10 20.00%"' °16.21- Design Engineer 27.90 391 28.98% 8.09 16 42.11% '`1115 .' CAD Tech 27.90 391 28.98% 8.09 16 42.11% 11.75 Resident Engineer 38.26 16 1.19% 0.45 Surveyor 30.47 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTALS 1349 100% $36.89 176 100.00% $48.82 38 100% a30.97 50 100% $48.09 4 PREPARED BY THE AGREEMENTS UNIT 100% $47.35 Printed 5/14/2010 3:38 PM AVERAGE HOURLY PROJECT RATES FIRM Stanley Consultants, Inc. DF-824-039 REV 12/04 PSB DATE 0611141110 PRIMEISUPPLEMENI SHEET 2 OF 5 PAYROLL AVG Contract Documents Hours" % Wgtd Public Meetings Hours % SCAT Wgtd Hours % WWgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd CLASSIFICATION HOURLY RATES Part. Avg Part. Avg Part. t Avg. Part. Avg Part. Avg Part. Avg Project Principal 59.03 23 23.47% 13.85 Senior Traffic Engin; 63.68 24 2.46% 1.57 Protect Manager 47.35 155 15.90% 7.53 26 26.63% 12.56 8 100.00% 11A7.35 Traffic Engineer 51.04 60 6.15% 3.14 19 10.39% 8.90 Design Engineer 27.90 360 36.92% 10.30 15 15.319% 4.27 CAD Tech 27.90 360 36.92% 10.30 15 15.31% 4.27 Resident Engineer 38.26 16 1.64% 0.63 Surveyor 30.47 i TOTALS 975 100% $33.46 98 f 100% $44.85 8 100% $47.35 0 0% $0.00 0 0% $0.00 0 0% $0.00 40 19 PREPARED BY THE AGREEMENTS UNIT 10' Printed 5/14/2010 3:38 PM IN-HOUSE DIRECT COST COST ESTIMATE OF CONSULTANT SERVICES 41 FIRM Stanley Consultants, Inc. DATE 05/14/10 PSB OVERHEAD RATE 1.51 PRIMEISUPPLER COMPLEXITY FACTOR 0 PROJECT MANAGEMENT AND COORDINATION $185 Total Mileage Meetings Miles $/mile Total $ 10 30 0.5 150 Prints Meetings Pages Copies $/page Total $ 10 5 7 0.1 35 DATA COLLECTION $60 Total Mileage Trips Miles $/mile Total $ 3 40 0.5 60 SITE ASSESSMENT AND TECHNOLOGY SELECTION $20 Total Mileage Trips Miles $/mile Total $ 1 40 0.5 20 CONTRACT DOCUMENTS $2,835 Total Sheets 11x17 Copies Submittals $/page- Total $ 79 12 3 0.13 369.72 Sheets 22x34 Copies Submittals $/page Total $ 79 12 3 0.5 1422 Spec Pages Copies Submittals $/page Total $ 180 12 3 0.1 648 Mylars Sheets 22x34 Copies Submittals $/page Total $ 79 1 1 5 395 PUBLIC MEETING $575 Total Mileage Meetings Miles $/mile Total $ 3 40 0.5 60 Boards Copies Meetings $/Board Total $ 5 1 3 1 15 Invites Meetings $/Invite Total $ 500 2 0.5 500 • Total $3,675 • ATTACHMENT A CITY OF EVANSTON PROFESSIONAL SERVICES AGREEMENT This Agreement is for the provision of all Services necessary to the City of Evanston, made this May 24, 2010 , 200_1 by and between the City of Evanston, located at 2100 Ridge Avenue, Evanston, Illinois, 60201 ("City") and Stanley Consultants, Inc. ("Consultant"). In consideration of the mutual covenants herein contained, Consultant agrees to perform the Services hereinafter described, and City agrees to pay the amounts hereinafter described, all on the terms and conditions hereinafter set forth. I. COMMENCEMENT DATE Consultant shall commence the Services on the date provided in Addendum A. If Addendum A does not provide any specific commencement date, Consultant shall commence the Services no later than three (3) DAYS AFTER City executes and delivers this Agreement to Consultant. II. COMPLETIONDATE Consultant shall complete the Services by the date set forth on Addendum A. If Addendum A does not provide any specific completion date, Consultant shall perform the Services diligently and continuously with an adequate number of qualified employees to ensure completion as soon as reasonably possible. III. PAYMENTS • City shall pay Consultant those fees set forth on Addendum A. Payment shall be made upon the completion of each task for a project, as set forth in City's Request 21 for Proposal No. # (Exhibit A). Any expenses in addition to those set forth on • Addendum A must be specifically approved by the City in writing in advance. IV DESCRIPTION OF SER VICES Consultant shall perform the services (the "Services") set forth in Addendum A. Services are those as defined in the City's Request for Proposal No. # (Exhibit A), and Consultant's Proposal (Exhibit B). • 22 V. GENERAL PROVISIONS A. Services. Consultant shall perform the Services described in Addendum A in a professional and workmanlike manner. All Services performed and documentation (regardless of format) provided by Consultant shall be in accordance with th ihighez essi iagtitn dree lsomamors or omissions, ambiguities, coordination problems, and other defects in the documentation. Consultant shall take into account any and all applicable plans and/or specifications furnished by City or by others at City's direction or request, to .Consultant during the term of this Agreement. All materials, buildings, structures, or equipment designed or selected by Consultant shall be workable and fit for the intended use thereof, and will comply with all applicable governmental requirements. Consultant shall cause its employees to observe the working hours, rules, security regulations and holiday schedules of City while working at the Property and to perform their respective duties in a.manner which does not unreasonably interfere with City's business and operations, or the business and operations of the tenants and occupants of the Property. Consultant shall take all necessary precautions to assure the safety of its employees who L are engaged in the performance of the Services, all equipment and supplies, used in connection therewith, and all property of City, or other parties that may. be affected in • connection therewith. If so requested by City, Consultant shall. promptly replace any employee or, agent performing the. Services if, in the opinion of the City, such -performance is unsatisfactory. B. Representation and Warranties. Consultant represents and warrants that: (1) Consultant possesses and will. keep in force all required licenses to perform the Services, (2) the employees of Consultant performing the Services are fully qualified, licensed as required, and skilled to perform the services, and (3) Consultant and its employees performing the Services have had substantial experience performing comparable services for other parties during the past five (5) consecutive years. C. Termination. City may, at any time, with or without cause, terminate this Agreement upon seven (7) days written notice to Consultant.- If the City terminates this agreement, the City will -make payment to Consultant for services performedpriorto termination. D. Independent Contractor. (1) Consultant's status shall be, that of an independent contractor and not that of a servant, agent, or employee of City.. Consultant shall not hold Consultant out, nor claim to be acting, as a servant, agent. or employee of City. Consultant" is not • authorized to, and shall not, make or undertake any agreement, understanding, waiver or representation on behalf of City. (2) Consultant shall at its own expense - comply with all applicable workmen's compensation, unemployment insurance, 23 employer's liability, tax withholding, minimum wage and hour, and other federal, • state, county and municipal laws, ordinances, rules, regulations and orders. Consultant agrees to abide by the Occupational Safety & Health Act of 1970 (OSHA), and as the same may be amended from time to time, applicable state and municipal safety and health laws and all regulations pursuant thereto. E. Conflict of Interest. Consultant represents and warrants that no prior or present services provided by Consultant to third parties conflict with the interests of City in respect to the Services being provided hereunder except as shall have been expressly disclosed in writing by Consultant to City and consented to in writing to City. F. Ownership of Documents and Other Materials. All originals, duplicates and negatives of all plans, drawings, reports, photographs, charts, programs, models, specimens, specifications, and other documents or materials required to be furnished by -Consultant hereunder, including drafts and reproduction copies thereof, shall be and remain the exclusive property of City, and City shall have the unlimited right to publish and use all or any part of the same without payment of any additional royalty, charge, or other compensation to Consultant. Upon the termination of this Agreement, or upon request of City, during any stage of the Services, Consultant shall promptly deliver all such materials to City. Consultant shall not publish, transfer, license or, .except in connection with carrying out obligations under this Agreement, use or reuse all or any part of such reports and other documents, including working pagers, without the prior written approval of .City, -provided, however, that Consultant may retain copies of the same for Consultant's own general reference_ . consultant is not responsi Die _ for any _ reuse of its work on another project or for purposes not intended by the work. G. Payment. Invoices for payment shall be submitted by Consultant to City at the address set forth- above, together with reasonable supporting documentation, City may require .such additional supporting documentation as City reasonably deems necessary or desirable. Payment shall be made in accordance with the Illinois Local Government Prompt Payment Act, after City's receipt of an invoice and all such supporting documentation. H. Right to Audit. Consultant shall for a period of three years following performance of the Services, keep and make available for the inspection, examination and audit by City or City's authorized employees, agents or representatives, at all reasonable time, all records respecting the services and expenses incurred by Consultant, including without limitation, all book; accounts, memoranda, receipts, ledgers, canceled checks, and any other 'documents indicating, documenting, verifying or substantiating the cost and appropriateness of any and all expenses. If any invoice submitted by Consultant pis found to have been overstated, Consultant shall ,provide 'City an immediate refund of the overpayment (together with interest at the lesser of 18% or per annum or the highest rate permitted by applicable law), and shall reimburse all of City's • expenses for and in connection with the audit respecting such invoice. 24 • I. Indemnity. Contractor must defend, indemnify, keep and hold harmless the City of Evanston, its officers, representatives, elected and appointed officials, agents and employees from and against ainyamd ailioassW, iaeldingcthoae wlate $at: performance of the services or breach of the agreement including: l . injury, death or damage of or to any person or property; 2. any infringement or violation of any property right (including patent, trademark or copyright); 3. failure to pay or perform or cause to be paid or performed Contractors covenants and obligations as and when required under this Contract or otherwise to pay or perform its obligations to any subcontractor; 4. the City's exercise of its rights and remedies under this Contract; and 5. injuries to or death of any employee of Contractor or any subcontractor under any workers compensation statute. "Losses" means, individually and collectively, liabilities of every kind, including losses, damages and reasonable costs, payments and expenses (such as, but not limited to, court costs and reasonable attorneys' fees and disbursements), claims, demands, actions, suits, proceedings, judgments or settlements, any or all of which in any way arise out of or relate to the acts or omissions of Contractor, its employees, agents and subcontractors. At the City Attorney's option, Contractor must defend all suits brought upon all such Losses and must pay all costs and expenses incidental to them, but the City has the right, at its option, to participate, at its own cost, in the defense of any suit; without relieving, • Contractor of any of its obligations under this Contract. Any settlement must be made only with the prior written consent of the City Attorney, if the settlement requires any action on. the part of the City. - - To the extent permissible by law, Contractor waives any limits to the amount of its obligations to indemnify, defend or contribute to any sums due under any Losses, including any claim by any employee of Contractor that may be subject to the Workers Compensation Act, 820 ILCS 30511 et seq. or any other related law or judicial decision (such as, Kotecki v. Cyclops Welding Corporation, 146 Ill. 2d 155 (1991)). The City, however, does not waive any limitations it may have on its liability under the Illinois Workers Compensation Act, the Illinois Pension Code or any other statute. The indemnities in this section survive expiration or termination of this Contract for matters occurring or arising during the term of this Contract or as the result of or during the Contractors performance of Services beyond the term. Contractor acknowledges that the requirements set forth in this section to indemnify, keep and save harmless and from defend the City are apart,om and not limited by the Contractor's duties under this Contract, including the insurance requirements set forth in the Contract. • p Consultant shall carry and maintain at its own cost with such J. Insurance. companies as are reasonably acceptable to City all necessary liability insurance (which - shall -include -as a minimum the requirements set forth below) during .the term of this 25 Agreement, for damages caused or contributed to by Consultant, and insuring Consultant . against claims which may arise out of or result from Consultant's performance or failure to perform the Services hereunder: (1) worker's compensation in statutory limits and employer's liability insurance in the amount of at least $500,000, (2) comprehensive general liability coverage, and designating City as additional insured for not less than $3,000,000 combined single limit for bodily injury, death and property damage, per occurrence, (3) comprehensive automobile liability insurance covering owned non -owned and leased vehicles for not less than $1,000,000 combined single limit for bodily injury, death or property damage, per occurrence, and (4) errors and omissions or professional liability insurance respecting any insurable professional services hereunder in the amount of at least $1,000,000. Consultant shall provide City with certificates of insurance and, if requested by City, certified copies of the policies of insurance evidencing the coverage and amounts set forth in this Section. Consultant's certificate of insurance shall contain a provision that the coverage afforded under the policy(s) will not be canceled or reduced without thirty (30) days prior written notice (hand delivered or registered mail) to City. K. Confidentiality. In connection with this Agreement, City may provide Consultant with information to enable Consultant to render the Services hereunder, or Consultant may develop confidential information for City. Consultant agrees (i) to treat, and to obligate Consultant's employees to treat, as secret and confidential all such information whether or not identified by City as confidential, (ii) not to disclose any such information or make available any reports, recommendations and /or conclusions which Consultant may make for City to any person, fine or corporation or use the same in any manner whatsoever without first obtaining • City's written approval, and (iii) not to disclose to City any information. obtained by Consultant on a confidential basis from any third party unless Consultant shall have first received written permission from such third party to disclose such information. L. Use of City's Name or Picture of Property. Consultant shall not in the course of performance of this. Agreement or thereafter use or permit the use of City's name nor the name of . any affiliate of City, nor any picture of or reference to the Property in any advertising, promotional or other materials prepared by or on behalf of Consultant,. nor disclose or transmit the same to any other party. M. No Assignments or Subcontracts. Consultant shall not assign or subcontract all or any part or its rights or obligations hereunder without City's express prior written approval, and any attempt to do so shall at City's option be null and void and of no force or effect whatsoever. Consultant shall not employ, contract with, or use the services of any other.architect, interior designer,, engineer, consultant, special contractor, or other third party in connection with the performance of the Services without the prior written consent of City. N. Compliance with Applicable Statues, Ordinances and Regulations. In performing the Services, Consultant shall comply with all applicable federal, state, county, and municipal statues, ordinances and regulations, at Consultant's • sole cost and expense, except_to_the- extent expressly provided -to the -contrary in - Addendum A. 26 • D. Liens and Encumbrances. Consultant, for itself, and on behalf of all subcontractors, suppliers, materialmen and others claiming by, through or under Consultant, hereby waives and releases any and all statutory or common law mechanics' materialmens' or other such lien claims, or rights to place a lien upon the Property or any improvements thereon in connection with any Services performed under or in connection with this Agreement. Consultant further agrees, as and to the extent of payment made hereunder, to execute a sworn affidavit respecting the payment and lien releases of all subcontractors; suppliers and materialmen, and a release of lien respecting the Services at such time or times and in such form as may be reasonably requested by City. Consultant shall protect City from all liens for labor performed, material supplied or used by Consultant and/or any other person in connection with the Services undertaken by consultant hereunder, and shall not at any time suffer or permit any lien or attachment or encumbrance to be imposed by any subcontractor, supplier or materialmen, or other person, firm or corporation, upon the Property or any improvements thereon, by reason or any claim or demand against Consultant or otherwise in connection with the Services. P. Notices. Every notice or other communication to be given by either party to the other with respect to this Agreement, shall be in writing and shall not be effective for any purpose -unless the same shall be -served personally or by United States certified or registered mail, postage prepaid, addressed if to City as follows: City of Evanston, 2100 Ridge Avenue, Evanston, Illinois ­ 6020I,° Attention: Purchasing Division and to Consultant at the address first above set forth, or at such other address or addresses as City or Consultant may from time to time designate by notice given as above provided. Q. Attorney's Fees. In the event that any action, suit, or other proceeding is instituted to remedy, prevent, or obtain relief from a, breach of this Agreement, or ,arising out of a breach of this Agreement, ,the. preyailing,:,partyshall-. recover from the unsuccessful party as part of the judgment all of such parry's attorneys' fees incurred in each and every such action, suit, or other proceeding. R. Waiver. Any failure or delay by City to enforce the provisions of this Agreement shall inno way constitute a waiver by City of any contractual right hereunder, unless such waiver is in writing and signed by City. S. Severability. In the event that any provision of this Agreement should be held void, or unenforceable, the remaining portions hereof shall remain in full force and effect. T. Choice of Law. The rights and duties arising under this Agreement shall be governed by the laws of the State of Illinois. U. Limitation of Liability. No individual of City shall have any personal liability in connection with this agreement. Consultant shall look solely to the assets of City for the satisfaction of any judgment in connection herewith. • V. Time. All time limits provided in this Agreement and any Addenda or Exhibits hereto are of the essence of this -Agreement. - - - - - - 27 W. Survival. Except as expressly provided to the contrary herein, all provisions of this • Agreement shall survive all performances hereunder. VI. INTEGRATION This Agreement, together with Addendum A, Exhibit A through Exhibit B constitute the entire agreement between the parties and supersedes all previous written or oral agreements, if any, relative to the subject matter hereof. In the event of any inconsistency between this Agreement, the Addenda, and any Exhibits, this Agreement shall control over the Addenda and Exhibits. In the event of inconsistency among Addenda or Exhibits, the more detailed Addenda or Exhibit shall control. In no event shall any proposal or contract form submitted by Consultant be part of this Agreement unless agreed to a signed by both parties and attached and referred to herein as an Addendum, and in such event, only the portions of such proposal or contract form consistent with this Agreement and other, Addenda and Exhibits hereto shall be part hereof. IN WITNESS WHEREOF, the parties hereto have each approved and executed this Agreement on the day, month and year first above written. CONSULTANT: Lin CITI' OF EVANSTON 2100 RIDGE AVENUE EVANSTON, IL 60201 0 Its: vice President Its: FEIN Number: 42 -13 2 0 75 8 Date: Date: May 24, 2010 Attest: 28 • • • ADDENDIM A • • This ADDENDUM A to that certain Consulting Agreement dated May 24 , 2010 between the City of Evanston, 2100 Ridge Avenue, Evanston, Illinois, 60201("City") and Stanley Consultants, Inc. ("Consultant") sets forth the Commencement and Completion Date, Services, Fees, and Reimbursable Expenses as follows: I. COMMENCEMENT DATE: II. COMPLETION DATE: III. FEES: IV. SERVICES: As defined in RFP # 10-91 and Consultants Proposal Dated: May 24, 2010 29 ATTACHMENT B DISCLOSURE OF OWNERSHIP INTERESTS, City of Evanston Ordinance 15-0-78 requires all persons (APPLICANT) seeking to do business with the City to provide the following information with their proposal. Every question must be answered. If the question is not applicable, answer with "NA". APPLICANTNAME: Stanley Consultants, Inc. APPLICANT ADDRESS: 8501 W. Higgins, Suite 760, Chicago, IL 60631 TELEPHONE NUMBER: 773.6 9 3.9624 FAX NUMBER: 7 7 3.6 9 3.7690 APPLICANT is (Check One) 1. Corporation()) 2. Partnership () 3. Sole Owner( ) 4. Association() 5. Other ( ) Please answer the following questions on a separate attached sheet if necessary. SECTION I - CORPORATION _ Ia. Names and addresses of all Officers and Directors of Corporation. See Attached lb. (Answer only if corporation has 33 or more shareholders.) Names and addresses of all those shareholders owning shares equal to or in excess of 3% of the proportionate ownership interest and the percentage of shareholder interest. (Note: Corporations which submit S.E.C. form IOK may substitute that statement for the material required herein.) N/A lc. (Answer only if corporation has fewer than 33 shareholders.) Names and addresses . of all shareholders -and -percentage-of interest of -each herein. -(Note: - Corporations- - - - - 30 • • • which submit S.E.C. form 10K may substitute that statement for the material requested herein.) N/A SECTION 2 - PARTNERSHIP/ASSOCIATION/JOINT VENTURE 2a. The name, address, and percentage of interest of each partner whose interests therein, whether limited or general, is equal to or in excess of 3%. N/A 2b. Associations: The name and address of all officers, directors, and other members with 3% or greater interest. N/A SECTION 3 - TRUSTS 3 a. Trust number and institution. N/A 3b. Name and address of trustee or estate administrator. N/A 3c. , Trust or estate beneficiaries: Name, address, and percentage of interest in total entity. N/A 31 SECTION 4 - ALL APPLICANTS - ADDITIONAL DISCLOSURE, 4a. Specify which, if any, interests disclosed in Section 1,2, or 3 are being held by an agent or nominee, and give the name and address of principal. S.C. Companies, Inc. 4b. If any interest named in Section 1,2, or 3 is being held by a "holding" corporation or other "holding" entity not an individual, state the names and addresses of all parties holding more than a 3% interest in that "holding" corporation or entity as required in I (a), I (b), I (c), 2(a), and 2(b). See Attached 4c. If "constructive control' of any interest named in Sections 1,2, 3, or 4 is held by another party, give name and address of party with constructive control. ("Constructive control' refers to control established through voting trusts, proxies, or special terms of venture of partnership agreements.) N/A I have not withheld disclosure of any interest known to me. Information provided is accurate and current. Date Signature of Person Preparing Statement Title ATTEST: Notary Public (Seal) 32 • • Stanley Consultants, Inc. DIRECTORS Steven J. Allchin, 2861 Rolling Meadow Lane, Muscatine, IA 52761 James A. Hollatz, 2262 Ridgeview Drive, Muscatine, IA 527E1 Bennett D. Reischauer, 1610 Mulberry, Muscatine, IA 52761 Gayle A. Roberts, 6914 Nottingham, Bettendorf, IA 52722 Ronald J. Schulte, 2667 Aunt Polly Lane, Muscatine, IA 52761 Richard C. Smith, 101 Sterling Woods Court, Muscatine, IA 52761 Richard H. Stanley, 516 Hogan Court, Muscatine, IA 52761 Dale R. Sweere, 2670 Tom Sawyer Road, Muscatine, IA 52761 Gregs G. Thomopulos, 75 Shagbark Court, Iowa City, IA 52246 0 OFFICERS Chair: Gregs G. Thomopulos, 75 Shagbark Court, Iowa City, IA 52246 Chair Emeritus: Richard H. Stanley, 516 Hogan Court, Muscatine, IA 52761 President: Gayle A. Roberts, 6914 Nottingham, Bettendorf, IA 52722 Sr. Vice Presidents: Steven J. Allchin, 2861 Rolling Meadow Lane, Muscatine, IA 52761 James A. Hollatz, 2262 Ridgeview Drive, Muscatine, IA 52761 Michael E. Hunzinger, 7054 East Bobwhite Way, Scottsdale, AZ 85262 L. Lynn Pruitt, 606 Broadway, Nichols, IA 52766 Bennett D. Reischauer, 1610 Mulberry, Muscatine, IA 52761 Steven J. Schebler, 7011 Holdorf Dr., Blue Grass, IA 52726 Richard C. Smith 101 Sterling Woods Court, Muscatine, IA 52761 Vice Presidents: Asst. Vice President, Architecture (IA): Asst. Vice President, Real Estate Services (1A): Asst. Vice President, Structural (AZ): Secretary: Asst. Secretaries: -- - - - --Treasurer. - Asst. Treasurer. Kevin W. Cavanaugh, 6912 S. Miller Street, Littleton, CO 80127 Michael R. Chase, 16413 N. 11"' Place, Phoenix, AZ 85022 Robert T. Darnell, 18005 45w Avenue North, Plymouth, MN 55446 T.shaka E. Dennis, 1468 Artimino Lane, Boynton Beach, FL 33410-6102 Marc A. Elliott, 209 Normandy Court, Muscatine, IA 52761 Robert E. Farrar, 20158 East Aintree Ct., Parker, CO 80138 Michael D. Flattery, 268 62nd Ct., West Des Moines, IA 50266 Gary W. Foster, PO Box 1211, Muscatine, IA 52761 Mark 1. Freeman, 2086 East 4425 South, Salt Lake City, LIT 84124 Gregory P. Gesicki, 21798 N. Ingram Court, Maricopa, AZ 85239 David W. Grounds, 6302 N. San -Andros, West Palm Beach, FL 33411 Mark A. Herithorn, 801 West Third Street, Muscatine, IA 52761 Robert E. Jacobs, 3284 West Iron Gate Rd., South Jordan, LIT 84095 J. Craig Johnson, 3040 Holly Lane North, Plymouth, MN 55447 Larry R. Johnson, 9313 S. Lark Sparrow Drive, Highlands Ranch, CO 80126 James L. IGII, 2200 Mulberry, Muscatine, IA 52761 Robert M. Koss, 627 Commons Road, Naperville, IL 60563 William A. Liegois, 512 Hogan Court, Muscatine, IA 52761 Ian J. McAlister, 1123 Hampton Court, Iowa City, IA 52240 Michael-J. McKenna,-2668-BeckyThatcher-Rd,_Muscatine,-IA52761 - Thomas J. Morgan, 13404 Athens Trail, Austin, TX 78729 Patrick E. Mullin, 2922 Mulberry, Muscatine, IA 52761 W. Todd Nicoll, 9529 S. Bellmore Lane, Highlands Ranch, CO 80126 P. Russell Price, 2635 Seven Oaks Park, Muscatine, IA 52761 Robert J. Rusch, 2674 Tom Sawyer Road, Muscatine, IA 52761 Ronald J. Schulte, 2667 Aunt Polly Lane, Muscatine, IA 52761 Larry A. Shell, 2199 North Hill Rd., Muscatine, IA 52761 Samuel D. Stone, 8766 Jefferson Drive, Eagle Mountain, LIT 84005 Dale R. Sweere, 2670 Tom Sawyer Road, Muscatine, IA 52761 W. Scott Wonders, 883 N. Windham Place, Eagle, ID 83616 Bruce H. Worthington, 8131 W. Catherine, Chicago, IL 60656 Robert D. Zicafoose, 14414 E. Sweetwater Ave., Scottsdale, AZ 85259 Debashis Sarkar, 2648 Quail Run, Muscatine, IA 52761 Craig F. Reischauer, 108 West 5"', Muscatine, IA 52761 Dan R. Shiosaka, 7002 West Tonto Drive, Glendale, AZ 85308-5534 Nancy D. Elliott, 209 Normandy Court, Muscatine, IA 52761 Henry F. Marquard, 108 Eagle Watch Road, Muscatine, IA 52761 Karen L. McDaniel, 702 Barry Street, Muscatine, IA 52761 - --Richard-C.-Smith, 101 Sterling Woods Court, Muscatine,-IA-52761 Steven J. Allchin, 2861 Rolling Meadow Lane, Muscatine, IA 52761 William C. Harper, 2232 Hickory Hills Road, Muscatine, IA 52761 C • • • Disclosure of Ownership Interest The completed form follows this section. PERCENT OF OWNERSHIP SC COMPANIES, INC. May 2010 NAME & ADDRESS PERCENTAGE OVER 3% Stanley Member Stock 18.6% Bonus Plan Stanley Building 225 Iowa Avenue Muscatine, IA 52761 Gregs G. Thomopulos 7.86% 75.Shagbark Court Iowa City, IA 52246 Richard H. Stanley 4.67% - - - 51-6; Hogan. Curt-- - - - -- Muscatine, IA 52761 James A. Hollatz 4.86% 2262 Ridgeview Drive Muscatine,, IA 52761 Bennett D..Reischauer 4.13% 1610 Mulberry Ave. Muscatine, IA 52761 Richard W. Mettee 3.02% 3807-East Morning Dove Trail Phoenix, AZ 85050 • Route: Sheridan Road, Various locations Section: 10-00258-00-TL County: Cook County Scope of Services Project Understanding Stanley Consultants r,- The overall scope of the project consists of traffic signal equipment replacement and signal interconnect at existing signalized intersections along Sheridan Road. The project includes the following key tasks: 1. Conduct a review of available traffic signal technologies that will improve traffic management and increase pedestrian safety at the signalized intersections. A technical memorandum will be prepared to summarize the findings and recommendations. The recommended technologies will be implemented at the intersections as approved by the City. 2. Prepare contract documents for traffic signal modernization and signal interconnect at the intersections shown below. 3. Present project and proposed improvements at two public meetings. 4. After construction, Signal Coordination and Timing (SCAT) optimization services will be provided by Metro Transportation Group for intersections shown below. The overall project will be divided in three separate sets of contract documents for corridors as shown below: Corridor 1. Sheridan Road at South Boulevard and Main Street (2 intersections) Corridor 2. Sheridan Road at Burnham Place and Dempster Street (2 intersections) Corridor 3. Sheridan Road at Chicago Avenue, Foster Street, Noyes Street, Lincoln Street, and Central Street (5 intersections) The tasks for the individual corridor are summarized in Table 1. below. - - Table 1 �TaWSummary - - - Corridor (Intersections) Traffic Interconnect SCAT Public Signals Meeting 1—South Blvd and Main St (2) Yes 2—Bumham PI and Dempster St (2) Yes 3—Chicago Ave, Foster St, Noyes Yes Yes Yes Yes 1 St, Lincoln St, Central St (5) , The approved Phase I geometry and intersection improvements will be used for the proposed signal placement. Phase I design files will be providedby the City of Evanston for use in plan preparation. Stanley Consultants will prepare plans, ,specifications, and estimates for the proposed improvements. The proposed scope does : not include any bidding assistance and construction engineering services. We offer the following detailed scope of engineering services. • • • Route: Sheridan Road, Various locations Section: 10-00258-00-TL Stanley Ccnsultants County: Cook County Scope of Services Scope of Work We offer the following scope of services. 1. Project Management and Coordination a) Attend Kick-off meeting with IDOT and City of Evanston. b) Attend meeting with IDOT, Bureau of Traffic to present 80 percent contract documents. The project goals, constraints, and variances will be discussed. c) Attend six coordination meetings with the City to discuss project progress, present proposed improvements, and discuss review comments. d) Attend meeting with ComEd to discuss location of electric service. e) Coordinate project with utility agencies. f) Manage budget, schedule, and process invoices during the length of the project. 2. Data Collection a) Obtain from City Phase I files in Microstation format including topographic_ survey, Right -of - Way, proposed geometry, and pavement markings. - b) Conduct pick-up survey as necessary. The topographic survey conducted during the Phase I will be obtained and reviewed to identify additional survey needs. Alotal of four days (64 • hours) of survey time is assumed for this purpose. IEI will conduct the topographic survey and Stanley Consultants will process the survey -data. The pick-up survey -will be merged -. with the Phases I survey -data - - - - - - - - - - — - -- - - - -- - - - - - c) Obtain. existing traffic signal plans from the City / IDOT. d) Obtain public (from City) and private utility atlases. e) Conduct field visit to verify topographic survey, review intersection constraints, identify potential conflicts, and prepare photolog. 3. Technology Review a) Review available traffic signal :technologies and prepare technical memorandum for City review. The review will identify benefits, limitations, costs, and implementation examples. The following technologies will be reviewed: i. Radio Interconnect in lieu of fiberoptic interconnect ii. Video detection in lieu of loop detectors iii. Automated pedestrian detection in lieu of push buttons iv. Accessible pedestrian signals in addition to countdown signals V. LED street name signs in lieu of traditional metal signs 4. Site Assessment and Identify Improvements a) The viability of radio interconnect technology has to be verified along the corridor. A site • assessment will be conducted by Brown Traffic Products Inc, using equipment to be used for Route: Sheridan Road, Various. locations Section: 10-00258-00-TL County: Cook County Scope of Services Staniey Consultants- p.�� the final installation. Fiber optic technology will be used if radio interconnect is not found feasible. b) Stanley Consultants will meet with the City to identify the optional technologies and improvements that the City would like to consider for implementation. 5. Contract Documents The contract documents will be prepared in three stages: Preliminary, Pre -final, and Final contract documents as discussed below: 80 Percent Contract Documents (Preliminary Contract Documents) a) Prepare 80 percent complete plans in English format. IEI will assist with plan preparation. The following sheets are anticipated. Sheet Description Title Index of Sheets Summary of Quantities 1, Legend Temporary Signal Installation (10=20') Temporary Cable Plans I, Signal Installation (1 °=20') 1--Gable-Plans Signal Interconnect (1°=50') I Street Sign Sheet Standard Details Total Corridor 1 Corridor 2 Corridor 3 1 1 1 1 1 1 1 1 1 1 1 1 2 2 5 2 2 5 2 -2 5 2- ==1 --2-- .---I---:--5--- NA I NA l 4 1 I 1 I 1 8 I 8 I 8 21 I 21 I . 37 b) Prepare specifications including special provisions, supplemental specifications, and checksheets. c). Prepare summary of quantities, estimate of time, and an estimate of construction cost using the most current unit prices. d) Independent QA/QC review will be conducted by Senior Traffic Engineer and Resident Engineer to ensure constructability. The QA/QC documentation will be submitted to the City. e) Submit 80 percent contract documents to [DOT, City, and Utility companies for review. 95 Percent Contract Documents (Pre -final Contract Documents) • • a) Receive review comments from IDOT, City, and utility companies on preliminary contract documents. b) Based on the review comments, prepare pre -final 'contract documents including plans, specifications, quantities, and cost estimates. • c)_ Prepare disposition of comments for comments from all agencies._ • • • Route: Sheridan Road, Various locations Section: 10-00258-00-TL County: Cook County Scope of Services d) Perform QA/QC review. e) Submit pre -final plans to IDOT, City and utility companies for review. Final Contract Documents Stanley Consultants a) Receive review comments from IDOT, City, and utility companies on pre -final contract documents. b) Based on the review comments, prepare final contract documents including plans, specifications, quantities, and cost estimates. c) Submit mylars and pdfs to IDOT for project letting. d) Attend pre -construction meeting with contractor, [DOT, City and utility companies. 6. Public Meetings The public meetings will be conducted to present the improvements in Corridor 3 a) Prepare notifications, flyers, and exhibits for.use during the public meetings and prepare meeting summary after the meeting. The notifications shall be printed in black and white on regular 8.5"x11" paper using a double -sided format. b) Attend two public meetings to discuss project goals and proposed improvements. The meeting will be conducted in a n open house format according to City requirements. c) Attend one meeting to review public meeting exhibits and perform,a dry -run of the meeting. 7. Signal Coordination and Timing (SCAT) Metro Transportation, SCAT consultant, -will conduct the SCAT analysis after construction is complete. We do not anticipate their involvement; during the design engineering phase of the s k: project.. IEI will perform classification traffic counts for the morning, afternoon, and evening peak hours. All deliverables will be in print, AutoCad, and pdf format. • . OL Preliminary Schedule Sheridan Road Traffic Signal and Interconnect G, -`2 1, P, M Task July Aug Sept Oct` -Nov`,DecJan,Feb Mar Apr May June July Aug Sept Oct I Contract Negotiations 11 Project Coordination III Data Collection ■ A Technology Review V Site Assessment Z,� VI Contract Documents V1, Public Meetings VIII IDOT Processing and Letting City Council Contract Approval: May 24, 2010 Consultant Tasl( Review Period Deliverable 311MAP Stanley Consultants INC A Stanley Group Company Engineering, Environmental and Construction Servion - Worldwide EXHIBIT A • - __ 1NFr-RAZS-1 F U(-1TURE May 12, 2010 Sagar R. Sonar, P.E., PTOE Senior Engineer Stanley Consultants 8501 West Higgins Road, Suite 730 33 West Monroe Street Suite 1540 Chicago, IL 60603-5322 Integrity I Excellence I Innovation Chicago, IL 60631 Reference: Infrastructure Engineering, Inc. Scope Project: Evanston Traffic Signal Design/Signal System Work Dear Mr. Sonar: Infrastructure Engineering, Inc. (IEI) is pleased to provide services for the above mentioned project. As you have requested, IEI's detailed scope is listed below. 146 following work will be provided at three corridors (Sheridan Road from South Blvd. to Main St., Sheridan Road from Burnham Pl. to Dempster St., and Sheridan Road from Chicago Ave. to Central St) - 1. Survey: City of Evanston has GIS data with all utility information, sidewalk locations, parkway, water and sewer, traffic signal, and pavement marking information. Once this information is provided to IEI, the pick-up survey will include tying in to an existing benchmark to verify locations and elevations of existing traffic signal equipment, trees, utility manholes and curbs and sidewalks at intersections only. The survey will be collected according to IDOT standards. This work will be limited to 72 hours (two people for 4 days) and will not include: photo logs, generation of base file, verification or rectification of field data compared to GIS data, and sign survey. 2. IEI will also provide QA/QC of the project plan submittals. Plan sheets to be included: 1. Title sheet: provide a standard IDOT cover sheet with project location map and index of standard drawings (to be provided by Stanley). 2. Index of Sheets: Sheet names, numbers, and total sheets to be provided by Stanley and compiled by IEI. 3. Summary of Quantities sheet: quantities to be supplied by Stanley and compiled by IEI. • • • • • • j INFRASTRUCTURE I. 33 Nest Moiroe Street Suite 1540 Chicago, IL 60603-5322 Integrity I Excellence I Innovation Mr. Sonar, P.E., PTOE May 1. 2, 2010 Page 2 4. Street Sign sheet: provide CADD work for 10 street signs for streets at signalized intersections. Since no mast arms will be provided, the IDOT standard design for the sign will be used but mounting details will be provided by Stanley. 5. Standard detail sheets: compile the IDOT standard details based on input from Stanley. In addition to work at these three locations, traffic counts will be provided at Sheridan Read from Chicago Ave. to Central Street. The scope of this work will be as follows: 1. IEI will provide traffic counts for 5 signalized intersections along Sheridan Road. IEI will use two traffic counters at each of the four T-intersections and three traffic counters at the four legged intersection. Counts will be provided during one weekday between the hours of 6:30-9:30 a.m., 11 a.m.-1 p.m., and 3:30-6:30 p.m. Onsite QA/QC will be provided. Data will be downloaded but not balanced. 2. Signal Interconnect Plans: IDOT standard Interconnect plans and schematic to be provided by IEI (including interconnect quantities). Signal modernization and cable plans showing proposed traffic signal equipment locations are to be provided by Stanley _ __ prior -to -the -start of work on -interconnect -plans: -Location of master- controller and detection type is also to be provided by Stanley. Additional items not included with this scope are: traffic analysis, traffic signal design, traffic signal plans, cable plans, temporary traffic signal plans, MOT, calculation of quantities (except as noted above), and erosion control and protection. The total fee in consideration for the services to be provided is Thirty Thousand Three Hundred Fifty Dollars ($30,350). Sincerely, Michael Sutton, P.E. Principal cc: Lanyea Collier, P.E. SCHEDULE Eo Letter of Latent to Perform 0 am President of Infrastructure Engineering, Inc. and have (Title of Afriant) (Name of MMI/EBE Firm) authority to execute this affidavit on behalf of this firm. I Michael Sutton (Name of Affiant) do hereby certify that: Infrastructure Engineering, Inc. intends to participate as a (Name of MWEBE Firm) Subcontractor on the project known as Sheridan Road, Evanston (Project Description) The Prime Contractor, . Stanley Consultants , will award a contract to my firm in the amount of $ 111-tJ010-:1'W for Survey and Plan Development (Type of Work) This notification is pursuant to the Prime Contractor's receipt of an executed agreement with the City of Evanston. Signed: Date: 4/27/2010 (MNVTBE Subcontractor) - Signed: `\ Date: (Bidder/Prime Contractor) Corporate Seals (where appropriate) This instrument was admowiedgad before me on this day of AP91L 2-010 by (109AEL haTbil as President (or other autho'zed officer) of I I r-70SITALCTLA. (Firm Name) (No(� Public Signature) tary Seal Commis'sion_�x ires: +0 Ju.i. 20 t o OFFICIAL SEAL GLORIA YU NtJTARY PUBLIC -STATE OF ILUN03 my Cp�gSS10N EpIREg 07110110 18 • AFFIDAVIT OF MWEBE STATUS I am President of Infrastructure Engineering, Inc. and have authority (Title ofAffiant) (Name of Firm) to execute this affidavit on behalf of this firm. I Michael Sutton (Name of Affiant) do hereby certify that: 1. This firm is a: (Check One Only) x Minority Business Enterprise (MBE) (A firm that is at least 51 % owned, managed and controlled by a Minority.) Women's Business Enterprise (WBE) (A firm that is at least 51 % owned, managed and controlled by a Woman.) Evanston Business Enterprise (EBE) (A firm located in Evanston for a minimum one year and which performs a "commercially useful function".) Please note: 49 CFR Part 26 Is used to evaluate compliance with the provisions of this specification. • 2. COPIES OF ALL MBE OR WBE CERTIFICATIONS HAVE BEEN ATTACHED. 3. The following information will be provided upon written request, through the prime contractor or, if no prime, directly to the City of Evanston a) actual work performed on any project and the payment thereof, and, b) any proposed changes, in the status of the firm which would render this affidavit null and void. c) further verification of the. indicated status Signature: ✓t, 4, (Sign iture of Affiant) This instrument was acknowledged before me on this ! day of Well, 1010 , by M I C 4190_ , �i�(1.0 as President (or other a or d officer) of I ✓ r5akf12utU10 /) (Firm Name) Jul - (Notary ��bllc Signature) Commissi n lr res: to . )UL 2C1 O 19 Date: 4/27/2010 Corporate Seal (where appropriate) ENOTAR�YPUSUC ICIAL SEAL --.ORIAYU- STA f E OF p.UNOiS SION EXPIRESS110110 Notary Seat (i)Illinois Department of Transportafion FIRM NAME Infrastructure , Inc. PRIME/SUPPLEMENT Sub PTB NO. CLASSIFICATION Project Principal Project Manager Project Engineer Engineering Tech 1/II Surveyor Rodman Traffic Counters Payroll Rates DATE 06/12/10 ESCALATION FACTOR 0.00% CURRENT RATE ESCALATED RATE $64.18 $64.18 $58.77 $58.77 $35.74 $35.74 $22.44 $22.44 $37.21 $37.21 $22.00 $22.00 $1&09 $18.09 $0.00 $0.00 $0600 $0.00 $0.00 $0.00 $0.00 .$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Printed 5/12/2010 Page 1 BDE 025 (Rev.11/06) • • i i Cost Estimate of 1111nob Department Consultant Services Of Transportation (CECS) Firm Infrastructure , Inc. Date 05/12/10 Route Evanston Sheridan Road Section Overhead Rate 150:00% � Cook I Job No Complexity Factor 0 PTB & Item DBE Overhead In -House!' Fixed Outside Services DBE ! %of Drop Item Manhours Payroll & DirectFee Direct By Total Total l Grand Box Fringe Benefits Costs' j Costs Others Total (A) (B) (C) (D) (F1 (G) iB+C+D_+E+F+G) (B+G+D+E+F+G) Traffic Counting and QCQA 127 . 2,654.33 3,981.50 1 663.58 200.59 7,600.06 24.71% 7,025.42 Survey 75 2,324.10 3,486.15 - 842.49 372.68 ._ - - •23.15% Plan Preparation 178 5,528.24 8,292.36 i 2;003.99 i i 15,824.59 52.140/6 i TOTALS 380, 10,506.67 15,760.01 i • i 0.0.0 3,510.06 573.27, 0.00 I 0.00 30,350.00 100.00°% BDE 025 (Rev. 16) PPrint*12010 I11inc0 partmerrt of Transportation Route tvanston bneridan Road Section Average Hourly Project Rates; County Cook Consultant Infrastructure , Inc. Date 05/12/10 Job No. PTB/Item Sheet 1 Payroll Avg Total Project Rates Traffic Counting and QCQA Survey Plan Preparation Hourly Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours % Classification Rates Part. Avg Part. AVO Part. Avg ParL Avg Part. Project Principal 64.18 8 2.11% 1.35 1 0.79% 0.51 3 4.00% 2.57 4 2.25% 1.44 Project Manager 58.77 14 3.68% 2.17 2 1.57% 0.93 12 6.74% 3.96 Proiect Engineer 35.74 83 21.84% 7.81 13 10.24% 3.66 70 39.33% 14.06 Engineering Tech 1/11 22.44 92 24.21% 5.43 92 51.69% 11.60 Surveyor 37.21 36 9.47% 3.53 36 48.00% 17.86 Rodman 22.00 36 9.47% 2.08 36 48.06% ! 10.56 Traffic Counters 18.09 111 29.21 % 5.28 111 87.40% 15.81 TOTALS 0 0 0 o ' 0 0 0 0 I 0 0 o 0 0 0 0 0 1 o f I 1 I 0 l I I k I I o 380 1 100% 1 $27.65 127 100% $20.90 1 75 1 100% 1 '$30:99 l 178 1 100% $31.06 1 0 0% OF 1 Wgtd _Hours Avg Part. I i I $0.00 0 I i I I 0% Wgtd - Avg $0.00 BDE 025 (Rev. 1;1/06) Printed 5/12/2010 Page 3 caafth: Stanley Consultants i.c. A Stanley Group Company Engineering, Environmental and Construction Services - WorUMde • � :*,-4 ■ Rs PROJECT SCOPE The proposed work program is based on the scope of work contained in the RFQ for Sheridan Rd. project published on February 4, 2010, and our knowledge and experience gained through our past engagement as a Region One/District One Signal Coordination and Timing consultant. In addition to our District One work, our staff has completed numerous similar projects throughout various municipalities and Counties in Illinois. The overall objective of this project is to implement optimized signal timings for a newly constructed Sheridan Rd. closed loop systme for the City of Evanston in order to improve system safety and efficiency. The product of the study is the "turn key" implementation of optimized signal timing/phasing adjustments. In addition, a before/after comparative analysis of Measures of Effectiveness (MOEs) will be conducted to document benefits received from reduced travel times and individual intersection delays. Additionally, the Consultant (Metro) will provide any on -call services requested by the City on the Sheridan Rd. System to answer public complaints regarding traffic signal tuning. Task 1- Data Collection Information will be gathered from the newly designed traffic signal plans by Stanley Consultants and will include signal construction plans, signal equipment and interconnect information, phasing/timing patterns, accident data (as appropriate), etc. This information will be assimilated per study location to provide a base inventory of existing conditions. At each location, as -built drawing information will be field verified and intersection dimensions, crosswalk distances and lane widths measured. In addition, the stop -bar to stop -bar distances between signalized intersections in a system will be measured and any major mid -segment traffic generators will be identified. If needed, interviews will be conducted with appropriate city personnel in order to determine the most applicable format in which to provide optimization and timing adjustments for the various study locations. Manual turning movement counts (TMCs) will be conducted by the Consultant at each identified study location. These TMCs will_ normally_ be made_ from_ 6:30_to-_-- 9:30 a.m., 11:00 a.m. to 1:00 p.m., and from 3:30 to 6:30 p.m. on typical weekdays under normal driving conditions. Some intersections may require additional special counts during Friday evening or weekend periods (particularly where shopping -type trip generators are concentrated). Each TMC will be summarized in 15 minutes intervals and will identify special pedestrian movements, heavy vehicles, buses, and special saturation studies as necessary. Count information will be summarized in a manner consistent with the 2000 Hizhwav Capacity Manual (HCMI. . Initial speed/delay studies will be conducted in the field utilizing GPS technology and a PDA (Personal Digital Assistant) along identified corridors to establish a database for future comparative evaluations. Task 2 - Data Analysis The data collected will be reduced and thoroughly analyzed. If provided, • . _ . _collision diagrams will be evaluated to determine if any accident patterns have _ _developed--that..could be associated with item s such 'as' insufficient clearariee - - - - - - - - - intervals, inappropriate left -turn phasing, school zone or pedestrian' activity, equipment malfunction, etc. Peak period turning -movement counts will be summarized in a form sufficient for input to appropriate computer models. Signal equipment at the various study locations will be evaluated to determine adequacy and adaptability to potential phasing adjustments. Individual capacity analyses will be conducted for each signalized intersection to determine the existing level of service (LOS), and degree of saturation. This information will identify if signal optimization will increase the efficiency of the location or if vehicular volumes are exceeding the capacity of the intersection. These analyses will be conducted in accordance with the HCM guidelines. Appropriate signal timing settings will be developed for each peak period for isolated intersection control. Utilizing information such as intersection spacing, TMCs, minimum timing settings, phasing, saturation flow rates, measured speeds and posted speed limits, • etc., The Consultant will conduct signal system optimization analyses utilizing W3GL'1' _ • SYNCHRO 7.0 (or latest version) or other appropriate computer software. Optimization analyses will be conducted for the previously identified count periods and other identified peak periods. It is anticipated that 3 to 5 timing patterns would be warranted for most systems. Task 3 - implementation (Includes Traffic Responsive) Implementation plans for optimized signal timing/phasing plans will be developed and forwarded to the City's signal maintenance staff for review prior to implementation of new timings. The Consultant will implement closed loop system timing adjustments on an desk top personal computer and download the new information to the field controller units via telephone lines. If no phone line is included in the project, a laptop will be used to download timings directly into the controllers in the field. Timing and coordination adjustments will be made in the field at the controller cabinet. Consultant Personnel will be in the field in direct communication during all., implementation procedures to, assure the adjustments are acceptable by the equipment- and,to.,mQ ito_r. trafffic...operations. Fine-tuning -adjustments. will- be -- - - made to alleviate observed adverse operating conditions and enhance operations. This work will be closely coordinated with the City s signal maintenance staff to avoid operational problems and quickly resolve any problem areas. Task 4 - Evaluation In order to quantify the overall improvement in vehicular operations and efficiency, The Consultant will perform a. comparative analysis of vehicular MOEs. Utilizing the before and after speed/delay studies, the Consultant will calculate the expected decrease in delay and fuel consumption, decrease in carbon monoxide emissions, and the anticipated increase in overall travel speed and fuel efficiency., along study corridors. To .measure the overall corridor, including turning movements and cross -street traffic, before and after implementation analyses using the MOE outputs from the optimization software will be made to evaluate expected improvements in system operating conditions, such as total system delay, total number of stops and fuel consumption. • 4 Other measures of the improvements will be evaluated such as overall level of service improvements associated with reduced Volume/Capacity ratios. Isolated intersections can be evaluated by measuring average queue lengths, fixed-point timings and other measures to document improvements associated with optimized timings. PC -TRAVEL (latest version) will be used to evaluate the effects of the optimization of carbon monoxide, hydrocarbons and nitrous oxide on an annual basis. The input data consists of the ADT, distance and the average speed obtained from the before and after studies. Uponcompletion of the evaluation study, a final report will be issued for the Sheridan Rd. system, which includes the evaluation study, analysis results and the complete database utilized to develop the optimized timings. Recommendations for additional enhancements, equipment modifications and other observations will be included in this document. LIST OF DELIVERABLES The following work products and/or reports will be provided to the Department at various stages during the execution of a typical work order. 1. Progress Report will be done twice a month for each work order indicating current :period activities, projected work schedule and identification of problems, delays or other unusual circumstances. 2. Work Order Documentation notebook including: a. Summary Report, including system description, analysis methodology, MOE comparison results and special recommendations or observations. b. SYNCHRO 7.0 analyses for each analysis period and a copy on a - - _ CD. - C. SYNCHRO 7.0 analyses for each intersection and count period. d. Summary TMC traffic counts in report with turning movement diagrams for each intersection and count period. e. Before and after speed and delay runs. f. 7-day System. Detector Counts g. Implementation plans for each analysis period in the form of printed databases. One printed copy will be furnished to the Department in a 3-ring binder, clearly identified by work order and master/zone number upon completion of each work order. 3. Upon completion of the work, copies of the database shall be furnished to the Department, appropriate maintenance contractor and maintaining governmental agencies on CD. This database will include the intersection displays and any other system displays that the provided system software allows. A 3-ring binder will be provided to the municipality if desired. 1 • FIRM PSB PRIME/SUPPLEMENT DBE DROP ITEM BOX DBE Traffic Counts Data Collection Data Analvsis Implemenation (Evaluation I I I I I i I t i I I I �Subconsultant DL TOTALS E DF-824-039 REV 1 12/04 DATE 051121 0 190% 0 i Outside SERVICES % OF Direct BY DBE TOTAL GRAND] Costs OTHERS TOTAL TOTAL i (F) (G) (H) (B-G) 200.00 7,300.00 7,500.00 7,500.00 24.25% 3,415.06 11.04% 6.239.81 20.113% 7,648.87 24.73% 6,121.56 19.79% I I I I I I I I I I I 1 I I I I I I I I I I I I I i I � I I I I I I 1 I �I II! I 1 0.001 0.00% 200.001 7,300.001 7,500.00+ 30.925.301 100.00% DBE 24.25% Printed 5/12/2010 3:52 PM COSTA FIXED FE COST ESTIMATE OF CONSULTANT SERVICES Metro Transportation Group, Inc. MANHOURS PAYROLL (A) (8) 0.00 38 1,013.78 60 1,908.20 1 701 2,262.65 I 661 2,093.64 I I I I I I I I I I I I I 2341 7,278.27 OVERHEAD S FRINGE BENF (C) 0.00 1,926.18 3,625.58 4,299.04 3,977.92 13,828.711 OVERHEAD RATE COMPLEXITY FACTOR IN-HOUSE DIRECT FIXED COSTS FEE (D) (E) 0.00 100.00 375.10 706.03 250.00 837.18 50.00 1 ! I I I I I � I I I I � � I I I � f I I I I I I i I I, I I ! I I I ! I 1 0.00 400.0.01 11918.31 COSTA FIXED FE COST ESTIMATE OF CONSULTANT SERVICES Metro Transportation Group, Inc. MANHOURS PAYROLL (A) (8) 0.00 38 1,013.78 60 1,908.20 1 701 2,262.65 I 661 2,093.64 I I I I I I I I I I I I I 2341 7,278.27 OVERHEAD S FRINGE BENF (C) 0.00 1,926.18 3,625.58 4,299.04 3,977.92 13,828.711 OVERHEAD RATE COMPLEXITY FACTOR IN-HOUSE DIRECT FIXED COSTS FEE (D) (E) 0.00 100.00 375.10 706.03 250.00 837.18 50.00 1 ! I I I I I � I I I I � � I I I � f I I I I I I i I I, I I ! I I I ! I 1 0.00 400.0.01 11918.31 I I I I I I I 2341 7,278.27 OVERHEAD S FRINGE BENF (C) 0.00 1,926.18 3,625.58 4,299.04 3,977.92 13,828.711 OVERHEAD RATE COMPLEXITY FACTOR IN-HOUSE DIRECT FIXED COSTS FEE (D) (E) 0.00 100.00 375.10 706.03 250.00 837.18 50.00 1 ! I I I I I � I I I I � � I I I � f I I I I I I i I I, I I ! I I I ! I 1 0.00 400.0.01 11918.31 AVERAGE HOURLY PROJECT RATES FIRM Metro Transportation Group, Inc. PSB PRIME/SUPPLEMENT I PAYROLL AVG TOTAL PROJECT RATES Traffic Counts HOURLY Hours % Wgtd Hours %, I CLASSIFICATION RATES Part. Avg Part. Traffic Counters 0 Principal 46.37 75 32.05% 14.86 Engineer 24.52' 135 57.69% 14.15 j Technician 20.43 24 10.26% 2.10 #DIV/0l 0 I #DIV/0! 0 1 1 1 #DIV/O! 0 1, #DIV/01 o I I #DIV/O! 0 I #DIV/O! 0 1 1 #DIV/O! 0 #DIV/0! 0 #DIV/O! 0 1 #DIV/0! 0 #DIV/0! o 1 #DIV/O! O #DIV/01 0 I 1 #Dlvio! o I #DIV/0! o j I, #DIV/o! 0 I I I #DIV/01 0 I I 1 #DIV/O! 0 1 #DIV/01 0 I #DIV/o! 0 1 I 0 I I 0 I I o TOTALS I 234 1 100% $31.10 0 0.00% DF-824-039 REV 12/04 DATE 05/12/10 SHEET 1 OF j1 j Data Collection Data Analysis Implementation I Evaluation! Wgtd Hours % Wgtd Hours % Wgtd Hours % Wgtd Hours ;% Wgtd Avg Part Avg Part. Avg Part. Avg Part i Avg 6 15.79% 7.32 20 33.33% 15.46 25 35.71 % 16.56 24 36.36% 16.86 20 52.63% 12.91 _ 40 66.67% 16.35 45 64.29% 15.76 30 45.45% 11.15 12 I 31.58% ; I 6.45 I I I I I 12 16.18% � i I 3.71 I i 100% $32.32 66 100% $31.72 i Printed 5/12/2010 3:52J13M Stanley Consultants INC. A Stanley Group Company Engineering, Environmental and Construction Services - Worldwide EXHIBIT C 9 !1GROWN Traffic Products, Inc. To: Stanley Consultants 8501 West Higgins Rd., Suite 730 Chicago, IL 60631 USA Contact: Sagar Sonar Phone: 1 773-693-9624 Fax: 1 773-693-9624 Email: SonarSagar@stanleygroup.com RFQ #: Description: Sheridan Road: Site Assessment for Radio Interconnect Quote Number: Q017177 736 Federal Street Suite 2312 1 Davenport, IA 52803 1 1(563) 323-0009 Date: 04/26/2010 Prepared By: Nicole Kling Part # Description Quantity I FSO-IL-DIST-1 Conduct site assessment to evaluate the 8 viability of radio interconnect along Sheridan Rd. between Chicago Avenue & Central Street - Evanston, IL (# of hrs) Notes: Price Extended $115.00 $920.00 Total: 1 $920.00 1 112:tof the material will be approximately 90 daysafterreceipt of both an acceptable purchase order and approved submittal data if - - - required. Quoted prices are based on the entire value and volume of the quote. Payment terms are Net 30 days with prior approved credit. -Brown Traffic -Products, Inc. -retains title -to material -until -paid - in full.- Aservice'-charge of 1.5% per month ("189ti annuaPi=ate)"will be --- - assessed against all past due accounts. Prices and delivery quoted are .Irm for 30 days from the date of bid. The above quote does not include installation of the products quoted. On -Site technical assistance is available and will be quoted upon request. Quotation does not include sales tax. Sales tax will be added at time of invoice unless a valid Sales Tax Exempt certificate has been provided. Sales tax exempt certificate should accompany customer Purchase Order. limited Warranty: Brown Traffic Products only obligations shall be to replace such quantity of the product proven to be defective. Warranty Period: The length of warranty manufacturers have conveyed to the seller and which can be passed on to the buyer. Additional terms and conditions apply - See Brown Traffic Products Terms & Conditions document. Thank you for the opportunity to provide this quote. Camelot Manufacturing Edition Monday, April 26, 2010 10:51AM Page i of i f