HomeMy WebLinkAboutRESOLUTIONS-1995-030-R-95•
April 6, 1995
30-R-95
A RESOLUTION
Authorizing the City Manager to
Execute the TARP Assignment Agreement for
the Metropolitan Water Reclamation District
WHEREAS, the Metropolitan Water Reclamation District ("District') Tunnel and
Reservoir Plan, (TARP) is designed to collect the flow from combined sewers prior to
discharging to the waterways in order to significantly reduce pollution of the waterways and
provide flood relief for Chicago and neighboring communities; and
WHEREAS, the District desires sole ownership, control over and access to all
structures and facilities located at or connected with or involved in the operation of TARP
• for the purpose of maintaining uniformity in the operation of TARP; and
TARP,
WHEREAS, the City of Evanston ("City") seeks connection of its local sewer to
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
EVANSTON, COOK COUNTY, ILLINOIS:
SECTION 1: That the City Manager of the City of Evanston is hereby authorized
and directed to sign and the City Clerk hereby authorized and directed to attest on behalf
of the City of Evanston the TARP Assignment Agreement marked as Exhibit A and
attached hereto and incorporated herein.
•
- 1 -
• SECTION 2: That the City Manager of the City of Evanston is hereby authorized
and directed to negotiate any additional conditions or terms as are in the best interest of
the City of Evanston.
SECTION 3: This Resolution shall be in full force and effect following its passage
and approval in the manner required by law.
ATTEST:
W 11
%City�C?Ierk
Adopted: 1995
n
LJ
- 2 -
Mayor
•
TARP
ASSIGNMENT AGREEMENT
MWRD PERMIT NUMBER 92-041
THIS AGREEMENT, made and entered into this day of
, 19 , by and between the Metropolitan Water Reclamation District of
Greater Chicago (henceforth `the District' or 'MWRD"), a municipal corporation, organized and
existing under the laws of the State of Illinois, and the City of Evanston, organized and existing
under the laws of the State of Illinois (henceforth the 'City').
WHEREAS, the District's Tunnel and Reservoir Plan, (TARP) is designed to collect the
flow from combined sewers prior to discharging to the waterways in order to significantly reduce
pollution of the waterways and provide flood relief for Chicago and neighboring communities;
and
WHEREAS, the District desires sole ownership, control over and access to all structures
and facilities located at or connected with or involved in the operation of TARP for the purpose
of maintaining uniformity in the operation of TARP; and
• WHEREAS, the City seeks connection of its local sewer to TARP.
NOW, THEREFORE, the District and the City enter into this agreement among
themselves: -
ARTICLE I
CONVEYANCE
1. The City for and in consideration of $10.00 (ten and no/100 dollars) and other
valuable consideration, including the mutual promises made herein, hereby specifically conveys
and quit -claims to the District all of City's right, title and interest in and to all dry weather flow
take off structures, connecting structures, connecting conduits, and dropshafts if applicable,
along with all items specifically set forth in the attached Exhibit "A" (henceforth "the Structures")
in accordance with the terms and conditions as set forth herein; and the District shall henceforth
own and operate said Structures in accordance with the purpose of TARP. This agreement
specifically excludes any part of the City's local sewer system and control of any outfall to the
North Shore Channel, and such remains the exclusive responsibility of the City, and the City shall
be solely responsible for complying with all laws, orders, rules and regulations of the Federal,
State, County and Municipal Authorities in relation thereto.
2. The City does hereby grant to the District the exclusive right, privilege, authority,
and obligation to maintain, remove, improve, and repair any and all items as set forth in the
• attached Exhibit "A".
NFS 3W&r#S1hb9
3299E "1128
3. The City further grants to the District a perpetual easement with the right to enter •
upon the related premises, herein described in the attached plans marked as Exhibit 'B', for the
purpose of conducting maintenance operations or other purposes with respect to the aforesaid
Structures as may be deemed necessary by the District in the furtherance of the TARP program.
Said easement is to terminate if the MWRD removes and does not replace the Structures
conveyed hereby or if use or operation ceases of the structures conveyed hereby and their
replacements and accessions.
4. The City shall not make any alterations, additions or improvements to the
Structures without the consent of the District.
5. The City specifically warrants for a period of two years that the Structures
conveyed pursuant to this article are free from any defects.
6. The City shall give the District immediate notice of any damage or defect in the
Structures conveyed pursuant to this agreement. Provided, however, that the City is under no
obligation a) to inspect for damage or defects and b) to correct any damage or defects should
any come to the attention of the City after conveyance thereof to the District and the warranty
period has expired.
ARTICLE II
ACCESS
1. The City shall not open, close, cover, remove, modify or alter any of the
Structures, or enter upon the same without notice to and approval of the District. •
2. It is understood and agreed by and between the parties hereto that the City shall
not erect any, barricades or structures of any type or kind that would or could in the future
interfere with the District's access to the Structures as set forth in Exhibit 'A'.
3. The District shall be given a minimum of forty-eight hours advance notice of the
City's need to access the Structures, except if an emergency situation exists which warrants
otherwise. The District shall not unreasonably withhold approval for access to the Structures by
the City.
4. Any notice herein required to be given shall be served upon the Chief Engineer
of the District, and shall include the reason for access and a description of the activities to be
performed. Notice to the City shall be served upon the City Manager.
5. With respect to opening, closing, entering or exiting the Structures as set forth in
Exhibit 'A', all determinations, directions, and orders by the District representatives at the site
regarding the Structures shall be binding and conclusive.
6. The District's Maintenance and Operations Department shall have unlimited access
for the purpose of periodic inspection of any old or new construction.
•
1Cs X0&WVU" -
12W 941128 2
•
ARTICLE III
NEW CONSTRUCTION
1. Detailed plans of subsequent construction or material alteration of the Structures
as defined herein shall first be submitted to the Chief Engineer of the District for approval. The
work on such construction shall not begin until such approval is given to the City in writing,
which approval shall not be unreasonably withheld.
2. Any new construction shall be conveyed to the District in accordance with the
terms and conditions of this agreement, and shall be inspected by the Chief Engineer of the
District and the District's Maintenance and Operations Department prior to being placed in
operation.
years.
3. The City hereby warrants any new construction against defects for a period of two
ARTICLE IV
INDEMNITY AND OTHER CONDITIONS
1. The City shall compensate the District for any damages that the District may
sustain as a result of the City opening, closing, entering or exiting the stated Structures as set
forth in Exhibit W.
2. The City shall be solely responsible for and shall defend, indemnify, keep and save
• harmless the District, its Commissioners, officers, agents and employees, against all injuries,
death, losses damages, claims, patent claims, liens, suits, liabilities, judgments, costs and
expenses which may in any wise accrue, directly or indirectly, against the District, its
Commissioners, officers, agents or employees, in consequence of this conveyance, or which
may in any wise result therefrom or from any work done hereunder, whether or not it shall be
alleged or determined that the act was caused through negligence or omission of the City or
City's employees, or of any contractor of subcontractor, or their employees, if any, and the City
shall, at City's sole expense appear, defend and pay all charges of attorneys and all costs and
other expenses arising therefrom or incurred in connection therewith, and if any judgement shall
be rendered against the District, its Commissioners, officers, agents or employees, in any such
action the City shall, at the City's sole expense, satisfy and discharge the same.
•
3. The City covenants and agrees that it shall defend, indemnify and hold harmless
the District, from any suits, claims, expenses (including attorney's fees) or losses which may be
imposed by law for any bodily injury, including death resulting therefrom, or property damage,
including loss of use thereof, arising out of or in connection with any new construction or
alteration performed by the City.
4. The City shall be exclusively liable for any claims from its employees, contractors
or agents arising from opening, closing, entering or exiting the stated structures and shall
indemnify and hold harmless the District for any costs or expenses which may incur for those
purposes.
5299E U 1729 3
ARTICLE V is
ASSUMPTION BY GRANTEE
1. The District shall own and operate the stated Structures and assume the
responsibility of maintenance and upkeep of the stated Structures as long as the City fully
complies with all the terms and conditions set forth herein.
2. In the event, a defect occurs within the two-year warranty period for new
construction and alterations, the City shall reimburse the District for the cost of repair and any
consequential damages related thereto.
ARTICLE VI
MISCELLANEOUS PROVISIONS
1. Upon completion of construction of the Structures, the City shall furnish to the
District one set of reproducible as -built drawings of the Structures, signed and sealed by a
professional engineer registered in the State of Illinois.
2. That all terms and conditions of this agreement shall remain in force and effect,
and are not modifiable except by the mutual written agreement of the parties.
CITY OF EVANSTON:
By:
Clerk
METROPOLITAN WATER RECLAMATION
DISTRICT OF GREATER CHICAGO
By: 0
Chairman, Committee on Finance
Attest:
Clerk
Executed on the day of , 1994. •
No 30omfislsea
& M 901128 4
•
STATE OF ILLINOIS )
) SS.
COUNTY OF OOOK )
I. Theodore Williamson, a Notary Public in and for said County, in the State aforesaid,
DO HEREBY CERTIFY that Gloria Alitto Majewski, personally known to me to be the Chairman of
the Committee on Finance of the Board of Commissioners of the Metropolitan Water Reclamation
District of Greater Chicago, a municipal corporation, and Mary C. West, personally known to me
to be the Clerk of said municipal corporation, and personally known to me to be the same
persons whose names are subscribed to the foregoing instrument, appeared before me this day
In person and severally acknowledged that as such Chairman of the Committee on Finance and
such Clerk, they signed and delivered the said instrument as Chairman of the Committee on
Finance of the Board of Commissioners and Clerk of said municipal corporation, and caused the
corporate seal of said municipal corporation to be affixed thereto, pursuant to authority given
by the Board of Commissioners of said municipal corporation, as their free and voluntary act
and as the free and voluntary act and deed of said municipal corporation, for the uses and
purposes therein set forth.
• GIVEN under my hand and Notarial Seal this day of , A.D. 1995.
My Commission Expires:
is
NOTARY PUBUC
APPROVED:
APPROVED:
Chief, Maintenance and Operations
Engineer of Field Services
Assistant Chief Engineer
Chief Engineer
APPROVED AS TO FORM AND LEGALITY:
APPROVED:
Head Assistant Attorney
Attorney
General Superintendent
40
Exhibit A
TARP ASSIGNMENT AGREEMENT
MWRD PERMIT NUMBER 92-041
EVANSTON PHASE 11, AREA 1 RELIEF SEWER PROJECT
lEmerson Street_Cgnnectina Structure
The structure to be conveyed to the District are identified in Exhibit B (Sheet 1 of 1) of this
Agreement, and are herein described as follows:
1. Emerson Street Connecting Structure - The connecting structure facilities
consist of the connecting structure, one flap gate, and one manually operated
sluice gate.
2. 30-inch Diameter Connecting Conduit - This 37 foot long conduit connects the
connecting structure to the existing MWRD collecting structure.
•
-a3403MV4*j"
---------------------------
-------------------------- ---
n n CL_n n n n n
_ �----------------------_--_-_-_-�---_-_-_-_-- - + fir=
OUTFALL STRUCTURE
EMERSON STREET
._:. -
- �,.` r
CONNECTING STRUCTURE
:r !` 36 RS 1 r
-------------------------------------------
- 1
--------------------
/y -36 RS - - 1-
-,—PERWMENT EASEMENT3+00
1�
CONNECTING 16" DAP
' iz-j2 = 2+00 d o, ,o' 0, CONDUIT E `
�1
o " NT E EMENY r �A• C` _ SIGN- OTC
36 RS - ' A}Oo1 20, 1 1
11
L EXISTING DS 95"-0•
�� i TOP EL. 22.33
Ap..
73
= E'glile $ and Sdwats
,Z / PROPERTY
LINE
i
[0:TT=��
SCALE 0 30 FEET
I' = 30'
EMERSON STREET CONNECTING STRUCTURE
(SHEET 1 OF 1)
EVMSTON RF1lEF SEWER PROJECT
Cr gf sr ��