HomeMy WebLinkAboutRESOLUTIONS-2004-051-R-04• 9/17/2004
51-R-04
A RESOLUTION
Authorizing the Interim City Manager -to Sign a
Supplemental Agreement with TranSystems Corporation for
the Reconstruction of McCormick Boulevard
WHEREAS, the City of Evanston, the Illinois Department _"of
Transportation (IDOT), and TranSystems Corporation entered into an Agreement
dated April 7, 2004 to provide Consulting Engineering Professional -Services for
the Reconstruction.& McCormick -Boulevard; and
WHEREAS, the. City and (DOT have determined it is necessary "for
TranSystems Corporation to provide additional. consulting engineering services -
for said project; and
WHEREAS, the City has determined this 'Suppleme.ntal Agreement
is in the best interest of the City;
NOW, THEREFORE, BE IT RESOLVED.BY THE.CITY COUNCIL
OF THE "CITY OF EVANSTON, COOK COUNTY, ILLINOIS:
SECTION 1: That the Interim City Manager is hereby authorized to
sign and the City. Clerk'. hereby authorized to attest to the Supplemental
Agreement with TranSystems Corporation for additional McCormick Boulevard
Engineering Services, attached as -Exhibit 1.
51-R-04
SECTION 2: That the Interim City Manager is hereby authorized •
and directed , to negotiate any additional conditions of the Supplemental
Agreement -as may be determined to be in the best interests. of the City.
SECTION 3: That this_ Resolution shall be in full force and effect
from and after its passage .and approval in the manner provided by law.
6U41U-. ,
L rraine H. Morton, Mayor
Attest:
Mary P. rr ity Clerk
Adopted: � 7-1 , 2004 -
-2-
} ExHiQir 1�
Ca?P2AT/ON 44
._-
September 14; 2004
Mr. David C. Jennings
Director of Public Works
City of Evanston
2100 Ridge Avenue
Evanston, IL 60201
Attention: Mr. Sat Nagar-, P.E.
Interim City Engineer
Reference: Supplement No. 1 .to the Phase II Engineering -Agreement
City of Evanston
FAU 2832 / McCormick Boulevard
Section No.: 00-00218-00=FP
_Project No.: M-8003(221)
Job No:: D-91-281-02 -
Type of Funding: STU.
Dear Mr. Nagar:
• We are pleased to resubmit for your processing six 6 copies of the. Agreement for Supplement No.1
for the referenced project. Please note. that. this revised submittal deducts- 40 -hours for FHWA
coordination, since the Bureau of Programming presented the McCormick/ Green Bay Intersection .
design exceptions at the August 11, -2004 FHWA coordination rneeting. The Supplement, originally
_ submitted to. you on June 17, 2004, was reviewed. by IDOT on July r1.2, 2004 with only minor
comments. A draft disposition has been included for :.your review. The following . exhibits are
included:
Exhibit'A - Scope of Engineering Services — Supplement No. 1
Exhibit B - Cost Estimate of Consultant Services — Supplement No. 1 .
• Exhibit. C - Hourly Rate Range
• Exhibit D - Subconsultant Information:
Great Lakes Soils and Environmental Consultants, Inc.
Santacruz Associates, Ltd.
• . .Dispositions to IDOT District L— BLR&S comments dated July 12, 2004
If you concur with the. proposal outlined .in this Letter of Agreement, please execute the enclosed .
copies and -return five (5) executed copies to us. We will forward four (4) copies to IDOT for further -
processing. Please let us know if you have any questions or need any further infonnation. .
1051 Perimeter Drive, Suite 1025 • Schaumburg, Illinois 60173-5058 • Phone: (847) 605-9600 • Fax: (847) 605-9610
Supplement No. 1 to the Phase II Engineering Agreement
City of Evanston
FAU 2832 / McCormick Boulevard
Section No.: 00-00218-00-FP
Project No.: M-8003(221)
Job No.: D-91-281-02
Type of Funding: STU
Page 2 of 2
ACCEPTANCE
The City of Evanston hereby accepts the proposal outlined above and -does hereby engage TranSystems
to perform the Services described above, on the terms and .conditions set forth in the forgoing Letter
Agreement. This Amendment supplements the Phase II Engineering -Agreement and any work items
not changed by this Amendment will remain -as specified in the original contract.
TranSvstems Comoration
By:
Printed Name.:
Title: UE(,� /%dP!I-
Date:
Citv of EvanstonL n ._
By:
Pri to ame: i (�
Title: TeR i r� �/ IY 0 / Ia
Date:.
CCx2P�0i/?AT/O/V /�,I
September 14, 2004.-
Mr. David C. Jennings.
Director of Public Works
City of Evanston
-2100 Ridge Avenue
Evanston, IL 60201
Attention: Mr. Sat Nagar; P.E.
Interim City Engineer
Reference: Supplement No. 1 to the Phase II Engineering Agreement
City of Evanston .
FAU 2832 / McCormick Boulevard
Section No.: 00-00218-00-FP
Project No.: M-8003(221)
Job No.: D-91-281-02
Type of Funding: ST-U -
Dear Mr. Nagar:
We respectfully request. City approval of Supplement No. 1 Ito address additional professional . ..
engineering services related to design and coordination for the subject project.: ,This Supplement,' -
originally submitted to you on -.June- 17, 2004, was reviewed by the Illinois Department of
Transportation (IDOT) on July 12, 2004 with only minor comments. The attached documentation.
includes an itemized lisCof work tasks that were not included in the original agreement.
In general, this supplement is summarized by changes in scope that include additional - coordination.
meetings with the Metropolitan Water. Reclamation District of Greater - Chicago (MWRDGC),
supplemental geotechnical investigation services required to investigate soil conditions at the three
sewer outfalls, supplemental roadway lighting design and submittals required by the- Bureau of
Electrical Operations (BEO). to support lighting plans for the intersections of McCormick Boulevard
with Bridge'Street and Green Bay Road, development of an Intersection Design Study (IDS) for the
intersection of McCormick Boulevard and Green Bay Road . to maintain the existing dual left turn
configuration, supplemental storm sewer design as required -by the IDOT - Hydraulics unit,
development of a detail sheet for the Ecology Center entrance, preparation- of Plats" of Highways and.
Legal Descriptions for three (3) additional parcels including coordination with IDOT, and supplemental
land acquisition negotiation services to acquire right-of-way from MWRDGC -at Bridge Street and
Prairie Avenue.
•This. additional work is a vital part of the current success of the project. Because of these efforts the
project. is on schedule for the November 5, 2004 construction letting pending acquisition of right-of-
way. The project was able to get approval from the IDOT Hydraulics section and IDOT Bureau of
Programming to support our proposed Phase I Addendum. We also were able to convince IDOT
1051 Perimeter Drive, Suite 1025 • Schaumburg, Illinois 60173-5058 • Phone: (847) 605-9600 • Fax: (847) 605-9610
Bureau of Traffic to allow the existing dual left turn lane configuration to remain at the intersection of
McCormick Boulevard and Green Bay Road due to the high. volume of traffic which turns left onto
Green Bay Road. We achieved concurrence from IDOT BEO to maintain the majority of the existing
lighting system, updating only portions of the system which were affected by roadway widening. We
also were able to incorporate the Ecology Center entrance work into the McCormick Boulevard
Contract Plans.
Our request for Supplement No. 1 includes the following:
• Project Coordination $4,851
• Supplemental Soil Investigation - $7,600
• Pre -Final Contract Plans and Documents $21.,278
• Final Contract Plans and Documents $ l 3,277
• Right -of -Way Acquisition Services $18,927
The total amount requested for Supplement No. 1 is $65,933.
We -appreciate your consideration of this supplement. Please let us know if you have any questions or
require additional information.
Very truly yours,
TranSystems Corporation
Paul Schneider, P.E.
Project Manager
Enclosure - -
•
EXHIBIT A. - SCOPE OF ENGINEERING SERVICES
Supplement No.l
FAU 2832 / McCormick Boulevard
Section No.: 00-00218-00-FP
Project No. M-8003(221)
Job No.: D-91-281-02
City of Evanston
Supplement No.1 --Phase II EnemeermeF
--The hours listed are an -estimate
Proiect Coordination -. $4,851
Original Scope of Services did. not account for any.project coordination with the
Metropolitan Water Reclamation District of Greater Chicago (MWRDGC). There was
a kick-off meeting and a right-of-way meeting with MWRDGC to 'cooidinate right-of-
way/permanent easements. Also, meeting agendas; minutes and any meeting exhibits
for these two meetings are included in these. -hours -
-Total for this item: 42 hours
Supplemental Soil Investigation - $7,600
• Supplemental Geotechnical Investigation Services required to investigate soil
conditions at the three sewer outfalls through Ladd- Arboretum as. determined at the
May 19, 2004 MWRDGC coordination meeting (by Great Lakes Soil and
Environmental Consultants). -
Total for this item: by others.
Pre -Final Contract Plans and Documents - $21,278
Supplemental roadway lighting design including, photometric and voltage drop
calculations, and- lighting report to develop Lighting Plans for the relocation of
existing street lights at the McCormick Blvd. intersections with Bridge Street and
Green Bay road as determined at the May 3, 2004 IDOT coordination meeting (100
hours).
•
Exhibit A
-Page 1
Development of an Intersection Design Study for the intersection of McCormick
Blvd. and Green Bay Road in order to maintain the existing dual left turn
configuration from McCormick Blvd. to Green bay Road as requested at the June'7,.
2004 Evanston Coordination meeting (100 hours).
Total for this item: 200 hours
EXHIBIT A - SCOPE OF ENGINEERING SERVICES
Supplement No.l
Final Contract Plans and Documents - $13,277
Supplemental stone sewer design including, development of revised drainage areas
and the development of a 107year Hydraulic Grade Line (HGL), as required by the
Hydraulics unit (80 hours).
Develop a detail sheet for the Ecology Center entrance as requested at the June 7,
2004 Evanston Coordination meeting (40 hours).
Total for this item: 120 hours
RiLyht-of-Wav Acquisition Services - $18,927_
Preparation of Plats of Highways and Legal Descriptions for three (3) additional
parcels, including coordination with IDOT for -review and approval of the parcels. .
The City of Evanston will be responsible for all miscellaneous fees associated with
right-of-way services, including recording fees and title reports.. (City to issue all
checks) (100 hours).
Supplemental Land Acquisition Negotiation Services to.provide Appraisals, Review
Appraisals, and Negotiation Services .tq acquire right -of --way . from MWRDGC at •
Bridge Street and Prairie Avenue as determined .at the May 4, 2004 IDOT
coordination meeting and June 1, 2004 MWRDGC coordination meeting (by Santa
Cruz & Associates) (by others).
Total for this item: 100 hours
•
STEA01S
•
EXHIBIT A.- SCOPE OF ENGINEERING SERVICES
Supplement No. 1
Parcel 5: .
Located in the west corner of McCormick Boulevard and Grant Street. Owned by
MWRDGC as right-of-way for the North Shore Channel. Currently under Lease to
the City of Evanston under Lease/Permit NL-063 (12/01/66 to 05/21/32), site of
McCormick Park, operated by the City of Evanston.
ROW includes 5,583.1 SF of fee simple ROW acquisition from MWRDGC to realign
the intersection of Prairie Avenue to McCormick Boulevard.
Parcel 6:
Located in the north corner of McCormick Boulevard and Bridge Street. 'Owned by
MWRDGC as right-of-way for the North -Shore Channel. Currently under Lease to
the City of..Evansion under Lease/Permit NL-063 (12/01/66 to 05/21/32),.site of
Community Gardens, operated by the City of Evanston.
ROW includes 320.5 SF of fee simple.ROW acquisition from-.MWRDGC-required: to
improve the turning radius of the intersection of Bridge Street and McCormick
Boulevard, as well as for the permanent placement of traffic signal equipment.
Parcel 7:
Located in the west corner, of McCormick Boulevard and Bridge Street.: Owned by
MWRDGC as -right-of-way for the North Shore Channel. Currently under Lease to
the. City of Evanston under Lease/Permit NL-063 (12/01/66. to 05/21/32), site of
Community Gardens, operated by the City of Evanston. _
ROW includes 171,2 SF of fee simple ROW acquisition from-MWRDGC required to
improve. the turning radius, of the intersection of Bridge Street and McCormick
Boulevard,as well as for the permanent placement of traffic signal equipment.
Exhibit A %
Page 3